U.S. Department of Transportation Federal Highway Administration
Report to Congress Repurposed Earmark Submissions
4th Quarter Fiscal Year 2016
The Consolidated Appropriations Act, 2016, directs the Secretary of the Department of Transportation to “submit consolidated reports of the information provided by the States and territories each quarter to the House and Senate Committees on Appropriations.” Background Section 125 of the Department of Transportation Consolidated Appropriations Act, 2016, title I of division L, Public Law 114- 113, (hereinafter “Repurposing Provision”) provides the authority for a State or territory (hereinafter “States”) to repurpose any earmark that was designated on or before September 30, 2005, and is less than 10 percent obligated or final vouchered and closed. The repurposed funds may be obligated on a new or existing project in the State within 50 miles of the earmark designation. The project must be an eligible project under the Surface Transportation Block Grant Program (STBG) (23 U.S.C. 133(b)), or the Territorial and Puerto Rico Highway Program (THP) (23 U.S.C. 165). The Repurposing Provision was available to be applied in Fiscal Year 2016. The repurposed funds must be obligated on the identified projects no later than September 30, 2019. Discussion In March 2016, the Federal Highway Administration (FHWA) issued guidance on the Repurposing Provision. Shortly thereafter, FHWA began receiving requests from States to repurpose earmarks. During the 3rd quarter of Fiscal Year (FY) 2016, FHWA received requests to repurpose 171 projects totaling $149,790,783.88 from 11 States. During the 4th quarter, FHWA received requests to repurpose 2,074 projects totaling $1,677,138,816.77 from 43 States, District of Columbia, American Samoa, and U.S. Virgin Islands. Through the FY 2016 Repurposing Provision, the States are able to put a total of $1,826,929,600.65 of previously idle earmarked funding to use on critical highway and bridge projects. A similar provision was authorized in FY 2017. Funds repurposed under that provision will be reported in the next required report to Congress. Attachments Attached is a summary of the total number and amounts of earmarked projects that were repurposed by each State and territory during FY 2016. Also attached is a detailed list of earmarked projects that were submitted during the 4th quarter of FY 2016 for repurposing.
The FHWA previously submitted a report on 3rd quarter requests for repurposing that contained information on all repurposing requests submitted to FHWA through June 30, 2016. Since the transmittal of the previous report, FHWA has completed processing those 3rd quarter requests, which has resulted in amendments to the prior list of earmarked projects. As such, the amended 3rd quarter list of earmarked projects submitted for repurposing is also attached. Each State has reviewed the list and certified that the earmarks were eligible for repurposing, the projects receiving the funding are within 50 miles of the earmark location within the State, and the funding will be obligated for eligible purposes as required in the Repurposing Provision. List of Repurposed Earmarks The lists are organized by State and shows information pertaining to the original earmark on the left and new project descriptions on the right. For each earmark that was repurposed, the lists provide the description of the original earmark, amount available for repurposing, new project description(s) on which the funds will be used, and the repurposed amount for each of the identified new project descriptions. For example, New York has an earmark for “Westchester County, NY Rehabilitation of June Road Town of North Salem” and $520,767.00 is available for repurposing. New York is repurposing that total amount available for “ADA Sidewalks and Ramps - Upper Westchester.”
In some cases, a State repurposed multiple earmarks and put that funding toward the same project. For example, New York has an earmark for “Reconstruct Main Street in the Town of Lewisboro” and $72,106.00 is available for repurposing. The State also has an earmark for “Improvements to Clark Pl. and Cherry Ln. Rt. 6 and 6 N in Putnam County” and $296,437.00 is available for repurposing. New York is repurposing both of those amounts for “Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale.”
State Demo ID Project Description Amount Project Description Amount
NY NY272 Westchester County, NY Rehabilitation of June Road Town of North Salem 520,767.00 ADA Sidewalks and Ramps ‐ Upper Westchester 520,767.00
State Demo ID Project Description Amount Project Description Amount
NY NY301 Reconstruct Main Street in the Town of Lewisboro 72,106.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 72,106.00
NY NY302 Improvements to Clark Pl. and Cherry Ln. Rt. 6 and 6 N in Putnam County 296,437.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 296,437.00
In some scenarios, a State repurposed one earmark and put that funding toward multiple projects. For example, New York has an earmark for “Construct Northern State Parkway and LIE access at Marcus Ave. and Lakeville Rd. and associated Park and Ride” and $1,362,006.00 is available for repurposing. New York is repurposing that amount for three different projects: $500,000.00 for “Complete Plandome Rd Culvert reconstruction project, Town of North Hempstead,” $838,142.00 for “Complete 1.7 mile segment of the Hempstead Harbor Shoreline Trail, Town of North Hempstead,” and $23,864.00 for “Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip, Oyster Bay towns.”
State Demo ID Project Description Amount Project Description Amount
Complete Plandome Rd Culvert reconstruction project, Town of North
Hempstead
500,000.00
Complete 1.7 mile segment of the Hempstead Harbor Shoreline Trail,
Town of North Hempstead
838,142.00
Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
23,864.00
1,362,006.00Construct Northern State Parkway and LIE access at Marcus Ave. and
Lakeville Rd. and associated Park and Ride
NY587NY
Repurposed Earmarks
FY 2016 3rd and 4th Quarter
Summary
State # of Earmarks Repurposed Total Amount Repurposed
Alabama 31 86,766,184
Alaska 44 49,616,886
Arizona 22 30,405,489
Arkansas 39 18,064,929
California 184 197,922,100
Colorado 14 7,254,394
Connecticut 29 53,834,554
Delaware 16 16,362,418
District of Columbia 2 3,938,058
Florida 59 41,884,968
Georgia 100 96,676,929
Hawaii 11 11,338,114
Idaho 1 2,403,540
Illinois 196 53,149,172
Indiana 54 20,323,283
Iowa 28 37,524,119
Kansas 1 2,004,683
Kentucky 43 38,428,894
Louisiana 37 43,708,844
Maine 3 2,684,820
Maryland 5 9,453,924
Massachusetts 20 24,879,282
Michigan 95 53,202,441
Minnesota 27 14,921,231
Mississippi 15 9,463,413
Missouri 49 72,593,291
Montana 14 10,070,511
Nebraska 34 29,192,530
New Hampshire 15 6,710,781
New Jersey 120 103,921,634
New Mexico 39 38,662,025
New York 162 125,364,773
North Carolina 40 30,871,896
Ohio 70 44,775,398
Oklahoma 10 4,110,062
Oregon 9 3,860,011
Pennsylvania 197 128,091,091
South Carolina 20 31,371,930
South Dakota 32 29,628,257
Tennessee 102 75,528,022
Texas 18 36,183,537
Utah 15 5,802,189
Vermont 18 13,180,413
Virginia 63 60,907,567
Washington 126 46,319,394
West Virginia 2 577,222
Wyoming 8 588,364
American Samoa 5 732,062
U.S. Virgin Islands 1 1,673,972
Total 2,245 1,826,929,600.65
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Summary
State # of Earmarks Repurposed Total Amount Repurposed
Alabama 31 86,766,184.24
Alaska 44 49,616,886.18
Arizona 22 30,405,488.67
Arkansas 39 18,064,929.00
California 184 197,922,100.33
Colorado 14 7,254,394.00
Connecticut 29 53,834,553.63
Delaware 16 16,362,417.55
District of Columbia 2 3,938,057.62
Florida 59 41,884,967.67
Georgia 100 96,676,928.50
Hawaii 11 11,338,113.87
Illinois 196 53,149,172.22
Indiana 54 20,323,283.14
Iowa 28 37,524,118.72
Kentucky 43 38,428,894.25
Louisiana 37 43,708,844.15
Maine 3 2,684,820.00
Maryland 4 5,448,024.00
Massachusetts 20 24,879,282.00
Michigan 94 52,963,484.42
Minnesota 26 14,766,939.85
Mississippi 15 9,463,413.00
Missouri 49 72,593,291.12
Montana 14 10,070,510.99
Nebraska 34 29,192,530.20
New Hampshire 15 6,710,780.66
New Jersey 79 54,344,501.15
New Mexico 39 38,662,025.11
New York 162 125,364,773.00
North Carolina 39 30,357,034.60
Ohio 70 44,775,398.16
Oklahoma 10 4,110,062.26
Oregon 9 3,860,011.01
Pennsylvania 197 128,091,090.75
South Carolina 20 31,371,930.02
South Dakota 24 22,076,545.93
Tennessee 3 1,437,424.58
Texas 18 36,183,536.97
Utah 15 5,802,188.60
Vermont 3 4,508,524.81
Virginia 63 60,907,566.99
Washington 126 46,319,394.16
Wyoming 8 588,364.48
American Samoa 5 732,062.21
U.S. Virgin Islands 1 1,673,972.00
Total 2,074 1,677,138,816.77
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Alabama
State Demo ID Project Description Amount Project Description Amount
AL AL019 Construct the Decatur Southern Bypass (FY 1998) 4,100,399.00 Resurfacing on I‐65 from I‐565 to SR‐2 (US 72) 4,100,399.00
AL AL021 Dothan I‐10 Connector Alabama (FY2003) 4,966,882.78 Add lanes on SR‐12 (US‐84) from east of SR‐87 to east of CR‐507 4,966,882.78
AL AL023 Construct repairs to viaducts connecting downtown and midtown areas
Birmingham (FY 1998)
455,431.40 Sign rehab, On I‐20 from I‐59 to the St. Clair county line 455,431.40
AL AL043 Capital costs associated with track relocation, construction and rehab,
highway‐rail separation construction activities including ROW acquisition and
utility relocation, and signal improvements in Muscle Shoals, Tuscumbia and
Sheffield Al (FY 2001)
4,989,000.00 Additional lanes on SR‐133 from Sr‐20 to the Norfolk Southern RR 4,989,000.00
AL AL077 US‐278 from Sulligent to Guin (FY 2004) 136,612.06 Bridge replacement on SR‐118 over Little New River 136,612.06
AL AL108 Construction of Valleydale Road flyover and widening improvements from US‐
31 to US‐65 (FY 2005)
4,726,962.00 Resurfacing of I‐20 from the Coosa River to MP 173.294 4,726,962.00
AL AL112 Pedestrian improvements for Homewood, AL (FY 2005) 320,472.00 Sign rehabilitation on I‐20 from I‐59 to the St. Clair county line 320,472.00
AL AL114 I‐20 widening and safety improvements in St. Clair County (FY 2005) 4,005,900.00 I‐59 pavement rehabilitation from SR‐53 (US‐231) to the Etowah county line 4,005,900.00
AL AL116 Pedestrian improvements for Morris, Al (FY 2005) 106,823.67 Sign rehabilitation on I‐20 from I‐59 to the St. Clair county line 106,823.67
AL AL117 To construct up to 2 interchanges on US alternate Highway 72/Alabama
Highway 20 from Interstate 65 to US Highway 31 in Decatur, Alabama with
additional lanes as necessary (FY 2005)
4,005,900.00 Resurfacing on I‐65 from I‐565 to SR‐2 (US 72) 4,005,900.00
AL AL120 I‐65 widening from US‐31 in Alabaster (Exit 238) to AL 25 in Calera (Exit 228)
(FY 2005)
6,409,440.00 I‐59 pavement rehabilitation from SR‐23 to north of US‐231 at Whitney 6,409,440.00
AL AL121 Pedestrian improvements for Moody, Al (FY 2005) 106,823.67 I‐59 pavement rehabilitation from SR‐53 (US‐231) to the Etowah county line 106,823.67
AL AL128 Expand to 4 lanes US highway 278 from Sulligent to Guin (FY 2005) 801,180.00 Bridge replacement on SR‐18 (US‐43) over Deadwater creek 801,180.00
AL AL132 To construct up to 2 interchanges on US alternate Highway 72/Alabama
Highway 20 from Interstate 65 to US Highway 31 in Decatur, Alabama with
additional lanes as necessary (FY 2005)
1,602,360.00 Resurfacing on I‐65 from I‐565 to SR‐2 (US 72) 1,602,360.00
AL AL134 Pedestrian improvements for Gardendale, AL (FY 2005) 534,120.33 Resurfacing of I‐20 from the Coosa River to MP 173.294 534,120.33
AL AL137 Alabama Highway 36 extension and widening ‐ phase II (FY 2005) 801,180.00 Resurfacing of SR‐3 (US‐31) from Lacon Road to SR‐36 801,180.00
AL AL138 Pedestrian improvements for Northport, AL (FY 2005) 213,648.33 Additional lanes and Bridge replace, on I‐59 from south of McFarland
Boulevard to south of Buttermilk Road
213,648.33
AL AL142 Expand to 4 lanes US 278 from I‐65 to US‐231 (FY 2005) 2,804,130.00 Resurfacing of I‐65 from Jefferson county line to the Cullman county line 2,804,130.00
AL AL143 Design and construct a 4‐lane highway from Muscle Shoals, AL to I‐10 (FY
2005)
801,180.00 Additional lanes on SR‐133 from Sr‐20 to the Norfolk Southern RR 801,180.00
AL AL144 Construct I‐10/US‐231 connector from Dothan Al to Florida (FY 2005) 2,403,540.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84)
from Belaire Dr. to Pinetree Dr.
2,403,540.00
AL AL151 Construct additional lanes on SR‐77 from Southside, AL to Green Valley Road
(FY 2005)
1,362,006.00 I‐59 pavement rehabilitation from SR‐53 (US‐231) to the Etowah county line 1,362,006.00
AL AL152 The City of Calera, Alabama‐Northern Bypass Segment (US Highway 31 to
Alabama State Highway 25) (FY 2005)
5,188,024.00 Resurfacing I‐59 from the Tuscaloosa county line to north of Academy drive 5,188,024.00
AL AL153 Alabama Highway 36 extension and widening ‐ phase II (FY 2005) 240,354.00 Resurface SR‐3 (US‐31) from Lacon Road to SR‐36 240,354.00
AL AL155 Preliminary engineering, design, ROW acquisition, and construction of the I‐
10 connector (FY 2005)
15,022,126.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84)
from Belaire Dr. to Pinetree Dr.
15,022,126.00
AL AL159 To widen Highway 84 to 4 lanes west of I‐65 from Evergreen Monroeville and
beyond to the Alabama state line (FY 2005)
4,005,900.00 Bridge replacement on I‐65 over Murder Creek and Relief 4,005,900.00
ToFrom
3
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Alabama
State Demo ID Project Description Amount Project Description Amount
ToFrom
AL AL160 I‐65 widening from US‐31 in Alabaster (Exit 238) to AL 25 in Calera (Exit 228)
(FY 2005)
5,007,375.00 Pavement rehabilitation on I‐459 from I‐59 south of CR‐52 at Greenwood 5,007,375.00
AL AL161 Preliminary engineering, design, ROW acquisition, and construction of the
Tuscaloosa Bypass, Alabama (FY 2005)
5,011,707.00 Additional lanes and Bridge replace, on I‐59 from south of McFarland
Boulevard to south of Buttermilk Road
5,011,707.00
AL AL162 Dothan, I‐10 connector (FY 2005) 5,011,707.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84)
from Belaire Dr. to Pinetree Dr.
5,011,707.00
AL AL184 Grade crossing improvements along Wiregrass Central RR at Boll Weevil
Bypass in Enterprise, AL (FY 2005)
250,000.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84)
from Belaire Dr. to Pinetree Dr.
250,000.00
AL AL185 Grade crossing improvements along Conecuh Valley RR at Henderson
Highway (CR‐21) in Troy, AL (FY 2005)
300,000.00 Additional lanes on SR‐210 from Bauman Drive to US‐231 & SR‐12 (US‐84)
from Belaire Dr. to Pinetree Dr.
300,000.00
AL AL189 Engineering and right‐of‐way acquisition for the McWrights Ferry Road
Extension between Rice Mine Road and New Watermelon Road in Tuscaloosa
County (FY 2005)
1,075,000.00 Resurfacing SR‐13 from the I‐359 bridge to the Hugh Thomas Bridge 1,075,000.00
Total Amount Repurposed 86,766,184.24
Total # of Earmarks Repurposed 31
4
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Alaska
State Demo ID Project Description Amount Project Description Amount
AK AK003 Construct Spruce Creek Bridge in Soldotna 218,477.73 Kenai Spur Road Rehabilitation 218,477.73
AK AK004 Construct capital improvement to Intermodal freight and passenger facilities
servicing the AMH and other related transportation modes in Seward
provided that the state public authority which owns the current Intermodal
facilities carrie
531,443.00 Seward Road Improvements 531,443.00
AK AK006 Construct Pt. Mackenzie Intermodal Facility 814,627.78 Parks Hwy MP 48.8 to 52.3 Pittman Rd to Big Lake Rd Reconstruction 814,627.78
AK AK008 Construct Coffman Cove Ferryboat 326,474.00 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended
Parking
326,474.00
AK AK011 Extend West Douglas Road 1,332,696.13 Egan Drive Improvements ‐ Main Street to 10th Street 1,332,696.13
AK AK013 Construct Gravina Island Bridge in Ketchikan 5,376,330.08 Gravina Access 5,376,330.08
AK AK014 Construct NW Alaska Railroad/Rail access 380,377.65 Kotzebue Cape Blossom Road 380,377.65
AK AK015 Construct North Denali access route 821,446.76 Parks Highway MP 239‐263 Reconstruction (Nenana Canyon to Bear Creek) 821,446.76
AK AK016 Construct Capital improvements to marine transportation facilities for Prince
of Wales Island
106,825.00 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended
Parking
106,825.00
AK AK018 Construct new access route to Ship Creek Access in Anchorage 2,307,734.43 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 2,307,734.43
AK AK019 Construct Bradfield Canal Road 88,464.02 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 88,464.02
AK AK022 Gravina Bridge, Ketchikan 1,987,000.00 GRAVINA ACCESS 1,987,000.00
AK AK023 Japonski Island Road, Sitka 713.60 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 713.60
AK AK054 Sitka Road Improvements, Alaska 24,414.93 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 24,414.93
AK AK055 University of Alaska Transportation Research Center 2,685.07 Noble Street Upgrade: Fairbanks 2,685.07
AK AK072 Construct False Pass causeway and road to the terminus of the south arm
breakwater project
1,399,184.66 AMHS Tustumena Replacement Vessel 1,399,184.66
AK AK078 Akutan Airport Access 152,362.00 AMHS Tustumena Replacement Vessel 152,362.00
AK AK079 Bridge and road work at Little Susitna River Access road in Mat‐Su Borough 1,001,475.00 Parks HWY MP 48.8 to MP 52.3 Pittman Rd to Big Blake Rd Reconstruction 1,001,475.00
AK AK080 Emergency evacuation road at Point Hope, North Slope Borough 2,999,940.54 Point Hope Transportation Infrastructure & Transit Improvements 2,999,940.54
AK AK081 Bogard/Sheldon Extension Mat‐Su Borough Description Changed 8/28/2008
Hatcher Pass Ski Development Road in Matanuska‐Susitna Borough
406,299.00 Parks HWY MP 45 to 52 Pittman Rd to Big Blake Rd Reconstruction 406,299.00
AK AK082 Coffman Cove IFA Ferry terminal or IFA vessel debt repayment for MN Prince
of Wales Ferry
325,039.08 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended
Parking
325,039.08
AK AK084 Planning, design and EIS of Bradfield Canal Road 203,150.00 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 203,150.00
AK AK085 Pt. MacKenzie in Mat‐Su Borough plan and design road access Description
changed 8/28/2008 Hatcher Pass Ski Development Road in Matanuska‐
Susitna Borough
101,576.00 Parks HWY MP 45 to 52 Pittman Rd to Big Blake Rd Reconstruction 101,576.00
AK AK087 Necessary imp to Indian River Rd in Sitka 212,680.68 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 212,680.68
AK AK095 Construct access road and bridge crossing the Naknek River terminus points
in South Naknek‐King Salmon Hwy
3,004,425.00 Alaska Peninsula Highway Bridges 3,004,425.00
AK AK096 Anchorage Traffic Congestion Relief 507,875.00 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 507,875.00
AK AK097 Earthwork and roadway construction Gravina Access PJ 11,663,651.76 Gravina Access 11,663,651.76
AK AK104 Various road imp in Petersburg 4,638.17 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 4,638.17
AK AK107 Float Plane road in Aleknagik 1,001,475.00 Paving Wood River Bridge Approach Roads 1,001,475.00
ToFrom
5
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Alaska
State Demo ID Project Description Amount Project Description Amount
ToFrom
AK AK109 Coffman Cove Road paving in Coffman Cove 49,448.03 Prince of Wales ‐ Clark Bay Ferry Terminal and Seaplane Float Expended
Parking
49,448.03
AK AK111 Construction of trail between Lake Lucille and Big Lake in Mat‐Su 2,002,950.00 Parks HWY MP 48.8 to MP 52.3 Pittman Rd to Big Blake Rd Reconstruction 2,002,950.00
AK AK114 Intermodal Ferry dock in Hoonah 132,621.16 AMHS Gustavus Ferry Terminal Modifications 132,621.16
AK AK116 Improvements to Lake Camp Road in Bristol Bay Borough 304,725.00 Alaska Peninsula Highway Bridges 304,725.00
AK AK117 Feasibility study of constructing natural gas pipeline from NSB to South
Central Alaska along existing transportation corridors
313,824.51 Parks Highway MP 239‐263 Reconstruction (Nenana Canyon to Bear Creek) 313,824.51
AK AK121 Bristol Bay: Transportation imp to the access road and bridge crossing at the
Naknek River
3,004,425.00 Alaska Peninsula Highway Bridges 3,004,425.00
AK AK125 Chignik: Inter‐Village Road, for design, engineering, permitting and
construction
5,007,375.00 Chignik Public Dock 5,007,375.00
AK AK135 Wrangell: Road Improvements 626.49 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 626.49
AK AK136 Petersburg Road imp including design, engineering, permitting and
construction
1,355.32 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 1,355.32
AK AK138 Southeast: Planning, Design, and EIS of Bradfield Canal Road 203,150.00 Wrangell ‐ Evergreen Road Improvements and Pedestrian Access 203,150.00
AK AK143 Sitka: Imp to Indian River Rd including design, engineering, permitting and
construction
596.98 Sitka Sawmill Creek Road Resurfacing and Pedestrian Improvements 596.98
AK AK144 Anchorage: Handicapped and ped access construction, surfacing & other imp
for 2006 Natl Veterans Wheelchair Games
300,761.00 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 300,761.00
AK AK147 Fairbanks: O'Connor Road Bridge replacement 250,369.00 Noble Street Upgrade: Fairbanks 250,369.00
AK AK148 Anchorage Transportation improvement to the Creekside Development 454,547.20 Glenn Highway Airport Heights to Hiland Road Pavement Preservation 454,547.20
AK AKF01 Alaska 2004 Akutan Ferry Planning & Design 286,629.42 AMHS Tustumena Replacement Vessel 286,629.42
Total Amount Repurposed 49,616,886.18
Total # of Earmarks Repurposed 44
6
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Arizona
State Demo ID Project Description Amount Project Description Amount
AZ AZ006 Tucson: Veterans Memorial Interchange/Palo Verde Bridge Replacement 939,184.58 I‐10; Ina Rd TI (MP 148), Reconstruct Traffic Interchange and Mainline in
Tucson
939,184.58
AZ AZ035 Upgrade and Widen SR 85 to I 10 (Mileposts 120 141) 183,443.00 SR‐347 @ Union Pacific RR, Grade Separation in Maricopa 183,443.00
AZ AZ036 Improving Lone Pine Dam Road in Navajo County 203,150.00 US 60; SR 77 (MP 342.0) to 40th St (MP 343.33) Roadway Widening in Show
Low
203,150.00
AZ AZ038 Pinal Avenue/Main Street right‐of‐way acquisition Pinal county, Casa Grande,
AZ To reconstruct Main St. to include a bypass for commercial traffic
438,337.19 I‐10; Early Rd to I‐8, Widen to 6 Lanes, near Casa Grande 438,337.19
AZ AZ039 Navajo Route 20/Navajo Nation, Coconino County, AZ/To Conduct a 2‐lane
road design for 28 miles of dirt road between the communities of La Chee,
Coppermine, and Gap
81,259.00 US 160; IR 6731 to SR 98, Construct four (4) bus pullouts near Tuba City 81,259.00
AZ AZ040 Kabba Wash project between I‐40 and Wikieup 295,924.12 US 93; Burro Creek Bridge (NBI#846) MP 139, Bridge Rehabilitation, South of
Wikieup
295,924.12
AZ AZ043 Navajo Mountain Road on the Navajo Nation 101,576.00 US 160; Long House ‐ Kayenta Pavement Preservation 101,576.00
AZ AZ045 Design and construction of roadway improvements on U.S. 60 from 67th
Avenue to McDowell
1,602,360.00 US 93; Vulture Mine Rd to Jct SR 89 Roundabout and two miles of 4 lane
divided highway, NW of Wickenburg
1,602,360.00
AZ AZ046 Construct pedestrian and bicycle overpass at McDowell Road and 35th
Avenue in Phoenix
243,780.00 Various Locations; Quarter Sections 27‐19, 27‐20, 27‐25, 28‐19, Pave Dirt
Alleys in Phoenix
243,780.00
AZ AZ047 Upgrade and re‐opening of Main Street in Yuma 101,624.00 4th Ave Gateway, State Line (MP 0) ‐ 1st St (MP 0.3) in Yuma, pedestrian
lighting and signage
101,624.00
AZ AZ048 Planning, design, and construction of Navajo Route 9010‐off of I‐40 at Houck,
AZ (Exit 348) to Pine Springs Day School
349,418.00 I‐40; Black Creek Bridge EB#1134 and Houck TI UP #955, near Saunders 349,418.00
AZ AZ050 Construct of Modify Railroad Grade Separations on 6th ST. and 22nd St. and
Reconstruct Speedway Blvd. Underpass in Tucson
10,655,695.00 I‐10; Ina Rd TI (MP 248), Reconstruct Traffic Interchange and Mainline, in
Tucson
10,655,695.00
AZ AZ051 Replacement of Safford Bridge which crosses the Gila River directly north of
Safford, AZ on North 8th Avenue
932,945.00 8th Avenue and Airport Road, Intersection Improvement in Safford 932,945.00
AZ AZ053 Construct bridges at Aspen St., at Birch St., at Cherry St., at Bonito St., at
Thorpe St.
304,725.00 Kachina Trail; Kachina Boulevard to Ancient Trail, Roadway Reconstruction,
south of Flagstaff
304,725.00
AZ AZ055 Many Farms, Apache County ‐ For the preconstruction (including survey and
archeological clearances0 and construction of N8086 and N8084 on the
Navajo Nation. Preconstruction (including survey and archeological
clearances) and construction
48,756.00 US 191; Aqua Sal 1004/1005. Lukachikal Wash 1008 (MP 476.34), deck rehab,
south of Round Rock
48,756.00
AZ AZ058 Pilocane Cliffs reconstruction between Wikieup and the Santa Maria River 402,131.80 US 93; Vulture Mine Rd to Jct SR 89 Roundabout and two miles of 4 lane
divided highway, NW of Wickenburg
402,131.80
AZ AZ059 Scott Ranch Road. Navajo County‐Connect White Mountain Road (SR 260)
and Penrod Road (SR 77)
420,421.62 US 60; SR 77 (MP 342.0) to 40th St (MP 343.33) Roadway Widening in Show
Low
420,421.62
AZ AZ060 Design and Construction of Rio Salado Pedestrian Bridge in Tempe, AZ 243,780.00 Tempe; South city limits to US 60 on Scottsdale Rd, Fiber install, in Tempe 243,780.00
AZ AZ062 U.S. 60 and U.S. 93 connection on the eastern edge of central Wickenburg 1,602,360.00 US 93; Vulture Mine Rd to Jct SR 89 Roundabout and two miles of 4 lane
divided highway, NW of Wickenburg
1,602,360.00
AZ AZ064 Pave remaining stretch of BIA Route 4 from the junction of the BIA Route 4
and N8031 in Pinon, AZ, to the Navajo and Hopi border
162,520.00 SR 264; Dinnabito Wash Bridge #1013, northwest of Second Mesa 162,520.00
AZ AZ065 Arizona Department of Transportation; for those projects it has identified as
highest priorities
9,947,132.41 I‐10; Ina Rd TI (MP 248), Reconstruct Traffic Interchange and Mainline, in
Tucson
9,947,132.41
AZ AZ066 Replacement of Safford Bridge which crosses the Gila River directly north of
Safford, AZ on North 8th Avenue
1,144,965.95 8th Avenue and Airport Road, Intersection Improvement in Safford 1,144,965.95
ToFrom
7
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Arizona
State Demo ID Project Description Amount Project Description Amount
ToFrom
Total Amount Repurposed 30,405,488.67Total # of Earmarks Repurposed 22
8
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Arkansas
State Demo ID Project Description Amount Project Description Amount
AR AR002 Access Control Demo, Construction of, and improvements to, US 63 in
Jonesboro, Arkansas
565,033.00 I‐55 ‐ Jonesboro (Sel. Secs.) ‐ System Preservation of select sections of I‐555 in
Craighead, Poinsett & Crittenden Co
565,033.00
AR AR006 North Belt Freeway project (N. Little Rock) 527,691.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
527,691.00
AR AR008 Ft. Smith: Improve Phoenix Avenue in the vicinity of the Ft. Smith Airport 695,426.00 Hwy. 71 ‐ Hwy. 22 ‐ Reconstruction of approximately 4 miles of I‐540 in
Sebastian County
695,426.00
AR AR009* DeValls Bluff: Replacement Bridge Across the White River 164.00 Hwy. 13 ‐ Screeton ‐ System preservation of approximately 6 miles of Hwy. 70
in Lonoke & Prairie Counties
164.00
Stone Co. Line ‐ Baxter Co. Line ‐ System preservation of approximately 7
miles of Hwy. 5 in Izard County
653,265.00
Hwy. 62 West ‐ Hwy. 62 East ‐ System Preservation of approximately 5 miles
of Hwy. 62B in Baxter County.
1,200,000.00
AR AR011* Uniform Traffic Control Devices Hwy Project (Statewide) 37,025.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
37,025.00
AR AR014 Development of Little Rock Port Authority 239,707.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
239,707.00
AR AR016 Widen Highway 65/82 from Pine Bluff to the Mississippi State line [see P.L.
106‐69 Section 361]
455,874.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
455,874.00
AR AR017 Upgrade US Rt. 67, Newport to Missouri State line 130,392.00 Arrington St. ‐ Hwy. 157 ‐ System Preservation of approximately 2 miles of
Hwy. 14 in Jackson County.
130,392.00
AR AR021 Construct Highway 371 from Magnolia to Prescott [see P.L. 106‐69 Section
361]
195,089.00 Hwy. 8 ‐ Nevada Co. Line (Sel. Secs.) ‐ System preservation of approximately
30 miles of Hwy. 53 in Clark County
195,089.00
AR AR022 Upgrade U.S. 65 in Faulkner and Van Buren Counties 260,785.00 I‐40 ‐ North (Sel. Secs.) ‐ System Preservation of approximately 2 miles of
Hwy. 363 in Pope County
260,785.00
AR AR024 Upgrade Arkansas State Highway 59 from Rena Road to Old Uniontown Road
in Van Buren
219,493.00 Hwy. 71 ‐ Hwy. 22 ‐ Reconstruction of approximately 4 miles of I‐540 in
Sebastian County
219,493.00
AR AR025 Construct Highway 82 from Hamburg to Montrose [see P.L. 106‐69 Section
361]
455,874.00 Hwy. 133S ‐ Co. Rd. 16 ‐ System Preservation of approximately 5 miles of
Hwy. 133 in Ashley County
455,874.00
AR AR026 Construct bypass at Ashdown 434,141.00 Cossatot River ‐ DeQueen ‐ Major Widening of approximately 6 miles of Hwy.
71 in Sevier County
434,141.00
AR AR027 Upgrade Highway 63, Marked Tree to Lake David 869,283.00 I‐55 ‐ Jonesboro (Sel. Secs.) ‐ System Preservation of select sections of I‐555 in
Craighead, Poinsett & Crittenden Co.
869,283.00
AR AR028 Enhance area in the vicinity of Dickson Street in Fayetteville 130,392.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the
intersection of Hwy. 71B & I‐49 in Benton County
130,392.00
AR AR030 Construct turning lanes at US‐71/AR‐8 intersection in Mena 21,732.00 Cossatot River ‐ DeQueen ‐ Major Widening of approximately 6 miles of Hwy.
71 in Sevier County
21,732.00
AR AR031 Enhance area around the Paris Courthouse in the vicinity of Arkansas Scenic
Highway 22 and Arkansas Scenic Highway 309, Paris Arkansas
34,771.00 Hwy. 71 ‐ Hwy. 22 ‐ Reconstruction of approximately 4 miles of I‐540 in
Sebastian County
34,771.00
AR AR032 Improve Highway 167 from Fordyce, Arkansas, to Saline County line [see P.L.
106‐69 Section 361]
69,428.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
69,428.00
AR AR035 Little Rock River Rail Project 173,857.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
173,857.00
AR AR036 Improvements to I‐30 From Benton to Geyer Springs Exit in Little Rock 173,857.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
173,857.00
AR AR037 Development of Interchange at Intersection of I‐40 and Airport Road in West
Memphis
521,570.00 I‐55 ‐ Jonesboro (Sel. Secs.) ‐ System Preservation of select sections of I‐555 in
Craighead, Poinsett & Crittenden Co.
521,570.00
To
US‐412, AR Between Mount Home and Viola, ArkansasAR010AR 1,853,265.00
From
9
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Arkansas
State Demo ID Project Description Amount Project Description Amount
ToFrom
AR AR040 Construction of and improvements to highway projects in the corridor
designated by section 1105(c)(18)(C)(ii) of the Intermodal Surface
Transportation Efficiency Act of 1991 [see P.L. 106‐69 Section 361]
477,374.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
477,374.00
AR AR067 Junction Bridge Rehabilitation and conversion from rail to pedestrian use 130,016.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
130,016.00
AR AR069 Bentonville, Arkansas Widen Arkansas Highway 102 between U.S. 71B and
the west city limits
152,362.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the
intersection of Hwy. 71B & I‐49 in Benton County
152,362.00
AR AR070 Widen to four lanes, improvement, and other development to U.S. Highway
167 from LA State line north to I‐530.
507,875.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
507,875.00
AR AR072 Highway 165: Railroad Overpass 162,520.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
162,520.00
AR AR074 Rogers, Arkansas‐‐Construct new interchange on I‐540 near the existing Perry
Road overpass.
507,875.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the
intersection of Hwy. 71B & I‐49 in Benton County
507,875.00
AR AR081 Highway 67: Kiehl Avenue‐‐ Vandenberg Boulevard: rehabilitating and
widening Highway 67 from four to six lanes from Kiehl Ave. to Vandenberg
Blvd
300,662.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
300,662.00
AR AR082 Highway 412: Baxter Co. to Ash Flat 162,520.00 Stone Co. Line ‐ Baxter Co. Line ‐ System preservation of approximately 7
miles of Hwy. 5 in Izard County
162,520.00
AR AR087 Washington County, Arkansas‐‐Replace and rebuild Tilly Willy Bridge 81,259.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the
intersection of Hwy. 71B & I‐49 in Benton County
81,259.00
AR AR095 Construction of I‐530 between Pine Bluff and Wilmar 6,004,152.00 Construction of Monticello Bypass & I‐69 connector on new location in Drew
County
6,004,152.00
AR AR100 Highway 67: Kiehl Avenue‐‐ Vandenberg Boulevard: rehabilitating and
widening Highway 67 from four to six lanes from Kiehl Ave. to Vandenberg
Blvd
406,299.00 Hot Springs ‐ I‐30 (Widening) ‐ Major widening of approximately 19 miles of
Hwy. 70 in Garland & Saline Counties
406,299.00
AR AR104 Develop a railroad overpass connecting U.S. Highway 67 and U.S. Highway
371 in Prescott
53,632.00 Hwy. 8 ‐ Nevada Co. Line (Sel. Secs.) ‐ System preservation of approximately 8
miles of Hwy. 67 in Clark County
53,632.00
AR AR107 Rogers‐‐Construct new interchange on I‐540 near the existing Perry Road
overpass
342,510.00 Hwy. 71B Interchange. Improvements. ‐ Interchange improvements at the
intersection of Hwy. 71B & I‐49 in Benton County
342,510.00
AR AR109 Highway 165: Railroad Overpass Construction. 203,150.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
203,150.00
AR AR110 Improve Highway 412: Baxter Co. to Ash Flat. 101,574.00 Stone Co. Line ‐ Baxter Co. Line ‐ System preservation of approximately 7
miles of Hwy. 5 in Izard County
101,574.00
AR AR112 Widening of Highway 65/82: Pine Bluff‐Greenville Bridge 203,150.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
203,150.00
AR AR113 Highway 167 Widening: Fordyce to Sheridan Bypass 203,150.00 Hwy. 65B ‐ Hwy. 65 ‐ Reconstruction of approximately 12 miles of I‐530 in
Jefferson County
203,150.00
*Subject to availability of funds upon additional research.
Total Amount Repurposed 18,064,929.00Total # of Earmarks Repurposed 39
10
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
CA CA001 Construct Ontario International Airport Ground Access Program 3,983,931.23 Grove Avenue from 4th Street to State Street/Airport Drive and the
intersection of Grove Avenue and Holt Boulevard in the City of Ontario ‐
street widening and intersection improvements
3,983,931.23
CA CA015 Upgrade SR 4 East in Contra Costa County 743,346.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
743,346.00
CA CA016 Improve Burbank Airport Access 2,719,124.76 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,719,124.76
CA CA050 Oxnard: Extend Rice Road, widen Hueneme Road and construct interchange.
(Improve and modify the Port of Hueneme Intermodal corridor Phase II in
Ventura County)
1,689,736.08 Vineyard/Patterson Resurfacing in Oxnard. 1,689,736.08
CA CA053 Long Beach: Airport Access 41,446.27 SR‐71 Gap from I‐10 to Rio Rancho Rd 41,446.27
CA CA054 For improvements on I‐15 and I‐40 in CA, NV, & AZ, including the I‐15/US‐95
interchange in Nevada (for improvements on I‐15 and I‐40 in CA, NV, & AZ),
including the I‐15/US‐95 interchange in Nevada ($10.5 million of which shall
be expended on the Nevada portion of the corridor)
1,837,883.64 US 395 from SR 18 in Victorville to Chamberlaine Lane in Adelanto ‐ widen
highway and turn channelization
1,837,883.64
CA CA059 CA 138, CA14 to 50th Street E 925,000.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 925,000.00
CA CA061 Widen I‐15 in San Bernardino County, California 2,092,582.61 North 1st Avenue over the BNSF Railroad yard in the City of Barstow ‐ bridge
replacement
2,092,582.61
CA CA069 Improve SR 91 ‐ Green River Road interchange 580,360.00 McKinley Street grade separation at the BNSF Railroad tracks in the City of
Corona
580,360.00
CA CA078 Enhance Fort Bragg and Willits Passenger Stations 33,905.00 City of Fort Bragg; Chestnut Street from Franklin to Dana Street, Chestnut
Street Corridor Project
33,905.00
CA CA079 Widen and improve I‐5/State Route 126 interchange in Valencia. 2,334,145.86 Pavement Preservation on various streets in City of Santa Clarita 2,334,145.86
CA CA081 Realign and improve California Route 79 in Riverside County 475,612.75 SR 91 HOV remnant work along the Pachappa Underpass in the City of
Riverside
475,612.75
CA CA083 Upgrade Fort Irwin Road from I‐15 to Fort Irwin 596,037.56 North 1st Avenue over the BNSF Railroad yard in the City of Barstow ‐ bridge
replacement
596,037.56
CA CA087 Upgrade I‐680 Corridor, Alameda County 797,763.90 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
797,763.90
CA CA089 Upgrade Highway 99, Sutter County 690,029.79 Howsley Road Bridge Replacement 690,029.79
CA CA124 Implement safety and congestion mitigation improvements along Pacific
Coast Highway, Malibu
100,972.69 SR‐71 Gap from I‐10 to Rio Rancho Rd 100,972.69
CA CA126 Construct extension of State Route 180 between Rt. 99 and the Hughes/West
Diagonal
1,351,569.00 SR 180 East ‐ west of Kingsburg Canal to west of Alta Main Canal in Fresno
County ‐ Road Construction
1,351,569.00
CA CA138 Conduct Highway 65 Improvement and Mitigation Project 390,648.80 Regional Connect Card Program ‐ Sacramento Region 390,648.80
CA CA139 Undertake Median Improvements Along E. 14th Street, San Leandro 72,893.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
72,893.00
CA CA145 Construct improvements to Harry Bridges Blvd., Los Angeles 2,913,935.50 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,913,935.50
CA CA148 Improve the Avenue H overpass in Lancaster, California 412,272.80 SR‐71 Gap from I‐10 to Rio Rancho Rd 412,272.80
CA CA157 Upgrade D Street Between Grand and Second Street, Hayward 83,237.66 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
83,237.66
CA CA169 Construct Imperial Highway grade separation and sound walls at Esperanza
Road/Orangethoupe Avenue in Yorba Linda, California
1,196,276.40 Gene Autry Way / I‐5 road extension and HOV Access in Anaheim, California 1,196,276.40
CA CA171 Construct Cabot‐Camino Capistrano Bridge project in Southern Orange
County
965,937.89 San Juan Creek Bridge Replacement, LOSSAN Corridor in the City of San Juan
Capistrano.
965,937.89
ToFrom
11
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
CA CA176 Extend State Route 52 in San Diego 72,789.89 Pedestrian Improvements in San Diego near San Diego Airport along Palm
Street.
72,789.89
CA CA186 Construct Arbor Vitae Street improvements, Inglewood 2,632,337.89 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,632,337.89
CA CA187 Install Silicon Valley Smart Corridor Project Along the I‐880 Corridor 409,756.47 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
409,756.47
CA CA190 Construct Tulare County Roads in Tulare County 8,063.16 Avenue 144 from Burnett Road to Road 96, west of the community of Tipton 8,063.16
CA CA197 Kingvale, California Satellite Operation Control Center 489,015.98 Bridge Rehabilitation from 0.6 miles to 0.4 miles south of Bell Road in Placer
County.
489,015.98
CA CA200 Ventura County Highway Video Camera Monitoring Project, California 496,750.00 Route 101 in Ventura County Widening and/or improvement 496,750.00
CA CA205 Compton Willow Creek ITS Project (Letter from Congresswoman Richardson
clarifying earmark description since Compton Willow Creek does not exist and
ITS project is not a viable project for this location. Project should be
"Installation of Safety lights" on Compton Creek OK per April 1/26/09)
496,750.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 496,750.00
CA CA213 Ramsey Street extension, Banning, California 1,738,625.00 I‐10 Bypass south of I‐10 from the City of Banning east city limits to Apache
Trail in the community of Cabazon
1,738,625.00
CA CA214 Safety Enhancement on Sherman Way between De Sota and Topanga
Canyon, California
159,394.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 159,394.00
CA CA217 Construction, including related activities, of an extension of highway 180
from the City of Fresno to I‐5 in Fresno to I‐5 in Fresno County, California
1,061,148.70 SR 180 East ‐ west of Kingsburg Canal to west of Alta Main Canal in Fresno
County ‐ Road Construction
1,061,148.70
CA CA229 Interstate 5‐Sorrento Valley Road and Genesee Avenue Interchange Projects 141,737.55 SR 163/Friars Road Interchange and adjacent ramps and roadway in San
Diego ‐ Interchange and roadway improvements
141,737.55
CA CA273 I‐80 Colfax Narrows Project, California 519,020.50 Increase Capacity on I‐80 between Sacramento/Placer County Line and State
Route 65.
519,020.50
CA CA288 SR‐152 Safety Improvements, Santa Clara County 10,408.36 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
10,408.36
CA CA298 Street Improvements, Gardena, California 36,539.97 SR‐71 Gap from I‐10 to Rio Rancho Rd. 36,539.97
CA CA303 Vasco Road Safety Improvements 431,070.39 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
431,070.39
CA CA309 Builds a Pedestrian Bridge from Hill Street to the Bay Trail, Belmont 321,605.88 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
321,605.88
CA CA316 Adams Street Rehabilitation Project, Glendale 310,858.20 Pennsylvania Avenue Rehabilitation Project ID: LA0G1314 (LA11G1) 310,858.20
CA CA319 Will add landscaping enhancements along the Ronald Regan Freeway Route
118 for aesthetic purposes.
2,323,422.00 Simi Valley Arterial Resurfacing 2,323,422.00
CA CA321 State Route 86S and Ave. 66 highway safety grade separation 3,605,310.00 Avenue 66 from west of Lincoln Street to Dale Kiler Road in Riverside County ‐
construct grade separation
3,605,310.00
CA CA327 Soundwall construction on the 210 Freeway, Pasadena 506,813.82 SR‐71 Gap from I‐10 to Rio Rancho Rd 506,813.82
CA CA333 Reconstruct 710 southern terminus off ramps, Long Beach 2,403,540.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,403,540.00
CA CA337 Study of Thomas Bridge to meet future cargo and passenger traffic needs of
the ports of Long Beach and Los Angeles
1,602,360.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,602,360.00
CA CA342 Construct a raised landscaped median on Alondra Blvd. between Clark Ave.
and Woodruff Ave. in Bellflower
320,472.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 320,472.00
CA CA344 Santa Anita Avenue Corridor Improvement project, Arcadia, California 806,759.30 SR‐71 Gap from I‐10 to Rio Rancho Rd. 806,759.30
12
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
CA CA349 Construction of a traffic signal at the intersection of Independence Avenue
and Sherman Way
100,148.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 100,148.00
CA CA351 Complete the Bay Trail Along the Western Edge of the American Canyon
Wetlands Edge Bay Trail
237,440.13 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
237,440.13
CA CA353 Implement streetscape project on Central Avenue from 103rd Street to
Watts/103rd Street Station, Watts
2,884,720.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,884,720.00
CA CA355 Upgrade and Extend Commerce Avenue, City of Concord 1,602,360.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
1,602,360.00
CA CA359 Widen Firestone Blvd. between Ryerson Blvd. and Stewart and Gray Road in
Downey
1,602,360.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,602,360.00
CA CA360 Construct Air Cargo Access Road to Oakland International Airport Construct I‐
580 Interchange, Livermore
721,062.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
721,062.00
CA CA361 Widen Lakewood Blvd. between Telegraph Rd. and Fifth St. in Downey 854,943.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 854,943.00
CA CA362 Pasadena Ave/Monterey Rd. Partial Grade Separation, Preliminary
Engineering, Feasibility, South Pasadena
240,354.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 240,354.00
CA CA366 Carlsbad, CA Construction of Poinsettia Lane 1,602,360.00 El Camino Real from Cassia Road to Camino Vida Roble in the City of Carlsbad,
San Diego County.
1,602,360.00
CA CA367 Construct pedestrian enhancements on Broadway in Los Angeles 2,002,950.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,002,950.00
CA CA370 Rehabilitate street surface of Cedros Avenue between Burbank Blvd. and
Magnolia Blvd.
34,451.20 SR‐71 Gap from I‐10 to Rio Rancho Rd 34,451.20
CA CA375 Tuolumne, Stanislaus and Merced Counties Upgrade Existing County
Highway, J59
335,950.01 Stanislaus County SR 132 road widening, PM R12.4 to R16.2 335,950.01
CA CA376 Diamond Bar On‐Off Ramp at Lemon Ave. on SR 60 8,441,548.36 SR‐71 Gap from I‐10 to Rio Rancho Rd 8,441,548.36
CA CA377 Reconstruct Interchange for South‐bound traffic Entering i‐80 from Central
Avenue, City of Richmond
3,124,602.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
3,124,602.00
CA CA381 Begin construction of road from U.S. 395 west towards SR 14 801,180.00 US 395 from SR 18 in Victorville to Chamberlaine Lane in Adelanto ‐ widen
highway and turn channelization
801,180.00
CA CA390 Grade Separation at Vanowen and Clybourn, Burbank 517,932.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 517,932.00
CA CA392 Upgrade CA SR4 East from the Vicinity of Loveridge Road to G Street, Contra
Costa County
1,658,885.29 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
1,658,885.29
CA CA395 Construct Inland Empire Transportation Management Center in Fontana to
better regulate traffic and dispatch personnel to incidents
1,201,770.00 Install fiber optic cable to the Transportation Management Center in the City
of Fontana
1,201,770.00
CA CA397 Planning, design, engineering, and construction of Naval Air Station, North
Island access tunnel on SR 75‐282 corridor, San Diego.
444,571.05 City of Coronado, Coronado Gateway Project ‐ Operational Improvement 444,571.05
CA CA399 North Atlantic Pedestrian Bridge, Monterey Park Pedestrian Safety
Improvements near North Atlantic Boulevard, Monterey Park (Change per
H.R. 1195‐6/6/08)
480,708.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 480,708.00
CA CA401 Design Traffic Flow Improvements Azusa and Amar, City of West Covina 144,424.01 SR‐71 Gap from I‐10 to Rio Rancho Rd. 144,424.01
CA CA406 Rehabilitate street surfaces in Sherman Oaks 99,346.60 SR‐71 Gap from I‐10 to Rio Rancho Rd. 99,346.60
CA CA407 Repair and realignment of Brahma Drive and Winnetka Ave. 240,354.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 240,354.00
CA CA410 Improve bridge 58‐7 on SR 115 that crosses the Alamo River in Holtville and
also project design and environmental analysis of a new bridge over the same
river.
99,445.20 Pavement Improvements. 6th Street between Holt Ave and Melon Avenue in
the City of Holtville, Imperial County.
99,445.20
CA CA413 Realign First St. between Mission Rd. and Clarence St. in Los Angeles 1,001,475.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 1,001,475.00
CA CA414 Construct Overpass on Central Ave. at the Railroad Crossing in Newark 600,885.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
600,885.00
13
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
CA CA417 Widen State Route 98 from Route 111 to State Route 7, Calexico. 3,590,545.17 Road Widening on SR98, from Rockwood Ave to Ollie Ave in the City of
Calexico, Imperial County
3,590,545.17
CA CA422 Widen Santa Maria River Bridge on U.S. Highway 101 between Santa Barbara
County and San Luis Obispo County
475,920.62 Operational and safety improvements on US101 ramps at Avila Beach
Drive(SB ramp node Intersection)
475,920.62
CA CA424 Improvements to State Route 67/State Route 52 interchange. 5,900.00 Pedestrian Improvements in San Diego near San Diego Airport along Palm
Street.
5,900.00
CA CA425 Construct Valley Boulevard Drainage Improvements, El Monte. 600,885.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 600,885.00
CA CA426 Implement intelligent management and logistics measures to improve freight
movement, Gateway Cities
544,873.04 SR‐71 Gap from I‐10 to Rio Rancho Rd 544,873.04
CA CA427 Los Angeles Regional Diesel Emissions Reduction Program For Engine Retrofit,
Gateway Cities
400,590.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 400,590.00
CA CA429 Fresno County, CA Widen Friant Road to four lanes with class II bicycle lanes. 346,654.00 American Avenue from SR 99 to Temperence Avenue in Fresno County‐ Road
Reconstruction
346,654.00
CA CA439 Upgrade Bellflower intersections at Alondra Blvd. and at Rosecrans Ave. in
Bellflower
175,726.95 SR‐71 Gap from I‐10 to Rio Rancho Rd 175,726.95
CA CA442 Long Beach Intelligent Transportation System: Integrate functioning traffic
management center that includes the port, transit, airport as well as the city's
police and fire departments, Long Beach.
2,403,540.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,403,540.00
CA CA444 Construct sound barriers at the I‐805/SR 54 Interchange, National City 681,003.00 City of National City, San Diego County. Road Rehabilitation 681,003.00
CA CA446 Compton Arterial Reconstruction and Improvement Program, Compton. 2,147,907.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,147,907.00
CA CA448 Construction of new freeway between I‐15 and U.S. 395, including new
interchange at I‐15.
4,005,900.00 Green Tree Boulevard at the BNSF Railroad crossing in the City of Victorville ‐
construct grade separation
4,005,900.00
CA CA454 Reconstruct Bloomfield Ave. with medians from Carson St. to north city limits
in Hawaiian Gardens.
74,229.41 SR‐71 Gap from I‐10 to Rio Rancho Rd 74,229.41
CA CA455 Reconstruct Paramount Blvd. with medians and improve drainage from
Artesia Blvd. to Candlewood St. in Long Beach
137,533.08 SR‐71 Gap from I‐10 to Rio Rancho Rd 137,533.08
CA CA458 Construct Traffic Flow Improvements Vincent and Lake Drive, West Covina 137,352.03 SR‐71 Gap from I‐10 to Rio Rancho Rd 137,352.03
CA CA459 Construction of a Lincoln Bypass on SR 65 in Placer County, CA 422,838.34 Regional Connect Card Program ‐ Sacramento Region 422,838.34
CA CA464 Construct truck lane on Keystone Road from State Route 111 to Austin Road,
Imperial County.
788,886.44 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to
Fawcett Road, Paving, Drainage ADA
788,886.44
CA CA466 Freeway 180 Improvements Fresno 903,476.00 Intersection of Marks Avenue and Nielsen Avenue in the City of Fresno ‐
Traffic Signal Installation
903,476.00
CA CA467 Construction of a smart crosswalk system at the intersection of Arminta St.
and Mason Ave.
40,059.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 40,059.00
CA CA468 Improve I‐8 off ramp at Ocotillo to the Imperial Valley College Desert
Museum/Regional Traveler Visitor Center, Imperial County
801,180.00 Conservation easement, access improvements and parking facilities at the
Desert museum, Imperial County
801,180.00
CA CA470 Add Turn Lane and Adaptive Traffic Control System at Intersection of San
Tomas Expressway and Hamilton Avenue in Campbell
378,692.13 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
378,692.13
CA CA471 Interchange improvements at Rice Avenue and U.S. Highway 101 in the City
of Oxnard.
1,015,448.29 Vineyard/Patterson Resurfacing in Oxnard. 1,015,448.29
CA CA475 Project Design, Environmental Assessment, and Roadway Construction of
Lonestar Road from Alta Road to Enrico Fermi Drive San Diego County
246,578.14 Bradley avenue Overpass at SR67 including adjacent ramps and roadways in
County of San Diego.
246,578.14
CA CA476 Project Study Reports for I‐ 105 and I‐405 Interchanges at Los Angeles
International Airport.
320,472.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 320,472.00
14
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
CA CA477 Reconstruct Whittier Blvd. and improve parkway drainage from Philadelphia
Ave. to Five Points in Whittier
1,358,351.38 SR‐71 Gap from I‐10 to Rio Rancho Rd. 1,358,351.38
CA CA478 Conduct project report study on Old River School Rd‐Firestone Blvd.
intersection re‐ configuration.
400,590.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 400,590.00
CA CA479 Operational and Highway Safety Improvements on HWY 94 between the 20
mile marker post on Jamul and HWY 188 in Tacate
2,403,540.00 Roadway Improvements and realignment in the County of San Diego on
Emery Road at and near SR94.
2,403,540.00
CA CA483 Conduct study of SR 130 Realignment Project, San Joaquin County and Santa
Clara, CA
1,602,360.00 Track extension. Stockton Robert Cabral Station to ACE maintenance facility,
south of Alpine Avenue
1,602,360.00
CA CA487 Construction of new roadway lighting on major transportation corridors in
the Northeast San Fernando Valley.
78,427.03 SR‐71 Gap from I‐10 to Rio Rancho Rd. 78,427.03
CA CA488 Rehabilitation of Tulare County Farm to Market road system 506,363.28 Avenue 144 from Burnett Road to Road 96, west of the community of Tipton 506,363.28
CA CA489 Implement Northeast San Fernando Valley Road and Safety Improvements. 48,236.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 48,236.00
CA CA501 Upgrade and Reconstruct the I‐80/I‐680/SR 12 Interchange, Solano County 1,775,546.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
1,775,546.00
CA CA503 Construct an Interchange on Highway 70 at Georgia Pacific Road in Oroville 1,958,192.41 State Route 70 Passing Lanes from Cox Lane to 0.1 mile south of Palermo
Road
1,958,192.41
CA CA505 Ramona Avenue Grade Separation, Montclair, California 1,602,360.00 Central Avenue Overhead at UPRR tracks 0.2 mi. south of Holt Boulevard in
the City of Montclair ‐ Bridge rehabilitation and widening. Bridge No. 54C‐
0112.
1,602,360.00
CA CA506 Construction of a smart crosswalk system at the intersection of Topanga
Canyon Blvd. and Gault St.
40,059.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 40,059.00
CA CA508 Randolph St. improvements between Wilmington Ave. and Fishburn Ave. in
Huntington Park.
961,416.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 961,416.00
CA CA511 Reconstruct and widen Del Amo Blvd. to four lanes between Normandie Ave.
and New Hampshire Ave., Los Angeles County
2,403,540.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,403,540.00
CA CA514 Construct Route 101 Bicycle/Pedestrian Overpass at Milbrae Ave. for the San
Francisco Bay Trail
487,601.51 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
487,601.51
CA CA518 The Foothill South Project, construct 16 miles of a six‐lane limited access
highway system
8,011,801.00 NB SR‐241 to EB SR‐91 and WB SR‐91 to SB SR‐241, HOT connectors 8,011,801.00
CA CA521 Design and Construction Camino Tassajara Crown Canyon to East Town
Project, Danville
84,010.10 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
84,010.10
CA CA522 Realignment of La Brea Avenue to reduce congestion, City of Inglewood. 1,501,865.32 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,501,865.32
CA CA532 Construct Operational and Safety Improvements to I‐880 N 29th Ave in
Oakland
215,950.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
215,950.00
CA CA535 Design and Construct new Interchange at Potrero Blvd and State Route 60 in
Beaumont
1,602,360.00 SR 91 HOV remnant work along the Pachappa Underpass in the City of
Riverside
1,602,360.00
CA CA538 Construct truck lane on Baughman Road from State Route 78/86 to Forrester
Road, Westmorland.
368,649.01 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to
Fawcett Road, Paving, Drainage ADA
368,649.01
CA CA540 I‐5 Sorrento Valley/Genesee Avenue, San Diego, CA 419,024.01 SR 163/Friars Road Interchange and adjacent ramps and roadway in San
Diego ‐ Interchange and roadway improvements
419,024.01
CA CA541 To Construct road surface improvements, and improve road safety from
Brawley Water plant to Hwy 86 to 9th Street to 18th Street, Brawley.
200,318.96 Rio Vista Avenue between Allen Street and Cattle Call Drive, in the City of
Brawley, Imperial County.
200,318.96
15
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
CA CA544 710 Freeway Study to comprehensively evaluate the technical feasibility of a
tunnel alternative to close the 710 Freeway gap.
2,403,540.00 Design and ROW for new multimodal transportation center. On Aviation Blvd
from Arbor Vitae St to 96th St.
2,403,540.00
CA CA551 Rancho Vista Blvd, Widening Project 2,804,130.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 2,804,130.00
CA CA558 Widen Haskell Avenue between Chase St. and Roscoe Blvd. 160,236.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 160,236.00
Harbor Drive Multi‐Modal Corridor along Harbor Drive and Tidelands Avenue
between 10th Avenue Marine Terminal.
379,201.62
and National City Marine Terminal. Work to include Multi‐Modal Traffic
Impact Assessment.
243,780.00
CA CA562 Streetscape and Transportation Enhancements on 7th Street in Calexico,
Traffic Signalization on Highway 78, Construction of the Renewable Energy
and Transportation Learning Center, improve and enlarge parking lot, and
create Bus stop, Brawley
801,180.00 Parking lot paving and ADA access improvements on CA‐78 in the City of
Brawley, Imperial County.
801,180.00
CA CA565 Las Tunas Drive Pedestrian Enhancement, San Gabriel 120,177.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 120,177.00
CA CA566 Improve Access to I‐80 at Eureka Road Interchange 162,520.00 Regional Connect Card Program ‐ Sacramento Region 162,520.00
CA CA567 Interstate 15, California Oaks Road Interchange Project 1,602,360.00 Reconstruct the I‐215 / Keller Road interchange in the City of Murrieta 1,602,360.00
CA CA568 Acquire Lands for Mitigation Adjacent to U.S. 101 as Part of Southern Santa
Clara County Wildlife Corridor Protection and Scenic Enhancement Project
400,590.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
400,590.00
CA CA574 Construct landscape medians along Skyline Drive from Sears Avenue to 58th
Street, San Diego.
140,194.09 SR 163/Friars Road Interchange and adjacent ramps and roadway in San
Diego ‐ Interchange and roadway improvements
140,194.09
CA CA576 Upgrade essential road arterials, connectors, bridges and other road
infrastructure improvements in the Town of Desert Hot Springs, CA
199,064.17 I‐10 Bypass south of I‐10 from the City of Banning east city limits to Apache
Trail in the community of Cabazon
199,064.17
CA CA579 Widen Bundy Drive between Wilshire and Santa Monica Boulevards in the
City of Los Angeles.
3,327,620.17 SR‐71 Gap from I‐10 to Rio Rancho Rd. 3,327,620.17
CA CA582 Replace twin 2 lane bridge with single 4 lane bridge on SR 138 over Big Rock
Wash
400,590.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 400,590.00
CA CA589 Construct Cabot‐Camino Capistrano Bridge Project and related roadway
improvements in Cities of Mission Viejo and Laguna Niguel, California
671,942.10 Crown Valley Parkway from La Pata Drive to Moulton Parkway and from
Greenfield Drive to Cabot Road
671,942.10
CA CA591 Construction of a traffic signal at the intersection of Hamlin St. and Corbin
Ave.
100,148.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 100,148.00
CA CA594 Forest Highway 171 Upper Skyway Improvement 1,369,862.59 State Route 70 Passing Lanes from Cox Lane to 0.1 mile south of Palermo
Road
1,369,862.59
CA CA595 Construct crosswalk bump‐ outs and related streetscape improvements on
Temple St. between Hoover St. and Glendale Blvd., Los Angeles
79,311.64 SR‐71 Gap from I‐10 to Rio Rancho Rd. 79,311.64
CA CA600 Construct the Los Angeles River bicycle and pedestrian path in the San
Fernando Valley.
460,679.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 460,679.00
CA CA601 Construct Route 101 Bicycle/Pedestrian Overpass at Milbrae Ave. for the San
Francisco Bay Trail
1,001,475.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
1,001,475.00
CA CA602 Conduct necessary planning and engineering and implement comprehensive
corridor management plan for Arroyo Seco Historic Parkway, Los Angeles.
403,782.63 Design and ROW for new multimodal transportation center. On Aviation Blvd
from Arbor Vitae St to 96th St.
403,782.63
CA CA608 Design and Construct Access Improvements in North Central Business District,
Sacramento
687,602.59 Construct Cl 1/Multi‐use Trail on the s side of the American River Pkwy, from
28th St to H St in Sacramento
687,602.59
CA CA609 Establish I‐15 Interchange at Nisqualli and Mojave River crossing in San
Bernardino County.
741,487.07 Green Tree Boulevard at the BNSF Railroad crossing in the City of Victorville ‐
construct grade separation
741,487.07
CA CA613 Rosecrans Avenue and Bridge Arterial Reconstruction Project, Compton 3,167,325.02 SR‐71 Gap from I‐10 to Rio Rancho Rd 3,167,325.02
622,981.62Construct truck ramp linking Interstate 5 to the National City Marine Cargo
Terminal, National City
CA560CA
16
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
CA CA614 Conduct study and construct Daggett Road, Port of Stockton, CA, access
project
809,786.32 Navy Drive, between McCloy Avenue and W. Washington Street. Widening
and bridge replacement.
809,786.32
CA CA616 Implement streetscape improvements along Wilbur Avenue to enhance
traffic and pedestrian safety.
80,118.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 80,118.00
CA CA617 Provide landscape enhancement of an existing open culvert on Atherton
Street, Long Beach
410,220.43 SR‐71 Gap from I‐10 to Rio Rancho Rd 410,220.43
CA CA618 Crenshaw Blvd. Rehabilitation, Maricopa St. to Sepulveda Blvd., City of
Torrance
203,676.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 203,676.00
CA CA623 Construct pedestrian sidewalk enhancements in Bellflower 44,144.27 SR‐71 Gap from I‐10 to Rio Rancho Rd 44,144.27
CA CA626 Construct 213th Street pedestrian bridge to provide safe passage for
pedestrians and wheelchairs, Carson.
254,704.02 SR‐71 Gap from I‐10 to Rio Rancho Rd 254,704.02
CA CA633 Conduct Environmental Review of Proposed Improvements Related to the
Connection of Dumbarton Bridge to Highway 101
400,590.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
400,590.00
CA CA634 Construct parking facility and improve access to Imperial Valley Expo 42,231.05 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to
Fawcett Road, Paving, Drainage ADA
42,231.05
CA CA635 Develop bicycle paths and pedestrian access to Third Avenue, Chula Vista. 69,331.18 Interstate‐5 Light Rail Trolley Corridor from State Route‐54 to Main Street. 69,331.18
CA CA636 Widen and Reconfigure Sepulveda and Culver Boulevards, Culver City. 2,195,233.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 2,195,233.00
CA CA637 Olsen Road widening and roadway improvements in Simi Valley, California. 178,244.31 Simi Valley Arterial Resurfacing 178,244.31
CA CA647 Improve Access Road to Beale Air Force Base (Smartville Road) 329,966.73 Shoulder Widening on Hammonton Smartville Road from South Golden
Parkway to 1 mile west
329,966.73
CA CA649 Citywide Traffic Signal Upgrades requiring the Installation of Hardware and
Software at 9 Major Intersections, Palo Alto
400,590.00 US 101 Express Lanes, North of San Antonio Rd (Santa Clara County) to South
of Grand Ave(San Mateo County)
400,590.00
CA CA650 Rehabilitate street surface of Addison St. between Kester Ave. and Lemona
Ave
37,655.80 SR‐71 Gap from I‐10 to Rio Rancho Rd. 37,655.80
CA CA651 Construct grade separations at Washington Ave. and UPRR crossing east and
Washington Ave. and La Cadena Drive in Colton
400,590.00 Washington Street from Reche Canyon Road to the east city limits of City of
Colton ‐ realign Reche Canyon Road to Hunts Lane
400,590.00
CA CA652 SR 91 I‐605 Needs Assessment Study, Whittier, CA 12,819.40 SR‐71 Gap from I‐10 to Rio Rancho Rd 12,819.40
On I‐5 in Solano Beach. From Lomas Santa Fe UC to SR‐78 overcrossing in
Oceanside in San Diego County.
556,200.80
Pedestrian Improvements in San Diego near San Diego Airport along Palm
Street.
244,979.20
CA CA657 Design and Construct new Interchange at Potrero Blvd and State Route 60 in
Beaumont
801,180.00 SR 91 HOV remnant work along the Pachappa Underpass in the City of
Riverside
801,180.00
CA CA666 Walnut Grove at Broadway Intersection Capacity Enhancements, San Gabriel. 200,295.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 200,295.00
CA CA668 Restoration of Victoria Avenue in the City of Riverside CA 400,590.00 Roadway widening of Magnolia Avenue from Buchanan Street to Banbury
Drive in the City of Riverside
400,590.00
CA CA670 Pedestrian Beach Trail in San Clemente, CA 121,180.00 San Juan Creek Bridge Replacement, LOSSAN Corridor in the City of San Juan
Capistrano.
121,180.00
CA CA673 Expand Diesel Emission Reduction Program of Gateway Cities COG 365,020.85 SR‐71 Gap from I‐10 to Rio Rancho Rd 365,020.85
CA CA675 Construct traffic circle in San Ysidro at the intersection of Via de San Ysidro
and West San Ysidro Boulevard, San Diego
240,354.00 SR 163/Friars Road Interchange and adjacent ramps and roadway in San
Diego ‐ Interchange and roadway improvements
240,354.00
801,180.00Construct parking facility and improve museum pedestrian access from
trolley station, San Diego
CA653CA
17
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
CA CA676 Construct and resurface unimproved roads in the Children's Village Ranch and
improve access from Children's Village Ranch to Lake Morena Drive, San
Diego County
801,180.00 On I‐5 in Solano Beach. From Lomas Santa Fe UC to SR‐78 overcrossing in
Oceanside in San Diego County.
801,180.00
CA CA679 Acquisition of land along CA 86 at the Desert Cahuilla Prehistoric Site,
Imperial County for environmental mitigation related to reducing wildlife
mortality while maintaining habitat connectivity
526,509.00 Road Widening on SR98, from Rockwood Ave to Ollie Ave in the City of
Calexico, Imperial County
526,509.00
CA CA680 Conduct preliminary engineering and design analysis for a dedicated
intermodal right‐of way link between San Diego and the proposed Regional
International Airport in Imperial Valley including a feasibility study and cost
benefit analysis evaluating the comparative options of dedicated highway or
highway lanes
1,179.04 Pedestrian Improvements in San Diego near San Diego Airport along Palm
Street.
1,179.04
CA CA682 Construct new sidewalks in the City of Heber, CA. 136,799.97 Heber Avenue from Highway 86 to Correll Road and south of Highway 86 to
Fawcett Road, Paving, Drainage ADA
136,799.97
CA CA683 To Convert a railroad bridge into a highway bridge spanning over the Feather
River between Yuba City and Marysville
3,170,875.15 5th St Bridge over the Feather River and 2nd Street Undercrossing. Bridge
replacement and approach work.
3,170,875.15
CA CA688 ITS and Intersection Improvements, LAX. 1,001,475.00 SR‐71 Gap from I‐10 to Rio Rancho Rd. 1,001,475.00
CA CA692 Compton Arterial Reconstruction and Improvement Program, Compton. 1,902,262.44 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,902,262.44
CA CA694 Sealing unpaved roads in Calaveras County 957,865.68 HMA / chipseal surfacing of Six Mile Road near Murphys from Vallecito Cal
Fire Road to Vallecito Bluffs Road
957,865.68
CA CA701 Interstate 5‐Sorrento Valley Road and Genessee Avenue Interchange Projects 534,703.11 SR 163/Friars Road Interchange and adjacent ramps and roadway in San
Diego ‐ Interchange and roadway improvements
534,703.11
CA CA708 Design and Construct Access Improvements in North Central Business District,
Sacramento
305,039.23 Construct Cl 1/Multi‐use Trail on the s side of the American River Pkwy, from
28th St to H St in Sacramento
305,039.23
CA CA712 Interchange Improvements: Laval and I‐5, City of Lebec. 471,269.86 In Bakersfield: Centennial Corridor, I‐5 to SR58 at Cottonwood; SR58/SR99 to
Westside Parkway ‐ Construct new freeway section
471,269.86
CA CA713 Planning, design, engineering, and construction of Naval Air Station, North
Island access tunnel on SR 75‐282 corridor, San Diego.
1,441,577.01 City of Coronado, Coronado Gateway Project ‐ Operational Improvement 1,441,577.01
CA CA723 Improvement of intersection at Aviation Blvd. and Rosecrans Ave. to reduce
congestion (El Segundo).
1,014,201.00 SR‐71 Gap from I‐10 to Rio Rancho Rd 1,014,201.00
CA CA730 Construct eastern loop of Campus Parkway in Merced 570,533.64 Campus Parkway Segment 2 (from Childs Avenue to State Route 140) 570,533.64
CA CA734 Hilmar/Turlock California Highway 99 interchange and safety
improvements/realignment of SR 165 project study report and environmental
studies in Merced and Stanislaus Counties
893,220.23 Hilmar Community Pedestrian Improvements (Collector Roadways within
Hilmar)
893,220.23
CA CA739 Feasibility study for constructing SR 130 realignment project connecting the
Central Valley and San Joaquin County and Santa Clara County
6,014,049.00 Track extension. Stockton Robert Cabral Station to ACE maintenance facility,
south of Alpine Avenue
6,014,049.00
CA CAM01 Interstate 215 at Barton Road overcrossing, City of Grand Terrace, San
Bernardino County‐ interchange reconstruction, including redesign of
northbound Barton Road on and off ramps and widening of Barton Road
bridge structure
1,659,609.17 Barton Road interchange improvement in the City of Grand Terrace 1,659,609.17
18
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
California
State Demo ID Project Description Amount Project Description Amount
ToFrom
Marin‐Sonoma Narrow: US 101
PM 04‐MRN‐101‐27.0/27.6
PM 04‐Son‐10‐0.0/4.5
15,000,000.00
SMART: San Rafael Bettini Transit Center 3,205,079.00
Total Amount Repurposed 197,922,100.33Total # of Earmarks Repurposed 184
18,205,079.00Multimodal Facility Improvements, construction, and ferry acquisition by
North Bay Ferry Service, Inc., located at Port Sonoma in Petaluma, California
CAM02CA
19
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Colorado
State Demo ID Project Description Amount Project Description Amount
CO CO003 PE Demo ‐ Interstate 66 Feasibility Study 10,000.00 US50 Chipseal in Manzanola and Las Animas in Bent County (20760) 10,000.00
CO CO016 Construction of, and improvements to, 17th Avenue and 23rd Avenue
highway ramps in Denver, Colorado
11,485.00 56th Ave widening at Pena Blvd. 11,485.00
CO CO017 Broomsfield Wadsworth Interchange, Colorado 396,751.00 Direct Connection across US 36‐120th Ave. 396,751.00
CO CO041 Construction of U.S. 24—Tennessee Pass, Colorado 458,070.00 US 24 MP143‐148, resurfacing, ADA improvements, guardrail 458,070.00
CO CO043 East 104th and U.S. 85 Intersection: Study, design, and construction of
needed improvements to intersection
67,446.00 I‐270 at Vasquez Planning and Environmental Linkage Study 67,446.00
CO CO046 CO 56th Avenue and Quebec Street Improvements Phase I, Denver 4,034,197.00 56th Ave widening at Pena Blvd. 4,034,197.00
CO CO052 Improve and Widen State Highway 44 from Colorado Boulevard to State
Highway 2
706,573.00 I‐270 at Vasquez Planning and Environmental Linkage Study 706,573.00
CO CO075 Transportation Improvements to U.S. 24‐‐Tennessee Pass 189,651.00 US 24 MP143‐148, resurfacing, ADA improvements, guardrail 189,651.00
CO CO076 Transportation Improvements to Bromley Lane and U.S. 85 Interchange 10,108.00 I‐270 at Vasquez Planning and Environmental Linkage Study 10,108.00
CO CO077 Transportation Improvements to 104th and U.S. 85 Intersection 94,826.00 I‐270 at Vasquez Planning and Environmental Linkage Study 94,826.00
CO CO088 Transportation Improvements to 56th Avenue and Quebec Street 405,607.00 56th Ave widening at Pena Blvd. 405,607.00
CO CO098 Improvements to 56th Avenue from Quebec St. to Havana St. and to Quebec
St. from I‐70 to 56th Ave. in Denver
773,477.00 56th Ave widening at Pena Blvd. 773,477.00
CO CO111 Improvement to 10th and U.S. 85 Intersection 96,202.00 I‐270 at Vasquez planning and Environmental Linkage Study 96,202.00
CO CO112 Denver Union Station 1.00 56th Ave widening at Pena Blvd. 1.00
Total Amount Repurposed 7,254,394.00Total # of Earmarks Repurposed 14
ToFrom
20
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Connecticut
State Demo ID Project Description Amount Project Description Amount
CT CT006 Norwich Intermodal Transportation Center
(FY 1995 ‐ Public Law 103‐331)
328,586.02 Retaining Wall Reconstruction on Route 12, Norwich 328,586.02
CT CT025 Implement Trinity College Area Road Improvements, Hartford
(FY 1998 ‐ Public Law 105‐178)
1,341,965.40 Traffic Signal Upgrades, Hartford 1,341,965.40
CT CT035 Pedestrian/disabled Access Improvements at Mark Twain House Historic site.
(Y 1998 ‐ Public Law 105‐178)
6,399.68 Traffic Signal Upgrades, Hartford 6,399.68
Rehabilitate Bridge 00255 ‐ I‐395 over Rt 85, Waterford 36,254.02
Replace Bridge 00488 ‐ CT66 over P&W RR, Windham 40,000.00
CT CT049 Beacon Falls‐Seymour, Connector Roadway (FY2004 ‐ Public Law 108‐199) 487,607.60 Naugatuck River Greenway, Waterbury 487,607.60
Rehab Br 00255 ‐ I‐395 over Rt 85, Waterford 3,000,000.00
Replace Br 00488 ‐ CT 66 over P&W RR, Windham 9,489,074.84
CT CT080 Construct roadway on East Commerce Drive, Oxford, CT (FY 2005 ‐ Public Law
109‐59)
400,590.00 I‐84 Improvements at Exit 16, Southbury 400,590.00
Farmington Canal Greenway, New Haven 471,890.00
Traffic Signal Upgrades, New Haven 471,600.00
Rehabilitation of the Grand Avenue Bridge (Br 03810) over the Quinnipiac
River, New Haven
258,280.00
CT CT086 Construct Pomfret Pedestrian Bridge (FY 2005 ‐ Public Law 109‐59) 80,118.00 Replace Br 02339 ‐ CT44 over Bark Meadow Brk, Pomfret 80,118.00
Realignment CT 37 @ Stacey Rd, Danbury 2,276,284.00
Widening CT 37 @ Barnum Rd, Danbury 447,728.00
Replace Br 02931 ‐ CT 2A over Dickerman's Brk, Preston 602,360.00
Replace Br 02932 ‐ CT 2A over Dickerman's Brk, Preston 1,000,000.00
CT CT092 Construct Entrance Ramp at Route 8 Exit 11, Shelton, CT (FY 2005 ‐ Public Law
109‐59)
801,180.00 Naugatuck River Greenway, Waterbury 801,180.00
CT CT093 Make Improvements to Plainfield Moosup Pond Road (FY 2005 ‐ Public Law
109‐59)
200,295.00 Rehab Br 00668 ‐ CT 12 over Mill Brook, Plainfield 200,295.00
CT CT095 Construct bike and pedestrian paths along Salem Greenway‐Salem, CT (FY
2005 ‐ Public Law 109‐59)
80,118.00 Route 85 Spot Improvements, Salem 80,118.00
CT CT098 Make Improvements to Plainfield Cemetery Road (FY 2005 ‐ Public Law 109‐
59)
160,236.00 Rehab Br 00668 over Mill Brook, Plainfield 160,236.00
CT CT099 Conduct multimodal study of Route 8 corridor between Beacon Falls‐Seymour
town line and Exit 40 (FY 2005 ‐ Public Law 109‐59)
357,370.87 Naugatuck River Greenway, Waterbury 357,370.87
CT CT104 Make Improvements to North Stonington, CT Westerly, R.I. Pawcatuck River
Bridge (FY 2005 ‐ Public Law 109‐59)
240,354.00 Replace Br 02968 ‐ CT 49 over Pendleton Brk, North Stonington 240,354.00
CT CT106 I‐84 Expressway Reconstruction from Waterbury to Southbury
(FY 2005 ‐ Public Law 109‐59)
1,201,770.00 Naugatuck River Greenway, Waterbury 1,201,770.00
Undertake road improvements associated with Coltsville Area
Redevelopment, Hartford
3,831,024.84
Traffic Signal Upgrades, Hartford 3,179,300.16
CT CT109 Realign, widen, and reconstruct Arch Street and connect pedestrian walkways
to Constitution Plaza in Hartford (FY 2005 ‐ Public Law 109‐59)
239,751.07 Traffic Signal Upgrades, Hartford 239,751.07
Installation of a Wayfinding Sign System, New Haven 1,141,175.00
Rehabilitation of the Grand Avenue Bridge (Br 03810) over the Quinnipiac
River, New Haven
3,866,200.00
Reconstruct Waterfront Street Corridor, City of New Haven (FY 2005 ‐ Public
Law 109‐59)
CT083 1,201,770.00CT
To
Route 11‐‐Connecticut Greenway Commission (FY 2003 ‐ Public Law 108‐7)CT046CT 76,254.02
12,489,074.84Construct Route 11 Extension and bicycle and pedestrian path from Salem to
Waterford
CT068CT
From
I‐84 Danbury Exits I‐11 Upgrade Interchanges (FY 2005 ‐ Public Law 109‐59) 2,724,012.00CT089CT
Make Improvements to Montville‐Preston Mohegan Bridge (FY 2005 ‐ Public
Law 109‐59)
CT091CT 1,602,360.00
Undertake road improvements associated with Coltsville Area
Redevelopment, Hartford (FY2005 ‐ Public Law 109‐59)
7,010,325.00CT107CT
Land acquisition, remediation, improvements and construction for ferry‐
highway‐rail terminal at junction of Interstates 91 and 95 adjacent to East
Street and Forbes Avenue in New Haven
5,007,375.00CT111CT
21
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Connecticut
State Demo ID Project Description Amount Project Description Amount
ToFrom
Replace Bridge 00315 ‐ US 1 over Noroton River, Stamford 602,950.00
Mill River Greenway, Stamford 1,400,000.00
CT CT133 Construct pedestrian and vehicular access road to Riverfront Park in
Glastonbury (FY 2005 ‐ Public Law 109‐59)
25,409.00 Traffic Signal Upgrades, Hartford 25,409.00
Rehab Br 06787 & 06788 ‐ CT207 over Beaver Brk, Franklin 960,000.00
Rehab Br 01291 ‐ CT97 over Beaver Brk, Sprague 1,040,000.00
Realignment, Brookwood to Williams Roads ‐ SR 740, Branford 4,461,812.39
Replace Br 00196 ‐ I95 over US 1, Branford 1,049,250.61
CT CT138 Widen Interstate 84 between Danbury and Waterbury (FY 2005 ‐ Public Law
109‐59)
6,472,801.13 Upgrade Expressway ‐ I 84 ‐ Phase 3, Waterbury 6,472,801.13
CT CT146 Make improvements to Plainfield Moosup Pond Road (FY 2005 ‐ Public Law
109‐59)
500,738.00 Rehab Br 00668 ‐ CT12 over Mill Brook, Plainfield 500,738.00
CT CTF01 Stamford High Speed Ferry (FY 2003 ‐ Public Law 108‐7) 496,750.00 Replace Bridge 00315 ‐ US1 over Noroton River, Stamford 496,750.00
CT CTF03 Stamford High Speed Ferry, Stamford (FY 2004 ‐ Public Law 108‐199) 440,386.00 Replace Bridge 00315 ‐ US1 over Noroton River, Stamford 440,386.00
CT CTF04 Stamford High Speed Ferry, Connecticut (FY 2005 ‐ Public Law 108‐447) 346,944.00 Replace Bridge 00315 ‐ US1 over Noroton River, Stamford 346,944.00
Total Amount Repurposed 53,834,553.63Total # of Earmarks Repurposed 29
Construct high‐speed ferry terminal in Stamford, Connecticut to facilitate
transportation between Connecticut and New York
2,002,950.00CT118CT
7,511,063.00Widen Interstate 95 between Branford and North Stonington
(FY 2005 ‐ Public Law 109‐59)
CT137CT
22
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Delaware
State Demo ID Project Description Amount Project Description Amount
DE DE009 Replacement of the Indian River Inlet Bridge, Sussex County, Delaware 487,560.00 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 487,560.00
DE DE013 City of Dover Transportation and Community and Systems Preservation 1,001,475.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 1,001,475.00
DE DE014 Wilmington Train Station Restoration 9,588.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 9,588.00
DE DE015 Replacement of the Lake Gerar Bridge in Rehoboth 23,039.35 SR 1, Little Heaven Grade Separated Intersection SPN 200412202 23,039.35
DE DE016 Wyoming Mill Road Realignment, Dover 529,208.59 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 529,208.59
DE DE017 Replacement of the Woodland Ferry on the Naticoke River between Seaford
and Laurel
2,503,688.00 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 2,503,688.00
DE DE018 Hydrogen Storage Research at Delaware State University in Dover 186,122.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 186,122.00
DE DE020 Replacement of Railroad Crossings in Wilmington and Marshallton 378,761.38 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 378,761.38
DE DE022 Improve pedestrian and bicycle access at the University of Delaware in
Newark
1,475.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 1,475.00
DE DE023 Replacement of Fixed Route Transit Buses 279,840.94 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 279,840.94
DE DE024 Enhance and expand the DelTrac Integrated Transportation Management 843,668.96 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 843,668.96
DE DE025 Planning, Design, and Construction of the Energy Exploration Center at the
Destination Station in Rehoboth Beach
384,728.89 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 384,728.89
DE DE027 Develop and construct an alternative route for truck traffic in the core
downtown area of Harrington
2,723,596.83 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 2,723,596.83
DE DE028 Build the Pomeroy Line Pedestrian/Bicycle Trail and Facility in Newark 1,467,530.11 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 1,467,530.11
DE DE029 Infrastructure and Streetscape Improvements on Rehoboth Avenue in
Rehoboth
5,063,616.50 SR 1, Little Heaven Grade Separated Intersection SPN T200412202 5,063,616.50
DE DE030 University of Delaware's Automotive Based Fuel Cell Hybrid Bus Program in
Newark
478,518.00 Wilmington Riverfront Access and Street Grid Redesign on SPN T200512102 478,518.00
Total Amount Repurposed 16,362,417.55Total # of Earmarks Repurposed 16
ToFrom
23
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
District of Columbia
State Demo ID Project Description Amount Project Description Amount
DC DC018 Planning, environmental work, and preliminary engineering of highway,
pedestrian, vehicular and bicycle access to the John F. Kennedy Center for the
Performing Arts in the District of Columbia FY2000
15,340.00 Metropolitan Branch Trail Fort Totten Design/Build 15,340.00
DC DC031 Highway Improvements to improve access to the Kennedy Center FY2005 3,922,717.62 Metropolitan Branch Trail Fort Totten Design/Build 3,922,717.62
Total Amount Repurposed 3,938,057.62Total # of Earmarks Repurposed 2
ToFrom
24
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Florida
State Demo ID Project Description Amount Project Description Amount
FL FL034 Construct Wonderwood Connector from Mayport to Arlington, Duval County,
Florida.
20,000.00 I‐95 (SR9) improvements 20,000.00
FL FL042 Construct interchange at 21st Street to provide access to Talleyrand Marine
Terminal
1,023,337.00 I‐295 (SR9A) improvements 1,023,337.00
FL FL052 Widen U.S 192 between CR 532 an I‐95 in Brevard and Osceola Counties 565,785.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
565,785.00
FL FL060 Construct Alden Road Improvement Project in Orange County, Florida 126,783.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
126,783.00
FL FL122 East Orange County Trailway System, Florida 24,192.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
24,192.00
FL FL150 Construct Saxon Blvd Extension, Volusia County,
Florida
1,682,478.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
1,682,478.00
FL FL151 Homestead, FL Widening of SW 328fromSW137 Ave. to 152 Ave. 5,598,102.00 City of Homestead ‐ Multimodal Transit Center 5,598,102.00
FL FL154 Construction of paved road over existing unpaved roadway on SE 144th Ave.
from SR 100 to U.S. 301, distance of 1.2 miles
245,250.00 SR 223 (ALT US 301) 245,250.00
FL FL155 Construct I‐4 Frontage Rd., Volusia County, Florida 1,602,360.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
1,602,360.00
FL FL156 Bicycle and Pedestrian Improvements in the Town of Windermere, Florida 44,687.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
44,687.00
FL FL163 Construct Flagler Avenue Improvements, City of Key West, Florida 155,690.00 City of Key West, Bahama Village Cultural Resource Assessment 155,690.00
FL FL167 U.S. 441 Traffic Improvements ‐ Road surface, road access, curb, gutter, and
right‐of‐way, Miami Gardens
145,062.00 City of Miami Gardens, Assessment and Road Improvements 145,062.00
FL FL169 Reconstruction of Hanford Boulevard, North Miami Beach 602,160.00 City of North Miami Beach ‐ Bus/Trolley Purchase FM #439907‐1 602,160.00
FL FL170 Construction of 4 lane highway around Jacksonville connecting U.S. 1 to
Route 9A
270,439.00 I‐95 (SR9) improvements 270,439.00
FL FL171 West Relief Bridge Rehabilitation, Bay Harbor Islands 1,201,770.00 Town of Bay Harbor Islands, Broad Causeway 1,201,770.00
FL FL174 Construct U.S. 1 Improvements, Cities of Holly Hill and Ormond Beach, Florida 56,055.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
56,055.00
FL FL176 Design and construction of double‐deck roadway system exiting FLL airport
connecting Y.S. 1 and I‐ 595
3,204,720.00 City of Hollywood Mobility Improvements 3,204,720.00
FL FL190 Homestead, FL Widening of SW 320 St. (Mowry Dr.) from Flagler Ave. to SW
187 Ave.
2,002,950.00 City of Homestead ‐ Multimodal Transit Center 2,002,950.00
FL FL191 U.S. 17‐92 and French Ave. Roundabout, Sanford 369,390.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
369,390.00
FL FL193 New Systems Interchange Ramps at SR 417 and Boggy Creek Rd in Orange
County, Florida
721,171.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
721,171.00
FL FL199 Construction and Design of Miami River Greenway Road Improvements and
5th Street Improvements.
1,073,744.00 SR 847/NW 47 AVENUE FROM SR 860/NW 183 STREET TO N. OF NW 199
STREET
1,073,744.00
FL FL201 Construct Atlantic Boulevard Improvements, Key West, Florida 121,257.00 City of Key West, Bahama Village Cultural Resource Assessment 121,257.00
FL FL202 Construct Route 9B from U.S. 1 to Route 9A (I‐295) to the Duval County line 450,732.00 I‐95 (SR9) improvements 450,732.00
SR 820 / Hollywood Blvd. 336,306.00
Pine Island Rd. 233,900.00
FL FL210 Normandy Blvd. and Cassat Ave. Transportation Enhancements, Jacksonville 111,545.00 I‐95 (SR9) improvements 111,545.00
To
570,206.00Town of Southwest Ranches Urban Interchange.FL207FL
From
25
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Florida
State Demo ID Project Description Amount Project Description Amount
ToFrom
FL FL212 Implement Kennedy Boulevard corridor improvements to improve safety in
Tampa.
310,461.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 310,461.00
FL FL214 Englewood Interstate connector in Sarasota County, Florida 725,575.00 Trail Bridge over Laurel Rd Legacy Trail, Pedestrian/wildlife crossing Sarasota
County
725,575.00
FL FL216 Plan and construct 17th Street in the City of Sarasota County, FL 1,536,865.00 Myrtle Street, sidewalks in Sarasota County 1,536,865.00
FL FL219 Conduct study for Port of Miami Tunnel, Miami, FL. 1,602,360.00 Port Miami Tunnel Freight Mobility Evaluation Study 1,602,360.00
FL FL223 Construct North Ormond Beach Business Park Interchange at I‐95 between
U.S. 1 and SR 40, Volusia County
297,886.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
297,886.00
FL FL229 Acquire right‐of‐way and construct East‐West Connector from SR 37 to SR
563 in Lakeland, FL
449,376.00 Ft. Fraser Trail Extension from SR540/Winter Lk Rd. to Combee Rd., Lakeland 449,376.00
FL FL230 City of Wilton Manors Powerline Road Streetscape Enhancement Project. 51,167.00 City of Hollywood Mobility Improvements 51,167.00
FL FL233 Traffic Reconfiguration of SR 934 and U.S. 1 Route, Miami. 160,321.00 SR 847/NW 47 Ave from SR 860/NW 183 St to N. of NW 199 St 160,321.00
FL FL235 Access Rd. Streetscaping, Sanford Airport 57,819.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
57,819.00
FL FL236 Destiny Rd. Reconstruction, Eatonville 801,180.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
801,180.00
FL FL241 Construction of Little Venice Road, Marathon, FL. 101,845.00 City of Marathon, Aviation Blvd., Bike Path/Trail 101,845.00
FL FL242 Construct St. Augustine to Palatka Rail Trail, Florida. 398,323.00 SR 313 398,323.00
FL FL248 Construct access road to entrances to Opa‐Locka Airport at Opa‐Locka Airport
at N.W. 135th Street and N.W. 47th Avenue, including improvements to N.W.
47th Avenue with median strip, City of Opa‐Locka.
1,602,360.00 SR 847/NW 47 Ave from SR 860/NW 183 St to N. of NW 199 St 1,602,360.00
FL FL253 Plant City Traffic Management System. 264,636.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 264,636.00
FL FL258 Grand Lagoon Bridge Replacement Project. The replacement of a two lane
bridge with a four lane bridge
540,757.00 SR 30 (US98) 540,757.00
FL FL262 New Kings Rd. Pedestrian Overpass and Enhancements, Jacksonville 193,893.00 I‐295 (SR9A) improvements 193,893.00
FL FL265 Construction of an interchange at Florida's Turnpike and Stirling Rd. in
Broward County.
4,437,703.67 Snake Road, FL 4,437,703.67
FL FL267 Implement Busch Boulevard corridor improvements to improve safety in
Tampa.
469,703.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 469,703.00
FL FL274 Alleviate congestion at Atlantic Corridor Greenway Network, City of Miami
Beach, FL.
51,590.00 City of Miami Beach ‐ recreational Corridor 51,590.00
FL FL279 Powerline Rearvision motor carrier backover motor carrier safety research. 85,427.00 34th St. N from Columbus Dr to US 92/E Hillsborough Ave 85,427.00
FL FL284 Coral Way, SR 972 Highway Beautification, Phase One, Miami, Florida 166,814.00 SR 847/NW 47 Ave from SR 860/NW 183 St TO N. OF NW 199 St 166,814.00
FL FL289 Construct improvements to NE 19th Street/NE 19th Terrace from NE 3rd
Avenue to NE 8th Avenue, Gainesville
120,051.00 SW 62nd Blvd. 120,051.00
FL FL295 New Systems Interchange Ramps at SR 417 and Boggy Creek Rd in Orange
Count, Florida
949,610.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
949,610.00
FL FL300 Construct Flagler Avenue improvements, City of Key West, Florida. 106,834.00 City of Key West, Bahama Village Cultural Resource Assessment 106,834.00
FL FL303 Widen Sr 80, Hendry County 346,719.00 US 27 (SR 80) from Industrial Canal to Central Street 346,719.00
FL FL305 Construction of four lane highway around Jacksonville connecting U.S. 1 to
Route 9A
225,366.00 I‐95 (SR9) improvements 225,366.00
FL FL309 City of Hollywood for US1/Federal Highway, North of Young Circle 134,464.00 City of Hollywood Mobility Improvements 134,464.00
26
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Florida
State Demo ID Project Description Amount Project Description Amount
ToFrom
FL FL310 City of Miami Greenway Roadway, construction and design of Miami
Greenway Road improvements and 5th St. improvements
671,091.00 SR 847 ‐ FM 430637‐1 671,091.00
FL FL315 West Palm Beach, Construction of U.S. 1, Flagler Drive Waterfront
Redevelopment and Traffic Calming Project.
214,024.00 City of Hollywood Mobility Improvements 214,024.00
FL FL320 New Systems Interchange Ramps at SR 417 and Boggy Creek Rd in Orange
Count, Florida
1,067,636.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
1,067,636.00
SR A1A @ Northeast 21st Avenue 333,590.00
Pine Island Rd., Broward County, FL 276,410.00
FL FL361 West Ave Bridge, City of Miami Beach 620,000.00 City of Miami Beach ‐ Recreational corridor 620,000.00
FL FLB01 A. Max Brewer Causeway Bridge, Florida (FY 2002 Supplemental
Appropriations Act P.L. 107‐206)
53,037.00 SR 414 (Maitland Blvd) from SR 400 (I‐4) to CR 427 (Maitland Ave), Add Lanes
and Rehabilitate Pavement
53,037.00
FL FLM01 Central Sarasota Parkway Interchange at I‐75,
Sarasota, Florida
470,209.00 Trail Bridge over Laurel Rd Legacy Trail, Pedestrian/wildlife crossing Sarasota
County
470,209.00
Total Amount Repurposed 41,884,967.67Total # of Earmarks Repurposed 59
610,000.00Pine Island Road pedestrian overpass, City of TamaracFL360FL
27
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Georgia
State Demo ID Project Description Amount Project Description Amount
GA GA008 Atlanta: Study of 5‐Points Intermodal Terminal 223,626.34 I‐285 @ I‐20 West Side Interchange Reconstruction & Widening (PI#0013918) 223,626.34
GA GA010 Lake Lanier access project 279,479.79 SR 347/Friendship Rd from Mcever Rd to Lake Lanier ‐ Phase II (PI#007319) 279,479.79
GA GA012 State Road 611 connector with I‐20 1,678,811.38 SR 16 from SR 100 to CS 1110/Columbia Drive (PI#M005454) 1,678,811.38
GA GA013 I‐75 advanced transportation management system in Cobb County 436,828.81 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 436,828.81
GA GA015 GA SR 316 Improvements‐‐Gwinnett, Barrow, Oconee Counties, Georgia 1,962,548.14 SR 316/US 29 @ SR 11 (PI#0008430) 1,962,548.14
GA GA016 Construct Athens to Atlanta Transportation Corridor 935,391.00 SR 316/US 29 @ SR 11 (PI#0008430) 935,391.00
GA GA018 Resurface Davis Drive, Green Street, and North Houston Road in Warner
Robins
220,093.34 I‐75 FM .30 MI S of SR 26/Houston to .43 MI N OF SR 96/Peach (PI#M005542) 220,093.34
GA GA023 Conduct a study of transportation alternatives in Northwest Georgia between
Atlanta and Chattanooga.
437,641.00 ROME‐Cartersville Development Corridor ‐ Scoping (PI#0013238) 437,641.00
GA GA026 Conduct a study of a multimodal transportation corridor from Lawrenceville
to Marietta
1,617,432.00 I‐285 FM I‐75/Cobb thru Fulton to I‐85/Dekalb‐Express Lanes (PI#0001758) 1,617,432.00
GA GA029 Construct North River Causeway and Bridge, St. Mary's County 746,395.78 CR 90/Colerain Road from W OF I‐95 to E OF Kings Bay Road (PI#0007414) 746,395.78
GA GA031 Construct surface transportation facilities along Atlanta‐Griffin‐Macon
corridor
734,161.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I (PI#311000‐) 734,161.00
GA GA034 Construct noise barriers on the west side of I‐185 between Macon Road and
Airport Thruway and on I‐75 between Mt. Zion Road and Old Dixie Highway in
the Atlanta area
496,327.74 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 496,327.74
GA GA037 Upgrade US RT. 27 2,212,623.41 CS 1081/Greenville Street @ CSX Railroad in Lagrange (PI#343455‐) 2,212,623.41
GA GA040 National Infantry Museum Transportation Network 978,535.00 I‐16 at I‐95 Interchange Reconstruction(PI#0012758) 978,535.00
GA GA046 Forsyth Downtown Streetscape Project, Georgia 265,728.00 SR 74 from SR 7/US 341 to Bibb County Line (PI#M005205) 265,728.00
GA GA060 Bouldercrest Road Improvements, Georgia 387,344.99 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 387,344.99
GA GA073 Construct Waycross East Bypass from U.S. 84 in Pierce County, Georgia to
U.S. 1 in Ware County, Georgia
2,563,775.00 CR 392/Hatcher Point Mall Road from SR 4/US 1 to SR 520/US 82
(PI#0007664)
2,563,775.00
GA GA075 Extend the south Toccoa Bypass east of Toccoa to CR 311, four lanes for
approximately 5.7 miles on new location
2,323,422.00 SR 106 from SR 59/Franklin to SR 63/Stephens (PI#M005200) 2,323,422.00
GA GA076 U.S. 19/SR 92 median work from Ellis Rd. to West Taylor ST, Griffin 1,201,770.00 SR 74 @ NS #718831X in Senoia (PI#333176‐) 1,201,770.00
GA GA078 Upgrade sidewalks and lighting, Wrightsville 320,472.00 SR 16 @ SHORT CREEK (PI#0007057) 320,472.00
GA GA079 Construction on U.S. 82 from Dawson to Alabama Line 801,180.00 SR 55 from Calhoun County Line to SR 520/US 82 (PI#M004800) 801,180.00
GA GA080 SR 4 widen from Milledgeville Road to Government Street, Richmond County 4,005,900.00 SR 10 from Old Louisville Road/Columbia to SR 223/Richmond (PI#0013248) 4,005,900.00
GA GA082 Intersection improvement at Harris Drive at SR 42 161,108.10 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 161,108.10
GA GA083 Streetscape project to replace sidewalks in downtown Forsyth 149,553.51 SR 74 from SR 7/US 341 to Bibb County Line (PI#M005205) 149,553.51
GA GA084 Resurface and widen Jac‐Art Road as part of the Bleckley County
Development Authority project
200,295.00 I‐16 @ 12 LOCS Between Bleckley County & Emanuel Country (PI#M004189) 200,295.00
GA GA085 Bike and pedestrian paths and other transportation enhancements at Georgia
Veterans Memorial Park
640,944.00 I‐285 @ I‐20 ‐ East side Interchange Reconstruction (PI#0013915) 640,944.00
GA GA088 Broad Avenue Bridge: Albany 43,030.54 SR 91 from Baker County Line to SR 62 (PI#M005565) 43,030.54
GA GA092 U.S. 341 U.S. 41 SR 7 from Barnesville to SR 3, Georgia 3,204,720.00 SR 7 from CS 600/Redbud Drive to CR 322/Meadovista Road (PI#M005045) 3,204,720.00
GA GA093 Streetscape‐Cordele 200,295.00 SR 300 from CR 29/Old Coney Road to SR 300 Conn (PI#M005498) 200,295.00
GA GA097 Rebuild sidewalks, install sidewalks, and add speed monitoring system, Alamo 250,369.00 SR 135 @ Altamaha River ‐ TIA (PI#0007037) 250,369.00
Tofrom
28
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Georgia
State Demo ID Project Description Amount Project Description Amount
Tofrom
GA GA098 Extend East Greene Street, install street lights, utilities, and landscaping,
Milledgeville
150,607.84 SR 243 from SR 29 to SR 22 (PI#M005465) 150,607.84
GA GA109 Construction of bypass around town of Hiram, from SR 92 to U.S. 278,
Paulding County, Georgia
178,360.00 SR 92 from CS 611/Malone Rd to CS 519/Nebo Rd‐Segment 1‐PH IV
(PI#0007691)
178,360.00
GA GA113 Widen SR 104 from SR 383/ Belaire Road to CR 515/ Cumberland Drive
(including bridges) in Columbia County.
3,204,720.00 SR 10 from Old Louisville Road/Columbia to SR 223/Richmond (PI#0013248) 3,204,720.00
GA GA116 Extension of Sugarloaf Parkway, Gwinnett County 2,403,540.00 I‐85 @ SR 324 (PI#0012698) 2,403,540.00
GA GA122 Streetscape‐Quitman 160,236.00 SR 35 @ 5 LOC; SR 38 @ 3 LOC &SR 133 @ 1 LOC‐Signal Upgrades
(PI#0010855)
160,236.00
GA GA125 Historic preservation of a city bus station in downtown Eastman 160,236.00 SR 87/US 23 from Log Cabin/Dodge to S of SR 257/Bleckley‐Tia (PI#222410‐) 160,236.00
GA GA126 Replace sidewalks, upgrade lighting, and install landscaping, Helena. 320,472.00 SR 87/US 23 from Log Cabin/Dodge to S of SR 257/Bleckley‐Tia (PI#222410‐) 320,472.00
GA GA132 Construct and improve Cobb County Trails. 554,855.88 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 554,855.88
GA GA135 I‐75 lanes from Aviation Boulevard to SR 54, Clayton County 1,201,770.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 1,201,770.00
GA GA137 Rebuild SR 10 Memorial Drive for bicycle and pedestrian safety, from
Mountain Drive to Goldsmith Road, Dekalb County
892,082.58 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 892,082.58
GA GA138 Construct sidewalks between Marion Middle School, City Park, and
Community Center, Buena Vista.
300,442.00 SR 355 from SR 137 to Talbot County Line (PI#M005290) 300,442.00
GA GA142 Streetscape project for lighting and landscaping on Main Street along Georgia
Highway 231, Davisboro.
226,857.14 SR 15 from CS 524/3rd Ave to SR 24/SR 88 (PI#M005067) 226,857.14
GA GA143 Revitalization project will extend and resurface the Roberta Walking Trail,
Roberta.
100,655.67 SR 22 from SR 7/Crawford to 0.58 MI W of Columbus Rd. Bibb (PI#M005137) 100,655.67
GA GA145 Riverside Drive Streetscape Project, Macon 400,590.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700 400,590.00
GA GA148 Upgrade sidewalks and lighting, Lyons. 115,551.00 SR 144 from SR 27 to SR 121 (PI#M004830) 115,551.00
GA GA151 Pave portions of CR 345, CR 44, and CR 45, Hancock County 400,590.00 SR 16 from SR 15 to Warren County Line (PI#M005513) 400,590.00
GA GA157 Greene County, Georgia conversion of I‐20 and Carey Station Road overpass
to full interchange.
882,856.00 I‐20 from NS #733146T/Morgan to SR 44/Greene (PI#M005197) 882,856.00
GA GA158 I‐20 HOV lanes from Evans Mill Road to Salem Road, Dekalb and Rockdale
Counties
1,201,770.00 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 1,201,770.00
GA GA160 Rockdale County Veteran's Park‐‐Create park trails 263,210.00 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 263,210.00
GA GA161 Streetscape‐Albany. 400,590.00 SR 300 from SR 520 to N of CR 243/Branch Road (PI#M005122) 400,590.00
GA GA165 SR 85 widening from Adams DR to I‐75 and reconstruct the Forest Parkway
interchange, Clayton County
1,201,770.00 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 1,201,770.00
GA GA167 Streetscape‐Thomasville 240,354.00 SR 111 @ Little Creek Tributary 5 MI SW of Moultrie (PI#0013744) 240,354.00
GA GA172 Extend sidewalks, upgrade landscaping in downtown Hawkinsville 400,590.00 CR 198/Tippettville Road @ Ten Mile Creek Trib NW of Finleyson (PI#331890‐
)
400,590.00
GA GA176 SR 26 from CR 17/Julian Simpson road to SR 87 (PI#M004852) 300,442.00 SR 26 from CR 17/Julian Simpson road to SR 87 (PI#M004852) 300,442.00
GA GA177 SR 36 passing lanes north of Jackson to Newton County line, Butts County,
Georgia.
2,443,599.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 2,443,599.00
GA GA181 Upgrade sidewalks, replace street lights, and landscaping, Metter. 78,530.39 SR 46 from SR 4 to Candler County Line (PI#M005329) 78,530.39
GA GA182 Intersection improvement at Lake Dow Road and SR 81 Harris Drive at SR 42. 51,723.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes 9PI#0014203) 51,723.00
GA GA185 SR 32 @ Otter Creek Approx 5 MI E of Douglas (PI#0011679) 160,236.00 SR 32 @ Otter Creek Approx 5 MI E of Douglas (PI#0011679) 160,236.00
GA GA186 I‐20 West from SR 5 Bill Arp to SR 6‐‐HOV Lanes 5,808,555.00 I‐285 @ I‐20 West Side Interchange Reconstruction & Widening (PI#0013918) 5,808,555.00
29
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Georgia
State Demo ID Project Description Amount Project Description Amount
Tofrom
GA GA189 Commission a study and report regarding the construction and designation of
a new Interstate linking Savannah, Augusta, and Knoxville.
52,642.00 I‐16 at I‐95 Interchange Reconstruction (PI#0012758) 52,642.00
GA GA190 Streetscape‐Bainbridge. 200,295.00 SR 310 from Decatur County Line to SR 1/US 27 (PI#M005325) 200,295.00
GA GA192 SR 133 south bound lane bridge replacement over the Georgia Florida Railnet
line, Dougherty County
801,180.00 SR 3 from Thomas County Line to Dougherty County Line (PI#M004963) 801,180.00
GA GA200 Construct Welcome Center, and pedestrian trail, Abbeville. 300,442.00 SR 233 from SR 90/Ben Hill to SR 112/Wilcox (PI#M005346) 300,442.00
GA GA201 SR 70/Fulton Industrial Boulevard widening from Camp Creek Parkway to the
SCL RR, Fulton County.
1,201,770.00 SR 70 from SR 154 to SR 139 (PI#M004931) 1,201,770.00
GA GA204 Commission a study and report regarding construction and designation of a
new Interstate linking Augusta, Macon, Columbus, Montgomery, and
Natchez.
52,642.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I (PI#311000‐) 52,642.00
GA GA206 Upgrade sidewalks, lighting, landscaping from Cherry Street to Hampton
Street, Industrial Park to Dooly Street, Montezuma.
201,390.01 SR 49 from SR 90 to SR 127 (PI#M005087) 201,390.01
GA GA208 Construction of I‐575 HOV Lanes from Sixes Road to SR 20, Cherokee County,
Georgia.
801,180.00 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 801,180.00
GA GA214 Commission a study and report regarding the construction and designation of
a new Interstate linking Savannah, Augusta, and Knoxville.
157,926.00 I‐16 at I‐95 Interchange Reconstruction (PI#0012758) 157,926.00
GA GA221 Commission a study and report regarding construction and designation of a
new Interstate linking Augusta, Macon, Columbus, Montgomery, and
Natchez.
157,926.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I (PI#311000‐) 157,926.00
GA GA226 Improve sidewalks, upgrade lighting, and add landscaping, Newton County
Yellow River Trail, Newton County [ref P.L. 110‐244, Sec 105(a)(155)]
685,114.63 SR 20 from Rockdale County Line to Henry County Line (PI#M005041) 685,114.63
GA GA231 Improve sidewalks, upgrade lighting, and add landscaping, Jackson Road
improvements and utility relocations within the city of Jackson [ref P.L. 110‐
244, Sec 105(a)(326)]
500,737.00 I‐75 from I‐475 to SR 155 ‐ Truck Lanes (PI#0014203) 500,737.00
GA GA235 Design and Construct Railroad Grade Crossing Gates in Acworth, GA 300,442.00 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 300,442.00
GA GA245 Upgrade SR 316 from I‐85 to SR 10 Loop, Gwinnett, Barrow, Oconee Counties
new interchanges and HOV lanes.
1,001,475.00 SR 316/US 29 @ SR 11 (PI#0008430) 1,001,475.00
GA GA253 SR 105 from Cannon Bridge Road to Walnut Street widening 2,002,950.00 I‐85 from N OF CR 134/Hamilton Mill Road to N of SR 211 (110610‐) 2,002,950.00
GA GA254 SR 369 from Cherokee Circle to CR 267/Hightower Circle Truck Lanes, Forsyth
County passing lanes
1,118,741.82 SR 369 @ Chattahoochee River/Lake Lanier (PI#122012‐) 1,118,741.82
GA GA255 SR 369 widening from SR 9 to SR 306 and interchange at SR 400, Forsyth
County.
1,886,897.42 SR 369 @ Chattahoochee River/Lake Lanier (PI#122012‐) 1,886,897.42
GA GA265 Greene County, Conversion of I‐20 and Carey Station Road to a full
interchange
801,180.00 I‐20 from NS #733146T/Morgan to SR 44/GREENE (PI#M005197) 801,180.00
GA GA266 Southeastern Economic Alliance, Next Generation High Speed Rail
Development.
2,002,950.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I (PI#311000‐) 2,002,950.00
GA GA267 Commission a study and report regarding the construction and designation of
a new route linking Savannah, Augusta, and Knoxville.
658,026.00 I‐16 at I‐95 Interchange Reconstruction (PI#0012758) 658,026.00
GA GA268 Commission a study and report regarding construction and designation of a
new Interstate linking Augusta, Macon, Columbus, Montgomery, and
Natchez.
658,026.00 I‐16 from I‐75 to SR 87; including SR 87 Interchange ‐ Phase I (PI#311000‐) 658,026.00
30
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Georgia
State Demo ID Project Description Amount Project Description Amount
Tofrom
GA GA274 Transportation improvements to Dekalb County, Southeast DeKalb Arterial
Analysis
55,738.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 55,738.00
GA GA275 City of Macon, Second Street Bridge Replacement, Reconstruction of ROW. 3,004,425.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 3,004,425.00
GA GA280 Fulton County, Atlanta, Georgia, right‐of‐way acquisition to complete a
multimodal corridor on SR 1019 by closing property ownership gap.
2,002,950.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 2,002,950.00
GA GA281 Tift County Bypass U.S. 82/ SR 520 W to U.S. 319/SR 35 E Truck Route U.S.
Highway 82
4,506,638.00 I‐75 from Lowndes County Line to 0.32 MI S OF Southwell Blvd (PI#M005543) 4,506,638.00
GA GA284 Columbia County, SR 104, improvements from SR 383 to CR 515. 2,002,950.00 SR 10 from Old Louisville Road/Columbia to SR 223/Richmond (PI#0013248) 2,002,950.00
GA GA290 SR 206 from N OF Broxton to N HWY/Ben Hill to N OF SR 32/Coffee
(PI#M004860)
2,203,245.00 SR 206 from N of Broxton Hwy/Ben Hill to N of SR 32/Coffee (PI#M004860) 2,203,245.00
GA GA291 City of Smyrna, Railroad Quiet Zone 424,022.85 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 424,022.85
GA GA292 City of Smyrna, Brawner Park development and construction 581,275.13 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 581,275.13
GA GA293 City of Smyrna, Railroad Pedestrian Bridge. 334,299.69 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 334,299.69
GA GA294 City of Duluth, intersection realignment and road extension of Davenport Rd.
at Buford Hwy.
801,180.00 SR 120 from SR 141/Fulton to Peachtree Ind Blvd/Gwinnett (PI#721000‐) 801,180.00
GA GA299 City of Macon, Wimbish Road, widening and striping for bike lanes. 500,738.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 500,738.00
GA GA300 Pierce Avenue, widening/ striping to create bike lanes from Ingelside Ave. to
Riverside Drive
500,738.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 500,738.00
GA GA301 City of Macon, Rivoli Drive, widening, striping to create bike lanes 901,328.00 I‐75 NB from SR 19 to I‐16 ‐ Phase II (PI#0012700) 901,328.00
GA GA302 Rockdale County, Georgia Veterans Memorial Park pedestrian walkway 301,738.00 I‐285 @ I‐20 ‐ East Side Interchange Reconstruction (PI#0013915) 301,738.00
GA GA315 I‐75/CR 65/Union Grove Road‐‐New interchange, Gordon County 3,508,004.18 I‐75/I‐575 Managed Lanes in Cobb & Cherokee (PI#0008256) 3,508,004.18
GA GA316 SR 85 widening from Adams Drive to I‐75 and reconstruct the Forest Parkway
interchange
3,508,195.00 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 3,508,195.00
GA GAM01 Noise Walls on I‐20 from Fulton Industrial Blvd to HE Holmes, Fulton County,
Georgia
435,992.40 I‐285 from I‐75 to I‐20 ‐ Express Lanes (PI#0013917) 435,992.40
GA GAM02 I‐285 Noise Walls from I‐20 to Bouldercrest Road, Georgia 451,401.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 451,401.00
GA GAM03 I‐285 Noise Walls , Henderson Mill to Chamblee Tucker Road, Georgia 470,209.00 I‐285 from I‐20 to I‐85 ‐ Express Lanes (PI#0013914) 470,209.00
GA GAM04 I‐75 /Aviation Blvd Atlanta, GA 752,335.00 I‐75 NB CD System from SR 331 to I‐285 (PI#713210‐) 752,335.00
Total Amount Repurposed 96,676,928.50Total # of Earmarks Repurposed 100
31
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Hawaii
State Demo ID Project Description Amount Project Description Amount
HI HI007 Construct Kapaa Bypass 5,137,557.13 Kuhio Highway, Kapaa Stream Bridge Replacement 5,137,557.13
HI HI008 Replace Sand Island Bridge 2,527.73 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream
Bridge Replacement
2,527.73
HI HI014 Construct of, and improvements to, Kekaha Kauai access roads 60,548.30 Poipu Road Multimodal Improvements 60,548.30
HI HI024 Construct Waimea Bypass 801,180.00 Queen Kaahumanu Highway Resurfacing, Vicinity of Kekaha Kai State Park 801,180.00
HI HI025 Construct Puainako Street 801,180.00 Mamalahoa Highway, Hilea Bridge Replacement & Ninole Bridge
Replacement
801,180.00
HI HI030 Study of East Hawaii Alternative Road, Island of Hawaii 160,236.00 Kawailani Street Improvements, Iwalani Street to Pohakulani Street 160,236.00
HI HI031 Leeward Coast Access Study 400,590.00 Study of Waianae Coast Emergency Access Road 400,590.00
HI HI033 Replace and Rehabilitate Kamehameha Highway Bridges, Island of Oahu 801,180.00 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream
Bridge Replacement
801,180.00
HI HI034 Construct Bike Lanes on Kalanianaole Highway, Vicinity of Makapuu to Keolu
Drive
240,354.00 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream
Bridge Replacement
240,354.00
HI HI035 Construct Kapaa Bypass 2,403,540.00 Kuhio Highway, Kapaa Stream Bridge Replacement 2,403,540.00
HI HIF01 Honolulu Harbor Pier 19 Ferry Terminal Improvements 529,220.71 Kamehameha Highway, Nanahu Bridge Replacement and Kawela Stream
Bridge Replacement
529,220.71
Total Amount Repurposed 11,338,113.87Total # of Earmarks Repurposed 11
ToFrom
32
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
IL IL024 Upgrade Illinois 336 between IL 61 to south of Loraine 59,226.52 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams
County Line
59,226.52
IL IL084 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
19,242.48 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
19,242.48
IL IL086 Improve Campus Transportation System, Chicago 106,673.00 Arterial St. Resurfacing Project #69 ‐ South Area 106,673.00
IL IL088 Resurface S. Chicago Ave. From 71st to 95th Streets 48,000.00 130th and Torrence Intersection Improvement, Chicago 48,000.00
IL IL089 Improve access to 93rd Street Station 56,374.00 130th and Torrence Intersection Improvement, Chicago 56,374.00
IL IL093 Rehabilitate 95th St. between 54th Place and 50th Ave. 15,059.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge
15,059.00
IL IL096 Rehabilitate Timber Bridge over Little Muddy River 18,629.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking
on IL15 from E Sunswept Rd to Main St in Bluford
18,629.00
IL IL098 Resurface 95th St. between Western Ave. and Stony Island 1,373,261.98 130th and Torrence Intersection Improvement, Chicago 1,373,261.98
IL IL099 Construct improvements to Pleasant Hill Road 70,375.21 299' of replacement of superstructure on bridge carrying Makanda Rd over
Drury Creek
70,375.21
IL IL101 Improve access to the Rantoul Aviation Center 53,879.51 0.108 mile of the removal and replacement with a box culvert the structure
carrying Leverett Rd over a ditch west of Leverett
53,879.51
IL IL103 Reconstruct Mt. Erie Blacktop 78,294.80 4.16 miles of milling, resurfacing, pavement marking and signal upgrades on
US 50 from the Marion County line to CH 6 at Xenia
78,294.80
IL IL105 Intersection Improvements at 79th and Stoney Island 261,097.68 130th and Torrence Intersection Improvement, Chicago 261,097.68
IL IL107 Consolidate rail tracks and eliminate grade crossings as part of Gateway
Intermodal Terminal access project
28,237.00 Project consists of pavement widening, traffic signal modernization and
pedestrian access improvements. Work will include hot‐mix asphalt
pavement and PCC sidewalk construction, curb and gutter removal &
replacement, drainage improvements and all other work necessary to
complete the project on Halsted Street from 183rd Street to 187th Street in
the Village of Glenwood.
28,237.00
IL IL108 Resurface Cicero Ave. between 127th St. and 143rd St. 165,354.92 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
165,354.92
IL IL110 Construct Marion Street multi‐modal project 39,501.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
39,501.00
IL IL111 Improve Sugar Grove US 30 80,896.34 Remove the superstructure, repairs to the superstructure, and replacement
with PPC deck beams with a 5" wearing surface
80,896.34
IL IL113 Extend South 74th St. 198,977.44 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB
to I‐55/64 WB
198,977.44
IL IL115 Construct Towanda‐Barnes Road 146,078.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek,
located west of 3600E Road
146,078.00
IL IL118 Improve Constitution Avenue 1.21 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
1.21
IL Il122 Improve Constitution Avenue 77,831.76 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
77,831.76
ToFrom
33
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL123 Widen 143rd Street 100,398.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
100,398.00
IL IL125 Conduct Midwest Regional Intermodal facility feasibility study 44,473.18 Cold‐in‐place recycling on FAS 194 (Prophet Rd) from Star Rd to Tampico Rd ‐
4.98 mi in length
44,473.18
IL IL127 Construct access road to Melvin Price Visitors Center 28,237.00 Resurfacing, patching, curb & gutter replacement & sidewalk replacement on
College Avenue from Central Avenue to Washington Avenue in the city of
Alton. FAU9119
28,237.00
IL IL131 Replace Lebanon Ave. Bridge and approaches 18,825.00 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of
Lebanon. Soil Mod, HMA binder & surf courses, storm sewer
18,825.00
IL IL133 Reconstruct Midlothian Turnpike 12,560.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
12,560.00
IL IL137 Improve local streets in the Village of Crestwood 66,457.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
66,457.00
IL IL139 Technology Avenue between US 45 and Willenborg St. 946.71 0.01 mile of the removal and replacement of the structure carrying IL 121
over Long Point Creek 9 miles north of Montrose
946.71
IL IL143 Reconstruct Broad Street between Maple St. to Sixth St. 3,029.77 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of
Lebanon. Soil Mod, HMA binder & surf courses, storm sewer
3,029.77
IL IL147 Widen US 20 737,042.50 2.0 mi of reconstruction of IL 2 from Riverside Blvd to Auburn St in Rockford 737,042.50
IL IL148 Improve IL 159 6,761.00 Resurface FAU 8891 (Springer Ave/Sheridan Ave) from IL 143 to Jefferson Rd
in Edwardsville
6,761.00
IL IL151 Upgrade US 40 2,360.00 0.01 mi of the complete removal of a structure on US40 and replacing it with
embankment adding a pipe culvert just No of Marshall
2,360.00
IL IL152 Construct Raney Street Overpass 22,420.98 0.01 mile of the removal and replacement of the structure carrying IL 121
over Long Point Creek 9 miles north of Montrose
22,420.98
IL IL153 Construct new entrance to Midway Airport Terminal 596,261.29 Arterial St. Resurfacing Project #69 ‐ South Area 596,261.29
IL IL156 Construct I‐88 interchange at Peace Road 37,649.00 0.83 mile of the removal and replacement of the structure carrying IL89 over
the Illinois River located 1 mile south of US 6
37,649.00
IL IL159 Reconstruct Claire Blvd. 62,012.09 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
62,012.09
IL IL162 Undertake streetscaping between Damen and Halsted 61,586.69 Arterial St. Resurfacing Project #69 ‐ South Area 61,586.69
IL Il164 Upgrade industrial park road 0.02 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB
to I‐55/64 WB
0.02
IL IL165 Construct Confluence Bikeway 15,484.00 Resurfacing, patching, curb & gutter replacement & sidewalk replacement on
College Avenue from Central Avenue to Washington Avenue in the city of
Alton. FAU9119
15,484.00
IL IL166 Extend Veteran's Memorial Drive over I‐57 0.20 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking
on IL15 from E Sunswept Rd to Main St in Bluford
0.20
34
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL169 Construction and improvements ‐ US DOT structure numbered 289‐961‐H at
FAS Rt 37 in IL
523,874.46 Replace the bridge carrying FAU 5148 (Perryville Road) over the Union Pacific
Railroad, located 0.50 miles south of Harrison Avenue
523,874.46
IL IL171 Extension of Sallee Street from Washington to Historic Rt 66, Litchfield, IL 570,023.28 Cold‐in‐place recycling, patching, HMA binder & surface courses, HMA
shoulders, aggregate shoulders & pavement markings on FAU 7998
570,023.28
IL IL173 Hotze Road‐Salem, Illinois 98,629.94 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of
Lebanon. Soil Mod, HMA binder & surf courses, storm sewer
98,629.94
IL IL189 ITS 174 in Peoria, IL 100.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
100.00
IL IL226 Preconstruction and Construction of IL 83 at IL 132 81,259.00 Replace the traffic signals on FAU 1257 (Deerfield Road) at Jewel‐Osco Plaza
and the installing fiver optic cable interconnect from Richfield Ave to Jewel‐
Osco Plaza along Deerfield Road. Project is located in the Village of Deerfield.
81,259.00
IL IL227 Construct Bike, Pedestrian Paths, Orland Hills 32,504.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
32,504.00
IL IL228 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
81,259.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
81,259.00
IL IL230 Reconstruction of Mockingbird Lane and Stratford St, Granite City 162,520.00 Project consists of road reconstruction including PCC pavement, curb &
gutter, sidewalk, driveways, storm sewer, pavement marking and all other
work necessary to complete the project in accordance with the plans and
specifications on East main Street from 0.29 miles east of Lange Avenue to
0.62
162,520.00
IL IL231 City of Havana, Illinois Upgrades to Broadway Street 77,405.89 8.55 mi of milling, resurfacing, patching, shoulders, guardrail, etc. on IL97
east of McKinley St. in Havana to 0.3 mi N of CR 800
77,405.89
IL IL233 Upgrade streets in the City of Rushville, IL 81,436.50 0.13 mi of the replacement of the box culvert on IL100 from the BNSF RR
viaduct to northerly for 0.21 mi in Frederick
81,436.50
IL IL236 Improve Great River Road, Warsaw 80,719.52 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams
County Line
80,719.52
IL IL240 Construct Bissel Street Roadway Connector, Tri‐City Regional Port District 81,259.00 Project consists of road reconstruction including PCC pavement, curb &
gutter, sidewalk, driveways, storm sewer, pavement marking and all other
work necessary to complete the project in accordance with the plans and
specifications on East main Street from 0.29 miles east of Lange Avenue to
0.62
81,259.00
IL IL242 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
22,753.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
22,753.00
IL IL243 Upgrade roads, The Village of Berkeley 101,159.38 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
101,159.38
IL IL244 Construct new bridge on Illinois Prairie Path over East Branch River in Milton
Township, IL
24,377.00 Project consists of interconnecting 3 existing closed loop traffic signal systems
and establish an ethernet based communications system at various locations
in the City of Naperville on Washington Street from Warrenville Road to
Royce Road; along Aurora Avenue from Washington Street to West Street;
along West Street from Aurora Avenue to Martin Avenue and along Chicago
Avenue from Washington Street to Ellsworth Street.
24,377.00
35
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL248 Construct Citywide bicycle path network, City of Evanston 20,335.97 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and
pedestrian underpass in the vicinity of Montrose
20,335.97
IL IL249 Improve Roads and Bridges, Cook County 325,042.00 Construct underpass @ intersection of Damen/Fullerton/Elston Ave, Chicago 325,042.00
IL Il250 Construct Reed Station Parkway Extension to IL Rt. 3, Carbondale 362,408.00 Replace the bridge carrying FAS 869 (CH14) over Little Muddy River, located
1.0 mi east of Elkville
362,408.00
IL IL252 Construct a new 2‐lane road extending north from University Park Drive and
improvements to University Park Drive
40,663.75 Resurface FAU 8891 (Springer Ave/Sheridan Ave) from IL 143 to Jefferson Rd
in Edwardsville
40,663.75
IL IL253 Development and construction of an interchange at Brisbin Rd and Interstate
80
487,560.00 The removal of two structures carrying Il 115 over Reddick run Creek and
replacing with box culverts just north of Cabery
487,560.00
IL IL254 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
18,283.00 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
18,283.00
IL IL255 South Shore Drive and 67th Underpass 1,041,534.00 Arterial St. Resurfacing Project #69 ‐ South Area 1,041,534.00
IL IL256 Resurface Clifton Park Ave. and S. Louis Ave., Village of Evergreen 32,504.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
32,504.00
IL IL257 State Street Road Improvements from 43rd Street to IL Rt. 157, East St. Louis 1,480,441.35 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB
to I‐55/64 WB
1,480,441.35
IL IL258 Study, design, and construction of roadway and sidewalk improvements in
the City of Monticello
91,986.92 Project consists of widening existing pavement and place paved shoulders
along roadway on Ridge road (CH4) from East Corporate Limits of Monticello
to Champaign county line in Piatt County. FAS 531/FAU 7536
91,986.92
IL IL259 Improve roads, The Village of Westchester 81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
81,259.00
IL IL261 Upgrade Ridge Avenue, Evanston 243,780.00 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and
pedestrian underpass in the vicinity of Montrose
243,780.00
IL IL262 Repair of CH 29 and reconstruction of CH 8 at interchanges with Interstate 55
at Towanda and Lexington, Illinois
81,259.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek,
located west of 3600E Road
81,259.00
IL IL263 Construct Bike, Pedestrian Paths, Orland Hills 113,320.26 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
113,320.26
IL IL265 East Peoria, Illinois Technology Blvd. upgrades 392,015.04 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
392,015.04
IL IL266 Upgrade streets, Stickney Township 193,919.06 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
193,919.06
IL IL272 Reconstruction and realignment of Baseline Rd., Montgomery, IL. 251,834.83 Remove the superstructure, repairs to the superstructure, and replacement
with PPC deck beams with a 5" wearing surface
251,834.83
IL IL275 Improve safety of a horizontal curve on Clarksville St. 0.25 miles north of
275th Rd. in Grandview Township, Edgar County
26,340.49 Rehabilitation of the structure carrying IL 49 over Brushy Fork Creek 1 mile
north of US 36
26,340.49
IL IL276 Upgrade traffic signal system on 87th Street, Chicago. 400,590.00 130th and Torrence Intersection Improvement, Chicago 400,590.00
36
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL Il277 Engineering of the Willow Creek Trail Extension from Rock Cut State Park to
the Long Prairie Trail
30,889.45 2.0 mi of reconstruction of IL2 from Riverside Blvd to Auburn St in Rockford 30,889.45
IL IL279 Resurfacing Congress Parkway The Illinois Department of Transportation 40,630.00 Arterial Street Resurfacing Project #63 ‐ North Area 40,630.00
IL IL280 City of Bartonville, Street widening and improvements and sidewalk
improvements.
144,605.90 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
144,605.90
IL IL282 Widen U.S. Route 67 from Macomb to Illinois 101 1,602,360.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116
from east of media to 0.9 miles west of US 67
1,602,360.00
IL IL289 Improve Highway‐Railroad Crossings, Galesburg 60,945.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116
from east of media to 0.9 miles west of US 67
60,945.00
IL IL291 Expand and improve Illinois Route 47 Roadway from Reed Road to Kreutzer
Road in Huntley, Illinois.
581,008.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd
including the addition of one new lane in each direction
581,008.00
IL IL294 Construct multi‐use pedestrian path between Oakton St. and Dempster St.,
Skokie.
20,315.34 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and
pedestrian underpass in the vicinity of Montrose
20,315.34
IL IL295 Development of a coordinated trail system, parking and trail systems in
Dixon, IL
260,032.00 Cold‐in‐place recycling on FAS 194 (Prophet Rd) from Star Rd to Tampico Rd ‐
4.98 mi in length
260,032.00
IL IL296 For Village of Lemont to construct a bridge over Chicago Ship and Sanitary
Canal linking Centennial Trail to I&M Canal Trail
80,118.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
80,118.00
IL IL297 For IDOT to expedite pre‐ construction and construction to widen I‐55 from
Naperville Road south to I‐80.
284,409.00 Resurface, patching, sidewalk replace and curb & gutter replace on FAU 281
(Crossroads Pkwy) from north Center Blvd to Veterans Pkwy
284,409.00
IL Il298 Complete Heavy Truck Loop for DuQuoin Industrial Park 239,479.06 Replace the bridge carrying FAS 869 (CH14) over Little Muddy River, located
1.0 mi east of Elkville
239,479.06
IL IL303 Improve Great River Road, Mercer County. 40,630.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116
from east of media to 0.9 miles west of US 67
40,630.00
IL IL307 For Will County for engineering and right‐of‐ way acquisition to extend 95th
Street from Plainfield‐Naperville Road east to Boughton Road.
40,630.00 Resurface, patching, sidewalk replace and curb & gutter replace on FAU 281
(Crossroads Pkwy) from north Center Blvd to Veterans Pkwy
40,630.00
IL IL312 Road Construction and reconstruction in the Village of Hampshire: Keyes
Ave., Industrial Drive Overlay, and Mill Avenue
170,609.00 Replace the superstructure on the bridge carrying FAU 2327 (Deerpath Road)
over Mill Creek in the City of Batavia. Project will also include approach
roadway construction.
170,609.00
IL IL313 Conduct study and design of Chicago North lakefront path expansion project 801,180.00 Arterial Street Resurfacing Project #63 ‐ North Area 801,180.00
IL IL315 Construct and expand Northwest Illinois U.S. Rt 20 from Freeport to Galena,
IL
2,470,626.00 2.0 mi of reconstruction of IL 2 from Riverside Blvd to Auburn St in Rockford 2,470,626.00
IL IL316 Improve U.S. Route 34 from Kewanee to Kentville Road. 400,590.00 Resurfacing and patching on IL 17 from W of 19th Ave to 220th St E of Aledo 400,590.00
IL IL319 Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to
Netty Green Road in Saline Co., Illinois.
162,520.00 656' of the removal and replacement of the structure carrying US 45 over
south fork of Saline River approx. 1 mile NE of Stonefort
162,520.00
IL IL320 Relocate Pocket Road/ Lakewood Place for Access to the Racehorse Business
Park, Alorton.
420,268.96 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB
to I‐55/64 WB
420,268.96
IL IL321 Construct commuter parking structure in the central business district in the
vicinity of La Grange Road, and for projects identified by the Village of La
Grange as its highest priorities
328,290.00 Resurfacing, curb & gutter replacement, sidewalk replacement and the
replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly
avenue to Maple Avenue in the Village of Brookfield.
328,290.00
IL IL325 Preconstruction and Construction at IL 120 at Bacon Road and Cedar Lake
Road
110,921.00 Phase I preliminary engineering to determine the rehabilitation or
replacement of the existing structure on Park Avenue West
110,921.00
37
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL327 To construct a new intersection of a public road and U.S. Route 50 and a new
street
44,692.00 4.16 miles of milling, resurfacing, pavement marking and signal upgrades on
US 50 from the Marion County line to CH 6 at Xenia
44,692.00
IL IL328 Upgrade roads, The Village of Maywood 81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
81,259.00
IL IL330 Upgrade Veterans Drive in Pekin, Illinois. 81,260.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
81,260.00
IL IL331 For DuPage County to construct certain segments of Southern DuPage County
Regional Trail
8,126.00 Project consists of interconnecting 3 existing closed loop traffic signal systems
and establish an ethernet based communications system at various locations
in the City of Naperville on Washington Street from Warrenville Road to
Royce Road; along Aurora Avenue from Washington Street to West Street;
along West Street from Aurora Avenue to Martin Avenue and along Chicago
Avenue from Washington Street to Ellsworth Street.
8,126.00
IL IL334 Upgrade Curtis Road in conjunction with State plan for I‐57 interchange; from
Duncan Rd. to 1st Street in Champaign.
568,820.00 6.029 miles of milling and resurfacing on US 45 from NCL of Tolona 568,820.00
IL IL336 Complete 80,000 lb. truck route between CH 2 (Burma Rd) and IL Rt. 130 in
Cumberland County.
243,780.12 0.01 mile of the removal and replacement of the structure carrying IL 121
over Long Point Creek 9 miles north of Montrose
243,780.12
IL IL337 Francis Cabrini/W. Green Homes CHA Street Construction, City of Chicago. 480,708.00 Arterial Street Resurfacing Project #63 ‐ North Area 480,708.00
IL IL338 Henry Horner Homes CHA Street Construction, City of Chicago 801,180.00 Arterial Street Resurfacing Project #63 ‐ North Area 801,180.00
IL IL339 Completion of the Grand Illinois Trail, Cook County 1,035,525.00 Arterial Street Resurfacing Project #63 ‐ North Area 1,035,525.00
IL IL344 Robert Taylor Homes CHA Street Construction, City of Chicago 440,649.00 130th and Torrence Intersection Improvement, Chicago 440,649.00
IL IL346 Construct Cedar Creek Linear Park Trail, Quincy. 40,630.00 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams
County Line
40,630.00
IL IL348 Resurface Trumbull Ave. and Homan Ave., Evergreen Park 32,504.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
32,504.00
IL IL350 For U.S. Rt. 30 intersection signals, turn and deceleration lanes between
Williams St. and IL Rt. 43 incl. 80th Ave, Wolf Rd., Lincoln Way HS and Locust
St.
1,351,036.73 Reconstruction of FAU 1637 (University Pkwy) from East of Governor's
Highway to East of Crawford Avenue, pavement removal, aggregate subbase
and subfraede, HMA pavement, curb & gutter, sidewalks, storm sewer, traffic
signals and pavement markings. Crawford Avenue will be reconstructed at
the intersection with University Parkway, all located in the Village of
University Park.
1,351,036.73
IL IL351 Preconstruction activities for Sangamon Valley Bicycle Trail (IL) 40,630.00 Cold‐in‐place recycling, patching, HMA binder & surface courses, HMA
shoulders, aggregate shoulders & pavement markings on FAU 7998
40,630.00
IL IL352 St. Charles Road, The Village of Bellwood. 356,097.95 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
356,097.95
Retaining Wall and rip‐rap along 19th Street from IL 84/92 to 0.1 mi S in Silvis 422,173.72
Bridge replacement at IL 97 over Haw Creek Tributary 6.5 mi N of Maquon 1,830,000.00
2,252,173.72Railroad crossing improvements on Illinois Route 82 in GeneseoIL354IL
38
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL355 Construction of a new bicycle‐pedestrian bridge in Wayne, IL 272,796.49 Replace the superstructure on the bridge carrying FAU 2327 (Deerpath Road)
over Mill Creek in the City of Batavia. Project will also include approach
roadway construction.
272,796.49
IL IL357 Village of South Jacksonville‐‐West Vandalia Road upgrades 77,579.87 Replace the bridge carrying El Dara Road (CH4) over Bull Run Creek, located
3.5 miles south of Barry. FAS 597
77,579.87
IL IL360 Pre‐construction and construction IL 15 over Wabash River at Mount Carmel 565,568.00 The removal and replacement with culverts of two structures carrying IL 130
over unnamed creeks
565,568.00
130th and Torrence Intersection Improvement, Chicago 719,921.00
130th and Torrence Intersection Improvement, Chicago 81,259.00
IL IL368 Reconstruct Winter Ave, existing 1 lane RR subway, and 1 lane bridge to
provide access to Winter Park in Danville
439,588.99 Replace existing three span precast box beam bridge with a single span steel
wide flange beam bridge, including roadway approaches on Maplewood Drive
(CH55) 0.1 mile North of Rantoul over Upper Salt Creek in Champaign County.
FAS 1523
439,588.99
IL IL369 Construct pedestrian tunnel at railroad crossing in Winfield, IL 81,259.00 Project consists of interconnecting 3 existing closed loop traffic signal systems
and establish an ethernet based communications system at various locations
in the City of Naperville on Washington Street from Warrenville Road to
Royce Road; along Aurora Avenue from Washington Street to West Street;
along West Street from Aurora Avenue to Martin Avenue and along Chicago
Avenue from Washington Street to Ellsworth Street.
81,259.00
IL IL370 Upgrade streets, undertake streetscaping, and implement traffic and
pedestrian safety signalization improvements and highway‐rail crossing safety
improvements, Oak Lawn
398,175.39 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
398,175.39
IL IL371 Improve Sheridan Road, Evanston 162,520.00 Phase II PE for the improvement of the Montrose Ave (FAU 1366) bridges and
pedestrian underpass in the vicinity of Montrose
162,520.00
IL IL373 Install traffic control devices on traffic signals in Village of Oak Lawn 19,503.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
19,503.00
IL IL375 Upgrade roads, The Village of Hillside. 81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
81,259.00
IL IL377 Construct Parking Facility and pedestrian walkways at 94th and S. Oak Park
Ave, Oak Lawn
19,503.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
19,503.00
IL IL378 Improve Mill Street, Rock Island 81,469.40 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
81,469.40
IL IL381 Road extension for Highway 22 in Macon County, IL 54,280.20 0.01 mile of the removal and replacement of the structure carrying IL 121
over Long Point Creek 9 miles north of Montrose
54,280.20
IL IL382 IL 8 from East Peoria to Washington, IL 82,798.89 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
82,798.89
IL IL383 Restoration and reconstruction of the central business district street.
Cambridge, IL.
97,512.19 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
97,512.19
801,180.00Improve Cottage Grove intersection, South Chicago Avenue and 71st StreetIL363IL
39
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL384 Improve 63rd Street, Chicago. 1,602,360.00 Construct underpass @ intersection of Damen/Fullerton/Elston Ave, Chicago 1,602,360.00
IL IL385 Establish transportation museum, Chicago 432,637.00 Arterial Street Resurfacing Project #63 ‐ North Area 432,637.00
IL IL386 For the construction of the Grand Avenue Underpass, Village of Franklin Park 94,260.52 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
94,260.52
IL IL387 Resurface Yellow Banks Road, Franklin County. 32,504.00 Replace the bridge carrying FAS 869 (CH14) over Little Muddy River, located
1.0 mi east of Elkville
32,504.00
IL IL388 Intersection Reconstruction at U.S. 12‐IL 31 Tryon Grove Road 73,134.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd
including the addition of one new lane in each direction
73,134.00
IL IL389 Construct Bridge Overpass, DuSable Museum‐Chicago 801,180.00 Various Pin and Link Expansion Joint Retrofits 801,180.00
IL IL390 Entry Road to Southern Illinois University Research Park, Carbondale. 165,068.00 299' of replace of superstructure on bridge carrying Makanda Rd over Drury
Creek
165,068.00
IL IL391 Improve safety of culvert replacement on 250th Rd. between 460th St. and
City Hwy 20 in Grandview Township, Edgar County
7,151.20 Rehabilitation of the structure carrying IL 49 over Brushy Fork Creek 1 mile
north of US 36
7,151.20
IL IL392 Traffic Signalization, Matteson 73,743.00 Traffic Signalization, Matteson 73,743.00
IL IL393 Preconstruction and construction McCarthy Road, Bell Road to U.S. 45 and
123rd Street U.S. 45 to 86th Avenue in Palos Park
72,483.80 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
72,483.80
IL IL394 Establish transportation museum, Chicago 400,590.00 Arterial Street Resurfacing Project #63 ‐ North Area 400,590.00
IL IL395 Road extension for Redco Drive to Skyline Drive, Williamson County. 221,259.00 299' of replace of superstructure on bridge carrying Makanda Rd over Drury
Creek
221,259.00
IL IL399 Extension North from Rt. 30 to Wheeler Road and Galena Boulevard
extension west of Rt. 47 in Sugar Grove, IL
386,797.00 Replace the superstructure on the bridge carrying FAU 2327 (Deerpath Road)
over Mill Creek in the City of Batavia. Project will also include approach
roadway construction.
386,797.00
IL IL400 Improve roads, The Village of Westchester 22,753.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
22,753.00
IL IL403 Reconstruct and Widen Route 60 Bridge over I‐94 in Lake Forest. 914,174.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd
including the addition of one new lane in each direction
914,174.00
IL IL404 For Village of Bolingbrook to construct Remington Blvd. extension. 75,180.16 Resurface, patching, sidewalk replace and curb & gutter replace on FAU 281
(Crossroads Pkwy) from north Center Blvd to Veterans Pkwy
75,180.16
IL IL408 Improve Streets, Merrionette Park 48,756.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
48,756.00
IL IL409 Offramp and overpass from I‐ 57 outside of Marion and necessary connector
roads.
406,299.00 656' of the removal and replacement of the structure carrying US 45 over
south fork of Saline River approx. 1 mile NE of Stonefort
406,299.00
IL IL411 Washington Street Widening, Gurnee 273,032.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd
including the addition of one new lane in each direction
273,032.00
IL Il412 Improve Roads and Bridges, Cicero 223,398.81 Resurface, base repair, patching & curb & gutter replace on FAU 2790 (Austin
Blvd) from Roosevelt Rd to Cermak Rd in Town of Cicero
223,398.81
IL IL413 Project is a stand‐alone roadway improvement consisting of the complete
reconstruction of the roadway, The Village of Forest Park.
81,259.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
81,259.00
40
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL414 Upgrade County Highways 18 and 22 in conjunction with State I‐57
interchange plan north of Mattoon.
162,520.00 0.01 mile of the removal and replacement of the structure carrying IL 121
over Long Point Creek 9 miles north of Montrose
162,520.00
IL IL415 Construct I‐57 Bridge Overpass, City of Markham. 480,708.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
480,708.00
IL IL417 Construct access roads to National Great Rivers Research Center. 101,576.28 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB
to I‐55/64 WB
101,576.28
IL IL421 To construct Veterans Memorial Drive Extension. Will link Mount Vernon on
the east side of I‐57 with incorporated area lying west
81,259.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking
on IL15 from E Sunswept Rd to Main St in Bluford
81,259.00
IL IL427 Resurface Shawnee College Road, Pulaski County 128,085.00 4.21 mi of patching and resurfacing on IL37 from the Wye W of Mounds City
to Mounds Rd
128,085.00
IL IL428 For Cook County to reconstruct and widen 127th Street between Smith Road
and State Street in Lemont
36,567.00 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
36,567.00
IL IL430 Construct Leon Pass overpass, and for projects identified by the Village of
Hodgkins as its highest priorities
78,009.00 Resurfacing, curb & gutter replacement, sidewalk replacement and the
replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly
avenue to Maple Avenue in the Village of Brookfield.
78,009.00
IL IL431 Undertake Streetscaping project on Harlem Avenue initiating from 71st
Street to I‐80, Cook County
638,382.52 Rehabilitate the bridge that carried Chatham Street from Canal Street to
Fulton Street over the Cal‐Sag Channel in the City of Blue Island. MS 1030
bridge is being currently closed to traffic and will be converted from a
vehicular bridge to a pedestrian bridge.
638,382.52
IL IL433 Upgrade Roads, Summit 78,009.05 Resurfacing, curb & gutter replacement, sidewalk replacement and the
replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly
avenue to Maple Avenue in the Village of Brookfield.
78,009.05
IL IL435 Construct bike/pedestrian paths, facilities and infrastructure improvements in
Spring Rock Park, Western Springs Park District.
58,506.00 Resurfacing, curb & gutter replacement, sidewalk replacement and the
replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly
avenue to Maple Avenue in the Village of Brookfield.
58,506.00
IL IL436 Upgrade roads, Plainfield 24,377.00 Resurfacing, patching, sidewalk replacement and curb & gutter replacement
on FAU 281 (Crossroads Pkwy) from north Center Blvd to Veterans Pkwy
24,377.00
IL IL439 Reconstruction and Improvement of North Lincoln Ave, O'Fallon. 136,110.01 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of
Lebanon. Soil Mod, HMA binder & surf courses, storm sewer
136,110.01
IL IL440 Reconstruction of 20th Street, Granite City 121,891.00 Project consists of road reconstruction including PCC pavement, curb &
gutter, sidewalk, driveways, storm sewer, pavement marking and all other
work necessary to complete the project in accordance with the plans and
specifications on East main Street from 0.29 miles east of Lange Avenue to
0.62
121,891.00
IL IL441 Road Alignment from IL Route 159 to Sullivan Drive, Swansea 91,417.00 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of
Lebanon. Soil Mod, HMA binder & surf courses, storm sewer
91,417.00
IL IL442 State Rt. 78 to Lathrop Street to 2900 E (Township Road)‐‐A 1.5 mile village
street extension, bridges, and upgrading of existing street
27,971.49 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
27,971.49
IL IL443 Bloomington‐Normal East Side Highway Corridor. 81,259.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek,
located west of 3600E Road
81,259.00
41
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL445 Construct and expand Northwest Illinois U.S. Rt 20 from Freeport to Galena,
IL
5,007,375.00 2.0 mi of reconstruction of IL 2 from Riverside Blvd to Auburn St in Rockford 5,007,375.00
IL IL451 To construct Veterans Memorial Drive Extension. Will link Mount Vernon on
the east side of I‐57 with incorporated area lying west
2,950.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking
on IL15 from E Sunswept Rd to Main St in Bluford
2,950.00
IL IL453 Improvements to Harrison Street, Quincy 44,073.09 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams
County Line
44,073.09
IL IL454 Construction of Joliet Arsenal Road improvements, Will County. 20,504.58 Reconstruction of FAU 1637 (University Pkwy) from East of Governor's
Highway to East of Crawford Avenue, pavement removal, aggregate subbase
and subfraede, HMA pavement, curb & gutter, sidewalks, storm sewer, traffic
signals and pavement markings. Crawford Avenue will be reconstructed at
the intersection with University Parkway, all located in the Village of
University Park.
20,504.58
IL IL457 Improve U.S. Route 34 from Kewanee to Kentville Road. 500,738.00 Improve U.S. Route 34 from Kewanee to Kentville Road. 500,738.00
IL IL459 Road improvements in Elmwood Park, Franklin Park, Northlake, Oak Park,
River Forest, River Grove, and Stone Park
93,418.54 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
93,418.54
IL IL462 Improvements to Maple/ Manteno Lake Road, Manteno 103,436.71 The removal and replacement of the structure carrying IL 102 over Rock
Creek, 6.5 miles NW of Bourbonnais
103,436.71
IL IL464 Constitution Trail Extension‐‐Grove Street south to Lafayette Street,
Bloomington.
1,106.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek,
located west of 3600E Road
1,106.00
IL IL469 Upgrade Roads, Summit 39,358.72 Resurfacing, curb & gutter replacement, sidewalk replacement and the
replacement of drainage structure on FAU 1365 (Shields Avenue) from Eberly
avenue to Maple Avenue in the Village of Brookfield.
39,358.72
IL IL471 For the construction of the Grand Avenue Underpass, Village of Franklin Park 1,475.00 Pavement widening and reconstruction, curb & gutter, sidewalks storm
sewer, landscaping and pavement markings on FAU 1007 (McDermott Drive)
from Taft Avenue to Wolf Road in the Village of Berkeley
1,475.00
IL IL472 Construction of IL Route 31‐‐Algonquin Bypass to Rakow Road 10,325.00 .89 mi of reconstruction of IL 31 from N of Trinity Dr to S of Rakow Rd
including the addition of one new lane in each direction
10,325.00
IL IL473 Road improvements associated with Diversatech Campus, Manteno. 1,033.00 The removal and replacement of the structure carrying IL 102 over Rock
Creek, 6.5 miles NW of Bourbonnais
1,033.00
IL IL474 Upgrade Veterans Drive in Pekin, Illinois. 123,018.61 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
123,018.61
IL IL475 Street Resurfacing, City of Centreville. 110,262.51 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB
to I‐55/64 WB
110,262.51
IL IL479 Mitchell Road to Farnsworth Avenue improvements, Aurora 3,688.00 Remove the superstructure, repairs to the superstructure, and replacement
with PPC deck beams with a 5" wearing surface
3,688.00
IL IL481 Improve Great River Road, Mercer County. 738.00 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116
from east of media to 0.9 miles west of US 67
738.00
IL IL482 Improve Great River Road, Warsaw 369.01 5.54 miles of milling and resurfacing on IL96 from Sutter Rd to the Adams
County Line
369.01
IL IL489 Improve Lightfoot Road, City of Farmington 738.00 Replace the structure carrying FAU 6595 (Sheridan Road) over Dry Run Creek,
located south of Richmond Ave in the City of Peoria
738.00
IL IL492 City of Havana, Illinois Upgrades to Broadway Street 14,452.79 8.55 mi of milling, resurfacing, patching, shoulders, guardrail, etc. on IL97
east of McKinley St. in Havana to 0.3 mi N of CR 800
14,452.79
IL IL495 Bike trail extension for the Kankakee River Trail Project, Kankakee. 1,075.46 The removal and replacement of the structure carrying IL 102 over Rock
Creek, 6.5 miles NW of Bourbonnais
1,075.46
42
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Illinois
State Demo ID Project Description Amount Project Description Amount
ToFrom
IL IL496 Improve Highway‐Railroad Crossings, Galesburg 16,875.77 Approx 8.7 miles of widening, milling, resurfacing, patching, etc. on IL 116
from east of media to 0.9 miles west of US 67
16,875.77
IL Il497 Improvements to township roads in and adjacent to the Shawnee National
Forest, Pope County. [ref P.L. 110‐244, Sec 105(a)(264)]
13,167.75 299' of replacement of superstructure on bridge carrying Makanda Rd over
Drury Creek
13,167.75
IL IL503 Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to
Netty Green Road in Saline Co., Illinois.
2,950.00 656' of the removal and replacement of the structure carrying US 45 over
south fork of Saline River approx. 1 mile NE of Stonefort
2,950.00
IL IL506 Constitution Trail Extension‐‐Grove Street south to Lafayette Street,
Bloomington.
369.00 Replace the bridge carrying FAS 1477 (CH 40) over a branch of Salt Creek,
located west of 3600E Road
369.00
IL IL507 Improvements to 11th Avenue streetscape, campus trails and bridges at
Augustana College in Rock Island
2,213.00 0.01 miles of the removal and replacement of the structure carrying IL 81
over the BNSF RR at Lynn Center.
2,213.00
IL IL508 Improvements to Oakland, Main Street, Eldorado and Fairview, streetscape in
the vicinity of Millikin University, Decatur.
2,213.30 0.01 mile of the removal and replacement of the structure carrying IL 121
over Long Point Creek 9 miles north of Montrose
2,213.30
IL IL510 Restoration of the historic railroad depot and intermodal in Mattoon. 1,770.00 0.01 mile of the removal and replacement of the structure carrying IL 121
over Long Point Creek 9 miles north of Montrose
1,770.00
IL IL511 Construct overpass, U.S. 40 to Southwest Andrews Drive in Greenville. 1,475.00 Recon of FAU 9249 (Schuetz St) from Monroe St to Madison St in City of
Lebanon. Soil Mod, HMA binder & surf courses, storm sewer
1,475.00
IL IL516 Construct new Mississippi River Bridge and related roads in the vicinity of
East St. Louis
2,355,635.77 0.711 mi of proposed bridge and additional lane on I‐64 from MLK Bridge EB
to I‐55/64 WB
2,355,635.77
IL IL520 To construct Veterans Memorial Drive Extension. Will link Mount Vernon on
the east side of I‐57 with incorporated area lying west
4,683.00 1.95 miles of milling, resurfacing, shoulders, patching and pavement marking
on IL15 from E Sunswept Rd to Main St in Bluford
4,683.00
IL IL521 Construction of Joliet Arsenal Road improvements, Will County. 2,341.00 Reconstruction of FAU 1637 (University Pkwy) from East of Governor's
Highway to East of Crawford Avenue, pavement removal, aggregate subbase
and subfraede, HMA pavement, curb & gutter, sidewalks, storm sewer, traffic
signals and pavement markings. Crawford Avenue will be reconstructed at
the intersection with University Parkway, all located in the Village of
University Park.
2,341.00
IL IL523 Construct a four lane connection between Rt. 13 and Rt. 45 and upgrades to
Netty Green Road in Saline Co., Illinois.
51,629.00 656' of the removal and replacement of the structure carrying US 45 over
south fork of Saline River approx. 1 mile NE of Stonefort
51,629.00
Resurfacing, patching, curb & gutter, sidewalks and pavement markings on
FAU 1392 (First Street) from West Avenue to Willow Road in the City of
Elmhurst.
397,000.00
Reconstruct FAU 1551 (Plainfield Road) from manning Road to Cass Avenue in
DuPage county. Base course widening, resurfacing, sidewalks, traffic signals,
and pavement markings.
800,000.00
IL ILM02 Improvements on the Kennedy Expressway in Chicago 2,879,073.20 Construct underpass @ intersection of Damen/Fullerton/Elston Ave, Chicago 2,879,073.20
Total Amount Repurposed 53,149,172.22Total # of Earmarks Repurposed 196
1,197,000.00I‐55 at various locations from Lemont Road to Illinois 83 in Darien, DuPage
County ‐ construction of sound barriers
ILM01IL
43
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Indiana
State Demo ID Project Description Amount Project Description Amount
IN IN051 Improvements to McClung Rd, Boston St, Larson St, and Whirlpool Drive in
the city of LaPorte, IN (2001)
34,352.50 Laporte, Laporte Co, Construct Chessie Bike‐Ped Trail 1, Bike/Pedestrian
Facilities
34,352.50
IN IN055 I‐65/70 Market Square Redesign/Replace ramp, Indiana (2003) 68,663.69 Indianapolis, Install school zone flashers at various schools in Marion County,
Pedestrian Flashing Beacons
68,663.69
IN IN058 Indiana Dunes National Lakeshore (IDNL) hike/bike trail and pedestrian
bridge/overpass, Indiana (2003)
24,837.00 Porter County, 1.6 miles south of CR 1000 S over Kankakee River Bridge #62,
Bridge Replacement
24,837.00
IN IN059 INDOT US‐31 Environmental and Design study, Indiana (2003) 9,028.87 Warsaw, Kosciusko Co., Husky Trail Rd: From Mariner Dr to Warsaw City
limits (0.2 mi S of CR 200N) Road Rehabilitation (3R/4R Standards)
9,028.87
Sign project, Delaware County, VA 1033, Sign inventory and replacement for
Town of Eaton
53,550.00
Bridge 226 on County Road 419 East over Bike/Ped. Trail , Bridge Removal ,
Delaware Co.
713,800.00
Bridge #161 over White River on CR 170S, 1.8 miles S of SR 32 , Bridge
Rehabilitation, Delaware Co.
226,150.00
IN IN076 Gary Green Link Trail, Indiana, Lake County (2005) 26,423.83 Gary, Industrial Highway EJ&E overpass to E of Main Airport Entrance Phase 1
, Road Reconstruction
26,423.83
IN IN079 Hoosier Heartland Highway, Miami and Huntington Counties, Indiana (2005) 66,650.70 Huntington, Huntington Co. CN Resurface of State road completed in 2014, 66,650.70
IN IN089 Oak Savannah Trail, Indiana (2005) 4,613.65 Sign Replacement, Safety Improvement, Sign Modernization (Series Of Units), 4,613.65
IN IN095 Construction of Dixon Road from Markland Avenue to Judson Road in
Kokomo, Indiana (2005)
115,551.00 Howard Co. Judson Road , Judson Road; Dixon Road to Phillips Street in
Kokomo, Road Reconstruction (3R/4R)
115,551.00
IN IN098 Construct interchange at I‐ 65 and 109th Avenue, Crown Point, Indiana (2005) 621,398.22 I‐65 from US 231 to US 30, Added Travel Lanes, Crown Point, Lake County 621,398.22
IN IN100 Upgrade Traffic Signals Phase III in the City of Muncie, Indiana (2005) 126,535.17 City of Muncie, Delaware Co., Bike/Pedestrian Facilities near Bunch Blvd &
near St.Rd. 32 over White River
126,535.17
IN IN103 Construct Grade Separation Underpass on Main Street in Mishawaka, Indiana
(2005)
1,602,360.00 St. Joseph Co., Bridge Rehab on Cleveland over St. Joseph River, Bridge
Rehabilitation Or Repair
1,602,360.00
IN IN107 Reconstruct and widen Shelby County Indiana 500 East from 1200 N to U.S.
52 (2005)
801,180.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line , 801,180.00
IN IN108 Extend Everbrook Drive from SR 332 to Bethel Avenue in the City of Muncie,
Indiana (2005)
512,755.00 Trail in Muncie, Delaware Co., MS BIKE, new trail‐ phase 2; Near SR 32 over
White River, near Bunch Blvd, Bike/Pedestrian Facilities
512,755.00
IN IN111 Upgrade rail crossing at 93rd Avenue, St. John (2005) 160,236.00 Lake Co., Bridge #36 State Line Road over Kankakee River, Bridge
Replacement
160,236.00
IN IN112 Study Traffic on Muncie By‐ Pass from Centennial Avenue to McGalliard Road
in the City of Muncie and Delaware County, Indiana (2005)
96,142.00 Delaware County, ST 1024, Bridge # 516 over White River on Tillotson
Avenue, 0.15 miles north of SR32 Bridge Replacement
96,142.00
IN IN114 Reconstruct Boston Street, from State Road 2 to Bach St., Larson‐Whirlpool
St. in LaPorte, Indiana (2005)
199,228.61 Laporte, Laporte Co, Construct Chessie Bike‐Ped Trail 1, Bike/Pedestrian
Facilities
199,228.61
IN IN117 Improve Intersection at Jackson Street and Morrison Road in the City of
Muncie, Delaware County, Indiana (2005)
105,186.00 White River Greenway from Nature Preserve to Kitselman trail head (Phase 3)
in Muncie, Delaware Co.; Bike/Pedestrian Facilities.
105,186.00
IN IN120 Construct Shelby County Indiana Shelbyville Parkway (2005) 400,590.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line, 400,590.00
IN IN125 Acquire right‐of‐way for and construct University Parkway from Upper Mount
Vernon Road to SR 66 (2005)
603,417.71 Newburgh, Warrick Co., B. Gene Aurand Trailhead to Pollack Ave/SR662
intersection (Phase 3A), Bike/Pedestrian Facilities
603,417.71
IN IN126 Conduct study for U.S. 50 Corridor Improvements, Dearborn County, Indiana
(2005)
240,354.00 Jennings Co. , Bridge 52 over Otter Creek on Co RD 560 E, Br Repl,
Comp.Cont.Precast Conc. Beam
240,354.00
To
993,500.00SR‐332 Reconstruction at I‐69, Delaware County, Indiana (2003)IN061IN
From
44
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Indiana
State Demo ID Project Description Amount Project Description Amount
ToFrom
IN IN128 Improve Bailie Street, Kentland Biking and pedestrian trail construction,
Kentland [ref P.L. 110‐244, Sec 105(a)(100)] (2005)
27,108.44 Curb sidewalk reconstruction SR 2 (Commercial Ave) Freemont to Burr St,
Local Road Project, Lowell, Lake Co.
27,108.44
IN IN132 Preliminary engineering, right‐of‐way, and construction for Perimeter
Parkway‐West Lafayette/ Purdue University, Indiana (2005)
614,627.80 Cherry Lane, intersection of McCormick in West Lafayette; Intersect. Improv.
W/ Added Turn Lanes.
614,627.80
Porter Co., 1.6 miles south of CR 1000 S over Kankakee River Bridge #62 ,
Bridge Replacement
128,756.00
Porter Co., Marquette Greenway, Calumet Trail Phase V, Bike/Pedestrian
Facilities
56,313.25
IN IN139 Complete construction of paths at Hamilton County Riverwalk, Noblesville,
Indiana (2005)
45,446.75 Hamilton Co. new road reconstruction CN, 136th Street at Prairie Baptist
Road, approx 1.3 miles SE of I‐69 and SR 238 ,
45,446.75
George's Hill Rd to Old Lanesville Rd N ‐ N I‐64 Harrison Co; New Road
Construction
2,698,578.91
0.7 miles North of Beechwood Way (Bridge 43) Crawford Co Bridge 1,555,687.09
IN IN142 Study alternatives along 2 miles of railroad to eliminate in‐town highway‐ rail
crossings to improve safety and reduce congestion in Delaware County
(2005)
120,177.00 Yorktown, Delaware Co. bridge, Tiger Drive, Bridge 141, over White River, 0.6
mi N of SR 32, Bridge Rehabilitation
120,177.00
IN IN146 Reconstruct Standard Avenue, Whiting (2005) 105,738.00 Lake Co., Bridge #36 State Line Road over Kankakee River, Bridge
Replacement
105,738.00
Plymouth, Marshall Co., Improve SRTS path & ADA along Baker St from
Columbus thru Randolph intersection Bike/Pedestrian Facilities
314,460.20
Culver, Marshall Co., Academy Rd. and College Ave., Bike/Pedestrian Facilities 86,129.80
IN IN155 Construction of Dixon Road from Markland Avenue to Judson Road in
Kokomo, Indiana. (2005)
27,006.40 Howard Co. Judson Road , Judson Road; Dixon Road to Phillips Street in
Kokomo, Road Reconstruction
27,006.40
IN IN158 Construct interchange at I‐ 65 and 109th Avenue, Crown Point, Indiana (2005) 891,814.03 I‐65 from US 231 to US 30, Added Travel Lanes, Crown Point, Lake County 891,814.03
IN IN159 Transportation improvements to 126th Street Project, Town of Fishers,
Indiana (2005)
171,674.81 Hamilton Co. new road reconstruction CN, 136th Street at Prairie Baptist
Road, approx 1.3 miles SE of I‐69 and SR 238 ,
171,674.81
IN IN161 Construct grade separation underpass on Main Street in Mishawaka, Indiana
(2005)
400,590.00 St. Joseph Co. , Bridge Rehab on Cleveland over St. Joseph River, Bridge
Rehabilitation
400,590.00
IN IN167 Reconstruct and widen Shelby County, Indiana 500 East from 1200 North to
U.S. 52 (2005)
200,295.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line, Road
Reconstruction (3R/4R Standards)
200,295.00
IN IN168 Extend Everbrooke Drive from SR 332 to Bethel Avenue in the City of Muncie,
Indiana (2005)
128,189.00 Muncie, Delaware Co. new trail‐ phase 2; Near SR 32 over White River, near
Bunch Blvd; Bike/Pedestrian Facilities.
128,189.00
Styline Drive from SR 64 to Chestnut Street in Dubois County; New Bridge 235,680.51
From 4.56 mi S of N Jct of SR‐56 to 0.86 mi N of N Jct of SR‐56 resurface US‐
231 Dubois County; HMA Overlay, Preventive Maintenance.
332,855.57
IN IN171 Upgrade rail crossing at 93rd Avenue, St. John, Indiana (2005) 40,059.00 Lake Co., Bridge #36 State Line Road over Kankakee River, Bridge
Replacement, Other Construction
40,059.00
IN IN172 Study traffic on Muncie bypass from Centennial Avenue to McGailliard Road
in the City of Muncie and Delaware County, Indiana (2005)
24,035.00 Bridge # 516 over White River on Tillotson Avenue, 0.15 miles north of SR32
Delaware Co. bridge; Bridge Replacement
24,035.00
IN IN174 Reconstruct Boston Street, from State Road 2 to Bach Street, Larson‐
Whirlpool Street in LaPorte, Indiana (2005)
150,221.00 Laporte, Laporte Co, Construct Chessie Bike‐Ped Trail 1, Bike/Pedestrian
Facilities
150,221.00
IN IN180 Construct Shelby County, Indiana Shelbyville Parkway, Indiana (2005) 100,148.00 Shelby Co. CR 400, CR 400N from CR 825W to Shelby‐Johnson Co line, Road
Reconstruction (3R/4R Standards)
100,148.00
400,590.00Construct Hoham Drive Extension in Plymouth, Indiana (2005)IN147IN
568,536.08Construct U.S. 231 in Spencer and Dubois Counties (2005)IN169IN
185,069.25North Calumet Avenue Improvements, Valparaiso (2005)IN138IN
4,254,266.00Construction of I‐64 Interchange, Harrison County, Indiana (2005)IN141IN
45
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Indiana
State Demo ID Project Description Amount Project Description Amount
ToFrom
IN IN184 Construction of multi‐use paths, Town of Fishers, Indiana (2005) 28,983.44 Hamilton Co new road reconstruction, CN, 136th Street at Prairie Baptist
Road, approx 1.3 miles SE of I‐69 and SR 238, Sight Distance Improvement
Sight Distance Improvement
28,983.44
IN IN186 Conduct study for U.S. 50 Corridor improvements, Dearborn County, Indiana
(2005)
60,089.00 Jennings Co., Bridge 52 over Otter Creek on Co RD 560 E, Br Repl,
Comp.Cont.Precast Conc. Beam
60,089.00
IN IN188 Improve Bailie Street, Kentland, Indiana (2005) 7,249.63 Bridge #81 on Hickory Rd over Yellow River in Marshall Co; Bridge
Replacement
7,249.63
IN IN192 Preliminary engineering, right‐of‐way and construction for Perimeter
Parkway‐‐West Lafayette/ Purdue University, Indiana (2005)
529,854.69 Cherry Lane, intersection of McCormick in West Lafayette; Intersect. Improv.
W/ Added Turn Lanes.
529,854.69
IN IN198 North Calumet Avenue improvements, Valparaiso, Indiana (2005) 165,276.84 Porter County, 1.6 miles south of CR 1000 S over Kankakee River Bridge #62 ,
Bridge Replacement
165,276.84
IN IN199 Complete construction of paths at Hamilton County Riverwalk, Noblesville,
Indiana (2005)
10,111.00 Hamilton Co new road reconstruction CN, 136th Street at Prairie Baptist
Road, approx 1.3 miles SE of I‐69 and SR 238, Sight Distance Improvement
Sight Distance Improvement
10,111.00
IN IN201 Construction of I‐64 interchange, Harrison County, Indiana (2005) 1,063,567.00 George's Hill Rd to Old Lanesville Rd N ‐ N I‐64 in Harrison Co; New Road
Construction.
1,063,567.00
IN IN202 Study alternatives along 2 miles of railroad to eliminate in‐town highway‐ rail
crossings to improve safety and reduce congestion in Delaware County,
Indiana (2005)
30,044.00 Tiger Drive, Bridge 141, over White River, 0.6 mi N of SR 32 in Delaware
County; Bridge Rehabilitation Or Repair.
30,044.00
IN IN203 Improve SR 9 Greenfield Corridor (2005) 14,707.21 White River Greenway from Nature Preserve to Kitselman trail head (Phase 3)
in Muncie, Delaware Co.; Bike/Pedestrian Facilities.
14,707.21
IN IN205 SR 56 Reconstruction, Aurora, Indiana (2005) 1,025,510.00 Jennings Co. , Bridge 52 over Otter Creek on Co RD 560 E, Br Repl,
Comp.Cont.Precast Conc. Beam
1,025,510.00
Plymouth, Marshall Co., Greenways Trail between Jefferson & Garro St. near
the Yellow River, Bike/Pedestrian Facilities
20,000.00
Academy Rd. and College Ave., Bike/Pedestrian Facilities, Culver, Marshall Co. 80,148.00
IN IN215 Removal of I‐65/I‐70 Market Street Ramp and Streetscaping, Indianapolis
(2005)
628,198.61 Hendricks County Bridge Extension of the National Road Heritage Trail: West
County Line to Amo in Hendricks County; Bike/Pedestrian Facilities
628,198.61
IN IN220 Widen unsafe U.S. 24 between Fort Wayne and Defiance, OH (2005) 535,948.21 Fort Wayne Allen Co., Pufferbelly Trail: State St, to Fernhill Ave,
Bike/Pedestrian Facilities
535,948.21
IN INM01 I‐64, 2.3 miles west of SR 135, Harrison County ‐ interchange justification
study, environmental documentation, and design of new interchange (2005)
855,000.00 George's Hill Rd to Old Lanesville Rd N ‐ N I‐64 Harrison Co, New Road
Construction, Harrison County
855,000.00
Total Amount Repurposed 20,323,283.14Total # of Earmarks Repurposed 54
100,148.00Construct Hoham Drive Extension in Plymouth, Indiana (2005)IN207IN
46
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Iowa
State Demo ID Project Description Amount Project Description Amount
IA IA009 US 20 Realignment Early to Fort Dodge 6,698.80 Detour for US20 from L21 to IA31 6,698.80
IA IA013 Highway 2 ‐ Sidney to I‐29 26,673.68 Relocated US34 bridge over I‐29 26,673.68
IA IA023 Julien Dubuque Bridge 9,722,683.43 Southwest Arterial: US61‐US151 to US20/Seippel Rd and east on US 20 to NW
Arterial incl. Menards Frontage Rd
9,722,683.43
IA IA036 Clinton Co ‐ US 30 Mississippi River Bridge Study 277,285.68 US30 improvements in Clinton County 277,285.68
IA IA058 Hoeven Corridor/Outer Drive Project, Sioux City, Iowa 216,655.20 I‐29 Reconstruction Project, Sioux City 216,655.20
IA IA067 Study of direct link to I‐80, Pella 117,160.44 In the City of Pella, Oskaloosa St from Prairie St to SE 16th St 117,160.44
IA IA070 Study for NE Beltway, Polk Co 100,058.11 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 100,058.11
IA IA096 Construction of approaches and viaduct on Edgewood Rd SW over the UP RR,
Prairie Creek, and the CRANDIC RR
130,773.20 C Ave NE: from Collins Rd to Blairs Ferry Rd 130,773.20
Southwest Arterial: US61‐US151 to US20/Seippel Rd and east on US 20 to NW
Arterial incl. Menards Frontage Rd
7,275,058.00
US20: Swiss Valley Rd Intersection including work on Seippel Rd and
Barrington Dr
9,895,196.00
Military Road Improvements 2,859,247.00
IA IA099 Construction of NW 26th St interchange on I‐35, Polk Co 248,637.40 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 248,637.40
IA IA107 TI to Hoeven Corridor/Outer Drive Project, Sioux City 993,129.53 I‐29 Reconstruction Project, Sioux City 993,129.53
IA IA110 TI to Edgewood Road Viaduct, Cedar Rapids 512,460.16 C Ave NE: from Collins Rd to Blairs Ferry Rd 512,460.16
IA IA140 Construction of Sioux City, Iowa Hoeven Corridor, Outer Driver Project 746,635.19 I‐29 Reconstruction Project, Sioux City 746,635.19
IA IA143 UNI, Native Roadside Vegetation Enhancement Center, construction and
equipment
246,597.64 US218 at Co Rd C‐57 Interchange 246,597.64
IA IA145 Drake 28th and Carpenter Streets Improvements, Des Moines 310,301.38 E. Indianola Ave – Phase 4 – From E. Porter Ave to Army Post Rd in Des
Moines, IA
310,301.38
IA IA147 Great River Road National Scenic Byway, Rivers to the Sea, Dubuque Co 483,016.81 Southwest Arterial: US61‐US151 to US20‐Seippel Rd and east on US 20 to NW
Arterial incl. Menards Frontage Rd
483,016.81
IA IA153 Lewis and Clark Trail Study 47,582.60 I‐29: Reconstruction in Sioux City 47,582.60
IA IA157 Mississippi River Trail, Leach Park in Bettendorf to Riverdale 558,174.81 US67 from 10th to 17th in Bettendorf 558,174.81
IA IA159 American Discovery Trail, connection to Clear Creek Trail, Coralville 108,547.51 Clear Creek Trail Phases 6 & 7, Coralville 108,547.51
IA IA160 Downtown Improvement Project, Dewitt 208,990.34 S. 6th Avenue from Lake St. to S. 5th St., Dewitt 208,990.34
IA IA162 McCollister Boulevard, Iowa City 406,466.74 Dubuque Street Greenway Project 406,466.74
IA IA163 Country Home Road, Linn county 115,713.00 IA 100: In Cedar Rapids, from US 30 to Covington Rd (Co Rd W36) 115,713.00
E‐57 Paving from X Ave to Y Ave, Boone County 171,783.00
R‐27 Paving from E‐52 to US‐30, Boone County 630,090.00
IA IA175 Study of direct link to I‐80, Pella 110,258.00 In the City of Pella, Oskaloosa St from Prairie St to SE 16th St 110,258.00
IA IA178 Study for NE Beltway, Polk County 76,679.77 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 76,679.77
IA IA188 Hoeven Corridor/Outer Drive Project, Sioux City 209,545.94 I‐29 Reconstruction Project, Sioux City 209,545.94
IA IA194 Construction of NW 26th Street Interchange I‐35, Polk County 68,281.16 NW 66th Ave/Kempton Bridge Reconstruction Project Phase 2, Polk Co 68,281.16
IA IA206 Kimberly Road improvements and construction in Davenport 643,738.20 I‐74: In Bettendorf and Davenport (Central Section) 643,738.20
Total Amount Repurposed 37,524,118.72Total # of Earmarks Repurposed 28
801,873.00Rehabilitation and Retrofit of Historic Boone County Wagon BridgeIA170IA
To
20,029,501.00US 20 Mississippi River Bridge and approaches, Dubuque County IA097IA
From
47
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Kentucky
State Demo ID Project Description Amount Project Description Amount
KY KY013 Louisville: Waterfront Development Roadway Improvements 389,144.20 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
389,144.20
KY KY020 Construct highway rail grade separations along the City Lead in Paducah 231,232.00 1‐122.01 | Paducah Waterfront 231,232.00
KY KY021 Extend Hurstbourne Parkway from Bardstown Road to Fern Valley Road 744,107.00 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
744,107.00
KY KY022 Correct Rock Hazard on US 127 N Russell County 2,001.81 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass,
Russell County
2,001.81
KY KY025 Reconstruct KY‐210 from Hodgenville to Morning Star Road, Larue County 1,524,659.43 5‐538 | Construct new I‐65 interchange between KY 480 and KY 245. 1,524,659.43
KY KY026 Construct Kentucky 31E from Bardstowns to Salt River 66,661.97 5‐538 | Construct new I‐65 interchange between KY 480 and KY 245. 66,661.97
KY KY030 Construct Savage‐Sedar Knob Bridge at Koger Creek 231,508.45 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass,
Russell County
231,508.45
KY KY034 Construct US 127 Jamestown Bypass 684,403.09 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass,
Russell County
684,403.09
KY KY035 Reconstruct Liberty and Todd Roads, Lexington 1,206,667.62 7‐8902 | Extend existing 4‐ln on Liberty Rd from Graftons Mill Ln to New
Circle Rd & improve intersection
1,206,667.62
KY KY037 Construct KY‐70 from Cave City to Mammoth Cave 183,277.80 5‐538.00: Bullitt County; CONSTRUCT NEW I‐65 INTERCHANGE BETWEEN KY
480 AND KY 245
183,277.80
KY KY038 Reconstruct US‐231: $5,625,000 for the segment between Dry Ridge Road
and US‐231 and US‐31; $3,000,000 for the segment between Allen‐Warren
County line and Dry Ridge Road
1,213,715.99 3‐16.04 | Construction of new I‐65 interchange in Warren County. 1,213,715.99
KY KY041 Reconstruction of the Louisville Trolley Barn 130,393.00 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
130,393.00
KY KY043 Ohio River Major Investment Study Project, Kentucky and Indiana, and
preliminary engineering and ROW acquisitions associated with the project
[Multi‐State project with Indiana, see IN049]
3,569,612.50 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
3,569,612.50
KY KY079 Trevillian Way, Kentucky 9,994.99 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
9,994.99
KY KY092 Louisville Medical Center Development Corporation Project, Kentucky 12,953.50 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
12,953.50
KY KY106 Replace Bridge over Stoner Creek, 2 Miles East of U.S. 27 Junction, Bourbon
County
265,915.36 7‐1124 | Replace bridge on CR‐1308 (MP 3.588) over Townsend Creek; .9 MI
E of JCT KY 353
265,915.36
KY KY107 Right‐of‐way for and construction of Pennyrile Parkway Extension from 41A S.
to I 24
739,529.00 2‐180 | Widen KY‐911 from US‐41A to Oak Grove. 739,529.00
KY KY108 Reconstruct I 64 KY 180 Interchange, Boyd County, Kentucky 162,520.54 9‐1081 | Replace bridge on KY 474 over Smith Creek at intersection of KY 474
& Nunn Road(CR 1507) 022B00123N
162,520.54
KY KY109 Reconstruct KY 393, Oldham County, Kentucky 162,521.00 5‐483 | Six lane priority section of I‐71 between I‐265 to Lagrange, KY in
Oldham County
162,521.00
KY KY111 Construction of bypass between KY 55 and U.S. 68 at Lebanon in Marion
County
346,654.00 4‐8916 | Heartland Parkway: Lebanon Bypass to Marion/Washington Line 346,654.00
KY KY113 Reconstruct U.S. 127 at Bellows Road, Mercer County 400,054.76 7‐1116 | Replace bridge and approaches on KY‐152 over Herrington Lake at
the Mercer/Garrard Co line (084B00005N)
400,054.76
KY KY118 Reconstruction of KY 259 in Edmonson County from Green River Bridge at
Brownsville to Kyrock Elementary School.
596,920.16 3‐16.04 | Construction of new I‐65 interchange in Warren County 596,920.16
ToFrom
48
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Kentucky
State Demo ID Project Description Amount Project Description Amount
ToFrom
KY KY121 Construct Westbound Access to Mountain Parkway from Exit 18 (KY 1057),
Powell County
319,025.74 10‐126 | Widen the Mountain Parkway to 4‐lanes from Campton to
Salyersville
319,025.74
KY KY123 Construct Pedestrian Mall and Streetscape Improvements on Lexington,
College, Walnut and Gilespie Streets, Wilmore.
318,398.54 7‐915 | Reconstruct intersection of KY 29 north of Wilmore 318,398.54
KY KY128 Improve Prospect Street Pedestrian Access, Berea 438,927.85 7‐251.40 | Priority section II & III: Widen US‐25 from US 421 to Pumpkin Run. 438,927.85
KY KY131 Reconstruct U.S. 127 at U.S. 127 South, Mercer County 63,056.93 7‐1116 | Replace bridge and approaches on KY‐152 over Herrignton Lake at
the Mercer/Garrard Co line
63,056.93
KY KY132 Reconstruct U.S. 127 from Hustonville Road to the Mercer County Line, Boyle
County
121,890.00 7‐1116 | Replace bridge and approaches on KY‐152 over Herrignton Lake at
the Mercer/Garrard Co line
121,890.00
KY KY133 Construct Northern Bypass of Somerset, KY and I‐66 from the Cumberland
Parkway west of Somerset, Kentucky to I‐75 south of London, Kentucky
2,844,099.46 8‐196 | Widen US‐27 from KY‐590 to Bell Street in Stanford (Includes new
Goshen Cut‐off Rd)
2,844,099.46
KY KY134 Replace U.S. 68 and U.S. 150 Bridge over Chaplin River, Perryville. 425,885.00 7‐1116 | Replace bridge & approaches on KY‐152 over Herrington Lake at the
Mercer/Garrard Co line
425,885.00
KY KY136 Widen KY 11 from U.S. 460 to the Mount Sterling Bypass, Montgomery
County.
1,028,672.93 7‐250.10 |Reconstruct US 460 at Lucky Stop Hill 1,028,672.93
KY KY138 Reconstruct U.S. 127 at the U.S. 127 and U.S. 127 North Bypass, Mercer
County
425,279.75 7‐1116 | Replace bridge and approaches on KY‐152 over Herrignton Lake at
the Mercer/Garrard Co line
425,279.75
KY KY140 Construct South Airfield Road, Boone County, Kentucky 271,526.48 6‐17.04 | Transportation improvements to Brent Spence Bridge 271,526.48
KY KY141 Construct two bridges across the Ohio River from Louisville to southern
Indiana.
6,424,719.53 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
6,424,719.53
KY KY142 WIDEN AND RECONSTRUCT KY 698 AT MASON GAP ROAD, LINCOLN COUNTY 617,914.83 8‐196 | Widen US 27 from KY 590 to Bell St in Standord (MP 18.2 TO MP
18.9), Lincoln Co
617,914.83
KY KY145 Construct Kidville Road (KY 974) Interchange at the Mountain Parkway, Clark
County
149,896.09 10‐126 | Widen the Mountain Parkway to 4‐lanes from Campton to
Salyersville
149,896.09
KY KY149 Owensboro Riverfront Development Project in Owensboro. 3,047,254.63 2‐8300 | Widening KY‐54 from the US‐60 bypass toward Whitesville from
milepost 2.45 to milepost 8.0.
3,047,254.63
KY KY151 Oregon Road Bridge Replacement Project in Mercer County. 282,550.73 7‐1116 | Replace bridge & approaches on KY‐152 over Herrington Lake at
Mercer/Garrard Co line (084B00005N)
282,550.73
KY KY152 Ashland Riverfront Development Project in Ashland. 1,123,098.00 9‐1081 | Replace bridge on KY 474 over Smith Creek in Carter at intersection
of KY 474 & Nunn Rd(CR 1507) 022B00123N
1,123,098.00
KY KY156 Abraham Lincoln Project, LaRue County 495,163.00 5‐538 | Construct new I‐65 interchange between KY 480 and KY 245. 495,163.00
KY KY157 Breathitt‐Pennyrile Extension, Christian County 253,935.00 2‐180 | Widen KY‐911 from US‐41A to Oak Grove. 253,935.00
KY KY159 Transportation Improvements to Hwy 163 from Hwy 90 to Tompkinsville,
Monroe County
2,122,504.95 8‐108 | US 127 from North bank of Cumberland River to Jamestown Bypass,
Russell County
2,122,504.95
KY KY163 21st Century Parks Project in Louisville, Kentucky 3,818,622.64 5‐715.41 | Louisville Bridges; Kentucky traditional NH funding for FY 2017
pledged to support financing of LSIORB
3,818,622.64
KY KY165 Owensboro Riverfront Development Project in Owensboro, Kentucky 962,024.00 2‐8300 | Widening KY‐54 from the US‐60 bypass toward Whitesville from
milepost 2.45 to milepost 8.0.
962,024.00
Total Amount Repurposed 38,428,894.25Total # of Earmarks Repurposed 43
49
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Louisiana
State Demo ID Project Description Amount Project Description Amount
LA LA021 Replace ferry in Plaquemines Parish 189,497.17 H.011276 New Orleans Airport Connector Road Sega 189,497.17
LA LA023 Increase Capacity of Lake Pntchartrain Causeway 248,120.91 H.011276 New Orleans Airport Connector Road Sega 248,120.91
LA LA027 Reconstruct Jefferson Lakefront Bike path in Jefferson Parish, LA 153,188.06 153,188.06
LA LA029 Construct a feasibility study, design and construction of connector between
LA 16 to I 12 Livingston
204,669.19 H.008250 I‐10 Highland to LA 73 204,669.19
LA LA044 Construct N/S Road / I 10 US 61 connection in Kenner, LA 2,270,168.36 H.011276 New Orleans Airport Connector Road Sega 2,270,168.36
LA LA047 Widen Lalpalco Blvd from Barataria Blvd to Destrehan Ave in Jefferson parish,
LA
638,701.41 H.011276 New Orleans Airport Connector Road Sega 638,701.41
LA LA048 LA Segment, Gulk Coast High Speed Rail 119,246.63 H.011276 New Orleans Airport Connector Road Sega 119,246.63
LA LA050 LA 3132 to Caddo_Bossier Port, Shreveport 354,801.15 H.011484 US 80 Red River BR Texas St Rehab (HB) 354,801.15
LA LA056 I 20 Garrett Road 496,750.00 H.011621 I‐20: LA 133 ‐ US 425 496,750.00
LA LA057 LA 18 Widening Jefferson Parish, LA 215,589.00 H.011276 New Orleans Airport Connector Road Sega 215,589.00
LA LA080 Develop Master Plan for NO RMC 40,630.00 H.011276 New Orleans Airport Connector Road Sega 40,630.00
LA LA082 Interstate Lighting System (I10 at LA 93) 24,378.00 H.003003 I‐10; E JCT I‐49 TO LA 328 24,378.00
LA LA085 Construct Miss River Trail and Bike path, NO 40,630.00 H.011276 New Orleans Airport Connector Road Sega 40,630.00
LA LA087 Installation of proper lighting standards to illuminate inbound and outbound
ramps of I 10 and LA 95
16,252.00 H.003003 I‐10; E JCT I‐49 TO LA 328 16,252.00
LA LA089 Upgrade highway railway x‐ings at Madison St. Gretna 16,252.00 H.011276 New Orleans Airport Connector Road Sega 16,252.00
LA LA092 Plan, design and construct Pointe Clair Expressway in Iberville Parish 2,403,540.00 H.009250 I‐10 Highland to LA 73 2,403,540.00
LA LA093 Water Well Road Gateway Corridor (LA 478) 1,841,133.16 H.001146 LA120: Bridges Near Provencal 1,841,133.16
LA LA094 Construction of Turn Lane Expansion w/signals at N/B off ramp on I 49 at US
90
40,630.00 H.003003 I‐10; E JCT I‐49 TO LA 328 40,630.00
LA LA096 Improve by widening, realigning and resurfacing 3.2 miles of LA 850 between
LA 145 and LA 821
256,009.93 H.011621 I‐20: LA 133 ‐ US 425 256,009.93
LA LA099 Construction of a direct intermodal truck access road from I 210 to the City
Docks of the Port of LC
9,658,251.15 H.000428 LA 12 Bridges 9,658,251.15
LA LA100 Improvements to Essen lane at I 12, Perkins Rd, Central thruway, O'Neal Ln,
Burbank Dr & Essan Pk and LA408 study
2,658,521.03 H.008250 I‐10 Highland to LA 73 2,658,521.03
LA LA101 Study for LA 25 Washington Parish 211,356.95 H.012191 LA 445 S End I‐12 Overpass ‐ US 190 211,356.95
LA LA106 Construct I 12 and LA 1088 Interchange 243,780.00 H.012191 LA 445 S End I‐12 Overpass ‐ US 190 243,780.00
LA LA108 Upgrade LA 28 to four lanes from LA 121 to LA 465 162,520.00 H012106 LA 465: US 171 to Fort Polk Gate 162,520.00
LA LA110 Construct LA 16 Inch at I 12 and improvements; Cook Rd improvements 9,662,312.62 H.009250 I‐10 Highland to LA 73 9,662,312.62
LA LA111 Improvements to Zachary Taylor Parkway 162,520.00 H.009250 I‐10 Highland to LA 73 162,520.00
LA LA116 New Iberia Rail Grade Separation 340,773.20 H.003003 I‐10; E JCT I‐49 TO LA 328 340,773.20
LA LA122 Widen LA 18 from Northrup Grumman/Avondale Shipyards to US 90,
Jefferson Parish
203,265.20 H.011276 New Orleans Airport Connector Road Sega 203,265.20
LA LA123 Improvements to LA 46, St Bernard Parish 32,504.00 H.011276 New Orleans Airport Connector Road Sega 32,504.00
LA LA131 Red River National Wildlife Refuge Visitor Center 243,780.00 H.011484 US 80 Red River BR Texas St Rehab (HB) 243,780.00
LA LA145 Connection between LA 51 bypass and old Baton Rouge LA 1040_Hammond 100,148.00 H.012191 LA 445 S End I‐12 Overpass ‐ US 190 100,148.00
LA LA148 Design and acquire ROW, LA I 69 2,503,688.00 H.011484 US 80 Red River BR Texas St Rehab (HB) 2,503,688.00
LA LA156 LA 1 Drainage and Sidewalk improvements in Grand Isle 285,365.63 H.004540 Leeville to Golden Meadow (Phase 2) 285,365.63
LA LA162 Improve Natchitoches Johnson Chute and Posey Road Connection from I 49
to LA1
237,503.82 H.001146 LA120: Bridges Near Provencal 237,503.82
LA LA178 George Ridge Road Bridge 21,313.18 H.011621 I‐20: LA 133 ‐ US 425 21,313.18
ToFrom
50
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Louisiana
State Demo ID Project Description Amount Project Description Amount
ToFrom
LA LA193 Planning, Design, and Construction of I 69 in TX, LA, AR, MS, TN, KY and IN 6,470,635.40 H.011484 US 80 Red River BR Texas St Rehab (HB) 6,470,635.40
LA LAM01 I‐20 Downing Pines Interchange, Louisiana (Funding in FMIS) 940,419.00 H.011621 I‐20: LA 133 ‐ US 425 940,419.00
Total Amount Repurposed 43,708,844.15Total # of Earmarks Repurposed 37
51
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Maine
State Demo ID Project Description Amount Project Description Amount
ME ME028 Relocation of southbound on‐ramp to I‐95 at Exit 184, Bangor ‐ Public Law
1090059 1702 157. Original allocation HY10 FY2005, LY10 FY 2006
1,502,213.00 Bridge replacement: Ohio Street / I‐95 bridge #5790 in Bangor, carrying Ohio
Street over I‐95
1,502,213.00
ME ME037 Modifications to Exit 7 / I‐295 and to Franklin Arterial, Portland ‐ Public Law
1090059 Section 1702 1231, original allocation FY 2007.
180,266.00 Portland ‐ I‐295 updating of wayfinding signage along I‐295 between exits 5
and 9. Signing; Highway Safety and Spot Improvements
180,266.00
ME ME074 Replacement of Waldo‐Hancock and construction of related pedestrian
walkways ‐ Public Law 1090059 1934 194. Original Allocation FY 2005
1,002,341.00 Bridge wearing surface replacement: Penobscot Narrows Bridge #6421 on the
Prospect‐Verona town line, carrying Rts 1 & 3 over the Penobscot River
1,002,341.00
Total Amount Repurposed 2,684,820.00Total # of Earmarks Repurposed 3
ToFrom
52
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Maryland
State Demo ID Project Description Amount Project Description Amount
Rehabilitate Hanover Street Bridge in Baltimore City ‐ Adding funds to
existing Earmark MD082
2,454,720.00
Inner Water Taxi Terminal Project 750,000.00
MD MD061 Per Review Study of Conflicts between Road System and Light Rail Operations
in Linthicum, MD
80,118.00 Rehabilitate Hanover Street Bridge in Baltimore City ‐ Adding funds to
existing Earmark MD082
80,118.00
MD MD062 Study Greater Towson Area Traffic Flow and Future Needs 160,236.00 Rehabilitate Hanover Street Bridge in Baltimore City ‐ Adding funds to
existing Earmark MD082
160,236.00
MD 355 Tunnel Underpass (BRAC) project: south of Jones Bridge Road/
Center Drive to North of South Wood
844,001.28
Drive/South Drive. This project is to tie WMATA station to the Bethesda
faculties
1,158,948.72
Total Amount Repurposed 5,448,024.00
Total # of Earmarks Repurposed 4
2,002,950.00Roadway Improvements from Intersection of US 29 in Montgomery County
along Industrial Parkway thru to FDA access/Cherry Hill Road
MD134MD
To
3,204,720.00Construction of Fringe and Corridor Parking Facility at intersection of Clinton
Street and Keith Avenue in Baltimore City
MD057MD
From
53
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Massachusetts
State Demo ID Project Description Amount Project Description Amount
MA MA015 Undertake improvements to South Station Intermodal Station 908,221.00 MBTA bus stop accessibility and operational improvements 908,221.00
MA MA117 Realignments and reconstruction of a section of Route 32 in Palmer to the
Ware town line
2,563,776.00 Design and construction of improvements to Route 32 in the Town of Palmer 2,563,776.00
MA MA119 Assabet River National Wildlife Refuge, MA, Design and Construction of
parking areas
42,662.00 Great Meadows National Wildlife Refuge Transportation Project 42,662.00
MA MA123 Construct new interchange on I‐95 between existing Route 1A ramp to the
north and Route 123 ramp to the south, Attleboro
500,738.00 Interchange Improvements at Routes 24 & 140 500,738.00
MA MA124 Commonwealth Ave/Kenmore Sq. roadway and pedestrian improvements 406,299.00 Improvements on Boylston Street, from Intersection of Brookline Avenue and
Park Drive to Ipswich Street in Boston
406,299.00
MA MA125 Improve traffic signal operations, pavement markings and regulatory signage,
Milton‐Boston City Line
1,201,770.00 Deck reconstruction over SE Expressway (East Milton Square), includes
parking and new landscaped area
1,201,770.00
MA MA127 Pedestrian Walkway for the Town of Norwood Design and construction of the
walking path at Ellis Pond, Norwood [ref P.L. 110‐244, Sec 105(a)(154)]
781,151.00 Intersection and signal improvements at US 1 (Providence Highway) and
Morse Street in Norwood
781,151.00
MA MA128 Study and design I 93/Mystic Ave. Interchange at Assembly Sq 400,590.00 Design of signal and intersection improvement on I‐93 at Mystic Avenue and
McGrath Highway
400,590.00
MA MA133 Longwood Ave/Urban Ring Tunnel Study 129,995.00 MBTA bus stop accessibility and operational improvements within the
Longwood Medical Area
129,995.00
MA MA149 Design and construct signal crossing and other safety improvements to
Emerald Necklace Greenway Bicycle Trail, Town of Brookline
600,885.00 Pedestrian bridge rehabilitation over MBTA off Carlton Street 600,885.00
MA MA154 East Boston Haul Road Construction 5,007,375.00 Construct Melnea Cass Corridor Improvement in Boston #5789 5,007,375.00
MA MA156 Design and construct the Quinebaug River Rail Trail Bikeway 801,180.00 Rail Trail & Quinebaug River bank stabilization in the Town of Southbridge 801,180.00
MA MA170 Massachusetts Bay Transportation Authority Secure Station, Boston 1,001,475.00 MBTA bus stop accessibility and operational improvements 1,001,475.00
MA MA174 Oxbow National Wildlife Refuge, Design and construction of a Visitor Contact
Station
152,362.00 Great Meadows National Wildlife Refuge Transportation Project 152,362.00
MA MA175 Rehabilitation and paving of Parker River Road 20,315.00 Intersection and signal improvements at Route 125 and Massachusetts
Avenue in North Andover
20,315.00
MA MA181 Chelsea Roadway Improvements 2,002,950.00 Chelsea Silver Line Gateway Phase Two 2,002,950.00
MA MA188 Construct access improvements to the Lawrence Gateway Project, Lawrence 65,000.00 608407 Lawrence‐ Traffic Signal Improvements on Common Street and Lowell
Street
65,000.00
MA MA189 Construct pedestrian and vehicular access improvements on the existing
Brightman Street Bridge in Fall River
500,738.00 Corridor improvements on Route 79/Davol Street 500,738.00
MA MA194 Road improvements between Museum Road and Forsyth Way in Boston. 2,784,425.00 Construct Melnea Cass Corridor Improvement in Boston #605789 2,784,425.00
MA MA199 Construct Lechmere Station area roadway and access improvements in
Cambridge.
5,007,375.00 Green Line Extension 5,007,375.00
Total Amount Repurposed 24,879,282.00Total # of Earmarks Repurposed 20
ToFrom
54
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Michigan
State Demo ID Project Description Amount Project Description Amount
MI MI005 Traffic Improvement Demo‐ Petoskey MI, US 31 Bypass or upgrade existing
local roads. (See PL 104‐205 Sect 406) Petoskey area transportation needs
53,781.86 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand
Traverse County line easterly to Kalkaska Rd
53,781.86
MI MI006 M‐59: Urban Highway Corridor Demo (MI) 1,352,329.22 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
1,352,329.22
MI MI007 Urban Airport Access Safety Demo (MI) Detroit Airport 1,953,951.34 Wayne County ‐ Cherry Hill Rd ‐ Canton Center Rd to Haggerty Rd ‐ Restore
and Rehabilitate
1,953,951.34
MI MI008* Bristol Rd Relocation ‐ PE Demo ‐ Flint (MI) 79,765.86 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
79,765.86
MI MI009 M‐84: Expansion Saginaw‐PE Demo‐ Bay Counties, MI 15,466.45 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
15,466.45
MI MI010 US‐31 in cities of Niles & Benton Harbor‐ PE Demo 2,840.36 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the
intersection with Howard Street in the City of Kalamazoo
2,840.36
Monroe County ‐ Dennison Rd ‐ over Middle Br Macon Drain ‐ Bridge
replacement
879,335.04
Monroe County ‐ Macomb N ‐ Elm E to Grove E ‐ Restore and Rehabilitate 39,098.60
MI MI017 Flint: Design & construct 1.02 miles of 5‐lane roadway 2,399.77 City of Flint ‐ Resurface ‐ Kearsley Street ‐ Chevrolet Avenue to Beach Street 2,399.77
MI MI018 Traverse City: Traverse City Bypass 65,877.61 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand
Traverse County line easterly to Kalkaska Rd
65,877.61
MI MI019 Cadillac: Improvements to US 131 from Cadillac to Manton to Traverse City 10,756.88 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand
Traverse County line easterly to Kalkaska Rd
10,756.88
MI MI023 Jackson County: US 127 Upgrading 327.80 Branch County ‐ Multi course HMA overlay ‐ M‐60 ‐ From the St. Joseph
County line for 8.0 miles easterly
327.80
MI MI024 Vienna Township: I‐75/M57 interchange 41,969.92 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
41,969.92
MI MI029 20M dollars appropriated in PL 103‐122 shall be made available to MI. for M‐
59 RR‐Xing project at Pontiac; Bristal Road projects near Flint and $500,000
available to Maple Rd at Bishop Airport.
162,066.26 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
162,066.26
MI MI038 Construct route improvements along Washington Ave. between Janes Ave. to
Johnson St. and East Genesee Ave. Sagin
131.82 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
131.82
MI MI039 Construct Tawas Beach Road/US 23 interchange improvements, East Tawas 138,533.64 Iosco County ‐ Hot Mix Asphalt Reconstruction ‐ US‐23 ‐ North of Tawas
Beach Road to 110' south of Kirkland Drive, City of Tawas and Baldwin
Township
138,533.64
MI MI042 Operational improvements on M‐24 from I‐75 to the northern Oakland Co.
border
12,550.00 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
12,550.00
MI MI046 Construct Bridge Street bridge project in Southfield 125.12 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
125.12
MI MI071 Replace Barton Rd./M‐14 interchange, Ann Arbor 266,581.19 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
266,581.19
MI MI073 Construct M‐24 Corridor from I‐69 to southern Lapeer County 1,039,022.38 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
1,039,022.38
MI MI080 Construct US‐27 between St. Johns and Ithaca 8.21 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
8.21
To
918,433.64Rail Consolidation/Highway Safety ‐ Monroe (MI)MI011MI
From
55
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Michigan
State Demo ID Project Description Amount Project Description Amount
ToFrom
MI MI088 Conduct engineering and design and improve I‐94 in Calhoun and Jackson
Counties
192,071.85 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the
intersection with Howard Street in the City of Kalamazoo
192,071.85
MI MI090 Construction of, and improvements to, the Detroit, Michigan Ambassador
Bridge Ga
684,250.35 Macomb County ‐ Reconstruct ‐ M‐59 from M‐53 to E of Romeo Plank Road,
City of Sterling Heights, City of Utica and Shelby Township
684,250.35
MI MI095 I‐96/ Cedar/Pennsylvania Interchange, Michigan 212,373.06 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
212,373.06
MI MI097 Oakland County Smart Corridor and Emergency Routing System, Michigan 30,357.38 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft. of
South Blvd from Fredmoore Dr to Livernois ‐ Road ‐ Local road ‐ add right turn
lanes, upgrade signal and resurface intersection
30,357.38
MI MI109 Clinton Township Hike/Bike Pathway, Michigan 499.99 Macomb County ‐ River Bends Park ‐ Gene Shepard Park to Shelby to Utica
Park ‐ Bike/Pedestrian ‐ construct hike/bike path
499.99
MI MI114 Grand River Avenue, City of Novi, Michigan 42,894.28 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft. of
South Blvd from Fredmoore Dr to Livernois ‐ Road ‐ Local road ‐ add right turn
lanes, upgrade signal and resurface intersection
42,894.28
MI MI125 Traverse City Study 127.01 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand
Traverse County line easterly to Kalkaska Rd
127.01
MI MI128 South Lyon, 2nd St. between Warren and Haggadorn Pontiac Trail between
E. Liberty and McHattie Street [ref P.L. 110‐244, Sec 105(a)(92)]
100,148.00 City of South Lyon ‐ McMunn St ‐ Dorothy St to McHattie St ‐ Restore and
Rehabilitate
100,148.00
MI MI137 Construction and improvements to Western Avenue and associated streets
between Third Street and Terrace Street in Muskegon
635,563.80 City of Muskegon, Reconstruction of Laketon Ave from Getty to Creston 635,563.80
MI MI139 Alger County, Repaving a portion of H‐58 from Buck Hill towards Little Beaver
Road Alger County, to reconstruct, pave, and realign a portion of H‐58 from
2,600 feet south of Little Beaver Lake Road to 4,600 feet east of Hurricane
River [ref P.L. 110‐244, Sec 105(a)(114)]
177,933.75 H‐58, Alger County, Beginning at Newberg road, extending 1.8 miles Easterly ‐
Reconstruct ‐ hot mix asphalt paving, aggregate base, hot mix asphalt crush
and shape, shoulders, guardrail, pavement marking, traffic control
177,933.75
MI MI140 Allen Road under the CN Railroad Grade Separation, Woodhaven 3,263,009.37 Wayne County ‐ Allen Rd, Van Horn Rd, in the cities of Trenton and
Woodhaven ‐ restore and rehabilitate
3,263,009.37
MI MI143 Construct access road at intersection of Doerr Road and Schell Street to
Develop 65‐Acre of Municipal Tract of Industrial Land. Village of Cass City,
Tuscola County
20,830.40 Village of Cass City ‐ Crack Sealing, pavement markings ‐ Seeger street from
the south village limit to the north village limit.
20,830.40
MI MI144 Design, Right‐of‐Way and Construction of the I 196 Chicago Drive (Baldwin
Street) Interchange Modification, Michigan
5,082,806.75 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the
intersection with Howard Street in the City of Kalamazoo
5,082,806.75
MI MI145 Arenac County, Upgrade Maple Ridge Road from Briggs Road east to M65 169,723.68 Arenac County ‐ Reconstruct ‐ Sterling Rd ‐ Hull Rd to US23 169,723.68
MI MI147 Iosco County, Reconstruct Bissonette Road from Lorenz Road to Chambers
Road
33,921.00 Iosco County, Resurface, Putnam Road from Esmond Road to Webb Road 33,921.00
MI MI150 Cogshall Road Crossing Improvement and Life Safety Access Project in Holly,
MI
961,416.00 Oakland County ‐ Grange Hall Rd ‐ Intersection with N. Saginaw/North Holly
Rd ‐ Traffic Ops/Safety
961,416.00
MI MI151 Ontonagon County, Improve Fed. Forest Hwy 16 from M 38 to Houghton
County Line
58,791.89 Ontonagon County ‐ Reconstruct ‐ Mud Creek Road from Roussea Road to Fox
Road
58,791.89
MI MI154 Widen M72 from U.S. 31 easterly 7.2 miles to Old M72 268,360.58 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand
Traverse County line easterly to Kalkaska Rd
268,360.58
MI MI157 Resurfacing of Masonic Boulevard in Fraser. 266,031.51 City of Fraser ‐ Masonic Blvd ‐ Kelly Rd to Gratiot Ave ‐ Restore and
Rehabilitate
266,031.51
MI MI158 Reconstruction of Nine Mile Road in Eastpointe 117,196.39 City of Eastpointe ‐ Toepfer Rd ‐ Gratiot to Boulder ‐ Restore and Rehabilitate 117,196.39
56
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Michigan
State Demo ID Project Description Amount Project Description Amount
ToFrom
MI MI159 M‐168 Reconstruction in the village of Elberta 199,513.93 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand
Traverse County line easterly to Kalkaska Rd
199,513.93
MI MI166 M‐13 Washington Avenue Streetscape Project. Phase II of High Priority
Project 192 in Public Law 105‐550, City of Saginaw
338,506.18 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
338,506.18
MI MI167 Construct railroad grade separation on M‐85 (Fort Street) North of Van Horn
Road, Trenton.
1,143,073.06 Macomb County ‐ Reconstruct ‐ M‐59 from M‐53 to E of Romeo Plank Road,
City of Sterling Heights, City of Utica and Shelby Township
1,143,073.06
MI MI168 Construct pedestrian trail and bridge in Kearsley Park in Flint. 80,118.00 City of Flint ‐ Resurface ‐ Kearsley Street ‐ Chevrolet Avenue to Beach Street 80,118.00
MI MI170 Construction of Greenways in Pittsfield Charter Township‐‐2.5 miles to
existing Ann Arbor Greenways, Pittsfield Charter Township
61,298.84 Washtenaw County ‐ Pittsfield Township ‐ Non‐motorized improvements ‐
Bike/Pedestrian
61,298.84
MI MI171 I‐96 Beck, Wixom Road Interchange, design, ROW, and construction 478,422.14 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
478,422.14
MI MI172 Construction of a hike and bike path from Riverbends Park, 22 Mile Road, to
Stony Creek Park, 25 Mile Road in Shelby Township. South to the city of Utica
[ref P.L. 110‐244, Sec 105(a)(200)]
110,974.83 Macomb County ‐ River Bends Park ‐ Gene Shepard Park to Shelby to Utica
Park ‐ Bike/Pedestrian ‐ construct hike/bike path
110,974.83
Oscoda County ‐ Reconstruction‐Crush, shape, pave, shoulder, pavement
marking and permanent sign replacement, North Mount Tom Rd from M‐33
north to Miller road & W. Miller Rd from Gerber Rd east to M‐33
132,033.00
Oscoda County ‐ Crush, shape, pave 2” HMA, shoulders and permanent
pavement markings, Townline Rd. from Lyle Road north to County line.
165,644.00
MI MI180 Purchase and implementation of various Intelligent Transportation System
technologies in the Grand Rapids metro region.
1,413,438.93 Kalamazoo County ‐ Reconstruct to install dual left turn lanes ‐ I‐94BL at the
intersection with Howard Street in the City of Kalamazoo
1,413,438.93
MI MI181 Menominee, Ogden Street Bridge rehabilitation project‐replacement of deck,
expansion joints, sidewalks, railing and all other joints
160,236.00 City of Menominee, paint structural steel, repair mechanical and seals of
Ogden Street Bridge
160,236.00
MI MI184 Construction of the I‐696 and Northwestern Highway Interchange Freeway
Ramps at Franklin Road in Southfield
473,889.76 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
473,889.76
MI MI186 Construction of Nonmotorized Pathway, City of Rockwood. 28,419.75 Wayne County ‐ Cherry Hill Rd ‐ Canton Center Rd to Haggerty Rd ‐ Restore
and Rehabilitate
28,419.75
MI MI188 Sault Ste. Marie, Reconstruct East Spruce Street with drainage, curb, gutter,
pavement, traffic control devices.
297,575.72 City of Sault Ste Marie ‐ Reconstruction ‐ E. Spruce Street, bridge over Power
Canal to Ord Street
297,575.72
MI MI189 Study and construct I‐96/ U.S. 31/Sternberg Road area improvements. 2,002,950.00 Muskegon County ‐ US‐31 ‐ C&O Railroad north to north of Fruitvale Road, in
village of Lakewood Club, townships of Dalton, Fruitland, Whitehall and
Montague
2,002,950.00
MI MI191 Construct North Central Muskegon County Corridor Improvements at U.S. 31
and Russell Road
392,191.67 River Road, from Horton to Buys Road, Resurface 392,191.67
MI MI192 St. Clair County Parks is working with 13 local units to develop the 54‐ mile
Bridge‐to‐Bay trail
118,159.55 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft of
South Blvd from Fredmoore Dr. to Livernois
118,159.55
MI MI194 Integrated highway realignment and grade separations at Port Huron, MI to
eliminate road blockages from NAFTA rail traffic.
45,431.81 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft of
South Blvd from Fredmoore Dr. to Livernois
45,431.81
MI MI196 Houghton County, Rehabilitate 2 piers and remove old bridge caissons for
Sturgeon River Bridge.
42,444.31 Houghton County, Rice Lake Road crush and shape 42,444.31
MI MI197 Westland, Ann Arbor Trail between Farmington and Merriman between
Hines Drive and Inkster, Flamingo Street between Ann Arbor Trail and Joy
Road, and the intersection of Warren Road and Newburgh Road [ref P.L. 110‐
244, Sec 105(a)(91)]
676,346.07 City of Westland ‐ Cowan Rd ‐ Wayne Rd to Farmington Rd ‐ Restore and
Rehabilitate
676,346.07
297,677.00Oscoda County, Reconstruction and surfacing of Valley Road from M‐33 west
to Mapes Road
MI177MI
57
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Michigan
State Demo ID Project Description Amount Project Description Amount
ToFrom
MI MI198 White Lake and Commerce, pave Cooley Lake Road Between Ripple Way and
Havenwood.
300,990.01 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and
Rehabilitate
300,990.01
MI MI202 Widen and reconstruct Walton Boulevard Bridge in Auburn Hills between
Opdyke and Squirrel Road
1,050,230.65 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and
Rehabilitate
1,050,230.65
Macomb County ‐ Macomb Orchard Trail ‐ 2230' East of M‐53 on the East
side of East Coon Creek to 3624' to the West side of Powell Rd ‐
Bike/Pedestrian ‐ construct trail segment
143,634.40
Macomb County ‐ River Bends Park ‐ Gene Shepard Park to Shelby to Utica
Park ‐ Bike/Pedestrian ‐ construct hike/bike path
343,257.00
MI MI207 Construct pedestrian and bicycle pathway at Chippewa Landing River Park in
the Village of Caro
64,094.00 City of Caro ‐ mill and overlay ‐ Gilford Road between Hooper Street and
Western city limit boundary
64,094.00
MI MI211 Planning and Engineering for The American Road, The Henry Ford Museum,
Dearborn
241,765.20 City of Dearborn ‐ Prospect Rd ‐ Schlaff to Schaefer ‐ Restore and
Rehabilitation
241,765.20
MI MI214 City of Menominee, Resurface Hattie Street Bridge deck 250 feet from 9th
avenue in Menominee to Riverside Avenue in Marinette, WI.
180,266.00 City of Menominee, Bridge Deck replacement and approaches 180,266.00
MI MI215 Emmet County, Ultra thin demonstration project resurfacing of Mitchell Road
from the City of Petoskey limits east to Division
6,241.59 2018 North Conway Road reconstruction project from Hathaway Road to
Edward Road., Emmet County
6,241.59
MI MI217 Ogemaw County, Overlay of Fairview Road to improve network of all‐season
truck routes
34,754.67 Ogemaw County, Reconstruct, State Road, Henderson Lake Road to Schagel
Rd.
34,754.67
MI MI221 Study and implement transportation system alternatives in the vicinity of U.S.
31/M 46
439,429.38 River Road, from Horton to Buys Road, Resurface 439,429.38
MI MI222 Study to determine replacement options for obsolete and structurally
deteriorating bridge (Trenton‐Grosse Isle Bridge) including approach
roadways, Charter County of Wayne
3,204,720.00 Wayne County ‐ Grosse Ile Bridge ‐ over Trenton Channel ‐ Bridge repair 3,204,720.00
MI MI223 Design, right‐of‐way and construction of passing relief lanes and
improvements necessary on M‐55, between M‐37 and M‐ 115
178,772.28 Kalkaska County ‐ Crush and Shape and Asphalt Resurfacing ‐ M‐72 ‐ Grand
Traverse County line easterly to Kalkaska Rd
178,772.28
MI MI227 Walled Lake, Widen Maple Road, west of Decker to Welch. 100,148.00 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and
Rehabilitate
100,148.00
MI MI228 Construction of Pittsfield Greenways Bridge‐‐Non‐ motorized bridge
enhancement onto existing Bemis Road Bridge, Pittsfield Charter Township
Pittsfield greenways construction to connect Pittsfield to the Ann Arbor
greenway system, Pittsfield Township [ref P.L. 110‐244, Sec 105(a)(352)]
39,516.00 Washtenaw County ‐ Pittsfield Township ‐ Non‐motorized improvements ‐
Bike/Pedestrian
39,516.00
MI MI233 Study road runoff in Little Black Creek between U.S. 31 and Seaway Drive. 73,841.03 West Michigan Shoreline Regional Development Commission ‐ study
strategies for port expansion and multi‐modal opportunities that can tie
water, air, rail and highway modes of transportation together to add
efficiency to the regional transportation network and enhance economic
opportunities in the port. The Port of Muskegon was the #1 project selected
for the Regional Prosperity Initiative (RPI) which was driven by Governor
Synder.
73,841.03
MI MI234 Eliminate major roadway on Cleary University campus and establish a new
roadway.
101,607.68 Oakland County ‐ Livernois, South Blvd ‐ at South Blvd intersection; 1700 ft of
South Blvd from Fredmoore Dr. to Livernois
101,607.68
MI 486,891.40Re‐surfacing Sebewaing Road in Huron County. Construct hike and bike path
as part of Bridgeview Bridge replacement in Macomb County [ref P.L. 110‐
244, Sec 105(a)(209)]
MI206
58
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Michigan
State Demo ID Project Description Amount Project Description Amount
ToFrom
MI MI237 Construct Industrial Park Service Road and Caine Road Bridge Replacement.
Village of Millington, Tuscola County
62,426.39 Main Street in the Village of Millington, Tuscola County between M‐15 and
Railroad Tracks just east of Depot St. Rotomill curb edges to 2" below finish
grade and mill 2" butt joints, clean and apply SS‐1H Bondcoat for adhesion of
2" overlay install 2" compacted thickness of 36A wearing course HMA
62,426.39
MI MI238 Canton, Pave Cherry Hill Rd. between Canton Ctr., and Haggerty 1,602,360.00 Wayne County ‐ Cherry Hill Rd ‐ Canton Center Rd to Haggerty Rd ‐ Restore
and Rehabilitate
1,602,360.00
MI MI239 Design, Right‐of‐Way and Construction of the I‐196 Chicago Drive (Baldwin
Street) Interchange Modification, Michigan
710,857.15 Newaygo County ‐ Single course chip with fog seal utilizing a scrub seal in
place of overband pretreatment. M‐20 ‐2,012' E of 144th Avenue east to 32'
W of Winter Street, in village of Hesperia, Ferry and New Field Townships,
Newaygo County. 44' E of Greenback east to 15' W of M‐37, in village of
Hesperia, Ferry, New Field, Denver, Lincoln and Wilcox townships, Oceana
and Newaygo counties.
710,857.15
MI MI246 Reconstruct and widen I‐94 in Kalamazoo 812,599.85 Branch County ‐ Multi course HMA overlay ‐ M‐60 ‐ From the St. Joseph
County line for 8.0 miles easterly
812,599.85
MI MI247 Construct an interchange at I‐675 and Warren Avenue near downtown
Saginaw
812,599.85 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
812,599.85
MI MI249 Reconstruct I‐75 from North of U.S.‐2 to Sault Ste. Marie and reconstruct the
existing roadway, Sault Ste. Marie
609,449.90 Emmet County ‐ HMA Crush and shape and HMA resurface US‐31 from
Douglas Lake Rd north to E. Levering Rd, McKinley Township, Emmett County
609,449.90
MI MI252 Allen Road under the CN Railroad Grade Separation, Woodhaven 6,008,850.00 Wayne County ‐ Allen Rd, Van Horn Rd, in the cities of Trenton and
Woodhaven ‐ restore and rehabilitate
6,008,850.00
City of Sault Ste Marie ‐ Reconstruction ‐ West 4th Avenue ‐ Hyde Street to
Oak Street
253,169.65
City of Sault Ste Marie ‐ Reconstruction ‐ E. Spruce Street, bridge over Power
Canal to Ord Street
174,968.71
MI MI256 Construction of the I‐696 and Northwestern Highway Interchange Freeway
ramps at Franklin Road in Southfield
304,724.98 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
304,724.98
MI MI259 Alger County, to reconstruct, pave, and realign a portion of H‐58 from 2,600
feet south of Little Beaver Lake Road to 4,600 feet east of Hurricane River
144,688.35 H‐58, Alger County, Beginning at Newberg road, extending 1.8 miles Easterly ‐
Reconstruct ‐ hot mix asphalt paving, aggregate base, hot mix asphalt crush
and shape, shoulders, guardrail, pavement marking, traffic control
144,688.35
MI MI262 Reconstruct and widen I‐94 in Kalamazoo 2,858,372.17 Branch County ‐ Multi course HMA overlay ‐ M‐60 ‐ From the St. Joseph
County line for 8.0 miles easterly
2,858,372.17
MI MI267 Jackson Road Boulevard Project, Scio Township 481,012.16 Washtenaw County ‐ Various Roads, Jackson, Baker, Liberty, Wagner and
Zeeb ‐ Restore and Rehabilitate
481,012.16
MI MI268 Blue Water Bridge Plaza Expansion, Improve Highway connections along I‐94
and I‐69 Port Huron
1,696,683.72 Macomb County ‐ Reconstruct ‐ M‐59 from M‐53 to E of Romeo Plank Road,
City of Sterling Heights, City of Utica and Shelby Township
1,696,683.72
MI MI271 Washington Ave. Streetscape and rail relocation in Saginaw 341,134.59 Saginaw County ‐ Mill & Two Course Overlay ‐ M‐46 ‐ West limits of Merrill to
Brennan Road
341,134.59
MI MI272 U.S. 131 widening from the Manistee River to north of M‐113 in Grand
Traverse County
847,757.61 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
847,757.61
MI MI273 11 Mile Road Reconstruction‐‐Berkley, Huntington Woods, Oak Park 192,404.88 Oakland County ‐ 12 Mile Rd ‐ Haggerty Rd to Farmington Rd ‐ Restore and
Rehabilitate
192,404.88
MI MI274 Planning design, and construction of a new American border plaza at the Blue
Water Bridge in or near Port Huron, MI
1,552,784.78 Genesee County ‐ Reconstruct mainline and ramps ‐ I‐69 ‐ East of Ballenger
Highway to west of Fenton road
1,552,784.78
428,138.36West Portage Avenue realignment, Sault Ste. Marie.MI254MI
59
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Michigan
State Demo ID Project Description Amount Project Description Amount
ToFrom
MI MI308 Greeway trail construction from City of Monroe to Sterling State Park, City of
Monroe
8,342.83 Monroe County ‐ Macomb N ‐ Elm E to Grove E ‐ Restore and Rehabilitate 8,342.83
MI MIM01 Berrien County ‐ I‐94 from I‐196 to Friday Road (Exits 34‐39) ‐ resurfacing
maintenance crossovers
25,979.40 Berrien County ‐ I‐94 and I‐196 ‐ restore, resurface, relocate road and bit
resurface and bit shoulders. Replace culvert ‐ location I‐94 to North of M‐63
25,979.40
MI MIM02 Oakland County ‐ I‐96/Wixom Road Interchange ‐ resurfacing maintenance
crossovers
163,155.64 Wayne County ‐ I‐275 ‐ Concrete pavement repairs, joint sealing and
miscellaneous work ‐ S. County Line to N. of Northline Road
163,155.64
*Subject to availability of funds upon additional research.
Total Amount Repurposed 52,963,484.42
Total # of Earmarks Repurposed 94
60
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Minnesota
State Demo ID Project Description Amount Project Description Amount
MN MN002 Bloomington Ferry Bridge 63,111.85 "MN120" Right of way Acquisition and Construction at CSAH 115/CR 116 for
the TH 55 corridor protection project
63,111.85
MN MN031 Undertake improvements to Hennepin County Bikeway 251,087.72 Lake Street Access Project to 35W 251,087.72
MN MN107 Construct recreational visitor center on the Mesabi Trail, City of Virginia,
Eveleth [ref P.L.110‐244, Sec 105(a)(5)]
178,726.80 **MN175"" Construct Mesabi Trail from McKinley to Bibwabik 178,726.80
MN MN111 Trail Extensions to Mesabi Trail, City of Aurora 135,455.37 St. Louis County CSAH 101 from County Road 955 to Kimberly Avenue in
Eveleth
135,455.37
MN MN112 Right‐of‐way acquisition for TH 23 Paynesville Bypass 237,757.20 MN104/MN234, TH 4:TH55 to I‐94, mill & overlay & TH 55:Kandiyohi/Stearns
Co Ln to the east
237,757.20
MN MN123 Construction of new highway between the bridge over Partridge River on
County Road 565 in Hoyt Lakes to the intersection of CSAH 21 and 70 in
Babbit
1,808,865.90 St. Louis County CSAH 110 from CSAH 16 to Hoyt Lakes Limits, 0.1 miles east
from Hoyt Lakes
1,808,865.90
MN MN124 Construct Soo Line Trail from north of Bowlus to the east side of Mississippi
River
58,618.00 SRTS project from US 10 to CSAH 54 in the city of Royalton 58,618.00
MN MN127 Ely Area Joint Public Works Complex 222,038.00 St. Louis County CSAH 101 from County Road 955 to Kimberly Avenue in
Eveleth
222,038.00
MN MN135 Reconstruct I‐694 White Bear Avenue (CSAH 65) Interchange in White Bear
Lake
59,210.00 *MN135* Lake St Access to I‐35W, purchase of R/W, PE, & Construction 59,210.00
MN MN150 Design, engineering, R/W acquisition, construction and construction
engineering for the reconstruction of TH 95, from 12th Ave to CSAH 13,
including bridge and approaches, ramps, intersecting roadways, signals, turn
lanes, and multiuse trail, North Branch
1,527,086.09 *MN150* *MN214* MSAS 203 (Summit Av) from Syndicate St. to Griggs St. in
St. Paul, Construction new bridge #62652 over Ayd Mill Rd & appr
1,527,086.09
MN MN152 Phase II/part II ‐ 129,437.38 *MN152* *ELLA* TH 10: Access Management from Lake Park to Frazee, turn
lanes, median closures
129,437.38
MN MN153 Reconstruct CSAH 4 and CSAH 5 (Forest Highway 11) between CSAH 15 and
TH 61 Silver Bay
236,679.00 Lake County CSAH 2 from 0.3 miles North of Forest Highway 11 to 2.6 miles
North, Grading and base
236,679.00
MN MN154 Roadway Improvements, City of Federal Dam 170,633.11 Reconstruct Cass Co CSAH 77 from south City Limits of Lakeshore to CSAH 78 170,633.11
MN MN159 MN159 Design and right‐of‐way acquisition for I‐35E CSAH 14 Main Street
Interchange, City of Lino Lakes, Minnesota
124,209.57 Reconstruction of Hanson Boulevard from 139th Ln NW to 0.1 mi N of CR 18 124,209.57
MN MN166 Paul Bunyan Trail, Walker to Bemidji Segment 61,222.00 *MN166* *MN186* Bena Trail, Old Housing Drive NE west to North Winnie
Road
61,222.00
MN MN178 Reconstruction of Airport Road from TH 53 to CR 296, Cirrus Drive from
Airport Road to TH 53 and TH 53 from Airport Road to Stebner Road
446,006.63 North Shore Scenic Dive, from Brighton Beach Boulevard to McQuade Safe
Harbor (Duluth city limit), shoulder widening
446,006.63
MN MN179 Reconstruct Grand Avenue (from Central Ave to 59th Ave W), Central Ave
(from Grand Ave to I‐35) and Bristol Street (from Central Ave to Grand Ave,
Duluth
88,815.00 North Shore Scenic Dive, from Brighton Beach Boulevard to McQuade Safe
Harbor (Duluth city limit), shoulder widening
88,815.00
MN MN184 Construct ramps and new bridge over Interstate 35 at CSAH 17, and
reconstruct CSAH 17 from west County Line to CSAH 30, Chisago County
792,088.77 CSAH 30 from CSAH 19 to CSAH 17, roadway reclamation, reconditioning and
resurfacing
792,088.77
MN MN186 Construct Paul Bunyan Trail, Walker to Bemidji Segment 111,937.92 *MN166* *MN186* Bena Trail, Old Housing Drive NE west to North Winnie
Road
111,937.92
MN MN187 Construction of Gitchi‐Gami State Trail from Silver Bay to Tettagouche State
Park
892,213.00 Demo ID #MN102, Gitchi‐Gami State Trail from Cascade River to Grand
Marais, Trail Construction
892,213.00
MN MN188 Construct bridge for Paul Bunyan Trail over Excelsior Road, Baxter 347,547.21 Baxter MSAS113, From Excelsior Road to Cottage Road in Baxter,
Reconstruction
347,547.21
ToFrom
61
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Minnesota
State Demo ID Project Description Amount Project Description Amount
ToFrom
MN MN199 I‐494 Lane Addition 256,521.08 *MN199* Lake St Access to I‐35W, purchase of R/W, PE, & Construction 256,521.08
MN MN204 Phase II/part II ‐ CSAH 15 to East of Scenic Highway 7 (1.2 miles). Completion
of Phase II/Part I of a project on Elizabeth Avenue in Coleraine to west of
Itasca County State Aid Highway 15 in Itasca County [ref P.L.110, Sec
105(a)(152)]
2,275,351.00 *MN204* TH 169, in Taconite from 0.3 mi. E Scenic Hwy 7 to 0.64 mi. E Jct TH
65 in Penguilly, PE for Environmental impact statement along E segment of
Cross Range Expressway
2,275,351.00
MN MN214 Design, engineering, R/W acquisition, construction and construction
engineering for the reconstruction of TH 95, from 12th Ave to CSAH 13,
including bridge and approaches, ramps, intersecting roadways, signals, turn
lanes, and multiuse trail, North Branch
676,181.00 *MN150* *MN214* MSAS 203 (Summit Av) from Syndicate St. to Griggs St. in
St. Paul, Construction new bridge #62652 over Ayd Mill Rd & appr
676,181.00
MN MN219 Planning, Design, and Construction for the Twin Cities Bioscience Corridor in
St. Paul
2,942,618.42 Jackson Street Reconstruction from 11th Street to University Avenue in St.
Paul
2,942,618.42
MN MN234 Right‐of‐way acquisition for TH 23 Paynesville Bypass 673,521.83 MN104/MN234, TH 4:TH55 to I‐94, mill & overlay & TH 55:Kandiyohi/Stearns
Co Ln to the east
673,521.83
Total Amount Repurposed 14,766,939.85
Total # of Earmarks Repurposed 26
62
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Mississippi
State Demo ID Project Description Amount Project Description Amount
MS MS005 Norrell Road & I‐20 in Hinds County, MS 25,151.00 I‐55 from Byram to McDowell Road, Hinds County 25,151.00
MS MS007 Highway Study ‐ Madison County 16,250.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 16,250.00
MS MS011 Upgrading of US‐98 from County line of Pike and Walthall Counties to Lamar
County, MS
54,032.00 I‐55 from SR 568 to US 98 West, Pike County 54,032.00
MS MS027 Upgrade Land Fill Road, Panola County 409,483.00 I‐55 Construct Truck Scales in Panola and Tate Counties 409,483.00
MS MS047 51‐43 Connector Canton, Mississippi 400,000.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 400,000.00
MS MS091 US 51 ‐ SR 43 Connector Road in Canton, Mississippi 63,619.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 63,619.00
MS MS098 Construct bicycle path, Petal 160,236.00 I‐59 from Lamar CL to US 98 East 160,236.00
MS MS104 Plan and Construct Highway 45 Bypass in Columbus 2,230,083.00 US 82 Interchange Improvements in Columbus, MS. 2,230,083.00
MS MS107 Upgrade roads in Terry, Edwards, Utica and Bolton, Hinds County 178,724.00 I‐55 from the Rankin County Line to the Madison County Line in Hinds County 178,724.00
MS MS112 Upgrade Blue Cane Road in Tallahatchie County, and roads in Webb and
Tutwiler
85,637.00 US 49E across Black Bayou [Bridge #278.4], Tallahatchie County 85,637.00
MS MS115 Gateways Transportation Enhancement Project, Hancock County 51,447.00 SR 43/603 Kiln Bypass from end of 4‐Lane to North of Kiln, Hancock County 51,447.00
MS MS126 Upgrade Safety Devices at Front Street Rail Crossing, Ellisville 40,059.00 I‐59 Interchange at SR 42 ‐ Forrest County 40,059.00
MS MS136 Upgrade roads in Port Gibson (U.S. Highway 61), Claiborne County 88,508.00 I‐20 Mississippi River Bridge 88,508.00
MS MS154 Transportation improvements for Pearl‐Pirates Cove Interchange, Pearl 5,007,375.00 West Rankin Parkway 5,007,375.00
MS MSF02 Water Taxi Study, Barnett Reservoir, Mississippi 652,809.00 Improve access to the reservoir by way of expansion, repair and/or paving of
the existing facilities; construction on public boat ramp and parking lot;
milling and overlaying.
652,809.00
Total Amount Repurposed 9,463,413.00Total # of Earmarks Repurposed 15
ToFrom
63
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Missouri
State Demo ID Project Description Amount Project Description Amount
MO MO017 Upgrade eastern Jackson County 197,134.53 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near
Emma
197,134.53
MO MO019 Construct Chouteau Bridge in Kansas City 3,332,885.82 Rt 29 Pavement improvements from Todd Creek to US 69 3,332,885.82
MO MO024 Construct Jefferson Ave viaduct over Mill Creek Valley in St. Louis 647,156.27 I‐70 pavement improvements from Fifth Street in St. Charles to Fee Road in
St. Louis County
647,156.27
MO MO036 Construct extension of bike path between Soulard Market area and
Riverfront in St. Louis
219,610.58 Rt 30, pavement improvements from St. Louis City limits to I‐55 219,610.58
MO MO037 Construction of airport ground trans terminal for Springfield/Branson Airport 14,350.94 Bridge Improvements over Radio Lane north of Springfield on Rt. 13 14,350.94
MO MO040 Develop bike/ped paths for town of Kansas and Riverfront Park in Kansas City 103,422.37 I‐435 pavement improvements from Missouri River Bridge to Rt 24 103,422.37
MO MO041 Construct Cuivre River Bridge at Lincoln County 49,298.23 Rt MM improve deficient bridge over Crooked Creek 49,298.23
MO MO042 Construct Rt 13 Missouri River Bridge at Lexington 201,503.91 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near
Emma
201,503.91
MO MO048 Resurface and maintain roads located in Missouri State Parks 88,580.29 Bridge Improvements over Radio Lane north of Springfield on Rt. 13 88,580.29
MO MO052 I‐55 Interchange project at Weaver Rd and River Des Peres 214,801.60 Rt 30, pavement improvements from St. Louis City limits to I‐55 214,801.60
MO MO064 Lewis and Clark Expressway, Jackson County 18,183.78 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near
Emma
18,183.78
MO MO087 Construct 2 lanes on Chouteau Trafficway from MO 210 to I‐35 1,602,360.00 I‐35 pavement improvements from I‐70 to the Kansas State line 1,602,360.00
MO MO088 Rt 291 Outer road improvements 162,521.00 Pavement Improvements on I‐49 from Blue Ridge Blvd to 163rd Street 162,521.00
MO MO091 Widening, curb and gutter improvements on Hwy 92 9,665.00 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near
Emma
9,665.00
MO MO095 Complete impact study for North Oak Highway Corridor redevelopment 77,979.61 Interchange and ramp improvements on Broadway at IS35/IS70 in Kansas City 77,979.61
MO MO097 Removal and replacement of Grand Ave Bridge in City of St. Louis 284,409.00 Shoulder and curve improvements from Rt 47 to Rt D on 94 284,409.00
MO MO103 Reconstruction of the Tucker Street Bridge in the city of St. Louis 806,729.63 Rt 30, pavement improvements from St. Louis City limits to I‐55 806,729.63
Rt 39 pavement and safety improvements from I‐44 to 0.2 miles north of
Olive Street in Aurora and on Rt M from Rt 96 to Rt 74
800,000.00
Rt 76 bridge improvements over Bull Shoals lake 500,000.00
I‐49 bridge improvements over BNSF and Spring River 702,732.44
MO MO109 Relocation and reconstruction of Rt MM from Rt 21 to Rt 30 1,865,306.17 Rt 55 pavement improvements from Rt Z to the Ste. Genevieve Co line 1,865,306.17
Rt 29 Pavement improvements from Todd Creek to US 69 152,435.77
Rt 29 Pavement improvements from Todd Creek to US 70 347,564.23
Pavement Improvements on I‐49 from Blue Ridge Blvd to 163rd Street 1,196,374.77
MO MO112 Relocate the entrance to the Shaw Nature Reserve 40,630.00 Rt BB pavement improvements from Rt A to Rt 50 40,630.00
Rt 44 pavement improvements on various sections from 1.25 miles east of Rt
37 to 0.5 miles east of Jasper Co
9,500,000.00
Rt 49 pavement improvements from Rt 59 near Goodman to near Bus 71
south of Rt 76
1,298,801.00
Rt 59 slide repairs 1.7 miles south of Rt EE near Ginger Blue 1,218,900.00
MO MO119 Interchange design and construction ‐ Main Street extension at I‐55 Cape
Girardeau
801,180.00 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from
3 miles south of 162 to 0.8 miles south of I‐55
801,180.00
MO MO122 Construct an extension of Mo 740 from US 63 to I‐70 Lake of the Wookds
interchange
2,002,950.00 I‐70 pavement improvements on the eastbound and westbound lanes from
MO River to near St. Charles Road
2,002,950.00
MO MO125 Construct Highway 465 to Highway 376 south from 376 to 76 4,807,080.00 Rt 76 bridge improvements over Bull Shoals lake 4,807,080.00
OR 44, pavement improvements on Antire Road near Eureka 500,000.007,511,800.00Improve Access to I‐55 Bayless Ave/Loughborogh AveMO126MO
1,696,374.77Construct Interstate flyover at Hughes Road and Liberty Drive to 76th StreetMO111MO
12,017,701.00Upgrade of Rt 71 from Pineville to Arkansas State lineMO118MO
To
2,002,732.44Study Highway 37‐60 entire corridorMO105MO
From
64
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Missouri
State Demo ID Project Description Amount Project Description Amount
ToFrom
I‐70 Pavement improvements along the reversible lanes from east of Union to
Broadway
1,500,000.00
Rt 61 pavement and ADA improvements from Rt M to south of Church Road 2,000,000.00
Rt 55 pavement improvements from Rt Z to the Ste. Genevieve Co line 3,511,800.00
MO MO127 Kansas City Smartport ITS for highways 5,253.82 I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near
Emma
5,253.82
MO MO128 I‐35 Access Modification planning, city of Kearney 820,600.65 Rt 92 Pavement improvements from Rt 33 in Kearney to Rt 69 in Excelsior
Springs
820,600.65
MO MO129 Construct additional exit ramp access lane from I‐44 to Kings highway,
enhance Shaw Avenue
416,954.00 Rt 30, pavement improvements from St. Louis City limits to I‐55 416,954.00
MO MO130 South County Riverfront access and trails project, Lemay 325,039.00 Rt 30, pavement improvements from St. Louis City limits to I‐55 325,039.00
MO MO133 Redesign and reconstruct I‐170 interchange at Ladue Rd 38,912.63 Rt 30, pavement improvements from St. Louis City limits to I‐55 38,912.63
MO MO134 STE. GENEVIEVE CO., MISSOURI RTE 61 BRIDGE REPLACEMENT OVER
ESTABLISHED CREEK
211,010.00 Rt 67 pavement improvements from St. Francois River Bridge to Jefferson
County
211,010.00
MO MO135 Study for RR crossing reconfiguration to eliminate highway crossings in
Springfield
801,180.00 I‐44 pavement improvements on disconnected sections from Greene Co line
to 2.3 miles east of Rt M and J
801,180.00
MO MO136 Upgrade Rt 94‐St. Charles Co east of Harvester Rd to west of Mid‐Rivers Drive 243,365.82 Shoulder and curve improvements from Rt 47 to Rt D on 94 243,365.82
MO MO138 Construct 4 lanes for Hwy 60 from Willow Springs to Van Buren 205,357.01 Rt 49 pavement improvements from Rt 72 / Rt 21 to Rt 34 in Piedmont 205,357.01
MO MO144 I‐470/Strother Rd interchange in Lee's Summit 29,989.28 Rt W pavement and sidewalk improvements from I‐435 to the Kansas State
line
29,989.28
Rt 24, pavement and shoulder improvements from Rt 5 in Keytesville to
Randolph CO
2,600,000.00
Rt 61, pavement and intersection improvements from Warren Barrett Drive
to 0.5 miles south of Rt 19
3,085,290.94
Bridge Improvements over BNSF and MNA railroads on Rt 96 1,000,000.00
Bridge improvements over Spring River Overflow on Rt 96 922,287.54
MO MO151 Interchange design and construction ‐ Main Street extension at I‐55 Cape
Girardeau
1,501,525.60 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from
3 miles south of 162 to 0.8 miles south of I‐55
1,501,525.60
Rt 8 pavement improvements from 0.2 miles east of Rt 19 at Steelville to Rt
AA in Washington County
1,700,000.00
I‐70 pavement improvements from Fifth Street in St. Charles to Fee Road in
St. Louis County
302,950.00
MO MO154 Realign and bridge replacement over First Creek east of 2nd Street to Rt 169
on MO92
2,002,950.00 I‐35 Pavement improvements from Fishing River Bridge to Rt 69/Pleasant
Valley Interchange
2,002,950.00
MO MO156 Construct interstate flyover at Hughes Rd and Liberty Drive to 76th Street 4,005,900.00 Rt 29 Pavement improvements from Todd Creek to US 69 4,005,900.00
MO MO157 I‐55 redesign, Cape Girardeau County 2,002,950.00 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from
3 miles south of 162 to 0.8 miles south of I‐55
2,002,950.00
Rt 61, new interchange at Rt P and Peine Road and safety improvements at
median crossover north of Peine Road
3,031,187.93
Shoulder and curve improvements from Rt 47 to Rt D on 94 1,449,939.61
I‐70 pavement improvements from Rt 13 in Higginsville to east of Rt Y near
Emma
2,000,000.00
4,481,127.54Page Avenue Extension, Phase II, St Charles CoMO160MO
2,886,072.95Lewis and Clark Expressway, 39th street to Hwy 24, Jackson CoMO162MO
1,922,287.54Upgrade to 4 lanes MO66 from Duquesne Rd to Rt 249 in Jasper CountyMO150MO
2,002,950.00Relocation and reconstruction of Rt MM from Rt 21 to Rt 30MO152MO
5,685,290.94Improve US 36 to divided four lane expressway from Macon to Rt 24MO145MO
65
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Missouri
State Demo ID Project Description Amount Project Description Amount
ToFrom
Rt 10 pavement improvements, ADA transition plan sidewalks from Rt 69 to
east of Fork Fishing River
886,072.95
MO MO165 I‐55 Interchange at Main Street, Cape Girardeau 549,807.93 I‐55 pavement improvements from I‐57 to north of Rt 61/62 near Ristin; from
3 miles south of 162 to 0.8 miles south of I‐55
549,807.93
MO MO167 Widen Rt 66 Duquesne Rd to Rt 249, Jasper Co 25,896.99 Rt 43, pavement improvements from south of Rt 171 to south of Murphy
Boulevard.
25,896.99
MO MO168 Grand Ave Bridge replacement in St. Louis City 1,644,327.44 Rt 55 pavement improvements from Rt Z to the Ste. Genevieve Co line 1,644,327.44
MO MO172 Upgrades to Scott Rd (Rt TT) ‐ Rollins Rd and Brookview Terrace in Boone Co 8,195.04 Pavement improvements on east and westbound lanes of IS70 in Boone Co
near Lake of the Woods Interchange
8,195.04
Total Amount Repurposed 72,593,291.12Total # of Earmarks Repurposed 49
66
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Montana
State Demo ID Project Description Amount Project Description Amount
MT MT002* US Highway 93 (Native Religious site) 20,000.00 8958‐Mittower Road N‐Route US 93‐Seal and Cover 20,000.00
MT MT022 US Highway 87 Improvements ‐ Value Added Commodity Processing Center,
Montana
184,202.45 8966‐Great Falls N&S ‐ Multiple locations on I‐15‐Crack seal of the existing
roadway & interchange ramps
184,202.45
MT MT025 Construction of S. 323 from Alzada to Ekalaka in Carter County. 10.01 8568‐Slide Repair S of Plevna‐Secondary Route 494‐stabilization of slide along
existing roadway
10.01
MT MT028 Transportation improvements for Babcock to Kagy Project, Bozeman 507,876.00 1298 ‐ Mission Interchange North ‐ State Primary Route 59/US 89 ‐
Reconstruct of existing road & structure
507,876.00
MT MT029 Transportation improvements for Townsend‐South Project, U.S. 287 1,963,729.77 8101‐Pipestone to Whitehall‐NH Route 90‐Seal and cover of existing
roadway, ramps and crossroads
1,963,729.77
MT MT032 Transportation improvements for Lonepine North and East Project, MT28 711,025.00 8955 ‐ Superior West ‐ Route I‐90 ‐ Microsurfacing 711,025.00
MT MT037 Develop and reconstruct Two Medicine Bridge, US 2, East of Glacier National
Park
2,398,268.00 7636‐Kiowa Junction N&S‐State Primary Route 58/US 89‐reconstruct of
roadway, new alignment, structure work
2,398,268.00
MT MT040 Taylor Hill Road reconstruction, Secondary 234, Montana 469,340.48 7983 ‐ Havre 7th Ave Bridge Deck rehabilitation/replacement 469,340.48
MT MT041 Develop and construct Shiloh Road reconstruction project, Billings 1,276,450.99 8721‐Billings NW‐NH Route 53/MT 3‐Crack seal, level, plant‐mix overlay with
seal and cover of existing roadway
1,276,450.99
MT MT046 Reconstruct Marysville Road consistent with final environmental document,
Lewis and Clark County
678,637.73 9197 ‐ Helena N Hill ‐ Sieben Int ‐ Route I‐15 seal and cover on the existing
roadway
678,637.73
MT MT050 Develop and contruct Helena I‐15 corridor consistent with final
environmental document and record of decision
1,276.00 9197 ‐ Helena N Hill ‐ Sieben Int ‐ Route I‐15 seal and cover on the existing
roadway
1,276.00
MT MT053 Develop and construct parking lot and transportation enhancements
including bicycle/pedestrian trails and urban plaza, serving the City of
Bozeman Public Library
108,228.00 1298 ‐ Mission Interchange North ‐ State Primary Route 59/US 89 ‐
Reconstruct of existing road & structure
108,228.00
MT MT056 Conrad I‐15 North Interchange modifications to provide access east of the
current interchange, Pondera County
1,366,656.56 5805 ‐ N of Bynum N, State Primary Route 3/US 89 ‐ Reconstruction of the
existing roadway
1,366,656.56
MT MT057 Develop and improve access road and structure serving the Port of Montana
and Silicon Mountain Technology Park
384,810.00 8101‐Pipestone to Whitehall‐NH Route 90‐Seal and cover of existing
roadway, ramps and crossroads
384,810.00
*Subject to availability of funds upon additional research. 10,070,510.99
Total Amount Repurposed 10,070,510.99Total # of Earmarks Repurposed 14
ToFrom
67
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Nebraska
State Demo ID Project Description Amount Project Description Amount
NE NE007 Corridor study for Plattsmouth Bridge area to US‐75 and Hornung Road 22,839.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 22,839.00
NE NE008 Conduct corridor study from Wayne to Vermillion‐Necastle bridge 244,766.98 State PN 32131, Resurfacing and bridge work on N‐12 east and west of
Wynot
244,766.98
NE NE011 Construct NE‐35 alternative and modified route expressway in Norfolk and
Wayne
2,566,073.81 State PN 31817A, urban reconstruction in Jackson 2,566,073.81
NE NE012 Construct bridge in Newcastle 80,142.00 State PN 32131, Resurfacing and bridge work on N‐12 east and west of
Wynot
80,142.00
NE NE014 Replace US‐81 bridge between Yankton, South Dakota and Cedar County,
Nebraska
97,883.00 State PN 32131, Resurfacing and bridge work on N‐12 east and west of
Wynot
97,883.00
NE NE016 Improve Nebraska Highways 8 and 15 in Fairbury 52,145.02 State PN 13184, replace viaduct west of Fairbury 52,145.02
NE NE034 Interstate 80 Interchange at Pflug Road, Sarpy County, Nebraska 1,602,360.00 State PN 13232, Resurface N‐109 south of Cedar Bluffs 1,602,360.00
NE NE037 Design, right‐of‐way and construction of rail‐grade separation throughout
Nebraska as identified by Nebraska Dept. of Roads
1,218,900.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 1,218,900.00
NE NE040 Construction of the Columbus, Nebraska North Arterial Road 365,669.00 State PN 42609, Resurface L‐63A north of Genoa 365,669.00
NE NE042 Design, right‐of‐way and construction of the Louisville bypass, Nebraska 3,002,950.00 State PN 22467A, new viaduct east of Murray 3,002,950.00
NE NE043 Cuming Street Transportation improvement project in Omaha, Nebraska 2,259,231.00 State PN 22689, Resurface W Maple Rd between 156th and 108th St in
Omaha
2,259,231.00
NE NE045 Missouri River Bridges between US‐34, I‐29 in Iowa and US‐75 in Nebraska 205,344.04 State PN 13159, Replace 4th Corso viaduct in Nebraska City 205,344.04
NE NE047 I‐80 Interchange at Pflug Road, Sarpy County, Nebraska 801,180.00 State PN 13232, Resurface N‐109 south of Cedar Bluffs 801,180.00
NE NE048 Missouri River Bridges between US‐34, I‐29 in Iowa and US‐75 in Nebraska 203,150.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 203,150.00
NE NE049 Construction of the Columbus, Nebraska North Arterial Road 763,023.91 State PN 42609, Resurface L‐63A north of Genoa 763,023.91
NE NE050 Design and construction of Missouri River Bridges between US‐34, I‐29 in
Iowa and US‐75 in Nebraska
50,787.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 50,787.00
NE NE051 Missouri River Bridges between US‐34, I‐29 in Iowa and US‐75 in Nebraska 121,890.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 121,890.00
NE NE053 Transportation Improvements for US‐81 Meridian Bridge, Yankton 182,835.00 State PN 32131, Resurfacing and bridge work on N‐12 east and west of
Wynot
182,835.00
NE NE056 Design, right‐of‐way and construction of the Louisville bypass, Nebraska 400,590.00 State PN 22467A, new viaduct east of Murray 400,590.00
NE NE057 Construction of I‐80 ‐ Cherry Avenue Interchange and East bypass, Kearney,
Nebraska
101,576.00 State PN 42575, Resurface N‐70 south or Ord 101,576.00
NE NE058 Interstate 80 Interchange at Pflug Road, Sarpy County, Nebraska 600,885.00 State PN 13232, Resurface N‐109 south of Cedar Bluffs 600,885.00
NE NE060 New roads and overpasses to relieve congestion and improve traffic flow
Antelope Valley
752,100.21 State PN 13111. Reconstruct intersection at 27th St and I‐80 in Lincoln 752,100.21
NE NE062 Cuming Street Transportation improvement project in Omaha, Nebraska 644,392.52 State PN 22689, Resurface W Maple Rd between 156th and 108th St in
Omaha
644,392.52
NE NE064 Midwest Roadside Safety Facility, UNL ‐ Lincoln, NE 101,576.00 State PN 00965, Infrastructure improvements to MwRSF facility 101,576.00
NE NE066 Design, right‐of‐way and construction of rail‐grade separation throughout
Nebraska as identified by Nebraska Dept. of Roads
554,742.57 State PN 13159, Replace 4th Corso viaduct in Nebraska City 554,742.57
NE NE067 Lincoln East Beltway, NE 157,254.50 State PN 13111. Reconstruct intersection at 27th St and I‐80 in Lincoln 157,254.50
NE NE068 I‐80 six lane (I‐180 ‐ 56th St.) Lincoln, NE 304,725.00 State PN 13111. Reconstruct intersection at 27th St and I‐80 in Lincoln 304,725.00
State PN 22689, Resurface W Maple Rd between 156th and 108th St in
Omaha
1,100,000.00
To
4,102,591.80Cuming Street Transportation improvement project in OmahaNE071NE
From
68
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Nebraska
State Demo ID Project Description Amount Project Description Amount
ToFrom
State PN 22690. Resurface W Maple Rd between Ramblewood and 156th St 3,002,591.80
NE NE075 Plan and design I‐80 Interchange at Pflug Road 1,001,475.00 State PN 22566, Resurface and bridge work on UUS‐30 between Fremont and
Arlington
1,001,475.00
NE NE076 Design and construction of Missouri River Bridges between US‐34, I‐29 in
Iowa and US‐75 in Nebraska
304,725.00 State PN 13159, Replace 4th Corso viaduct in Nebraska City 304,725.00
NE NE077 Construction of the North Arterial Road in Columbus 204,569.15 State PN 42609, Resurface L‐63A north of Genoa 204,569.15
NE NE078 Design and construction of Meridian Bridge between Nebraska and Yankton,
South Dakota
101,576.00 State PN 32131, Resurfacing and bridge work on N‐12 east and west of
Wynot
101,576.00
State PN 22690. Resurface W Maple Rd between Ramblewood and 156th St 1,100,000.00
State PN 22649. Resurface Military Ave from Benson ‐ Cuming St in Omaha 2,749,028.00
State PN 22710. Resurface Military Ave from Fort St ‐ 90th St in Omaha 850,000.00
State PN 22711. Resurface N‐133 from W Dodge Rd to I‐680 in Omaha 1,014,317.00
NE NE083 Construction of the North Arterial Road in Columbus 305,236.69 State PN 42609, Resurface L‐63A north of Genoa 305,236.69
Total Amount Repurposed 29,192,530.20Total # of Earmarks Repurposed 34
5,713,345.00Cuming Street Transportation improvement project in Omaha, NebraskaNE080NE
69
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New Hampshire
State Demo ID Project Description Amount Project Description Amount
NH NH003 Bridge Capacity Improvements (NH): Nashua River Bridge ‐ second bridge
(Public law 1000202, 1010164, 1000457, 1060346; Signed into law Dec 22,
1987, Nov. 21, 1989, Sept. 30, 1988 and Oct. 23, 2000 respectively)
4,445,000.00 Nashua 41049 X‐A004(543) Pavement Rehabilitation: Somerset Parkway,
NH101A, NH130, & NH111 (Fed‐Aid Eligible City Maintained)
4,445,000.00
NH NH022 Granite Street Bridge Project, New Hampshire (Public law 1080007; Signed
into law Feb. 20, 2003)
44,032.00 Manchester 29811 X‐A004(311) ‐ Multi‐Use path along abandoned RR line
from Gold St. to Perimeter Road.
44,032.00
NH NH026 NH DOT Londonderry South Road Advance, Mitigation/Wetland Creation
(Public law 1080199; Signed into law Jan. 23, 2004)
36,873.37 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area 36,873.37
NH NH030 Reconstruction and relocation of the intersection of Maple Avenue and
Charleston Road in Claremont (Public law 1080447; Signed into law Dec. 8,
2004)
31,206.08 Claremont 13248 X‐MGS‐STP‐X‐013(039) ‐ NH12 and North Street
intersection relocation
31,206.08
NH NH040 Reconstruction of NH11 and NH28 Intersection in Alton,
ii. Public law 1090059; Signed into law Aug 10, 2005)
286,806.77 Barnstead 14121E X‐A001(174) ‐ NH28 intersection improvement project
at Peacham Road
286,806.77
NH NH042 Construct Intersection at U.S. 3 and Pembroke Hill Road in Pembroke (Public
law 1090059; Signed into law Aug. 10, 2005)
87,078.31 Loudon‐Canterbury 29613 X‐A004(201) ‐ NH106 improvements from Clough
Hill Road to Shaws Road
87,078.31
NH NH044 South Road Mitigation in Londonderry (Public law 1090059; Signed into law
Aug 10, 2005)
560,754.72 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area 560,754.72
NH NH046 Construct Park and Ride, Exit 5 on I‐93 ‐ Londonderry, NH (Public law
1090059; Signed into law Aug. 10, 2005)
162,520.00 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area 162,520.00
NH NH047 Reconstruction and relocation of the intersection of Maple Avenue and
Charleston Road in Claremont (Public law 1090059; Signed into law Aug. 10,
2004)
40,631.00 Claremont 13248 X‐MGS‐STP‐X‐013(039) ‐ NH12 and North Street
intersection relocation
40,631.00
NH NH049 Construct Pedestrian, Bicycle bridge in Keene (Public law 1090059; Signed
into law Aug 10, 2005)
65,009.00 Keene 10309B X‐STP‐0111(007) ‐ Winchester Street Reconstruction from
NH101 to Pearl Street.
65,009.00
NH NH050 Hampton Bridge Rehabilitation ‐‐Hampton, NH (Public law 1090059; Signed
into law Aug 10, 2005)
121,890.00 Hampton 40797 A004(490) ‐ Ocean Blvd Study and Design Project. 121,890.00
NH NH051 Environmental mitigation at Sybiak Farm in Londonderry to offset effects of I‐
93 improvements (Public law 1090059; Signed into law Aug 10, 2005)
121,890.00 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area 121,890.00
NH NH052 Environmental mitigation at Crystal Lake in Manchester to offset effects of I‐
93 improvements (Public law 1090059; Signed into law Aug 10, 2005)
154,394.00 Salem‐Manchester 14633D A004(375) ‐ I‐93 Reconstruction Exit 4 Area 154,394.00
NH NH056 Reconstruction of NH11 and NH28 Intersection in Alton (Public law 1090059;
Signed into law Aug 10, 2005)
201,038.10 Barnstead 14121E X‐A001(174) ‐ NH28 intersection improvement project
at Peacham Road
201,038.10
NH NH061 Construct Intersection at U.S. 3 and Pembroke Hill Road in Pembroke (Public
law 1090059; Signed into law Aug. 10, 2005)
351,657.31 Loudon‐Canterbury 29613 X‐A004(201) ‐ NH106 improvements from Clough
Hill Road to Shaws Road
351,657.31
Total Amount Repurposed 6,710,780.66Total # of Earmarks Repurposed 15
ToFrom
70
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New Jersey
State Demo ID Project Description Amount Project Description Amount
NJ NJ002 Passaic Co ‐ Complete construction of Rt 21 512,288.61 Route 21, Dayton Street to Route 46 W, MP12.68‐14.35, Resurfacing 512,288.61
NJ NJ007* I‐280 Downtown Connector Interim Improvements bridges over Rt 4 368,144.70 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
368,144.70
NJ NJ009* Newark: To construct ramps to provide access to I‐78 26,835.01 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
26,835.01
NJ NJ012 Paramus: RT.17/4 Interchange Project 12,752.93 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
12,752.93
NJ NJ027 Construct New Jersey Exit 13A Flyover (extension of Kapowski Rd. to Trumbull
St)
1,886.17 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ
to Industrial Hwy Carteret, NJ
1,886.17
NJ NJ033 Relocate and complete construction of new multi‐modal facility 122,373.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
122,373.00
NJ NJ034 Revitalize Route 130 from Cinnaminson to Willingboro 947,416.84 Route 130, Charleston Road/Cooper Street (CR 630) to Crafts Creek,
Resurface, MP 43.01 ‐ 51.58
947,416.84
NJ NJ037 Construct road from the Military Ocean Terminal to the Port Jersey Pier,
Bayonne
24,949.62 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
24,949.62
NJ NJ038 Design, construct, and expand industrial roads connecting Carteret with
Woodbridge, Route 35 with Perth Amboy for increased truck traffic which will
ease delays and traffic at Turnpike Exit 12 and Route 35 underpass east and
for the NJ Carteret, NJ Ferry
1,065,112.12 Route 35, Perth Amboy Connector, Bridge Replacement‐MP52.3‐52.53 1,065,112.12
NJ NJ045 Replace Maple Grange Road bridge over Pochuck Creek in Sussex County 3,201.88 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
3,201.88
NJ NJ049 Improve Old York Road/Rising Run road Intersection in Burlington, Total
TEA21 Authorization $5,111,145
76,472.82 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
76,472.82
NJ NJ058 Construct Collingswood Circle Eliminator, Camden 301,492.71 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐
MP26.42‐27.8
301,492.71
NJ NJ060 Upgrade urban University Heights Connector, Newark 21,452.72 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
21,452.72
NJ NJ061 Construct Bicycle Trails and Riverside Improvements, West Deptford 171,543.78 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
171,543.78
NJ NJ068 Improvements at the Rosedal Road and Provinceline Road intersection in the
Township of Princeton, New Jersey
249,450.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
249,450.00
NJ NJ072 NJCDC Training Facility Project in Paterson, New Jersey 46,209.69 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
46,209.69
NJ NJ074 Improvements to Route 35 at Clinton Avenue and other intersections in the
Borough of Eatontown, New Jersey
498,900.00 Livingston Avenue Traffic Calming, New
Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78
498,900.00
NJ NJ076 Improvements to Route 641 in Hunterdon County, New Jersey 89,730.76 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
89,730.76
NJ NJ077 Spring Valley Road Project in Marlboro Township, New Jersey 1,197,360.00 Livingston Avenue Traffic Calming, New
Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78
1,197,360.00
NJ NJ080 Monroe Township Intersection Signalization Project, New Jersey 496,750.00 Livingston Avenue Traffic Calming, New
Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78
496,750.00
NJ NJ117* Rt 47 Chapel Heights Ave Goucester 96,546.83 Route 47, Grove St. to Route 130, Mill, Resurface & Sidewalk Repl.‐MP62.3‐
75.2
96,546.83
NJ NJ120 Construct Long Valley Bypass 801,180.00 Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83 (CR 517) 801,180.00
ToFrom
71
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New Jersey
State Demo ID Project Description Amount Project Description Amount
ToFrom
NJ NJ121 Rahway River Corridor Greenway bicycle and pedestrian path, South Orange 522,571.60 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
522,571.60
NJ NJ123 Construction of Route 206 Chester Township, NJ 570,007.49 Route 10, Hillside Ave (CR619 to Mt. Pleasant Tpk (CR665)‐Resurfacing &
Bridge Preservation‐MP.93‐7.2
570,007.49
NJ NJ125 Replace Rockaway Road bridge, Randolph Township, New Jersey 448,364.34 Route 10, Hillside Ave (CR619 to Mt. Pleasant Tpk (CR665)‐Resurfacing &
Bridge Preservation‐MP.93‐7.2
448,364.34
NJ NJ126 Rowan Boulevard Parking adjacent to Highway 322 Corridor in Glassboro
Township
801,626.11 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
801,626.11
NJ NJ131 Construct CR 538 Coles Mill Road Bridge over Scotland Run, Gloucester
County
189,512.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
189,512.00
NJ NJ132 Reconstruct Route 168 from Route 41 to 6th Avenue in Runnemede 346,384.57 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
346,384.57
NJ NJ137 University Heights Connector for improvements to First Street in Newark
from Sussex Street to West Market Street
241,437.80 Route 280, Route 21 Interchange Improvements & Bridge Rehab‐MP13.8‐15.2 241,437.80
NJ NJ138 Construct Rt 56 Maurice River Bridge Replacement, Salem and Cumberland
Counties
758,049.00 Route 49, Bridge over Maurice River, Replacement, MP 36.2 758,049.00
NJ NJ141 Union Boulevard revitalization and streetscape enhancements, Totowa 74,168.77 Route 280, Route 21 Interchange Improvements & Bridge Rehab‐MP13.8‐15.2 74,168.77
NJ NJ142 Construct Great Swamp National Wildlife Refuge road 57,776.00 Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83 (CR 517) 57,776.00
NJ NJ143 Pedestrian facilities and street lighting on Haddon Avenue from Albertson
Avenue to Glenwood Avenue, Haddon Township
100,067.21 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
100,067.21
NJ NJ144 South Essex Street Bridge Pedestrian Access
Improvements, Orange
463,082.20 Main Street and Scotland Road Intersection Improvements, Orange, MP 0.0
(Main St), MP 4.59 (Scotland Rd)
463,082.20
NJ NJ148 Broad Street streetscape project in Elizabeth to provide physical
improvements and to enhance transportation flow and efficiency
161,772.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐
15.2
161,772.00
NJ NJ151 Widening of Route 1 and intersection improvements in South Brunswick 707,605.00 Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement
Resurfacing‐MP7.9‐14.5
707,605.00
NJ NJ154 Bicycle facilities in West Deptford Township 92,136.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
92,136.00
NJ NJ155 Riverwalk in Millburn along the West Branch of the Rahway River 149,113.00 Route 82, Rahway River Bridge, Replacement, MP 0.38 ‐ 0.58 149,113.00
NJ NJ157 Replacement of Monmouth County bridges W‐7, W‐8, and W‐10 2,403,540.00 Livingston Avenue Traffic Calming, New
Brunswick, MP 0‐06‐1.08, MP 2.07‐2.78
2,403,540.00
NJ NJ158 Construct Rt. 49 Cohansey River Bridge Replacement, Cumberland County. 710,939.33 Route 49, Sarah Run Drive to Garrison Lane, Resurfacing & Sidewalk
Replacement‐MP18.8‐40.1
710,939.33
NJ NJ160 Route 82 Union County streetscape and intersection improvements 379,024.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐
15.2
379,024.00
NJ NJ163 Construct I‐287, I‐80, Route 202 Interchange 231,102.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
231,102.00
NJ NJ164 Transportation improvements in Liberty Corridor 3,041,032.65 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ
to Industrial Hwy Carteret, NJ
3,041,032.65
NJ NJ165 Expand Route 440‐‐State Street Interchange in Perth Amboy 1,416,897.78 Route 1, CR 533 (Quakerbridge Road) to
Ridge Road‐Design for Pavement
Resurfacing‐7.9‐14.5
1,416,897.78
NJ NJ168 Replacement of Signals at the intersections of Centennial Ave. at Lincoln Ave.
and Walnut Ave. at Lincoln Ave., Cranford, NJ
113,240.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
113,240.00
72
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New Jersey
State Demo ID Project Description Amount Project Description Amount
ToFrom
Johnston Avenue Road Improvements, Jersey City, MP 0.21‐0.85 (Grand St),
MP 0.00‐0.16 (Philip St)
128,171.00
Passaic Main Avenue Bus Terminal, Upgrade and Relocation, Passaic County 2,500,000.00
Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83 (CR 517) 139,041.20
Main Street and Scotland Road, Intersection Improvements, MP 0.0 (Main St),
MP 4.59 (Scotland Rd)
36,917.80
NJ NJ172 Quinn Road realignment, Clifton. Construct public access roadways and
pedestrian safety improvements in and around Montclair State University in
Clifton
243,780.00 Route 3, Route 46 Valley Road and Notch/Rifle Camp Road Interchange,
Contract B, Widening MP 59.1 ‐ 60.6
243,780.00
NJ NJ176 Planning for Liberty Corridor 83,098.78 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ
to Industrial Hwy Carteret, NJ
83,098.78
NJ NJ180 Construct waterfront walkway from North Sinatra Drive and 12th St. south to
Sinatra Drive in Hoboken.
758,049.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
758,049.00
NJ NJ181 Bridge replacement on Section 6V of Route 1 from Ryders Lane to Milltown
Road, North Brunswick
1,214,549.00 Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement
Resurfacing‐MP7.9‐14.5
1,214,549.00
NJ NJ182 Pedestrian facilities, street lighting and streetscaping improvements in
downtown Laurel Springs
124,007.30 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
124,007.30
NJ NJ194 New Jersey Underground Railroad for preservation, enhancement and
promotion of sites in New Jersey
256,378.00 Halls Mill Road, Realignment and Widening, Monmouth County, MP 0.00‐
1.31
256,378.00
NJ NJ196 Roadway and intersection modifications on New Jersey Route 82 379,024.00 Route 82, Rahway River Bridge, Replacement, MP 0.38 ‐ 0.58 379,024.00
Passaic‐Bergen Passenger Service Restoration, Technical Update and
Assessment
1,000,000.00
Livingston Avenue, Traffic Calming, New Brunswick, MP 0‐06‐1.08, MP 2.07‐
2.78
600,357.20
Schooleys Mountain Bridge Rehabilitation, Morris County, MP 13.83
(CR 517)
2,002.80
NJ NJ204 Construct Cape May and Supawana Meadows
National Wildlife Refuges Roadway and Parking
Improvements
173,327.00 Route 49, Sarah Run Drive to Garrison Lane, Pavement Mill, Resurface & ADA
Compliant Curb Ramps‐MP18.8‐40.1
173,327.00
Halls Mill Road, Realignment and Widening, Monmouth County, MP 0.00‐
1.31
5,600,000.00
Livingston Avenue Traffic Calming, New Brunswick, MP 0‐06‐1.08, MP 2.07‐
2.78
809,440.00
NJ NJ207 Pedestrian and bicycle facilities and street lighting in Barrington and
streetscape improvements to Clements Bridge Road from the circle at the
White Horse Pike to NJ Turnpike overpass in Barrington [ref P.L. 110‐244, Sec
105(a)(160)]
222,530.67 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
222,530.67
NJ NJ208 Maple Shade Township Streetscape Improvements of Mill Road, Rudderow
Ave., North and South Coles Ave. and Schoolhouse Lane
81,259.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
81,259.00
NJ NJ211 Rehabilitation existing structure at the Bridge Street bridge over the CSX
Railroad Trenton Line in Manville, NJ
526,420.00 Route 206 Bypass, Mountain View Rd to Old Somerville Rd (Sections 14A &
15A) MP 63.4‐66.4
526,420.00
NJ NJ212 Pedestrian facilities and street lighting on Route 551 from Route 130 to
Chestnut Street, Brooklawn
320,472.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
320,472.00
2,804,130.00Improvements to Clove Road and Long Hill Road in Little Falls and Upper
Mountain Ave. in Montclair
NJ171
6,409,440.00Reconfiguration of Bay Avenue and Polaris Street in Newark, NJNJ205NJ
NJ
1,602,360.00Construct Hackensack River Walkway in Bergen CountyNJ201NJ
73
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New Jersey
State Demo ID Project Description Amount Project Description Amount
ToFrom
NJ NJ213 Construct Rt 40 Reconstruction from Rt 77 to Elmer Lake, Elmer, Salem
County
1,137,073.00 Route 40, Elmer Lake to Elmwood Ave, resurfacing from MP 20.44 ‐ 27.4 1,137,073.00
NJ NJ216 Pedestrian facilities and street lighting on Haddon Avenue from Vorhees
Township line to Bater Avenue, Berlin Township
122,659.33 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ
to Industrial Hwy Carteret, NJ
122,659.33
NJ NJ221 Design, plan and build a permanent pedestrian/bicycle path along the banks
of the Elizabeth River
400,590.00 Johnston Avenue Road Improvements, Jersey City, MP 0.21‐0.85 (Grand St),
MP 0.0‐0.16 (Philip St)
400,590.00
NJ NJ233 Livingston pedestrian streetscape project along Mount Pleasant and
Livingston Avenues
247,251.42 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
247,251.42
NJ NJ235 Construct parking facility at the Robert Wood Johnson University Hospital and
UMDNJ with access to the intermodal train station, New Brunswick.
1,602,360.00 Route 280, Route 21 Interchange improvements & Bridge Rehab‐MP13.8‐15.2 1,602,360.00
NJ NJ237 Construct Parking Facility at McGinley Square in Jersey City 841,239.00 Johnston Avenue Road Improvements, Jersey City, MP 0.21‐0.85 (Grand St),
MP 0.0‐0.16 (Philip St)
841,239.00
NJ NJ239 Hudson County Fire and Rescue Department, North Bergen: Transportation
critical incident mobile data collection device
112,286.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
112,286.00
NJ NJ242 Port Reading‐‐Improvements to air quality through reduction of engine idling
behind Rosewood Lane
640,944.00 Tremley Point Connector Road, New Construction, Tremley Point Linden, NJ
to Industrial Hwy Carteret, NJ
640,944.00
NJ NJ244 Weehawken Baldwin Avenue Improvements 423,605.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐
15.2
423,605.00
NJ NJ248 Route 18 Reconstruction in downtown New Brunswick 764,273.00 Route 18, East Brunswick, Drainage and Pavement Rehabilitation‐MP35.4‐
39.5
764,273.00
NJ NJ250 Construct waterfront walkway from North Sinatra Drive and 12th St. south to
Sinatra Drive in Hoboken
3,790,618.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP 13.8‐
15.2
3,790,618.00
NJ NJ252 Route 29 conversion project to a full access freeway 2,357,765.88 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐
MP26.42‐27.8
2,357,765.88
NJ NJ260 Construct Rt. 49 Cohansey River Bridge Replacement, Cumberland County. 509,946.46 Route 49, Sarah Run Drive to Garrison Lane, Resurfacing & Sidewalk
Replacement‐MP18.8‐40.1
509,946.46
NJ NJ264 Route 18 Reconstruction in downtown New Brunswick 240,506.00 Route 18, East Brunswick, Drainage and Pavement Rehabilitation‐MP35.4‐
39.5
240,506.00
NJ NJ267 Route 29 conversion project to a full access freeway 2,044,225.31 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐
MP26.42‐27.8
2,044,225.31
NJ NJ268 Improvements to River Road in Camden 1,002,341.00 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐
26.42‐27.8
1,002,341.00
NJ NJ271 Expand TRANSCOM Regional ITS System in NJ, NY and CT 260,427.45 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐
15.2
260,427.45
NJ NJ292* Deleware Street Bridge Replacement Project, (CR640) Bridge Over Matthews
Branch in West Deptfor Township, New Jersey
1,500,000.00 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
1,500,000.00
NJ NJ293 Resurfacing and safety improvements to Tanyard Road (CR 663) from
Evergreen Avenue (CR 553) to Barlow Road in the Township of Deptford,
Borough of Woodbury Heights, and the City of Woodbury, NJ
36,066.51 Reconstruct CR 530 (South Pemberton Road) from Hanover Street (CR 616) to
US Route 206, MP 0 to 2.68
36,066.51
*Subject to availability of funds upon additional research.
Total Amount Repurposed 54,344,501.15
Total # of Earmarks Repurposed 79
74
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New Mexico
State Demo ID Project Description Amount Project Description Amount
NM NM001 Nuclear Waste Transportation Safety Demo (NM) 109.55 NM 502, Pavement Preservation 109.55
NM NM003 LOS ALAMOS TO SANTA FE HWY; PL 103‐211 RESCISSION $4 APPN 307 & $3
APPN 309
19,890.46 NM 502, Pavement Preservation 19,890.46
NM NM005* Right‐of‐way ‐ El Salto & Related Roads 30,293.28 US 285 SF to Espanola 30,293.28
NM NM007* Los Alamos: Santa Fe relief route 292,736.25 NM 502, Pavement Preservation 292,736.25
NM NM008* Port of Entry‐ Columbus/Sundland Park 5,890.53 NM 273, Pavement Preservation 5,890.53
NM NM013 Improve I‐25 at Raton Pass 1,452,902.35 US 87, Pavement Preservation 1,452,902.35
NM NM017 Improve Uptown in Bernalillo County 303,574.29 Reconstruct US 550 303,574.29
NM NM018 Extend Unser Boulevard in Albuquerque 110,314.00 Reconstruct US 550 110,314.00
NM NM021 Northwest Albuquerque/ Rio Rancho high priority roads 2,882,606.88 Reconstruct US 550 2,882,606.88
NM NM023 Santa Teresa Port of Entry Hazmat 102,927.50 NM 273, Pavement Preservation 102,927.50
NM NM029 Double Eagle II Airport (Paseo del Volcan) Interchange and Roadway
Rehabilitation, New Mexico
1,160,566.39 Reconstruct US 550 1,160,566.39
NM NM041 Coors I 40 Interchange Reconstruction, Albuquerque 5,322,338.56 Reconstruct US 550 5,322,338.56
NM NM042 Development of Paseo del Volcan corridor located in Sandoval County from
Iris Road to U.S. Highway 550
146,156.60 Reconstruct US 550 146,156.60
NM NM043 Construct an interchange on I25 to provide access to Mesa del Sol in
Albuquerque
5,608,260.00 Reconstruction interchange on I25 Rio Bravo interchange from NM500, Rio
Bravo Blvd Exit #220 to University
5,608,260.00
NM NM044 NM 128 JCT NM 31 East to Texas State Line 341,689.38 NM 176, Pavement preservation 341,689.38
NM NM045 Widening of U.S. 491 from Navajo 9 to Colorado State border 320,472.00 US 64, Pavement Preservation 320,472.00
NM NM047 I‐40/Munoz Reconstruction in the City of Gallup. 461,706.51 NM 371, Pavement Preservation 461,706.51
NM NM049 I‐10 Reconstruction, Las Cruces to Texas State Line 243,780.12 NM 273, Pavement Preservation 243,780.12
NM NM050 U.S. 62‐180 Reconstruction, Texas State Line to Carlsbad 1,136,186.04 US 62/180, Pavement Preservation 1,136,186.04
NM NM051 Chaco Wash Bridge and Road Improvements on Navajo Route 46 162,520.00 US 491 & US 550, Striping 162,520.00
NM NM053 Ease traffic congestion and improve intersection safety by identifying
alternative alignment to U.S. 84/285 and NM 68 through Espanola
1,602,360.00 US 285 SF to Espanola 1,602,360.00
NM NM054 Planning, Design and construction of bikeways and walkway at the City of
Santa Fe's downtown railyard redevelopment project
244,205.91 NM 502, Pavement Preservation 244,205.91
NM NM055 Improvements to San Juan County Road 7950 466,420.63 US 64, Pavement Preservation 466,420.63
NM NM060 Double Eagle II aviation facility for road construction 507,875.05 Reconstruct US 550 507,875.05
NM NM061 For Construction work on NM 176 in Lea County 508,375.52 NM 176, Pavement preservation 508,375.52
NM NM062 Rio Rancho, Iris Rd to US Highway 550 5,692,875.02 Reconstruct US 550 5,692,875.02
NM NM063 For U.S. 62/180 in Carlsbad 724,983.49 US 62/180, Pavement Preservation 724,983.49
NM NM066 Transportation Improvement to FS 235 and access to Magdalena Ridge
Observatory
142,206.00 US 60, Striping 142,206.00
NM NM068 Reconstruction of Canal St. and NM 524 South Truck Bypass in Carlsbad 579,399.40 US 62/180, Pavement Preservation 579,399.40
NM NM069 Reconstruction of I‐10 and I‐25 Interchange, Las Cruces 1,444,318.78 NM 273, Pavement Preservation 1,444,318.78
NM NM070 Extend College Blvd. Roswell 439,116.41 US 62/180, Pavement Preservation 439,116.41
NM NM072 Rehabilitate Espanola Main Street, Espanola 1,907,813.29 US 84/285, Pavement Preservation 1,907,813.29
NM NM073 I‐25/U.S. 64 Interchange rehabilitation in Raton 829,001.44 US 87, Pavement Preservation 829,001.44
NM NM074 Reconstruction of NM18 in Lea County 120,280.20 NM 176, Pavement preservation 120,280.20
NM NM075 Reconstruction of U.S. 180 in Grant County 164,685.42 US180 to Deming District Boundary, Striping 164,685.42
NM NM076 Reconstruction of U.S. 491 from Tohatchi to Shiprock 149,392.29 US 64, Pavement Preservation 149,392.29
NM NM077 Relocate the El Paso, TX rail yard to Santa Teresa 2,321,756.70 NM 273, Pavement Preservation 2,321,756.70
NM NMM01 I‐25/Tramway Interchange, Albuquerque, New Mexico 8,781.60 Reconstruct US 550 8,781.60
ToFrom
75
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New Mexico
State Demo ID Project Description Amount Project Description Amount
ToFrom
NM NMM02 I‐40 and Paseo del Volcan Interchange and Access Road to Double Eagle II,
Albuquerque, New Mexico
703,257.27 Reconstruct US 550 703,257.27
*Subject to availability of funds upon additional research.
Total Amount Repurposed 38,662,025.11Total # of Earmarks Repurposed 39
76
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
NY NY008 Long Island Expwy Safety Demo (4th Lane); PL 102‐388 SEC 347 Provides for
unspent balances from PL 100‐17 (149 (A)108) and PL 100‐457 To be used
instead on Robert Moses Causeway or Loop Parkway Bridge rehab projects
511,258.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
511,258.00
NY NY012* Schenectady: Exit 26 Bridge Project 1,159,343.00 PIN 108533 RT. 146 (Hamburg St): RT. 7 to Schenectady South City Line,
Safety Improvement (Median & Turn Lanes. Town of Rotterdam,
Schenectady County.
1,159,343.00
NY NY016* I‐87 Tappan Zee Br. Moveable Median Barrier 957,970.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway
(T of Stony Point, Clarkstown)
957,970.00
NY NY023 New York: Hell Gate Viaduct ‐ upgrade, repair and paint. (Administered by
FRA ) (1998)
1,303,924.00 Bronx River Greenway Pedestrian Bridges (X027.08) 1,303,924.00
NY NY044 Buffalo: Buffalo River/Gateway Tunnel Project 456,506.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 456,506.00
NY NY055 Improve Route 9 in Dutchess County 259,472.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway
(T of Stony Point, Clarkstown)
259,472.00
NY NY077 Construct intermodal transportation hub in Patchogue 1,480,720.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
1,480,720.00
NY NY079 Construct CR‐82 from Montauk Highway to Sunrise Highway in Suffolk County 63,537.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
63,537.00
NY NY080 Construct CR‐85 from Foster Avenue to CR97 in Suffolk County 183,305.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
183,305.00
NY NY083 Construct County Road 50 in the vicinity of Windsor Avenue. 220,108.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
220,108.00
NY NY090 Replace Route 28 bridge over NY State Thruway, Ulster Co. 414,669.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway
(T of Stony Point, Clarkstown)
414,669.00
NY NY096 Construct sound barriers on both sides of Grand Central Parkway between
172nd Street to Chevy Chase Road
1,282,120.00 PIN X02708 Bronx River Greenway Segment Phase 2 1,282,120.00
NY NY113 Construct Hudson River scenic overlook from Route 9 to Waterfront in
Poughkeepsie
36,456.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway
(T of Stony Point, Clarkstown)
36,456.00
NY NY114 Construct County Road 93 between NYS 27 and NYS 454. 160,599.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
160,599.00
NY NY116 Improve ferry infrastructure in Greenport 76,684.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
76,684.00
NY NY119 Construct Erie Canal Preserve I‐90 rest stop in Port Byron 579,738.00 PIN 375514 Creekwalk, Ph II, Jefferson to Colvin (Syracuse) 579,738.00
NY NY127 Improve Broadway in North Castle in Westchester County 555,282.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway
(T of Stony Point, Clarkstown)
555,282.00
NY NY130 Construct sound barriers on Grand Central Parkway between 244th Street
and Douglaston Parkway Provide landscaping along both sides of the Grand
Central Parkway from 188th street to 172nd street [ref. P.L. 109‐059, Sec
1703(a)(12)
155,777.00 PIN X02708 Bronx River Greenway Segment Phase 2 155,777.00
NY NY131 Construct Bike Paths along the Bronx River in Bronx Park 187,475.00 PIN X02708 Bronx River Greenway Segment Phase 2 187,475.00
NY NY142 Improve access to I‐84/Dutchess intermodal facility in Dutchess County 686.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 686.00
NY NY143 Reconstruct 79th Street Traffic Circle, New York City 608,498.00 PIN X02708 Bronx River Greenway Segment Phase 2 608,498.00
NY NY147 Construct congestion mitigation project for Riverhead 944,406.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
944,406.00
ToFrom
77
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
ToFrom
Roadway improvements, including but not limited to, Palisades Interstate
Pkwy. Mitigation Measures for New Square
560,000.00
Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 2,132,118.00
NY NY154 Improve Bedford‐Banksville Road from Millbrook to Connecticut State line 131,692.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dunderburge MTN Trailway
(T of Stony Point, Clarkstown)
131,692.00
NY NY156 Conduct feasibility study of new international bridges on the NY/Canada
border
96,982.00 PIN 780601 Northern Tier Multi‐Use Path, Town of Champlain, Clinton
County
96,982.00
NY NY162 Center for Advanced Simulation and Technology at Dowling College 76,618.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
76,618.00
NY NY164 Grade crossing eliminations along Route 17 in Chemung County, New York 213,525.00 PIN 6ADA02 ‐ Interstate Rest Stop ADA Compliance in Allegany and Steuben
counties
213,525.00
NY NY260 Town of Fishkill Old Glenham Road (aka Washington Ave.) reconstruction 260,784.20 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 260,784.20
NY NY272 Westchester County, NY Rehabilitation of June Road Town of North Salem 520,767.00 ADA Sidewalks and Ramps ‐ Upper Westchester 520,767.00
Beekman Ave pedestrian improvements ‐ install sidewalks/ADA ramps,
Village of Sleepy Hollow
291,401.00
Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 49,101.00
Construct sidewalks , Village of Nyack 982,520.00
Widen sidewalks along NY9W, Village of South Nyack 114,000.00
ST Bike RT 9: Rockland Lake River Tr & Dunderburg MTN Trailway (T of Stony
Point, Clarkstown)
505,840.00
NY NY283 Utica Marsh‐Reestablish Water Street 1,941,832.00 Bagg's Square/Harbor Point Pedestrian Way 1,941,832.00
NY NY285 Realign Union Valley Road in Town of Carmel 264,389.00 Route 100‐North County Trailway Safety Improvements Westchester Co 264,389.00
NY NY288 Construct W. 79th St. Rotunda, New York City 1,602,360.00 ADA Requirements in Richmond, NY & Kings Cos., NYC 1,602,360.00
NY NY289 Reconstruct a historic bridge crossing Maxwell Creek in the Town of Sodus,
NY
65,644.00 PIN 403191 RT 31 From Turk Hill Rd to Wayne Cl Overlay, Town of Perinton,
Monroe County
65,644.00
NY NY292 Rehabilitate a historic transportation‐related warehouse on the Erie Canal in
the Town of Lyons, NY
480,708.00 RT 390 Multi‐Use Trail From the Canalway Trail to RT 104, Monroe County 480,708.00
NY NY295 Town of Greenville rehabilitation of Grahamtown Rd. and Burnt Corners Rd 100,147.00 Construct new accessible sidewalks, ADA ramps and pedestrian beacons
along school route, Kingston
100,147.00
NY NY296 Town of Highlands reconstruction of bridge on School Street 180,266.00 Construct ADA compliant pedestrian mall , City of Port Jervis 180,266.00
NY NY301 Reconstruct Main Street in the Town of Lewisboro 72,106.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 72,106.00
NY NY302 Improvements to Clark Pl. and Cherry Ln. Rt. 6 and 6 N in Putnam County 296,437.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 296,437.00
NY NY310 Conduct NYS 5 construction study 64,094.00 Bagg's Square/Harbor Point Pedestrian Way 64,094.00
NY NY312 Reconfiguration of intersection and redesign of traffic signal timing at
Mohegan Ave. and Lakeland St
400,590.00 ADA Sidewalks and Ramps ‐ Upper Westchester 400,590.00
NY NY313 Improve bicycle and pedestrian safety on Main Street, Holbrook 100,148.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
100,148.00
NY NY318 Roadway improvements to Woodbury Rd. at intersection with Syosset‐
Woodbury Rd Roadway improvements to Jackson Avenue between Jericho
Turnpike and Teibrook Avenue
1,602,360.00 NY25A ADA Ramp Reconstruction N/S Line to BreadAndCheese Hollow Rd,
Cold Spring Harbor to East Northport
1,602,360.00
2,692,118.00Reconstruct Stoneleigh Avenue in Putnam CountyNY153NY
340,502.00Installation of new turning lane from Mohansic Ave. onto eastbound Route
202 and addition of new striped crosswalk
1,602,360.00Rockland County Hudson River Greenway Trail Project construction
NY275
NY276
NY
NY
78
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
ToFrom
State St., Seneca St., Buffalo St. Surface Improvements, Tompkins County 1,103,150.00
Cecil A. Malone Dr. Flasher & Gate Improvement, Tompkins County 300,000.00
RR Grade Xing Improvement NS Ithaca Sec Station Road, Tompkins County 300,000.00
Cecil A. Malone Dr. Surface Improvement, Tompkins County 299,800.00
NY NY321 Roadway improvements on Woodbine Avenue between 5th Avenue and
Beach Avenue
640,944.00 ADA Compliance in Nassau and Suffolk counties 640,944.00
Construct new sidewalks; install lighting and bike storage racks, City of Ithaca 367,720.00
Brindley St. Bridge Replacement Project, Tompkins County 1,234,640.00
NY NY328 Repair and repave the north side of the Mineola train station 120,177.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
120,177.00
NY NY333 Waterloo, NY by‐pass project 5,591,537.00 Extend Lake Trail from the NYS fairgrounds to the southern lakefront area,
Onondaga County
5,591,537.00
NY NY338 Realignment of Clove Road and Rt. 208, access management improvements in
Orange County
961,416.00 ADA Sidewalk & Ramps: Rockland County 961,416.00
Construct ADA compliant pedestrian mall , City of Port Jervis 166,371.00
Route 208 Sidewalk RT 52 to Most Precious Blood School (V of Walden
Orange Co)
53,954.00
NY NY342 Village of Unionville reconstruction of Main Street 64,094.00 Route 208 Sidewalk RT 52 to Most Precious Blood School (V of Walden
Orange Co)
64,094.00
NY NY345 Island Expressway access at Marcus Avenue and Lakeville Road and
associated Park and Ride
4,807,080.00 Grand Ave in Baldwin, Nassau County 4,807,080.00
NY NY347 Transportation Enhancements to support development of Erie Canal in
Orleans County, NY
137,154.00 PIN 403191 RT 31 from Turk Hill Rd to Wayne Cl Overlay, Town of Perinton,
Monroe Country
137,154.00
NY NY353 For the acquisition of ferry boats and ferry terminal facilities and operation of
ferry service from Rockland County‐ Yonkers‐Manhattan.
182,846.00 PIN X02708 Bronx River Greenway Segment Phase 2 182,846.00
NY NY355 Reconstruction of Tappan Street Bridge in Town of Newark Valley. 491,203.00 PIN 6108.58 SR 14 MBC Paving Watkins Glen 491,203.00
NY NY359 Town of Chester Surrey Meadow subdivision road improvements 420,354.00 Route 208 Sidewalk RT 52 to Most Precious Blood School (V of Walden
Orange Co)
420,354.00
NY NY363 Construct sidewalks and curbing on Tate Avenue in Village of Buchanan. 300,443.00 ADA Sidewalk & Ramps: Rockland County 300,443.00
NY NY366 Rehabilitate the Pines Bridge Road and Lake Avenue and Ryder Road, in
Ossining, York‐town, and New Castle
2,215,263.00 ADA Sidewalks and Ramps ‐ Upper Westchester 2,215,263.00
NY NY372 Town of Fishkill reconstruct Maple Ave. 19,628.80 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 19,628.80
Route 100‐North County Trailway Safety Improvements Westchester Co 160,000.00
ADA Sidewalks and Ramps ‐ Upper Westchester 641,180.00
NY NY377 State of NY Village of Kiryas Joel sidewalk project. 429,009.00 PIN 8T0342 ADA Sidewalk & Ramps: Rockland County 429,009.00
Bronx River Greenway Segment Phase 2 5,000,000.00
Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 2,370,856.00
Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 381,530.00
PMI Pavement Resurfacing, Columbia, Dutchess, Orange, Putnam, Rockland,
Ulster and Westchester counties
259,414.00
NY NY383 Land acquisition and improvements on Louisa Street, Peekskill, NY. 990,692.00 Route 100‐North County Trailway Safety Improvements Westchester Co 990,692.00
NY NY385 Village of Goshen Hatfield Lane reconstruction. 200,295.00 Wallkill Hamlet Sidewalks, Ulster County 200,295.00
NY319NY
NY323NY
2,002,950.00Rehabilitate highway bridges at Ithaca secondary line
1,602,360.00Peruville Road/Creating overpass to address intersection safety issue
220,325.00Town of Minisink South Plank RoadNY340NY
801,180.00Replace structurally deficient bridge over the Pocantico River, the Village of
Pleasantville Briarcliff Manor
NY375NY
7,370,856.00Preliminary design and environmental impact study for a collector‐
distributor road along I‐ 95 from Westchester Ave. to Bartow Ave.
NY381NY
640,944.00Town of East Fishkill new construction Bypass roadNY382NY
79
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
ToFrom
NY NY388 Westchester County, NY Rehabilitation of Lexington Ave, Mount Kisco 400,590.00 Route 100‐North County Trailway Safety Improvements Westchester Co 400,590.00
Route 100‐North County Trailway Safety Improvements Westchester Co 280,335.00
PMI Pavement Resurfacing, Columbia, Dutchess, Orange, Putnam, Rockland,
Ulster and Westchester counties
240,432.00
NY NY390 Construct sidewalks and roadway improvements on Oscawana Lake Road in
the Town of Putnam Valley.
480,708.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 480,708.00
ADA Compliance in Nassau and Suffolk counties 420,000.00
NY27 ADA Southampton Main Street to Post Office 1,683,098.00
NY NY394 Install Improvements for Pedestrian Safety including in the vicinity of PS K124 50,000.00 Grand Concourse Pedestrian Safety Improvement, PH.3, Bronx 50,000.00
NY NY395 Page Green‐‐Phase III‐‐ Reconstruction of 2.6 miles. Town of Virgil, Cortland
County.
462,347.00 PIN 375514 Creekwalk, Ph II, Jefferson to Colvin (Syracuse) 462,347.00
Construct sidewalks linking public schools on Scotchtown Road from Rte 207
to Murray Ave, Town of Goshen
179,740.00
Construct sidewalks/ADA compliant ramps, Town of Middletown 421,145.00
NY NY408 Enhance road and transportation facilities in the vicinity of the Brooklyn
Children's Museum
550,811.00 Grand Concourse Pedestrian Safety Improvement, PH.3, Bronx 550,811.00
NY24 ADA Ramp Reconstruction MSP to NY110, East Meadow to East
Farmingdale
1,682,835.00
Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
119,820.00
NY NY416 Study on extending Rt. 5 to Auburn 120,177.00 CR 10B‐Turnpike Rd Preservation Project, Cayuga Count 120,177.00
Burrstone Rd Pedestrian Walk Improvements (Utica College to North/South
Arterial)
128,236.00
Bagg's Square/Harbor Point Pedestrian Way 32,000.00
NY NY419 Repair Silver Mine Bridge in the Town of Lewisboro 120,177.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 120,177.00
Pedestrian/school crossing signal/ADA compatible, Town of Fallsburg 172,500.00
Rt 97 Scenic Byway/NYS Bike Route 17 Shoulder Restoration, Delaware and
Sullivan counties
428,385.00
NY NY424 Construct sidewalks and curbing on Westchester Avenue in Village of
Buchanan
220,325.00 Wallkill Hamlet Sidewalks 220,325.00
NY NY430 Big Ridge Road: Spencerport Village Line to Gillet Road in the Town of Ogden. 141,475.00 PIN 403191 RT 31 From Turk Hill Rd to Wayne Cl Overlay, Town of Perinton,
Monroe County
141,475.00
NY NY432 Suffolk County ITS arterial monitoring and performance measures 500,738.00 ADA Compliance in Nassau and Suffolk counties 500,738.00
NY NY438 Remediate road runoff in vicinity of Peconic Estuary watershed. 1,001,475.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
1,001,475.00
NY NY439 Mount Vernon Railroad Cut 2,002,950.00 Construct sidewalks/ADA compliant ramps, Town of Middletown 2,002,950.00
NY NY442 Construct visitor center, access road, and parking at Sam's Point Preserve,
Ellenville
400,590.00 Wallkill Hamlet Sidewalks 400,590.00
NY NY451 Construct Wayne County, NY rails to trails initiative 276,407.00 RT 390 Multi‐Use Trail from the Canalway Trail to RT 104, Monroe County 276,407.00
NY NY452 Access improvements for terminal located on 12th Ave. between W. 44th and
W. 54th St. in Manhattan
897,017.00 PIN X02708 Bronx River Greenway Segment Phase 2 897,017.00
Linear safety project Village of Wappingers Falls 561,683.00
ADA Sidewalks and Ramps: Rockland County 39,202.00
2,103,098.00Improve Long and Short Beach Road, Southampton.NY391NY
600,885.00Improve Rt. 17M access, safety and traffic managementNY400NY
1,802,655.00Roadway improvements to Jackson Avenue between Jericho Turnpike and
Teibrook Avenue.
NY413NY
160,236.00Construct improvements in Sight Distance at Road Grade and Trail Crossings
in Oneida and Herkimer Counties
NY418NY
520,767.00Construct Bicycle Path in Town of Bedford.NY389NY
600,885.00Design and construct Upper Delaware Scenic Byway Visitor Center,
Cochecton.
NY423NY
600,885.00Palisades Interstate Parkway Mitigation Measures for New Square.NY453NY
80
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
ToFrom
NY NY455 Deer Avoidance System, to deter deer from milepost marker 494.5, Ripley,
PA, to 304.2., Weedsport, NY along I‐90
200,295.00 CR 10B‐Turnpike Rd Preservation Project, Cayuga Count 200,295.00
NY NY458 Town of Warwick, NY. Bridge replacement on Buttermilk Falls Rd 140,207.00 Wallkill Hamlet Sidewalks 140,207.00
NY NY459 Town of Warwick, NY East Shore Road reconstruction. 464,955.00 PIN 848743 Route 208 Sidewalk: Rt 52 to Most Precious Blood School (V of
Walden Orange Co)
464,955.00
NY NY461 Traffic mitigation on Bridge Street and Maple Avenue, Florida, NY. 120,177.00 Wallkill Hamlet Sidewalks 120,177.00
Construct new accessible sidewalks, ADA ramps and pedestrian beacons
along school route, Kingston
270,011.00
Wallkill Hamlet Sidewalks 50,461.00
NY NY464 Rockland County and City of Yonkers to Lower‐Manhattan Ferry Boat project 113,180.00 PIN X02708 Bronx River Greenway Segment Phase 2 113,180.00
Reconstruct 1,200 linear ft. of Oakwood Drive and repair deteriorated
sidewalks. City of Peekskill
562,853.00
Beekman Ave pedestrian improvements ‐ install sidewalks/ADA ramps,
Village of Sleepy Hollow
318,445.00
NY NY470 Town of Wawayanda reconstruction of McVeigh Road 400,590.00 Wallkill Hamlet Sidewalks 400,590.00
NY NY479 Improve Maple Avenue, Smithtown. 155,413.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
155,413.00
NY NY480 Comprehensive traffic congestion mitigation study of Hauppauge Industrial
Park and surrounding area
349,425.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
349,425.00
NY NY482 Improvements at highway‐ rail crossings along the Southern Tier Extension
Railroad in Allegany, Cattaraugus, and Steuben Counties
182,128.00 Pedestrian movements along the Jamestown Riverwalk, and surrounds, City
of Jamestown
182,128.00
NY NY484 Deploy intermodal chassis ITS project in New York. 712,039.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 712,039.00
NY NY489 Warburton Avenue Bridge over Factory Lane, Hastings‐on‐Hudson, New York 500,738.00 Route 100‐North County Trailway Safety Improvements Westchester Co 500,738.00
NY NY490 Improve intersection of Old Dock and Church Street, Kings Park Road
improvements for Church Street between NY State Route 25A and Hilden
Street in Kings Park
400,590.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
400,590.00
NY NY496 Riverwalk in Irvington development. 200,295.00 Wallkill Hamlet Sidewalks 200,295.00
NY NY500 Construct the Auburn Connector Road Corridor, Auburn, NY 801,180.00 N. Division St/Owasco River Br. Replace., Cayuga County 801,180.00
NY NY504 Subsurface environmental study to measure presence of methane and
benzene gasses in vicinity of Greenpoint, Brooklyn, and the Kosciusko Bridge,
resulting from the Newtown Creek oil spill.
867,765.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 867,765.00
NY NY506 Improve bicycle and pedestrian safety, NY 25, Jamesport. 240,354.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
240,354.00
Construction of streetscape improvements to Main Street, Port Washington 500,000.00
Upgrade roads to the Garden City Industrial, Town of North Hempstead 297,827.00
Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
678,858.00
NY NY512 Portageville Bridge‐‐ Purchase existing bridge to convert to pedestrian bridge 1,466,159.00 RT 390 Multi‐Use Trail from the Canalway Trail to RT 104, Monroe County 1,466,159.00
NY NY513 Town of Southeast construction and repaving of town roads. 252,372.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 252,372.00
NY NY515 Little Falls Access: Repair and reconstruct High School and Lower School Road 192,283.00 Burrstone Rd Pedestrian Walk Improvements (Utica College to North/South
Arterial)
192,283.00
881,298.00
NY NY509 Road and pedestrian safety improvements Main Street, Village of Patchogue
$600,000 for road and pedestrian safety improvements on Main Street in the
Village of Patchogue; $900,000 for road and pedestrian safety improvements
on Montauk Highway, between NYS Route 112 and Suffolk County Road 101
in Suffolk County
1,476,685.00
NY NY469 Rehabilitation of NY Route 100 from Virginia Road to Westchester
Community College.
320,472.00Town of Goshen Orzeck Road reconstructionNY463NY
81
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
ToFrom
NY NY524 Town of North Salem improvements and repaving to Hawley Road
Rehabilitation of Sugar Hill Road in North Salem, NY [ref P.L. 110‐244, Sec
105(a)(94)]
160,236.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 160,236.00
ADA Compliance in Nassau and Suffolk counties 739,640.00
NY25A ADA Ramp Reconstruction N/S Line to BreadAndCheese Hollow Rd,
Cold Spring Harbor to East Northport
1,263,310.00
NY NY527 Rehabilitation of North and South Ridge Street and Wappanocca Avenue in
the Village of Rye Brook and City of Rye.
1,730,549.00 Route 100‐North County Trailway Safety Improvements Westchester Co 1,730,549.00
Extend Wassaic Trail to MNR station: Dutchess County 250,000.00
Improve ADA access of existing pedestrian facilities within the village of Red
Hook
88,256.00
ADA Sidewalk & Ramps: Rockland Country 863,514.00
NY NY531 Town of Southeast construction and repaving of town roads. 240,354.00 ADA Sidewalk & Ramps: Rockland Country 240,354.00
NY NY535 Kingston, Construct pedestrian waterfront walkway. 262,548.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dundergurb Mtn Trailway
(T of Stony Point, Clarkstown)
262,548.00
NY NY538 Stabilize Poughkeepsie Railroad Bridge and construct a pedestrian walkway
linking the two sides of the Hudson River, Poughkeepsie Total:
123,352.00 PIN 875904 ST Bike RT 9: Rockland Lake RVR TR & Dundergurb Mtn Trailway
(T of Stony Point, Clarkstown)
123,352.00
NY NY544 Rehabilitate Guy Lombardo Avenue and construct drainage improvements
and new sidewalks and curb cuts in Freeport, NY Traffic calming and safety
improvements to Lido Boulevard, Town of Hampstead, Nassau County
957,410.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
957,410.00
NY NY546 Great Neck Road Traffic Calming Project. 320,472.00 ADA Compliance in Nassau and Suffolk counties 320,472.00
Coeymans Hamlet ADA improvements and Pavement. Maintenance. 1,200,000.00
Rt. 4 Bike/Ped Improvements HVCC South Drive to Rt 43, Rensselaer County 1,000,000.00
Intersection improvements Rt.4 and Bloomingrove Road, North Greenbush 2,607,080.00
NY NY551 Harlem River Park and Bikeway. 801,180.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 801,180.00
NY NY555 Town of Chester, Lake Hill Farms subdivision road improvements 220,177.00 Wallkill Hamlet sidewalks 220,177.00
NY NY556 Elevation of road and construction of drainage improvements on Sequams
Lane Center and Sequams Lane West in the Town of Islip, NY. Total:
122,082.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
122,082.00
ADA Sidewalk & Ramps: Northern Westchester County 469,033.00
PMI Pavement Resurfacing, Columbia, Dutchess, Orange, Putnam, Rockland,
Ulster and Westchester counties
131,852.00
NY NY565 Realign Kirk Lake Drive in Carmel 88,130.00 Route 100‐North County Trailway Safety Improvements Westchester Co 88,130.00
NY NY575 Village of Highland Falls repaving and sidewalk construction of Berry Hill Road 60,088.00 Construct ADA compliant pedestrian mall , City of Port Jervis 60,088.00
NY NY577 Construct access to the NYS Thruway‐‐Montezuma National Wildlife Reserve. 1,201,770.00 CR 10B‐Turnpike Rd Preservation Project, Cayuga County 1,201,770.00
Complete Plandome Rd Culvert reconstruction project, Town of North
Hempstead
500,000.00
Complete 1.7 mile segment of the Hempstead Harbor Shoreline Trail, Town of
North Hempstead
838,142.00
Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
23,864.00
1,201,770.00NYSDOT Route 55 construction over Fishkill Creek and left turn lane
construction
NY528NY
4,807,080.00Construct Phase II I‐90 Connector ITS Laboratory in Rensselaer CountyNY547NY
2,002,950.00Construct access road and exit lanes for Center for Advanced Medicine: North
Shore LIJ Health System
NY525NY
NY
1,362,006.00Construct Northern State Parkway and LIE access at Marcus Ave. and Lakeville
Rd. and associated Park and Ride
NY587NY
600,885.00Reconfigure intersection of Ridge Street and Hallocks Mill Road and install
new traffic signal
NY557
82
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
ToFrom
NY NY591 Transportation Initiative to provide for a parking facility, in the vicinity of the
Manhattan College Community.
70,738.00 PIN X02708 Bronx River Greenway Segment Phase 2 70,738.00
ADA Sidewalk & Ramps: Rockland County 711,587.00
ST Bike RT 9: Rockland Lake RVR TR & Dundergurg Mtn Trailway (T of Stony
Point, Clarkstown)
89,593.00
NY NY597 Construction of and improvements to Amherst Street, Buffalo. 52,479.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 52,479.00
NY NY598 Construction of and improvements to Grant Street, Buffalo. Total: 25,177.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 25,177.00
NY NY599 Construction of and improvements to Hertel Avenue, Buffalo. 52,479.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 52,479.00
NY NY606 Construction of Bicycle Path and Pedestrian Trail in City of Buffalo 106,567.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 106,567.00
NY NY611 Construct multi‐modal facility in the vicinity of Brooklyn Children's Museum 240,354.00 Grand Concourse Pedestrian Safety Improvements, PH.3, Bronx 240,354.00
NY NY617 Planning and design, construction, and relocations for Southtowns Connector‐
‐NY Route 5 from Coast Guard Base to Ohio St, including Fuhrmann Blvd.
Improving Outer Harbor access through planning, design, construction, and
relocations of Southtowns Connector‐NY Route 5, Fuhrmann Boulevard, and a
bridge connecting the Outer Harbor to downtown Buffalo at the Inner Harbor
113,180.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 113,180.00
NY NY620 Improve Clover Ln. from Bay Ave. to Bay Rd., Hamlet of Brookhaven 216,319.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
216,319.00
NY NY622 Improve intersection of Old Dock and Church Street, Kings Park 100,148.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
100,148.00
Reconstruction of Nichols Road Town of Smithtown 582,479.00
ADA Compliance Nassau and Suffolk counties 230,719.00
NY NY627 Road improvements, Hamlet of Gordon Heights, Town of Brookhaven 344,507.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
344,507.00
NY NY629 Roadway improvements, Hamlet of Mastic Beach 320,472.00 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
320,472.00
ADA Compliance in Nassau and Suffolk counties 859,630.00
Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
41,698.00
NY NY632 Improve town weatherization capabilities on Tucker Drive, Poughkeepsie, NY. 200,295.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 200,295.00
NY NY633 Bedell Road improvements, Poughkeepsie, NY 104,153.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 104,153.00
NY NY634 Land acquisition and improvements on Main Street, Beacon, NY 400,590.00 Harlem Valley Rail Trail Extension Town of Millerton to Town of Hillsdale 400,590.00
NY NY644 Improvements to Route 12 in Broome and Oneida Counties 5,310,194.00 PIN 208805 RT 921B (Burrstone RD) / RT 5,8,12 (North‐South Art) Utica 5,310,194.00
NY NY646 Enhance Road and Transportation Facilities Near W. 65th Street and
Broadway, New York City (2005)
507,878.00 The Brooklyn‐Queens Expressway (BQE) Triple Cantilever Replacement
Project.
507,878.00
NY NY650 Road and transportation improvements near the Brooklyn Children's Museum 5,007,375.00 4th Avenue Safety Improvements Phase II‐ Vision Zero Great Streets: 18th ‐
33rd Streets, 52nd ‐ 60th Streets, Brooklyn
5,007,375.00
City of Rochester Eastman Trail‐Ridgeway Segment 1,400,000.00
Quaker Road Crossing Improvements, Wayne County 432,486.00
RT 390 Multi‐Use Trail from the Canalway Trail to RT 104, Monroe County 59,992.00
813,198.00Improve Old Willets Path from NY 454 to Rabro Dr., Smithtown.NY624NY
801,180.00High‐Speed EZ pass at the New Rochelle Toll Plaza, New RochelleNY595NY
901,328.00WLIU Public Radio Emergency and Evacuation Transportation Information
Initiative, Southampton.
NY630NY
1,892,478.00For research at the Rochester Institute of Technology Alternative Fuels and
Life‐Cycle Engineering.
NY652NY
83
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
New York
State Demo ID Project Description Amount Project Description Amount
ToFrom
NY NY659 Southtown connector improvements on NY Route 5 from the Coast Guard
Base to Ohio Street, Buffalo, NY/Buffalo Outer Harbor Road improvements.
895,502.00 PIN 580931 ADA Compliance 17/18, Erie & Niagara Counties 895,502.00
NY NY663 Reconstruction of East Avenue from Main Street to Henry Street in Hornell. 303,406.00 PIN 6ADA02 ‐ Interstate Rest Stop ADA Compliance in Allegany and Steuben
counties
303,406.00
NY NY664 Improvements to Widmer Road in the Town of Wappinger 500,738.00 Rustic Rail Replacement on Route 9D, Putnam and Dutchess counties 500,738.00
NY NY668 Design, Planning, and Construction of a Community Transportation Center
from Broadway to Manhattan College Parkway.
707,375.00 PIN X02708 Bronx River Greenway Segment Phase 2 707,375.00
NY NY670 For the CargoWatch Transportation Management Project for Study and
Implementation
355,536.00 ADA Requirements in Queens & Bronx Cos., NYC 355,536.00
NY NY671 Preparation, demolition, disposal and site restoration of Alert Facility on
Access Road to Plattsburgh International Airport
70,738.00 PIN 780601 Northern Tier Multi‐Use Path, Town of Champlain, Clinton
County
70,738.00
NY NY678 Roadway and Traffic Improvements for Suffolk County 212,613.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
212,613.00
NY NY683 Repair and Restoration of the Outdoor Area on 82nd Street and 5th Avenue 634,646.00 PIN X02708 Bronx River Greenway Segment Phase 2 634,646.00
Construct sidewalks/ADA ramps. Dobbs Ferry Village 329,000.00
Construction of new ADA sidewalks/provide access to MNR station, Town of
Harrison
165,000.00
Construct ADA compliant ramps and crosswalks , Town of Irvington 140,000.00
Reconstruct 1,200 linear ft. of Oakwood Drive and repair deteriorated
sidewalks. City of Peekskill
368,341.00
Reconstruction of E. Genesee Street connective corridor to Syracuse
University, Syracuse
475,000.00
Creekwalk, Ph II, Jefferson to Colvin (Syracuse) 4,536,707.00
ADA Compliance in Nassau and Suffolk counties 6,184.00
Grand Ave in Baldwin, Nassau County 467,680.00
Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in Babylon, Islip,
Oyster Bay towns
26,136.00
NY NY746 Improve NY State Route 112 from Old Town Road to NY State Route 347 1,604,932.00 PIN 000616 Ocean Pkwy Shared Use Path Phase 3 Tobay to Captree in
Babylon, Islip, Oyster Bay towns
1,604,932.00
NY NYF01 Twin Forks Passenger Commuter Ferry Terminal (Greenport and Sag Harbor
ferry service)
351,600.00 ADA Compliance in Nassau and Suffolk counties 351,600.00
*Subject to availability of funds upon additional research.
Total Amount Repurposed 125,364,773.00Total # of Earmarks Repurposed 162
5,011,707.00Various transportation projects related to the DestiNY USA projectNY692NY
500,000.00Road repair and maintenance in the Town of SouthamptonNY745NY
1,002,341.00South Lexington and Post Road Streetscape Expansion in White PlainsNY687NY
84
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
North Carolina
State Demo ID Project Description Amount Project Description Amount
NC NC026 Upgrade US‐158 in Warren and Halifax Counties 4,612,948.00 I‐85 from North of SR 1237 (Drewry‐Manson Rd) to Virginia State Line 4,612,948.00
NC NC033 Relocate US 1 from North of Lakeview to SR 1180, Moore and Lee Counties. 125,970.00 Replace Bridge 620002 over CSX Transportation in Aberdeen 125,970.00
NC NC038 Concord Parkway Traffic Signals System Integration, Concord. North Carolina
(used on U‐4448)
4,549.00 George Liles Parkway, SR 1304 (Roberta Road) to SR 1431 (Weddington
Road). (R‐2246B)
4,549.00
NC NC040 Hatteras Inlet ferry connecting Ocracoke Island and North Carolina Outer
banks, North Carolina
339,989.00 Construct River Class Ferry in Dare and Hyde Counties. 339,989.00
NC NC043 North Carolina State University Transportation Center 13,403.00 Crossing #628547G, West North Street, and Crossing #628551W, West South
Street, in Fremont. Crossing closures.
13,403.00
NC NC044 Southport and Fort Fisher Ferry Terminals, North Carolina 19,805.00 NC 211, SR 1500 (Midway Road) to NC 87 in Brunswick County 19,805.00
NC NC045 US Highway 29 Signal Integration ‐ Kannapolis, North Carolina (used on U‐
4448)
1,934.00 George Liles Parkway, SR 1304 (Roberta Road) to SR 1431 (Weddington
Road). (R‐2246B)
1,934.00
NC NC050 Marine Maintenance Facility Phase I, Manns Harbor, North Carolina 28,102.00 Construct River Class Ferry in Dare and Hyde Counties. 28,102.00
NC NC052 U.S. Highway 276 Project Study (NC) 113,500.00 US 64 Business, SR 1348 (Probart St) to US 64 in Brevard. (U‐5104) 113,500.00
NC NC055 Belmont Infrastructure and Streetscape Improvement, North Carolina 227,178.00 Main St, NC 115 (Old Statesville Rd)/SR 2004 (Mount Holly‐Huntersville Rd) to
south of Ramah Church Rd
227,178.00
NC NC067 Extend M.L. King, Jr. Boulevard in Monroe 162,520.00 NC 84, NC 16 to SR 1008 (Waxhaw‐Indian Trail Rd) in Wesley Chapel. (U‐
3467)
162,520.00
NC NC070 Upgrade US 1 in Rockingham 812,739.00 Future I‐73/I‐74 / US 220 Rockingham Bypass, SW of SR 1304 (Harrington
Road) to I‐73 / I‐74 interchange S of Ellerbe
812,739.00
NC NC075 Install ITS on U.S. 70 Clayton Bypass 81,259.00 I‐40, I‐440/US 64 in Wake County to NC 42 in Johnston County (STIP I‐5111) 81,259.00
NC NC084 Greensboro Signal System Replacement ITS Enhancement Project 1,015,749.00 SR 1008 (West Market St) from SR 2007 (Bunker Hill Rd) at Colfax to NC 68 in
Greensboro
1,015,749.00
NC NC085 Continued development of Cary, NC pedestrian bike paths 147,542.00 Crossing #628547G, West North Street, and Crossing #628551W, West South
Street, in Fremont. Crossing closures
147,542.00
NC NC086 Eliminate highway‐railway crossings in the City of Fayetteville NC 81,259.00 CSX, Closure of Plank Street. Signalize Yancey Street, Dudley Street, and
Chelly Street in Warsaw, Duplin County.
81,259.00
NC NC093 Construct Endor Iron Furnace Greenway enhancements from Deep River to
Sanford
179,526.00 US 1 / US 15 / US 501 from South of NC 78 (Tramway Rd) / SR 1303 (Center
Church Rd) to SR 1334 (Pendergrass Rd) in Sanford
179,526.00
NC NC099 To construct an interchange at an existing grade separation at SR 1602 (Old
Stantonsburg Rd.) and U.S. 264 Bypass in Wilson County, NC
492,515.60 US 301, Black Creek Road to SR 1515 in City of Wilson 492,515.60
NC NC103 Pack Square Pedestrian and Roadway Improvements, Asheville. 390,049.00 NC 63 (Leicester Highway), SR 1615 (Gilbert Rd) to west of SR 1004
(Newfound Rd) (U‐3301)
390,049.00
NC NC107 Construct new Route from Beach Drive (SR 1104) to NC 211 in Brunswick
County
325,039.00 NC 211, SR 1500 (Midway Road) to NC 87 in Brunswick County 325,039.00
NC NC108 Widen NC 150 from Cherryville to Lincolnton. 471,445.00 NC 273 (S. Main St), Tuckaseegee Rd (at Beatty Dr) to Highland St (at A & E
Dr) in Mounty Holly. (U‐3633)
471,445.00
NC NC109 Study feasibility of widening US 221/NC 226 from Woodlawn to Spruce Pine,
start planning and design, and make upgrades to improve safety.
630,502.00 Replacement of bridge 580017 carrying US 221 over Second Broad River in
McDowell County. (B‐3673)
630,502.00
NC NC116 North Carolina. Repair and improve safety features on U.S. Highway 19 from
Maggie Valley to Cherokee.
1,153,891.00 NC 209, US 23 Bus. to north of SR 1523 (Old Clyde Rd) at Lake Junaluska. (R‐
4047)
1,153,891.00
NC NC117 Northern Loop Project, City of Wilson 801,180.00 US 301, Black Creek Road to SR 1515 in City of Wilson 801,180.00
NC NC119 Construct relocated NC 16 in Lincoln and Catawba Counties, NC. 138,142.00 NC 16, SR 1895 to SR 1800 southeast of Newton. (R‐3100) 138,142.00
NC NC120 Battleground Rail to Trail Project, Guilford County, NC 81,259.00 SR 1008 (West Market St) from SR 2007 (Bunker Hill Rd) at Colfax to NC 68 in
Greensboro
81,259.00
ToFrom
85
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
North Carolina
State Demo ID Project Description Amount Project Description Amount
ToFrom
NC NC136 Norfolk Southern Intermodal System, Charlotte 25,267.00 I‐85, NC 73 (Exit 55) to SR 2180 (Lane Street). (I‐3802A) 25,267.00
CSX, Closure of Plank Street. Signalize Yancey, Dudley, and Chelly Streets in
Warsaw, Duplin County. (Y‐5500CB)
242,381.00
CSX, Closure of 3rd Street. Signalize 1st and Malloy, Robeson County (Y‐
5500 FC)
650,000.00
CSX, NC 711 (Third Street). Crossing Signal Upgrade in Pembroke, Robeson
County (Z‐5400FT).
582,000.00
CSX, NC 20 (West Broad Street). Crossing Signal Upgrade in Saint Paul,
Robeson County (Z‐5400FV).
270,000.00
CSX, US 501 (Main Street). Crossing Signal Upgrade in Rowland, Robeson
County. (Z‐5400FW)
350,000.00
US 401, West of Hampton Oaks Drive to East of Fairway Drive in Fayetteville,
Cumberland County (U‐4405).
931,460.00
NS, Dobson Drive. Crossing Signal Upgrade in Fayetteville, Cumberland
County (Z‐5400FX).
250,000.00
CSX, Brissom Drive. Crossing Signal Upgrade in Fayetteville, Cumberland
County (Z‐5400FY).
200,000.00
Short Line, NC 20 (Saint Paul Road)/SR 1458 (Scott Currie Road) in Raeford,
Hoke County (Z‐5400HD)
95,000.00
Upgrade to LED fixtures at various locations in Cumberland, Richmond and
Chatham Counties (Z‐5400ZZ)
200,000.00
Installation of railroad warning signage in Cumberland, Hoke, Moore,
Montgomery, Lee, Scotland (Z‐5400ZY)
50,000.00
NC NC144 Northern Loop Project, Wilson 3,004,425.00 US 301, Black Creek Road to SR 1515 in City of Wilson 3,004,425.00
NC NC145 Rail Track Replacement, Spencer. 74,336.00 I‐85 from North of SR 2180 (Lane St.) to US 29 / US 601 Connector in Rowan
County
74,336.00
NC NC151 Transportation Improvements for Peters Creek Pkwy, 1st St., 2nd St., and
Brookstown Ave., in Winston‐Salem
2,002,950.00 Winston‐Salem Northern Beltway ‐Eastern Section, US 421 / NC 150 /
Business 40 to US 158
2,002,950.00
NC NC155 Acquisition of rail corridors for use as bicycle and pedestrian trails, Durham. 2,002,950.00 SR 2220 (Old Chapel Hill Rd) from SR 1113 (Pope Rd) to SR 1116 (Garrett Rd)
in Durham County.
2,002,950.00
NC NC156 Construct an interchange at an existing grade separation at SR 1602 (Old
Stantonsburg Rd.) and US 264 Bypass in Wilson County
903,840.00 US 301, Black Creek Road to SR 1515 in City of Wilson 903,840.00
NC NC161 Pack Square Pedestrian and Roadway Improvements, Asheville. 1,033.00 NC 63 (Leicester Highway), SR 1615 (Gilbert Rd) to west of SR 1004
(Newfound Rd) (U‐3301)
1,033.00
NC NC162 Study feasibility of widening US 221/NC 226 from Woodlawn to Spruce Pine,
start planning and design, and make upgrades to improve safety.
636,783.00 Replacement of bridge 580017 carrying US 221 over Second Broad River in
McDowell County. (B‐3673)
636,783.00
NC NC174 Eliminate highway‐railway crossings in the City of Fayetteville NC 276,360.00 CSX, Closure of Plank Street. Signalize Yancey Street, Dudley Street, and
Chelly Street in Warsaw, Duplin County.
276,360.00
NC NC177 Acquire right‐of‐way and construct a new highway that will begin at NC 58
and follow east to U.S. 301, Wilson
2,004,683.00 US 301, Black Creek Road to SR 1515 in City of Wilson 2,004,683.00
NC NC178 Transfer of the Williams Street railroad switching operation to the Milan Yard
switching operation site, Fayetteville.
3,007,025.00 NCDOT Capital Yard South End Track Improvements 3,007,025.00
NC NCF01 North Carolina State Ferry (dredging and environmental studies). 144,547.00 Hatteras Ferry Dock in Dare County to Ocracoke Ferry Docks in Hyde County. 144,547.00
Total Amount Repurposed 30,357,034.60
3,820,841.00Eliminate highway‐railway crossings in the City of Fayetteville NCNC140NC
86
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
North Carolina
State Demo ID Project Description Amount Project Description Amount
ToFrom
Total # of Earmarks Repurposed 39
87
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Ohio
State Demo ID Project Description Amount Project Description Amount
OH OH003 PE DEMO ‐ Hubbard Expressway ‐ Youngstown (OH) 393,649.39 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 393,649.39
OH OH004 PE Demo ‐ I‐680 Access Ramps ‐ Youngstown (OH) 170,826.94 Resurface and replace Meridian Road from I‐680 to Trumbull County Line. 170,826.94
OH OH009 Brook Park‐Aerospace Tech. Prk Acc. 560,953.43 Repair and resurface Smith Road in the City of Brook Park from Snow Road to
Elm Ave.
560,953.43
OH OH015* Clark, Champaign and Logan Counties: US 68 Bypass 334,509.36 Improve Safety and congestion at the existing US 35 Factory and Orchard
intersections in Greene County
334,509.36
OH OH022* East Canton/Minerva: Route 30 Extension 1,199,730.13 Horizontal curve correction to mitigate the crashes that are occurring in the
curve on US 30 at SLM 11.70.
1,199,730.13
OH OH027 Lancaster Bypass 240,995.95 Installation of tower lighting at the Hill/Diley Interchange on US 33 240,995.95
OH OH044 Relocate SR 60 from Zanesville to Dresden 497,670.50 Resurfacing and related work to Northpointe Drive from SR146 to Maple
Avenue (SR60)
497,670.50
OH OH049 Upgrade Western Reserve Road, Mahoning County 84,769.64 Resurface and replace Meridian Road from I‐680 to Trumbull County Line. 84,769.64
OH OH066 Construct traffic signal in Hebron 10,065.41 Village of Hebron sidewalks on CR 79 north of US 40 to Enterprise Drive 10,065.41
OH OH078 Construct interchange at SR 11 and King Graves Rd. in Trumball Co. 729,706.43 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 729,706.43
OH OH082 Construct access and related improvements to Downtown Riverfront Area,
Dayton
92,240.00 Improve Safety and congestion at the existing US 35 Factory and Orchard
intersections in Greene County
92,240.00
OH OH095 Construct intermodal transit center in Cincinnati 372,840.00 Replacement of the existing Western Hills Viaduct. 372,840.00
OH OH096 High Priority highway and bridge projects 4,610,686.37 Interchange modification. Includes Bridge replacements 1)SR 541 over SR16
and 2) SR 541 over Muskingum River
4,610,686.37
OH OH098 Construct necessary connections for the Taylor Southgate Bridge in Newport
and the Clay Wade Bailey Bridge in Covington
481,986.01 Replacement of the existing Western Hills Viaduct. 481,986.01
OH OH099 Construction of, and improvements to, the Fort Washington. Way
reconfiguration project, Cincinnati, Ohio
646,116.00 Replacement of the existing Western Hills Viaduct. 646,116.00
OH OH105 Develop of Elyria Downtown Waterfront Walk, Elyria, Ohio 2,580.73 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals
in Village of Sheffield
2,580.73
OH OH107 Mahoning River Corridor of Opportunity Industrial Park Roadway
Improvement, Ohio
9,514.01 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 9,514.01
OH OH134 I‐675 Corridor Improvements 108,266.29 Improve Safety and congestion at the existing US 35 Factory and Orchard
intersections in Greene County
108,266.29
OH OH147 Renovate and expand national Packard Museum and adjacent historic
Packard facilities
310,477.59 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 310,477.59
OH OH159 Purchase of right of way for transportation enhancement activities in
Bainbridge Township, OH
107,476.00 Purchase of a portable messaging board to alert traveling public for
Bainbridge Township
107,476.00
OH OH160 Highway grade crossing improvement on Summit Road at Pataskala, OH 18,474.80 Reconstruction of Mink St from SR 16/Mink Street intersection improvement,
north to bridge just north of Havens Corner Rd
18,474.80
OH OH162 Construction of Gracemont Street Exchange Interstate 77 ‐ Bethlehem
Township and Pike Township, Ohio
231,435.29 Realign and reconfigure intersections of US‐62, Middlebranch, Harrisburg,
and 30th Street in Plain Township, Stark County
231,435.29
OH OH163 Construct bike and walking path from West 210 St to Metroparks Fairview
Park
280,413.00 Lorain Road Streetscape Project aka CUY‐10‐6.00 280,413.00
OH OH166 Construction of safety and related improvements on Rutlege Transfer Road in
Vernon Township, OH
96,142.00 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 96,142.00
OH OH168 Conduct Miami Street along SR 53 safety enhancement project to improve
access to railroad crossing
76,879.36 Demolition of former CSX RR bridge over the Maumee River leading to the
construction of bike/hike trail
76,879.36
ToFrom
88
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Ohio
State Demo ID Project Description Amount Project Description Amount
ToFrom
OH OH170 Construct Waverly, Ohio South Connector from U.S. 23 to SR 104 to SR 220 2,563,776.00 New Alignment to extend SR207 from US 23 to SR159 & SR180. Bridge
Replacement Project ROS‐23‐16.12
2,563,776.00
OH OH177 Construct connector roadway between SR 13 and Horns Hill Road in north
Newark
1,001,475.00 Replacement of the Cherry Valley Road Bridge 1,001,475.00
OH OH179 Construct Ohio River Trail from downtown Cincinnati, Ohio to Salem Road 335,994.10 Replacement of the existing Western Hills Viaduct. 335,994.10
OH OH187 Construct SR 104 into a 4‐lane facility with a turning lane in Ross County 773,187.93 Intersection project at ROS 159 SLM 5.23 & Delano Rd and Intersection
Project at ROS US 50 SLM 21.75
773,187.93
OH OH191 Construction of roadways and transportation improvements for downtown
Springfield, OH
330,811.89 Improve Safety and congestion at the existing US 35 Factory and Orchard
intersections in Greene County
330,811.89
OH OH192 Jackson Township, Ohio ‐ Hill and Dales Road widening 167,888.00 Realign and reconfigure intersections of US‐62, Middlebranch, Harrisburg,
and 30th Street in Plain Township, Stark County
167,888.00
OH OH199 Medina, Ohio ‐ Guilford Avenue urban road collector pavement
reconstruction
50,519.47 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals
in Village of Sheffield
50,519.47
OH OH200 Planning and construction of a network of recreational trails in Perry
Township
69,521.00 Continuation of trail funded by this earmark. Extend the path to improve
access to area in Perry Township in Lake County.
69,521.00
OH OH202 Conduct Phase II of US Route 68 bypass project in Urbana 1,842,714.00 Improve Safety and congestion at the existing US 35 Factory and Orchard
intersections in Greene County
1,842,714.00
OH OH206 Safety improvements to Paris Avenue intersections and Meese Road and
Easton Street ‐ Nimishillen Township, Ohio
509,912.27 Realign and reconfigure intersections of US‐62, Middlebranch, Harrisburg,
and 30th Street in Plain Township, Stark County
509,912.27
OH OH208 Construct new two lane road to Sycamore Street in Gallia County 1,001,475.00 PE, RW , and CO related to Interchange for GAL 35/7/735. 1,001,475.00
OH OH209 Road improvements, streetscapes and pedestrian safety additions to
Ashtabula Harbor
206,551.34 Improve lighting of the IR‐90 and SR‐534 interchange, in Harpersfield
Township, Ashtabula County, Ohio.
206,551.34
OH OH211 Pike County, OH Fog Road upgrade 454,829.00 Intersection project at ROS 159 SLM 5.23 & Delano Rd and Intersection
Project at ROS US 50 SLM 21.75
454,829.00
OH OH215 North Huntington Street improvements, Medina, OH 131,792.19 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals
in Village of Sheffield
131,792.19
OH OH222 Construct access improvements at I‐680 and internal roadways for Corridor of
Opportunity, Mahoning County
390,790.22 Widening and restriping of SR 46 in Mahoning and Trumbull Counties 390,790.22
OH OH225 Reconstruct Broadway Avenue in Lorain 83,285.63 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals
in Village of Sheffield
83,285.63
OH OH231 Construct a 4‐lane limited access road to link Newcomerstown and Cadiz 80,086.13 Replace existing bridge over US 250. 80,086.13
OH OH235 Upgrade Manchester Road in Akron 288,864.50 Resurface and replace Meridian Road from I‐680 to Trumbull County Line. 288,864.50
OH OH236 Structural improvements to two bridges over the Zimber Ditch between 38th
St. and Whipple Avenue in Canton, Ohio
40,630.00 Adding center TWLTL to State Route 800 in Canton Township between SLM
8.03 to SLM 8.35.
40,630.00
OH OH244 Construct road projects and transportation enhancements as part of
Riverscape Phase 3, Montgomery County, Ohio
538,701.24 Improve Safety and congestion at the existing US 35 Factory and Orchard
intersections in Greene County
538,701.24
OH OH246 Improvements to SR 91 in City of Twinsburg, OH 186,348.69 Improve the intersection of State Route 162 and Cleveland Massillon Road 186,348.69
OH OH249 Construct highway‐rail crossing safety upgrades at 3 grade crossings in
Madison Village, OH
28,034.39 Remove and replace with ADA compliant ramp ‐ SW corner of SR528 and
SR84 in the Village of Madison
28,034.39
OH OH257 Construct Eagle Avenue Viaduct ‐ demolition bridge, realignment of roadway
to replace bridge and reconstruction of two other bridges, Cleveland
400,590.00 Minor rehabilitation Main Ave ‐ W. 25th St to Center Street in City of
Cleveland
400,590.00
89
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Ohio
State Demo ID Project Description Amount Project Description Amount
ToFrom
OH OH266 Bicycle paths for the Magic Mile in Willougby, OH 640,944.00 Reconstruction of Erie Street in the City of Willoughby. 640,944.00
OH OH274 Construction of access road along east side of SR 8 in Summit County, OH 801,180.00 Improve the intersection of State Route 162 and Cleveland Massillon Road 801,180.00
OH OH276 Construct interchange improvements at SR 46 and 82 in Howland Township,
Trumbull County
41,164.00 Resurface and replace Meridian Road from I‐680 to Trumbull County Line. 41,164.00
OH OH279 Upgrade grade crossing safety devices in Elyria and North Ridgeville 77,358.80 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals
in Village of Sheffield
77,358.80
OH OH283 Construct roadway improvement project along state routes 37 and 78
through Fairfield, Perry, Morgan, Noble, Monroe Counties
30,172.37 PE, RW , and CO related to Interchange for GAL 35/7/735. 30,172.37
OH OH284 Feasibility study to construct a bridge over the Muskingum River in the
vicinity of McConnelsville
18,295.00 PE, RW , and CO related to Interchange for GAL 35/7/735. 18,295.00
OH OH285 Construct replacement of Morgan Township Road 209 between SR 60 and SR
78 in Morgan County.
809,925.95 Relocate CR 20 and TR 224 on ATH 690 1.60 to improve sight distance. Safety
project ‐ Spot pave on SR690.
809,925.95
OH OH289 Rehabilitation of SR 53 from Miami Street to north city limits including
approaches to the CSX railroad bridge, City of Tiffin
72,970.62 Demolition of former CSX RR bridge over the Maumee River leading to the
construction of bike/hike trail
72,970.62
OH OH293 Calm traffic on Greenfield St in City of Tiffin and improve intersection of
Greenfield St with routes 18 and 101
730,363.75 Demo CSX bridge over Maumee River to construct bike/hike Trail. Construct
Bikepath between Heidleberg University and a rec trail
730,363.75
OH OH297 Riversouth street network improvements in Columbus 609,519.28 Major widening from 4 to 6 lanes. Multi‐use path and sidewalk. Widen south
leg of Orion Place to provide 2 left turn lanes on WB Polaris Pkwy.
609,519.28
OH OH300 Land acquisition for construction of pedestrian and bicycle trails at Mentor
Marsh in Ohio
52,245.00 City of Mentor Marina & Nature Preserve ancillary trail improvements 52,245.00
OH OH302 Design and construct road enhancements Cleveland Port Authority in
Cleveland, Ohio
2,503,688.00 Main Gate realignment Improvements that are eligible for STBG 2,503,688.00
OH OH306 Ramp and roadway approaches on I‐75 toward Brent Spence bridge,
Cincinnati, OH
1,974,390.41 Reconstruction of I‐75 from Ohio River through the Western Hills Viaduct.
Brent Spence Bridge DD, RW & CO
1,974,390.41
OH OH314 South Connector in Waverly from U.S. 23 to SR 104 to SR 220 for new
development areas in a depressed Appalachian region. Waverly, OH
3,732,569.81 New Alignment to extend SR207 from US 23 to SR159 & SR180. Bridge
Replacement Project ROS‐23‐16.12
3,732,569.81
OH OH341 Delaware County SR 750 realignment and safety improvements 680,652.23 Major widening from 4 to 6 lanes. Multi‐use path and sidewalk. Widen south
leg of Orion Place to provide 2 left turn lanes on WB Polaris Pkwy.
680,652.23
OH OH342 Highway rail crossing safety upgrades at three locations in Madison Village,
OH
110,162.00 Highway Rail Crossing Safety Upgrades at Bessemer Ave/Norfolk Southern
Crossing in Cleveland, Ohio
110,162.00
OH OH345 Columbiana County Port Authority construct intermodal facility,
transportation safety improvements
93,296.00 Horizontal curve correction to mitigate the crashes that are occurring in the
curve on US 30 at SLM 11.70.
93,296.00
OH OH347 Transportation improvements for Ohio River Trail from Salem to downtown 1,001,475.00 Replacement of the existing Western Hills Viaduct. 1,001,475.00
OH OH349 Medina County US 224 turn lane addition, resurfacing, signage and other
improvements
385,696.55 Add EB right turn lane, install Qwick Kurb median & reconstruct traffic signals
in Village of Sheffield
385,696.55
OH OH351 Establish a Trans‐Erie ferry line from Cleveland, OH to Port Stanley, Ontario 1,001,475.00 Improvements to the surface transportation elements of the bulk pier
including pier rail, and bulk head as eligible under STBG funds.
1,001,475.00
90
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Ohio
State Demo ID Project Description Amount Project Description Amount
ToFrom
OH OH360 Construction, including design and engineering of an approx. 30,000 sq ft
terminal building to accommodate the Trans‐Erie ferry service which departs
the Cleveland‐Cuyahoga County Port Authority, Cleveland, OH
6,014,048.00 Improvements to the surface transportation elements of the bulk pier
including pier rail, and bulk head as eligible under STBG funds.
6,014,048.00
OH OHF01 Toledo‐Lucas County Port Authority Marina Ferry (3) 247,623.77 Demolition of former CSX RR bridge over the Maumee River leading to the
construction of bike/hike trail
247,623.77
*Subject to availability of funds upon additional research.
Total Amount Repurposed 44,775,398.16Total # of Earmarks Repurposed 70
91
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Oklahoma
State Demo ID Project Description Amount Project Description Amount
OK OK013 PE Demo ‐ Interstate 66 Feasibility: (15 States) 2,500.00 ACSTP ‐156C (136)SS US‐75A: FROM 0.6 MI. NORTH OF SH‐16 NORTH 7.5
MILES
2,500.00
OK OK039 I‐44 Exit ramp in the Luther area, Oklahoma 102,392.43 I‐35 at Waterloo Road, interchange reconstruction, Oklahoma County 102,392.43
OK OK047 Pogue Airport Access Road, Oklahoma 299,711.83 Claremore OK‐ rail/city street crossing improvements for increased safety and
a quiet zone
299,711.83
OK OK088 Construction of rail crossing in Claremore at Blue Star Drive and SH 66 1,602,360.00 Claremore OK‐ rail/city street crossings improvements for increased safety
and a quiet zone
1,602,360.00
OK OK096 Construction vehicular bridge over the Burlington Northern RR at War Bonnet
Crossing, Mannford, OK
801,180.00 Claremore OK‐ rail/city street crossings improvements for increased safety
and a quiet zone
801,180.00
OK OK099 Construct interchange south of I‐40 along Indian Nation Turnpike near
Henryetta
200,295.00 ACSTP ‐156C (136)SS US‐75A: FROM 0.6 MI. NORTH OF SH‐16 NORTH 7.5
MILES
200,295.00
OK OK113 Construction of rail crossing in Claremore at Blue State Drive and SH 66 400,590.00 Claremore OK‐ rail/city street crossing improvements for increased safety and
a quiet zone
400,590.00
OK OK121 Construct vehicular bridge over the Burlington Northern RR at War Bonnet
Crossing, Mannford
200,295.00 Claremore OK‐ rail/city street crossing improvements for increased safety and
a quiet zone
200,295.00
OK OK126 Navajoe Gateway Improvements Projects, U.S. 62 in Altus, OK 200,295.00 Tamarak Road and US‐283 intersection in Altus, OK; Developing improvement
project
200,295.00
OK OK129 Transportation improvements to Idabel Industrial Park Rail Spur, Idabel 300,443.00 US‐259 South of Idabel OK, reconstruction and preliminary activities 300,443.00
Total Amount Repurposed 4,110,062.26Total # of Earmarks Repurposed 10
ToFrom
92
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Oregon
State Demo ID Project Description Amount Project Description Amount
OR OR090 Rockwood Town Center for Stark Street from 190th to 197th 297,203.59 Cleveland St: Stark to Powell 297,203.59
OR OR093 Lake Road Reconstruction and Safety Improvements, Milwaukie 589,846.68 17th Ave ‐ Multi‐Use Trail 589,846.68
OR OR101 Study to evaluate alternatives in support of an eventual Astoria bypass,
Astoria
69,908.34 US30: Wonderly‐Swedetown & Gnat Creek‐Burnside Loop Section 69,908.34
OR OR106 Culvert Replacement, Sweet Home 130,192.00 US20 Mid‐block pedestrian crossing 130,192.00
OR OR109 Weaver Road Extension and Bridge Project, Douglas County 2,270,700.09 Repavement of Garden Valley Road 2,270,700.09
OR OR112 Construct turn lane on Gateway Boulevard, Cottage Grove 90,133.00 OR99 Urban Upgrade Project , which includes ramp and streetscape work 90,133.00
OR OR122 Construction of access road including sidewalks, bike lanes and railroad
crossing from Highway 99W to industrial zoned property, Corvallis
178,891.96 Bike/pedestrian/ADA improvements on collectors and arterials in City of
Corvallis
178,891.96
OR OR125 Hwy 99E/Geary Street Safety Improvements, Albany 123,515.86 Bike/pedestrian/ADA improvements on collectors and arterials in City of
Corvallis
123,515.86
OR OR132 U.S. Highway 20 and Airport Road Intersection 109,619.49 US20 Mid‐block pedestrian crossing 109,619.49
Total Amount Repurposed 3,860,011.01Total # of Earmarks Repurposed 9
ToFrom
93
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
PA PA005 Blair Co: US‐220 Altoona to Tyrone (Authorized via STURRA) 9,556.51 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown
Township, Blair County
9,556.51
PA PA014 Climbing Lane Safety Demo (PA) (US 15 in Tioga Co.) (Authorized via ISTEA) 16,494.98 SR 6, Milling and Resurfacing, Troy Township, Bradford County 16,494.98
PA PA015* Donora Industrial Park Access Rd. (Donora‐Monessen Bridge/I‐70) Authorized
via ISTEA
91,493.04 Interstate 70 at Bentleyville, Washington, PA, Interchange reconfiguration 91,493.04
PA PA021* Pennsylvania Quakertown Bypass (Bucks Co) (Authorized under ISTEA) 457,575.21 SR2038 (County Line Rd) Widening & rehabilitation, Horsham, Montgomery &
Warrington Townships, Bucks County
457,575.21
PA PA022* PA North Philadelphia Intermodal Facility (Authorized under ISTEA) 813,868.79 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
813,868.79
PA PA045* Aliquippa: Various 3‐R projects (Authorized via ISTEA). 30,712.43 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation;
Beaver County
30,712.43
PA PA056 Carroltown/DuBois: US 219 Improvements (Authorized via TEA‐21) 263,467.60 SR 56 over St. Clair Run, Culvert Replacement, City of Johnstown, Cambria
County
263,467.60
PA PA057* Robinson Township: Design work in Town Center (Authorized via TEA‐
21/ISTEA)
1,708,269.57 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay
Townships, Allegheny County
1,708,269.57
PA PA061 Upgrade US 30 from OH border to Pittsburgh Int. Airport (Authorized via
ISTEA)
2,353,200.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver
County
2,353,200.00
PA PA062 Philadelphia: Reconstruct Old Delaware Avenue Service Road (Authorized via
ISTEA).
15,820.56 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 15,820.56
PA PA063 Allegheny Co.: Expansion of M.L. King Busway to serve Pittsburgh Airport &
community (Authorized via TEA‐21)
1,209,947.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation,
City of Pittsburgh
1,209,947.00
PA PA065 Philadelphia: Improve mobility in vicinity of Pennsylvania Convention Center
(Authorized via ISTEA).
18,844.39 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 18,844.39
PA PA076 Construct Ardmore Streetscape project (Authorized via TEA‐21) 11,295.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
11,295.00
PA PA080 Renovate Harrisburg Transportation Center in Dauphin County (Authorized
via TEA‐21)
28,153.85 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
28,153.85
PA PA085 Construct highway‐transit transfer facility in Lemoyne (Authorized via TEA‐21) 194,503.00 Shirley Ave to Cumberland Valley Rail Trail, Bike/Ped Trail, Carlisle Borough,
Cumberland County
194,503.00
PA PA100 PA 26 over Piney Creek 2‐bridges in Bedford County (Authorized via TEA‐21) 113,260.00 Bridge Rehabilitation on Aughwick Mills Rd, Spring Creek Rd, Parks Road, and
Mills Lane in Huntingdon County
113,260.00
PA PA102 Conduct highway research, Drexel University [Under TEA‐21 Section 5118(b),
these funds shall be available for funding the establishment of the Intelligent
Infrastructure Institute at Drexel University] (Authorized via TEA‐21)
334,097.46 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
334,097.46
PA PA103 Construct Philadelphia Intermodal Gateway Project at 30th St. Station
(Authorized via TEA‐21)
363,637.90 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
363,637.90
PA PA106 Eliminate 16 at‐grade rail crossings through Erie (Authorized via TEA‐21) 486,928.00 SR 4016, New bridge, roadway rehab, signal upgrades & roundabout,
Millcreek/Fairview Twp. Erie County
486,928.00
PA PA111 Construct access to Tioga Marine Terminal, Ports of Philadelphia and Camden
(Authorized via TEA‐21)
1,045,526.58 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 1,045,526.58
PA PA114 Construct improvements to the Park Road extension connecting U.S. 222 and
U.S. 422, Spring Township (Authorized via TEA‐21)
343,920.45 SR 662 & SR 1010, Highway Restoration, Fleetwood Borough, Berks County 343,920.45
PA PA120 Construct Newton Hamilton SR 3021 over Juniata River in Mifflin County
(Authorized via TEA‐21)
37,649.00 SR 1005 over Laurel Run, Bridge Replacement, Armagh Township, Mifflin
County
37,649.00
ToFrom
94
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA123 Improve PA 16 including intersection with Antrim Church Road (Authorized
via TEA‐21)
593,100.00 US 11 over Conococheague Creek, Bridge Replacement, Greene Township,
Franklin County
593,100.00
PA PA125 West Philadelphia congestion mitigation initiative (Authorized via TEA‐21) 7,080.04 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
7,080.04
PA 896, Resurface & widen shoulders, Strasburg Boro, Strasburg Twp, & East
Lampeter Twp, Lancaster County
1,250,000.00
PA‐743 over Conewago Creek, Bridge Replacement, Mount Joy Township,
Lancaster County
1,312,748.00
PA PA131 Construct road connector and bridge over Allegheny River to link New
Kensington with Allegheny Valley Expressway (Authorized via TEA‐21)
2,827,679.74 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny
County
2,827,679.74
PA PA132 Construct Lackawanna River Heritage Trail in Lackawanna (Authorized via TEA‐
21)
13,918.08 SR 11, SR 3023, SR 2004 Resurfacing, City of Scranton & City of Wilkes Barre,
Lackawanna & Luzerne County
13,918.08
PA PA133 PA 997 over Muddy Run, Bridge Replacement, Letterkenny Township,
Franklin County
14,253.92 PA 997 over Muddy Run, Bridge Replacement, Letterkenny Township,
Franklin County
14,253.92
PA PA134 Improve PA‐8 between Cherry Tree and Rynd Farm (Authorized via TEA‐21) 611,213.49 SR 62 over Allegheny River, Bridge Replacement, Tionesta Township, Forest
County
611,213.49
PA PA135 Realign West 38th Street from Shunpike Road to Myrtle Street in Erie County
(Authorized via TEA‐21)
12,555.62 SR 4016, New bridge, roadway rehab, signal upgrades & roundabout,
Millcreek/Fairview Twp. Erie County
12,555.62
PA PA140 Gettysburg comprehensive road improvement study and construction of
projects identified in the study (Authorized via TEA‐21)
794,447.98 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
794,447.98
PA PA141 Improve access to Raystown in Huntingdon County (Authorized via TEA‐21) 556,756.21 SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement,
Huntingdon County
556,756.21
PA PA143 Conduct study and construct FT. Washington Transportation improvements,
Upper Dublin, PA (Authorized via TEA‐21)
91,456.99 SR 422 over Schuylkill River, Bridge Restoration, West Norriton and Upper
Merion Townships, Montgomery County
91,456.99
PA PA150 Allegheny Trail from Pittsburgh, PA to Cumberland MD (Authorized via TEA‐
21)
1,553,455.95 US 119, Highway Reconstruction, East Huntington Township, Westmoreland
County
1,553,455.95
PA PA151 Construct Western Innerloop from PA‐26 to State Route 3014 (Authorized via
TEA‐21)
105,317.88 SR 144 over SEDACOG JRA/Nittany Bald Eagle RR, Bridge Replacement,
Milesburg Borough, Centre County
105,317.88
PA PA153 Improve T‐344 Bridge over Mahantango Creek in Snyder County (Authorized
via TEA‐21)
86,743.50 SR 522 over Middle Creek, Bridge Replacement, Middle Creek Township,
Snyder County
86,743.50
PA PA156 Complete Broad Street ramps at Route 611 bypass in Bucks County
(Authorized via TEA‐21)
401,824.71 SR 2038 (County Line Road) widening & rehabilitation, Horsham,
Montgomery & Warrington Townships, Bucks County
401,824.71
PA PA161 Construct I‐95 access ramps at and around Philadelphia Int'l Airport
(Authorized via TEA‐21)
1,200,797.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia,
Philadelphia County
1,200,797.00
PA PA162 Construct park and ride facilities in Lower Bucks County (Authorized via TEA‐
21)
28,237.00 SR 2038 (County Line Road) widening & rehabilitation, Horsham,
Montgomery & Warrington Townships, Bucks County
28,237.00
PA PA163 Widen US‐11/15 between Mt. Patrick and McKees Half Falls in Perry County
(Authorized via TEA‐21)
11,769.88 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
11,769.88
PA PA165 Construct exit ramp on I‐180 at State Route 2049 in Lycoming County
(Authorized via TEA‐21)
1,102,666.56 I‐180 Resurfacing, Muncy & Muncy Creek Townships, Lycoming County 1,102,666.56
PA PA166 Construct bicycle and pedestrian facility between Washington's Landing and
Millvale Borough, Allegheny Co. (Authorized via TEA‐21)
232,620.94 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny
County
232,620.94
PA PA169 Construct PA 36 Convention Center Connector in Blair County (Authorized via
TEA‐21)
18,825.00 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown
Township, Blair County
18,825.00
PA PA175 Construct access road to Hastings Industrial Park, Cambria Co. (Authorized via
TEA‐21)
683,644.88 SR 56 over St. Clair Run, Culvert Replacement, City of Johnstown, Cambria
County
683,644.88
2,562,748.00Improve PA 23 Corridor from US 30 bypass between Lancaster Co line &
Morgantown (Authorized via TEA‐21)
PA129PA
95
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA176 Construct I‐81 noise abatement program in Dauphin County (Authorized via
TEA‐21)
41,243.03 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
41,243.03
PA PA177 Install citywide signalization (SAMI) project in Lebanon (Authorized via TEA‐
21)
88,499.00 US 22 over Elizabeth Run & SR 1011 over Deep Run, Bridge Replacements,
Bethel Township, Lebanon County
88,499.00
PA PA182 Install Traffic Signal upgrade in Clearfield Borough in Clearfield County
(Authorized via TEA‐21)
17,258.39 SR 0879 over Trout Run, Bridge Rehabilitation, Goshen Township, Clearfield
County
17,258.39
PA PA185 Construct PA16 Truck Climbing Lane in Franklin County (Authorized via TEA‐
21)
571,656.10 US 11 over Conococheague Creek, Bridge Replacement, Greene Township,
Franklin County
571,656.10
PA PA188 Improve Intersection of U.S. 30, S.R. 3066, and West Allegheny Road, North
Fayette Townshipt(Authorized via TEA‐21)
1,584,479.03 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay
Townships, Allegheny County
1,584,479.03
PA PA189 Construct Independence Gateway Transportation Ctr project, Philadelphia
(Authorized via TEA‐21)
182,592.48 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 182,592.48
PA PA191 Construct Abbey Trails in Abington Township (Authorized via TEA‐21) 393,628.60 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
393,628.60
PA PA210 Rehabilitate Streets Run Road, Pittsburgh, for emergency access (Authorized
via TEA‐21)
114,119.15 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation,
City of Pittsburgh
114,119.15
PA PA245 Urban Education Development Research & Retreat Center, Transportation
Education and Career Institute (Authorized as part of 2003 Appr (108‐7))
99,350.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 99,350.00
PA PA246 US 15 Market Street Bridge Replacement, Williamsport, Lycoming County,
Pennsylvania (Authorized via 2003 Appr (108‐7))
5,148.67 I‐180 Resurfacing, Muncy & Muncy Creek Townships, Lycoming County 5,148.67
PA PA269 Streetscape/Roadway Improvements to the Chester City (PA) Waterfront
(Authorized via 2004 Appr)
41,475.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 41,475.00
PA PA276 Campbelltown Connector and U.S. 322 Improvement Project, Pennsylvania
(Authorized via 2005 Appr)
33,372.72 US 22 over Elizabeth Run & SR 1011 over Deep Run, Bridge Replacements,
Bethel Township, Lebanon County
33,372.72
PA PA279 City of Reading, Pennsylvania (Authorized via 2005 Appr) 15,607.91 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 15,607.91
PA PA301 Street improvements, Abington Township (Authorized via SAFETEA‐LU) 14,042.68 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
14,042.68
PA PA304 Design and construct relocation of U.S. 11 between Ridge Hill and Hempt
Roads (Authorized via SAFETEA‐LU)
54,550.03 Shirley Ave to Cumberland Valley Rail Trail, Bike/Ped Trail, Carlisle Borough,
Cumberland County
54,550.03
PA PA305 Mercer County, PA I 79 and PA 208 Interchange Improvement Project
(Authorized via SAFETEA‐LU)
3,540.00 SR 18, SR 62, SR 3008 Resurfacing and Curb Ramps in The City of Hermitage 3,540.00
PA PA313 Reconstruction and repair of Haverford Ave. between 68th St. and
Lansdowne Ave. (Authorized in 2005 via SAFETEA‐LU)
240,354.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
240,354.00
PA PA314 South Phila. Access Rd. Design and construction of port access road from
South Phila Port and intermodal facilities, Pennsylvania
2,403,540.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 2,403,540.00
PA PA317 Development of Northwest Lancaster County River Trail (Authorized in 2005
via SAFETEA‐LU)
200,295.00 PA‐743 over Conewago Creek, Bridge Replacement, Mount Joy Township,
Lancaster County
200,295.00
PA PA323 Hazle Twp.: streetscaping, paving, lighting, safety improvements, parking,
roadway redesign and cross pipe and catch basin restoration and
replacement on Northgate, Mandy Court, Vine St., and 36th St. in Milnesville
West, and on Hillside Drive (including widening of rht bridge on Hillside Drive,
Club 40 Road, Sunburst and Venisa Drives, and Stockton #7 in Hazle
Township, Luzerne County (Authorized in 2005 via SAFETEA‐LU)
480,708.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
480,708.00
96
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA324 Larksville Boro., Luzerne City.: streetscaping, paving, lighting, safety
improvements, parking, roadway redesign, replacement of the Nesbitt St.
Bridge, and placement of a guiderail adjacent to St. Vladimir's Cemetery on
Mountain Road (SR 1007) in Larksville Borough, Luzerne County (Authorized
in 2005 via SAFETEA‐LU)
160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
160,236.00
PA PA325 Rt 60 Millennium Park Interchange, construct new interchange on Rt 60 to
provide access to new Lawrence County Industrial Park (Authorized in 2005
via SAFETEA‐LU)
640,944.00 SR 18 over Shenango River & CSX RR, Bridge Rehabilitation, City of New
Castle, Lawrence County
640,944.00
PA PA326 Purchase of right‐of‐way, utilities and construction for Northern Access to
Altoona from Interstate 99, Blair County, PA
69,537.80 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown
Township, Blair County
69,537.80
SR2021 (Ducktown Road) over Kruetz Creek; Hellam Township 2,000,000.00
I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
804,130.00
PA PA329 Conduct Environmental Impact Statement study for Parkway West corridor
(Authorized in 2005 via SAFETEA‐LU)
24,705.10 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay
Townships, Allegheny County
24,705.10
PA PA334 Two‐lane Extension of Bristol Road, Bucks County 1,602,360.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
1,602,360.00
PA PA337 Duryea Boro, Luzerne County, streetscaping enhancements, paving, lighting,
safety improvements, parking, garage & roadway redesign (Authorized in
2005 via SAFETEA‐LU)
160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
160,236.00
PA PA339 Design, engineering, right‐of‐way acquisition and construction of
streetscaping enhancements, paving, lighting, safety improvements, parking
and roadway redesign on Sampson Street, Dunn Avenue, Powell Street,
Josephine Street, Pittston Avenue, Railroad Street, McClure Avenue and
Baker Street in Old Forge Borough, Lackawanna County
160,236.00 Resurface, SR 11, SR 3023 in City of Scranton, Lackawanna County and SR
2004 , Luzerne County.
160,236.00
PA PA346 SR 10 Widening, New Morgan Borough & Caernarvon Township (Authorized
in 2005 via SAFETEA‐LU)
1,602,360.00 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 1,602,360.00
PA PA347 Widening of Rt. 22 and SR 26 in Huntingdon. Upgrades to the interchange at
U.S. Rt. 22 and SR 26 [ref P.L. 110‐244, Sec 105(a)(81)] (Authorized in 2005
via SAFETEA‐LU)
2,413,983.00 SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement,
Huntingdon County
2,413,983.00
PA PA348 Extension of Third Street from Interstate 83 to Chestnut St., Harrisburg
(Authorized via SAFETEA‐LU)
4,326,372.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
4,326,372.00
PA PA350 Widening of SR 1001 Section 601 in Clinton County (Authorized via SAFETEA‐
LU)
801,180.00 SR 0322, Intelligent Transportation System Devices, Armagh & Brown
Townships, Mifflin County
801,180.00
PA PA352 Construct PA 706 Wyalusing Bypass Bradford County (Authorized via SAFETEA‐
LU)
801,180.00 SR 6, Milling and Resurfacing, Troy Township, Bradford County 801,180.00
PA PA353 Plains Twp., Luzerne County, streetscaping, paving, lighting, safety
improvements, parking & roadway redesign on Oak St. from Stark St. to the
Twp. Line at Mayock St. and on East Mountain Blvd. (Authorized in 2005 via
SAFETEA‐LU)
160,621.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
160,621.00
PA PA356 Create a direct connection between State Road 29 and State Route 113
(Authorized in 2005 via SAFETEA‐LU)
213,784.86 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
213,784.86
PA PA357 Conduct environmental review and acquire right‐of‐way for preferred
alternative to improve PA 41 (Authorized via SAFETEA‐LU)
2,614,956.00 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West
Whiteland Twp, Chester County
2,614,956.00
2,804,130.00Design and construct interchange and related improvements to I‐83 Exit 4PA327PA
97
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA363 Intersection improvements at PA Route 209 and Water Company Road,
construction of a bridge and access enhancements to Nature and Arts Center,
Upper Paxton Township (Authorized via SAFETEA‐LU)
128,066.20 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
128,066.20
PA PA366 Plymouth Borough, streetscaping enhancements, paving, lighting, safety
improvements, parking, roadway redesign and catch basin restoration and
replacement on Cherry St, Willow St, Eno St, Flat Rd, Krispin St, Parrish St,
Carver St, Church St, Franklin Street, Carolina St, East Main St and Rear
Shawnee Ave (Authorized in 2005 via SAFETEA‐LU)
160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
160,236.00
PA PA368 Design, engineering, ROW acquisition, and construction of streetscaping
enhancements, paving, lighting, safety improvements, parking, and roadway
redesign on Old Ashley Rd, Ashley St, Phillips St, First St, Ferry Rd, and
Division St in Hanover Twp, Luzerne County [ref P.L. 110‐244, Sec
105(a)(128)] (Authorized in 2005 via SAFETEA‐LU)
66,841.56 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
66,841.56
PA PA369 Acquisition of adjacent property to planned Park‐n‐ Ride at Kressler and
Hamilton Boulevards in Wescosville, PA. (Authorized in 2005 via SAFETEA‐LU)
646,962.87 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover
Townships, Lehigh County
646,962.87
PA PA371 CUPSS, Pennsylvania, Urban Maglev Demonstration Test Project (Authorized
in 2005 via SAFETEA‐LU)
4,005,900.00 Interstate 70, Interchange Reconfiguration, Borough of Bentleyville,
Washington County
4,005,900.00
PA PA374 Modernize traffic signals, complete minor roadway realignment, and improve
channelization at U.S. 322 and PA 10 intersection (Authorized via SAFETEA‐
LU)
54,360.83 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West
Whiteland Twp, Chester County
54,360.83
PA PA377 Bethlehem Pike improvements from Valley Green Road to South of Gordon
Lane, Springfield Township (Authorized in 2005 via SAFETEA‐LU)
134,942.34 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
134,942.34
PA PA378 Design, engineering, ROW acquisition and construction of streetscaping
enhancements, paving, lighting, safety redesign on Mill Street from Prince
Steet to Roberts Street, John Street, from Roberts Street to end, Thomas St.
from Roberts St. to end, Williams St. from Roberts St. to end, etc. (Authorized
in 2005 via SAFETEA‐LU)
24,656.53 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
24,656.53
PA PA379 Construction SR 3024, Middle Creek Bridge II, South Canaan, Wayne County
(Authorized via SAFETEA‐LU)
289,712.30 SR 7206 over N Branch Calkins Creek, Bridge Replacement, Damascus
Township, Wayne County
289,712.30
PA PA380 Installation of comprehensive signage system across 1700 acres of urban
parks in Pittsburgh (Authorized in 2005 via SAFETEA‐LU)
73,134.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation,
City of Pittsburgh
73,134.00
PA PA384 Reconstruct Highway and replace bridge on US 422 between Berks County
Line and Schuylkill River in Montgomery and Chester Counties (Authorized in
2005 via SAFETEA‐LU)
1,201,770.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
1,201,770.00
PA PA389 Construct Cameron Street Bridge Northumberland County, Pennsylvania
(Authorized via SAFETEA‐LU)
1,180.00 SR 522 over Middle Creek, Bridge Replacement, Middle Creek Township,
Snyder County
1,180.00
PA PA390 Edwardsville Borough, streetscaping, paving, lighting, safety improvements,
handicap access ramps, parking & roadway redesign on Bilbow St from
Church St to Pugh St, on Pugh St from Swallow St to Main St, Jones Lane from
Main St to Hoblak St, etc. (Authorized in 2005 via SAFETEA‐LU)
160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
160,236.00
PA PA395 Bridge reconstruction and road widening on Route 252 and Route 30 in
Tredyffrin Twp., PA. In conjunction with the Paoli Transportation Center
Project (Authorized in 2005 via SAFETEA‐LU)
1,226,425.60 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
1,226,425.60
98
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA396 Design, engineering, ROW acquisition, and construction of streetscaping
enhancements, paving, lighting, safety improvements, parking and roadway
redesign at the intersection of Quincy/West Drinker/Electric Streets near the
Dunmore School complex in Dunmore Borough, Lackawanna County
320,472.00 Resurface, SR 11, SR 3023 in City of Scranton, Lackawanna County and SR
2004 , Luzerne County.
320,472.00
PA PA397 Add turn lane, modify signals and install pavement markings at intersection of
PA 422 and PA 662 in Amity Township (Authorized via SAFETEA‐LU)
2,867.00 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 2,867.00
PA PA398 Improvements to 8th and 9th Street bridges between Pleasant Valley Blvd.
and Valley View Blvd., Altoona, PA. [ref P.L. 110‐244, Sec 105(a)(84)]
(Authorized in 2005 via SAFETEA‐LU)
161,251.94 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown
Township, Blair County
161,251.94
PA PA408 Completion of beltway interchanges along Business Route 60 in Moon
Township, Allegheny County
801,180.00 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay
Townships, Allegheny County
801,180.00
PA PA411 Construct Dubois Regional Medical Center Access Road (Authorized via
SAFETEA‐LU)
48,756.00 SR 0879 over Trout Run, Bridge Rehabilitation, Goshen Township, Clearfield
County
48,756.00
PA PA418 Design, engineering, ROW acquisition, and construction of streetscaping
enhancements, paving, lighting, safety improvements, parking and roadway
redesign in Exeter Borough, Luzerne county
160,236.00 Intersection improvements on SR 415 and SR 309, Dallas Borough and
Township, Luzerne County
160,236.00
PA PA420 Route 89 Curve Realignment one mile north of Titusville on Route 89
(Authorized via SAFETEA‐LU)
24,377.00 SR 62 over Allegheny River, Bridge Replacement, Tionesta Township, Forest
County
24,377.00
PA PA421 Provide access to HOV ramp from Reedsdale Street with traffic signals,
pavement markings, lane control and fast acting gates. (Authorized in 2005
via SAFETEA‐LU)
446,476.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation,
City of Pittsburgh
446,476.00
PA PA427 David Lawrence Convention Center Phase IV reconstruction (Authorized in
2005 via SAFETEA‐LU)
961,416.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation,
City of Pittsburgh
961,416.00
PA PA428 Crows Run Relocation from SR 65 to Freedom Crider Road (Authorized in
2005 via SAFETEA‐LU)
3,084,543.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver
County
3,084,543.00
PA PA429 Avoca Borough, streetscaping enhancements, paving, lighting, safety
improvements, parking & roadway redesign on Third St. from Pittston Ave. to
Packer St.; Swift St. from Packer St. to Railroad St.; Clark St. from Main St. to
South St.; School st. from Ma (Authorized via SAFETEA‐LU)
9,459.42 Intersection improvements on SR 415 and SR 309, Dallas Borough and
Township, Luzerne County
9,459.42
PA PA435 Rail Crossing signalization upgrade, East Wesner Road, Maidencreek Twp,
Berks County (Authorized in 2005 via SAFETEA‐LU)
16,764.92 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 16,764.92
PA PA436 Construct additional northbound lane on Rt. 28 between Harmar and
Creighton Interchange (Authorized via SAFETEA‐LU)
4,587.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny
County
4,587.00
PA PA437 North Atherton Signal Coordination Project in Centre County (Authorized via
SAFETEA‐LU)
2,005,900.00 SR 1044 over SEDACOG JRA/Nittany Bald Eagle RR, Bridge Replacement,
Milesburg Borough, Centre County
2,005,900.00
PA PA444 Swamp Road Corridor Safety and Roadway Improvements, Bucks County 2,403,540.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
2,403,540.00
PA PA450 Highway rail‐crossing replacement in Osborne Borough (Authorized in 2005
via SAFETEA‐LU)
1,722,537.00 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay
Townships, Allegheny County
1,722,537.00
PA PA451 Valmont Industrial Park & PA Route 924 at Cranberry Creek connector road
(Authorized in 2005 via SAFETEA‐LU)
400,590.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
400,590.00
PA PA453 Street improvements, Whitemarsh Township 1,201,770.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
1,201,770.00
99
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA468 Ashley Borough, streetscaping enhancements, paving, lighting, safety
improvements, parking & roadway redesign on West Cemetery St. and
Fredrick Courts (Authorized in 2005 via SAFETEA‐LU)
160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
160,236.00
PA PA472 Moosic Borough, streetscaping enhancements, paving, lighting, safety
improvements, parking and roadway redesign (Authorized in 2005 via
SAFETEA‐LU)
160,236.00 Resurface, SR 11, SR 3023 in City of Scranton, Lackawanna County and SR
2004 , Luzerne County.
160,236.00
PA PA475 Reconstruct intersection of SR 51 and Franklin Ave (Authorized in 2005 via
SAFETEA‐LU)
1,722,537.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver
County
1,722,537.00
PA PA480 Construct Campbelltown Connector, Lebanon County. (Authorized via
SAFETEA‐LU)
203,150.00 US 22 over Elizabeth Run & SR 1011 over Deep Run, Bridge Replacements,
Bethel Township, Lebanon County
203,150.00
PA PA481 Eliminate existing rail line in Indian, PA to eliminate 37 at grade crossings and
reconstruct the line outside the town from Glenn Lock to Middletown
(Authorized in 2005 via SAFETEA‐LU)
325,039.03 US 119 over B&P Railroad, Bridge Replacement, Rayne Township, Indiana
County
325,039.03
PA PA483 Jeanette Truck Route (Authorized in 2005 via SAFETEA‐LU) 400,590.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland
County
400,590.00
PA PA488 Design, engineering, land acquisition, right‐of‐way acquisition, and
construction of a parking garage, streetscaping enhancements, paving,
lighting, safety improvements, parking, and roadway redesign in the city of
Wilkes‐Barre [ref P.L. 110‐244, Sec 105(a)(169)] (Authorized in 2005 via
SAFETEA‐LU)
213,587.14 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
213,587.14
PA PA489 Mount Joy Bridge Replacement on Route 230 (Authorized in 2005 via
SAFETEA‐LU)
82,794.68 PA‐743 over Conewago Creek, Bridge Replacement, Mount Joy Township,
Lancaster County
82,794.68
PA PA490 Transportation Enhancements along the Delaware Canal between Yardley, PA
and Bristol, PA
2,403,540.00 SR 2038 (County Line Road) widening & rehabilitation, Horsham,
Montgomery & Warrington Townships, Bucks County
2,403,540.00
PA PA491 Provide 4 through‐lanes on PA 100 by constructing two thru lanes to the east
of Ludwigs Corner (Authorized via SAFETEA‐LU)
4,005,900.00 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West
Whiteland Twp, Chester County
4,005,900.00
PA PA492 Completion of construction of final 2 ramps of I‐79 interchange with Parkway
West; widening of 1 mile of Parkway West leading to ramps. (Authorized in
2005 via SAFETEA‐LU)
194,271.73 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay
Townships, Allegheny County
194,271.73
PA PA495 Design and Construction of Portzer Road Connector, Bucks County 1,602,360.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
1,602,360.00
PA PA498 Reconstruction of 11 mile segment of the Lower Trail between Williamsport
and Mt Edna, Blair County, Pa.
94,360.96 SR 22, SR 1009, SR 2007, SR 2020, Roadway realignment, Frankstown
Township, Blair County
94,360.96
PA PA500 Wright Township, streetscaping enhancements, paving, lighting, safety
improvements, parking & roadway redesign (Authorized in 2005 via SAFETEA‐
LU)
160,236.00 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
160,236.00
PA PA505 Relocation and upgrade of Beaner Hallow Rd., Beaver County, PA 85,469.41 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver
County
85,469.41
PA PA506 4‐lane limited access facility connecting SR 119 to the PA Turnpike (Sony
Connector) (Authorized in 2005 via SAFETEA‐LU)
3,204,720.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland
County
3,204,720.00
PA PA507 Widen Route 666 in Forest Warren County [ref P.L. 110‐244, Sec 105(a)(56)]
(Authorized via SAFETEA‐LU)
95,056.92 SR 62 over Allegheny River, Bridge Replacement, Tionesta Township, Forest
County
95,056.92
PA PA510 Road and pedestrian improvements and realignment, through construction,
in York City NW Triangle. (Authorized in 2005 via SAFETEA‐LU)
261,215.54 US 30 over Paradise Creek, Bridge Replacement, Jackson & Paradise
Townships, York County
261,215.54
100
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA512 Construct highway safety and capacity improvements to improve the access
to the KidsPeace Broadway Campus (Authorized in 2005 via SAFETEA‐LU)
276,603.17 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover
Townships, Lehigh County
276,603.17
PA PA513 Construct interim U.S. 422 improvements at Valley Forge river crossing
(Authorized in 2005 via SAFETEA‐LU)
458,180.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
458,180.00
PA PA514 Northfield site roadway extension from Rt 60 to Industrial Park near the
Pittsburgh International Airport (Authorized in 2005 via SAFETEA‐LU)
400,590.00 I‐376 Reconstruction & Bridge Rehabilitation/Preservation, Moon & Findlay
Townships, Allegheny County
400,590.00
PA PA515 Slatelick Interchange for PA 28 at SR 3017, Armstrong County (Authorized via
SAFETEA‐LU)
1,922,832.00 SR 422, Roadway Realignment, Kittanning & Manor Townships, Armstrong
County
1,922,832.00
PA PA518 Street improvements to Ridge Pike and Joshua Road, Whitemarsh Township 640,944.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
640,944.00
PA PA520 Street Improvements, Upper Dublin Township 1,201,770.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
1,201,770.00
PA PA522 Construct improvements to Chambers Hill Road and Lindle Road (SR 441) at
its intersections with Interstate 283 and Eisenhower Boulevard (Authorized
via SAFETEA‐LU)
1,180.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
1,180.00
PA PA526 Safety improvements at Liberty Street with intersection with PA Rt. 61 in W.
Brunswick & N. Manheim Township (Authorized via SAFETEA‐LU)
1,526,808.88 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
1,526,808.88
PA PA527 Replace Stossertown Bridge (Main Street) over West Creek in Branch
Township, Schuylkill County (Authorized via SAFETEA‐LU)
400,590.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
400,590.00
PA PA528 Replace bridge over Little Mahantongo Creek at intersection of Hepler &
Valley Roads in Upper Mahantongo Twp. (Authorized via SAFETEA‐LU)
200,295.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
200,295.00
PA PA529 Replace Union Street Bridge over Middle Creek in the borough of Tremont
(Authorized via SAFETEA‐LU)
400,590.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
400,590.00
PA PA533 East‐West Corridor Rapit Transit, Pittsburgh‐planning, environment &
preliminary engineering (Authorized in 2005 via SAFETEA‐LU)
1,001,475.00 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation,
City of Pittsburgh
1,001,475.00
PA PA535 New interchange off Rt. 60 into proposed industrial park in Neshannock
Township (Authorized in 2005 via SAFETEA‐LU)
200,295.00 SR 18 over Shenango River/CSX RR, Bridge Rehabilitation, City of New Castle,
Lawrence County
200,295.00
PA PA537 Streetscape improvements, Geneva College (Authorized in 2005 via SAFETEA‐
LU)
1,346,984.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver
County
1,346,984.00
PA PA538 Construct the Alle‐Kiski Bridge and Connector (Authorized in 2005 via
SAFETEA‐LU)
1,001,475.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny
County
1,001,475.00
PA PA542 Crows Run Relocation from SR 65 to Freedom Crider Road (Authorized in
2005 via SAFETEA‐LU)
400,590.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver
County
400,590.00
PA PA543 Transportation Improvements to Jeannette Truck Route (Authorized in 2005
via SAFETEA‐LU)
100,148.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland
County
100,148.00
PA PA558 Widening of Rt. 22 and SR 26 in Huntingdon, upgrades to the interchange at
U.S. Rt. 22 and SR 26 (Authorized in 2005 via SAFETEA‐LU)
801,475.00 SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement,
Huntingdon County
801,475.00
PA PA559 Road impact improvements along Potomac River tributaries (Authorized in
2005 via SAFETEA‐LU)
250,369.00 Bridge Rehabilitation on Aughwick Mills Rd, Spring Creek Rd, Parks Road, and
Mills Lane in Huntingdon County
250,369.00
PA PA571 Design, engineering, ROW acquisition construction of streetscaping
enhancements, paving, lighting, safety improvements, parking and roadway
redesign in Wilkes‐ Barre. (Authorized in 2005 via SAFETEA‐LU)
18,014.63 SR 309, SR 1041 & SR 415, Intersection Improvement, Dallas Township,
Luzerne County
18,014.63
101
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA573 Construct PA 706 Wyalusing Bypass Bradford County (Authorized in 2005 via
SAFETEA‐LU)
200,295.00 SR 6, Milling and Resurfacing, Troy Township, Bradford County 200,295.00
PA PA575 Modernize traffic signals, complete minor roadway realignment, and improve
channelization at U.S. 322 and PA 10 intersection (Authorized via SAFETEA‐
LU)
60,784.35 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West
Whiteland Twp, Chester County
60,784.35
PA PA577 Construction SR 3024, Middle Creek Bridge II, South Canaan, Wayne County
(Authorized in 2005 via SAFETEA‐LU)
140,207.00 SR 191 over Dyberry Creek, Bridge Rehabilitation, Honesdale Borough, Wayne
County
140,207.00
PA PA579 Widening and improvements to SR 10, New Morgan Borough (Authorized in
2005 via SAFETEA‐LU)
1,001,475.00 SR 662 & SR 1010, Highway Restoration, Borough of Fleetwood, Berks County 1,001,475.00
PA PA580 Construct parking facility in Norristown, Montgomery County (Authorized in
2005 via SAFETEA‐LU)
5,143.27 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
5,143.27
PA PA582 Design and Construction of Portzer Road Connector, Bucks County 1,602,360.00 SR 422 over Schuylkill River, Bridge Restoration, West Norriton & Upper
Merion Townships, Montgomery County
1,602,360.00
PA PA583 Construction of pedestrian tunnel under Cherry Street in Philadelphia
(Authorized in 2005 via SAFETEA‐LU)
2,002,950.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
2,002,950.00
PA PA585 Two‐lane Extension of Bristol Road, Bucks County 400,590.00 SR 2038 (County Line Road) widening & rehabilitation, Horsham,
Montgomery & Warrington Townships, Bucks County
400,590.00
PA PA594 Improvements from US 11 southbound ramp to I‐81 in Antrim Township
(Authorized in 2005 via SAFETEA‐LU)
250,369.00 PA 997 over Muddy Run, Bridge Replacement, Letterkenny Township,
Franklin County
250,369.00
PA PA595 Construction of the Montour Trail, Great Allegheny Passage. (Authorized in
2005 via SAFETEA‐LU)
1,999.85 Interstate 70, Interchange Reconfiguration, Borough of Bentleyville,
Washington County
1,999.85
PA PA596 Transportation Improvements for Armstrong County, PA, Slatelick
Interchange for PA 28 at SR 3017 (Authorized in 2005 via SAFETEA‐LU)
442,234.70 SR 422, Roadway Realignment, Kittanning & Manor Townships, Armstrong
County
442,234.70
PA PA600 Reconstruct intersection of SR 51 and Franklin Ave. (Authorized in 2005 via
SAFETEA‐LU)
400,590.00 SR 65: Crows Run Rd to SR 18, reconstruction and bridge preservation; Beaver
County
400,590.00
PA PA601 South Phila. Access Rd. Design and construction of port access road from
South Phila Port and intermodal facilities, Philadelphia
500,738.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 500,738.00
PA PA605 Construct a road along the North Delaware Riverfront Corridor from Buckius
Street to Poquessing Creek
3,965,900.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 3,965,900.00
PA PA616 Improvements to the Pleasant Valley & Sandy Hill Roads intersection with SR
130 in Penn Township
2,002,950.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland
County
2,002,950.00
PA PA617 Construct an intermodal facility servicing Children's Hospital of Pittsburgh
(Authorized in 2005 via SAFETEA‐LU)
1,750.42 7th Street Bridge over Allegheny River/10th St Bypass, Bridge Rehabilitation,
City of Pittsburgh
1,750.42
PA PA621 For the Children's Hospital of Philadelphia Partners for Child Passenger Safety
program. (Authorized in 2005 via SAFETEA‐LU)
202,136.75 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
202,136.75
PA PA624 Improvements to access roads at the Please Touch Museum, Philadelphia
(Authorized in 2005 via SAFETEA‐LU)
1,001,475.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
1,001,475.00
PA PA625 Construction of the Schuylkill Gateway Project in Philadelphia, Pennsylvania
(Authorized in 2005 via SAFETEA‐LU)
13,335.18 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia, Philadelphia County
13,335.18
PA PA626 Security improvements to the Commodore Barry Bridge, Pennsylvania
(Authorized in 2005 via SAFETEA‐LU)
1,475.01 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 1,475.01
PA PA628 Bucknell University main campus entrance road & SR 15 intersection‐study &
construct improvements (Authorized in 2005 via SAFETEA‐LU)
1,001,475.00 SR 522 over Middle Creek, Bridge Replacement, Middle Creek Township,
Snyder County
1,001,475.00
PA PA634 Construct the Alle‐Kiski Bridge and Connector (Authorized in 2005 via
SAFETEA‐LU)
1,001,475.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny
County
1,001,475.00
102
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PA640 Repair and upgrade Cresheim Valley Drive, Philadelphia (Authorized in 2005
via SAFETEA‐LU)
450,664.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
450,664.00
PA PA641 Improvements to Penn's Landing Ferry Terminal, Philadelphia (Authorized in
2005 via SAFETEA‐LU)
400,590.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 400,590.00
PA PA643 To incorporate a portion of Old Delaware Avenue as the South Philadelphia
Port Access Road
400,590.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 400,590.00
PA PA646 Study the future needs of east‐west road infrastructure in Adams County
(Authorized in 2005 via SAFETEA‐LU)
500,738.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
500,738.00
PA PA648 Road impact improvements along Potomac River tributaries (Authorized in
2005 via SAFETEA‐LU)
200,295.00 Bridge Rehabilitation on Aughwick Mills Rd, Spring Creek Rd, Parks Road, and
Mills Lane in Huntingdon County
200,295.00
PA PA649 Davinci Center hydrogen fueled transit vehicles (Authorized in 2005 via
SAFETEA‐LU)
40,000.00 US 22, Reconstruction and rehabilitation, Whitehall & Hanover Township,
Lehigh County
40,000.00
PA PA651 Relocation of East Lake Road in Pyamatuning Township (Authorized in 2005
via SAFETEA‐LU)
100,148.00 SR 18, SR 62, SR 3008 Resurfacing and Curb Ramps in The City of Hermitage 100,148.00
PA PA661 Construct the Alle‐Kiski Bridge and Connector (Authorized in 2005 via
SAFETEA‐LU)
1,503,512.00 SR 3069 Liberty Bridge, Bridge Restoration, City of Pittsburgh, Allegheny
County
1,503,512.00
PA PA663 For interpretive signage and trails in Pittsburgh urban park land (Authorized
in 2005 via SAFETEA‐LU)
43,227.08 7th Street over the Allegheny River and the 10th Street bypass in the City of
Pittsburgh, Allegheny County.
43,227.08
PA PA665 Construction of the Schuylkill Gateway Project (Authorized in 2005 via
SAFETEA‐LU)
113,133.55 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
113,133.55
PA PA666 Davinci Center hydrogen fueled transit vehicles (Authorized in 2005 via
SAFETEA‐LU)
40,000.00 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover
Townships, Lehigh County
40,000.00
PA PA667 Construct a road along the North Delaware Riverfront Corridor from Buckius
Street to Poquessing Creek
1,002,341.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 1,002,341.00
PA PA669 Improvements to the Pleasant Valley and Sandy Hill Rds. Intersection with SR
130 in Penn Twp.
300,702.00 US 119, Highway Reconstruction, East Huntington Township, Westmoreland
County
300,702.00
PA PA670 Improvements to access roads at the Please Touch Museum (Authorized in
2005 via SAFETEA‐LU)
300,703.00 Passyunk Ave Drawbridge over Schuylkill River, Bridge Rehabilitation, City of
Philadelphia
300,703.00
PA PA715 UPMC Heliport in Bedford (Authorized in 2005 via SAFETEA‐LU) 750,000.00 SR 994 over Aughwick Creek and Three Springs Creek, Bridge Replacement,
Huntingdon County
750,000.00
PA PA718 Roadway construction improvements to Route 222 relocation, Lehigh County
(Authorized in 2005 via SAFETEA‐LU)
1,313,000.00 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover
Townships, Lehigh County
1,313,000.00
PA PA719 Construction of a bridge over Brandywine Creek as part of the Boot Road
extension project, Downington Boro. (Authorized via SAFETEA‐LU)
698,768.00 SR 202 over AMTRAK, Deck Replacement & Substructure Rehab, West
Whiteland Twp, Chester County
698,768.00
PA PA722 Intersection signalization at SR 3020 (Newburg Road)/ Country Club Road,
Northampton Cty. (Authorized in 2005 via SAFETEA‐LU)
250,000.00 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover
Townships, Lehigh County
250,000.00
PA PA723 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover
Townships, Lehigh County
168,258.73 US 22, Reconstruction, Rehabilitation, & Widening, Whitehall & Hanover
Townships, Lehigh County
168,258.73
PA PA724 Study future needs of East‐West road infrastructure in Adams County
(Authorized via SAFETEA‐LU)
115,200.00 I‐81/83, Congestion Reduction/Safety Improvement/Merge Lanes, Lower
Paxton Township, Dauphin County
115,200.00
PA PAF01 Riverlink Transit System ‐ Water Shuttle Component (Penns Landing dock
improvements) (2001 Appropriations Ferry Boat Award)
703,200.00 I‐95: Betsy Ross Bridge Ramps, Ramp Reconfiguration, City of Philadelphia 703,200.00
PA PAF02 Erie‐Western Pennsylvania Port Authority Ferry Vessel Acquisition (2004
Appropriations Ferry Boat Award)
704,618.00 SR 4016, New bridge, roadway rehab, signal upgrades & roundabout,
Millcreek/Fairview Twp. Erie County
704,618.00
PA PAF03 Pittsburgh Water Taxi (2004 Appropriations Ferry Boat Award) 440,386.00 7th Street over the Allegheny River and the 10th Street bypass in the City of
Pittsburgh, Allegheny County.
440,386.00
103
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Pennsylvania
State Demo ID Project Description Amount Project Description Amount
ToFrom
PA PAM01 Interstate 80‐Exits 298‐299 Renovation Project, Pennsylvania (2004
Appropriations Interstate Maintanence Discretionary Award)
705,314.00 SR 611, Pocono Township, Monroe County, Reconstruction & Safety
Improvements
705,314.00
PA PAM02 I‐80 Exit at Stoney Hollow Road (2002 Appropriations Interstate Maintanence
Discretionary Award)
2,164,721.02 SR 611, Pocono Township, Monroe County, Reconstruction & Safety
Improvements
2,164,721.02
*Subject to availability of funds upon additional research.
Total Amount Repurposed 128,091,090.75Total # of Earmarks Repurposed 197
104
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
South Carolina
State Demo ID Project Description Amount Project Description Amount
SC SC009 Widen and relocate SC‐6 in Lexington County 624,103.24 I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate
Preservation in Lexington & Richland ‐ 5105690
624,103.24
SC SC011 Construct pedestrian walkway and safety improvements along SC 277,
Richland Co.
81,029.41 I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate
Preservation in Lexington & Richland ‐ 5105690
81,029.41
SC SC017 Construct Calhoun/Clarendon Causeway 4,882,995.91 I‐95 (Near MM 100 to Near MM 134) Interstate Preservation in Clarendon ‐
STIP FY 2017
4,882,995.91
I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate
Preservation in Lexington & Richland ‐ 5105690
12,887,719.00
I‐95 (Near MM 100 to Near MM 134) Interstate Preservation in Clarendon ‐
STIP FY 2017
3,216,000.00
SC SC074 Widening and improvements of SC Highway 5 Bypass in York County 162,521.00 I‐77 (Near MM 34 to Near MM 48) Interstate Preservation in Fairfield ‐ STIP
FY 2017
162,521.00
SC SC076 Engineering, design, and construction of I‐73 from the North Carolina State
Line to I‐95
812,600.00 I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 812,600.00
SC SC078 Widening of Frontage Road from U.S. 72 to U.S. 56, Laurens, SC 227,526.00 I‐85 (Near MM 69 to Near MM 77) Interstate Reconstruction P029074 227,526.00
SC SC079 Medical University of South Carolina Roadway Enhancement 717,103.12 I‐526 Widening and Interchange Improvements P027507 717,103.12
SC SC082 Plan and build Interstate 73 from NC line to Myrtle Beach, SC. 812,600.00 I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 812,600.00
SC SC083 Extension of Wells Highway, Oconee County, South Carolina 162,521.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson
P029510
162,521.00
SC SC085 Construct I‐85 Brockman‐McClimon Interchange between Greenville
Spartanburg Airport and SC Highway 101 Interchanges
81,259.00 I‐85 (Near MM 69 to Near MM 77) Interstate Reconstruction P029074 81,259.00
SC SC086 Replace Milford Road Bridge, Anderson, SC 40,630.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson
P029510
40,630.00
SC SC087 Replace Murphy Road West Bridge, Anderson, SC 188,277.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson
P029510
188,277.00
SC SC088 Replace Murphy Road West Bridge, Anderson, SC 212,313.00 I‐85 (Near MM 19 to Near MM 21) Interstate Preservation ‐ Anderson
P029510
212,313.00
SC SC091 Construct grade separation and interchange improvements at U.S. 521,
Lancaster County
801,180.00 I‐77 (Near MM 34 to Near MM 48) Interstate Preservation in Fairfield ‐ STIP
FY 2017
801,180.00
I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 82,734.80
I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation
P027060609449
609,449.00
I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation
P027060238152.96
238,152.96
I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation
P027060162521
162,521.00
SC SC113 Harden Street Improvements in Columbia. Specific improvements will
include: modern traffic control signals, intersections, improved street lighting,
driveways, etc.
363,346.58 I‐26 (MM 101.0 to MM 108.0) and I‐126 (MM 0.0 to 4.0) Interstate
Preservation in Lexington & Richland ‐ 5105690
363,346.58
SC SC117 I‐95/SC 327 in Florence, SC, to construct northbound ramp and expand
existing ramps
3,004,425.00 I‐95 (Near MM 193 to Near MM 199) Interstate Rehabilitation P027060 3,004,425.00
SC SC118 Transportation Improvements for Highway 901, York County, SC 1,000,923.00 I‐77 (Near MM 34 to Near MM 48) Interstate Preservation in Fairfield ‐ STIP
FY 2017
1,000,923.00
Total Amount Repurposed 31,371,930.02Total # of Earmarks Repurposed 20
To
400,673.96Pine Needles Widening and Bridge ReplacementSC095SC
16,103,719.00Construct Briggs‐Pearson‐Delaine ConnectorSC071SC
692,183.80Upgrade of the I‐95/SC 327 Interchange near Florence.SC094SC
From
105
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
South Dakota
State Demo ID Project Description Amount Project Description Amount
SD SD122 Construction of four‐lane highway on U.S. 79 between Maverick Junction and
the Nebraska border
746,751.11 US16 in Rapid City, Urban Reconstruction ‐ NH 0016(79)68 PCN 027C 746,751.11
SD SD126 Pave and curb Cheyenne River Tribe Route 900, ``Chinatown'' in Eagle Butte 121,890.00 SD65 from US212 to SD20, Mill & AC Resurfacing and Fault Repair, P
0065(16)164 ‐ PCN 04F1
121,890.00
SD SD127 Railroad‐highway crossings in Pierre 881,298.00 I‐90 PCC Surfacing Jones County IM 0904(57)189 PCN 035E 881,298.00
SD SD129 Extend the Sioux Falls Bike Trail to Great Bear Rec Area 97,512.00 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102
PCN 025C
97,512.00
SD SD130 Redesign T corner on BIA #2 5 miles SW of Kyle on the Pine Ridge Reservation 60,945.00 Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐
NH‐PH 0018(177)104 PCN 02QC
60,945.00
SD SD131 Extend bike trail in Pine Ridge to the SuAnne Big Crow Boys and Girls Center 20,315.00 Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐
NH‐PH 0018(177)104 PCN 02QC
20,315.00
SD SD132 Extend Bicycle trail system in Aberdeen 65,009.00 SD26 from Hand/Spink County Line to US281, Mill and AC Resurfacing‐
P0026(01)267 PCN 026Q
65,009.00
US16 AC Resurfacing Near Wyoming State Line; NH 0016(88)0 PCN 05ML 600,000.00
US16 in Rapid City, Urban Reconstruction ‐ NH 0016(79)88 PCN 027C 841,917.39
SD SD141 Reconstruction and paving of BIA Route 27, Wounded Knee‐Porcupine Butte 497,080.76 Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐
NH‐PH 0018(177)104 PCN 02QC
497,080.76
SD SD143 Reconstruction and paving of streets on the Flandreau Indian Reservation 165,693.59 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102
PCN 025C
165,693.59
SD SD144 Construct Exit 61 I‐90 Rapid City (Heartland Expressway) 647,461.38 I‐90/US14A Exit 14 (Spearfish) Reconstruct Interchange, Reconfigure Ramps ‐
IM 0901(162)14 PCN 020U
647,461.38
SD SD146 Construct Wagner Community Streets, Yankton Reservation 16,569.36 US281 ‐ From the W Jct with SD44 to S of the Jct with SD42; AC Resurfacing ‐
NH 0281(111)48 PCN 04WF
16,569.36
SD SD147 Construct Marty Community Streets, Yankton Reservation 16,569.36 US281 ‐ From the W Jct with SD44 to S of the Jct with SD42; AC Resurfacing ‐
NH 0281(111)48 PCN 04WF
16,569.36
SD SD148 Construct Riverfront Walking trail between 4th Ave. and Main Street,
Mobridge
85,610.01 SD20 Urban Reconstruction in and near Hoven ‐ P 0020(117)254 PCN 02R9 85,610.01
SD SD155 Roadway improvements on I‐90 loop in Mitchell along Haven Street from
near Burr Street to near Ohlman Street
1,036,594.22 US281 AC Resurfacing in Aurora & Douglas Counties ‐ NH 0281(111)48 PCN
04WF
1,036,594.22
SD SD159 BIA route 15 resurfacing between Red Scaffold and Cherry Creek to Ziebach
County Road 33
414,233.97 SD65 from US212 to SD20, Mill & AC Resurfacing and Fault Repair, P
0065(16)164 ‐ PCN 04F1
414,233.97
SD20 Urban Reconstruction in and near Hoven ‐ P 0020(117)254 PCN 02R9 100,317.88
Structures, Shoulder Work, Mill & AC Resurface, US18 Pine Ridge to SD391 ‐
NH‐PH 0018(177)104 PCN 02QC
100,317.87
US18 Reconstruction in and near Mission ‐ NH 0018(176)206 PCN 039G 100,317.87
SD SD163 Construct Rail Spur in Brookings 751,106.00 US81 ‐ From 3rd Ave. NE to 18th Ave. NE in Watertown; Urban
Reconstruction ‐ NH 0081(93)157 PCN 026X
751,106.00
US16 Mill & AC Resurfacing Near Custer NH 0016(85)22 PCN 04E6 500,000.00
I‐190 Exit 1 to Jct of US16/SD44 in Rapid City; Urban Reconstruction; IM
1902(61)0 PCN 1162
520,462.51
US16 in Rapid City, Urban Reconstruction ‐ NH 0016(79)68 PCN 027C 1,300,000.00
SD SD167 Rosebud community streets reconstruction and paving 577,214.60 I90 ‐ Jackson Co; Replace Surfacing, Flatten Inslope, Edge Drains, Pipe work ‐
IM 0903(101)153 PCN 03W4
577,214.60
From
2,320,462.51Construction of four‐lane highway on U.S. 79 between Maverick Junction, and
the Nebraska border
SD166SD
1,441,917.39Construction of four‐lane highway on U.S. 79 between Maverick Junction, and
the Nebraska border
SD133SD
Acquisition of road maintenance equipment for Oglala, Rosebud and
Cheyenne River Sioux Tribes
300,953.62SD161SD
106
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
South Dakota
State Demo ID Project Description Amount Project Description Amount
From
SD SD169 Whether or not otherwise eligible in title 23, construct Phase II and III of
Phillips to the Falls Project. Notwithstanding any other provision of law, with
respect to costs for Phase II and III of this project paid for from this $40
million, the Federal share of project costs shall be 100 percent.
11,496,777.11 Sioux Falls I‐29 & I‐229 Reconstruction IM 0293(96)73 PCN 01QS 11,496,777.11
SD SD170 Rapid City Greenway Pedestrian and bike path expansion 192,404.90 I‐90/US14A Exit 14 (Spearfish) Reconstruct Interchange, Reconfigure Ramps ‐
IM 0901(162)14 PCN 020U
192,404.90
SD SD171 Brookings bike path 9,620.23 US81 ‐ From 3rd Ave. NE to 18th Ave. NE in Watertown; Urban
Reconstruction ‐ NH 0081(93)157 PCN 026X
9,620.23
SD SD172 Sioux Falls Bike Path‐‐Dunham Park, Skunk Creek, 12th St., and I‐29 to
Sertoma Park
112,556.81 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102
PCN 025C
112,556.81
Total Amount Repurposed 22,076,545.93
Total # of Earmarks Repurposed 24
107
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Tennessee
State Demo ID Project Description Amount Project Description Amount
TN TN052 Reconstruct Road and Causeway in Shiloh Military Park in Hardin County,
Tennessee.
980,337.58 Hardin Co., TN, New construction on SR‐128, From S. of One Stop Drive to S.
of Opel Loop
980,337.58
TN TN203 Construct force protection barriers along US‐41A at Fort Campbell in
Montgomery County, Tennessee.
406,300.00 Montgomery Co., TN, Widening on SR‐374, From S. of Dunbar Cave Road to
W. of Stokes Road
406,300.00
TN TN251 Improve streetscape and pavement repair in Scott County, Tennessee. 50,787.00 Anderson Co., TN, Bridge Replacement on SR‐9, Bridge over Clinch River, LM
10.71.
50,787.00
Total Amount Repurposed 1,437,424.58
Total # of Earmarks Repurposed 3
ToFrom
108
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Texas
State Demo ID Project Description Amount Project Description Amount
TX TX187 Extension of SH 349 of US 87 Relief Route in Dawson Country 2,002,950.00 Extension of SH 349 from SH 137 to US 87. Project is in Dawson County and is
adjacent to the US 87 Relief Route project
2,002,950.00
TX TX202 Acquire Kelly Parkway Corridor Right of Way through San Antonio 400,590.00 Upgrade from continuous illumination to high mast illumination, (LP 13 to SH
151)
400,590.00
TX TX236 Munn Street from Demaree Lane to Gellhorn Drive 801,180.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
801,180.00
TX TX260 Hike and bike trail will tie into the Gellhorn Drive project providing an
improved multi‐modal transportation facility
801,180.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
801,180.00
New project on Airport Blvd from Hiram Clark to FM 521. Project will
construct a 4 lane divided Urban Street Facility on a Urban Street Facility on a
new location.
342,189.00
Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
1,660,761.00
TX TX270 Right of Way acquisition for US 87 Relief Route 1,201,770.00 Extension of SH 349 from SH 137 to US 87. Project is in Dawson County and is
adjacent to the US 87 Relief Route project
1,201,770.00
TX TX281 Construction of four‐lane divided concrete arterial with drainage
improvements ‐ Sandy Lake Road: from Denton Tap Road to North Coppell
Road
801,180.00 Construction of 4 lane bridge and ramp modifications on SH 114 at Texas
Plaza in the City of Irving.
801,180.00
TX TX295 Acquisition of ROW and environmental preservation from IH 45 to US 59 for
Grand Parkway
11,216,521.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
11,216,521.00
TX TX307 Construct 25 mile stretch for the 177 mile loop, between IH 45 south and SH
288
9,213,570.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
9,213,570.00
TX TX318 Relocation of 10th Street near McAllen‐Miller International Airport. 600,885.00 Bicentennial Road from SH 107 to Trenton Rd Construct 4 Lane Urban
Roadway
600,885.00
TX TX324 SH 80/123 Overpass at US 181 in Karnes County 240,354.00 Rehab/pavement repair at SH 80/US 181 intersection 240,354.00
TX TX328 Conduct study of I‐10 and US 190 with a focus on congestion relief and the
need for a military & emergency relief transportation corridor.
160,236.00 I‐14 study to focus on the Central Texas Corridor. 160,236.00
TX TX335 Reconstruct Ella/Wheatley from Little York to West Gulf Bank 1,001,475.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
1,001,475.00
TX TX336 Construct Santa Fe Trail DART Light Rail Overpass from Hill Street to
Commerce Street along abandoned Santa Fe Rail Right of Way in Dallas.
801,180.00 Preliminary engineering for a grade separation on Prairie Creek Road at the
UP Railroad in the City of Mesquite
801,180.00
TX TX354 Construct Park Row bypass from Texas State Highway 6 to the Eldridge
Parkway in Houston, TX
1,602,360.00 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
1,602,360.00
TX TX371 Conduct feasibility study for an off ramp on IH 30 on to Hall Street for direct
access to Baylor University Medical Center in Dallas
801,180.00 Preliminary engineering for a grade separation on Prairie Creek Road at the
UP Railroad in the City of Mesquite
801,180.00
To
2,002,950.00Construct highway improvements on East Tidwell Ley Road and East Little
York Road
TX267TX
From
109
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Texas
State Demo ID Project Description Amount Project Description Amount
ToFrom
TX TX374 Replacement of Galveston Causeway RR Bridge in Galveston. The Secretary of
Transportation. shall transfer to the Commandant of the Coast Guard
amounts made available to carry out the project described in item #4985
contained in Section 1702 of SAFETE‐LU (119 Stat. 1447) to carry out project,
in accordance with the Act of June 21, 1940
1,532,500.97 Transfer to new project on Airport Blvd from Hiram Clark to FM 521. Project
will construct a 4 lane divided Urban Street Facility on a Urban Street Facility
on a new location.
1,532,500.97
TX TX389 Beaumont, TX Washington Blvd. Improvements 1,001,475.00 Resurface Roadway on Various Locations. See comments below for full
project description.
1,001,475.00
Total Amount Repurposed 36,183,536.97Total # of Earmarks Repurposed 18
110
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Utah
State Demo ID Project Description Amount Project Description Amount
UT UT007 I‐15 / University Avenue Interchange, Provo. 3,299.42 SR‐68; Saratoga Springs to Stillwater Parkway 3,299.42
UT UT015 Widen and improve 123rd/126th South from Jordan River to Bangerter
Highway in Riverton
3,587.58 I‐80: Lambs to Kimbals 3,587.58
UT UT035 US‐6, MP 256 Junction of US‐6 and SR‐123, Emery County, Utah 424,588.29 SR‐29; Cottonwood Cyn Rd to SR‐10 424,588.29
UT UT039 Construction to Bingham Junction Boulevard in Midvale City 737,359.69 I‐80: Lambs to Kimbals 737,359.69
UT UT042 Construct 2‐lane divided highway from the Atkinville Interchange to the new
replacement airport access road in St. George
407,067.00 I‐15; Washington County Line to Hamilton Fort 407,067.00
UT UT050 I‐15 Freeway Reconstruction ‐ Springville 200 South Interchange. 400 South
Interchange [ref P.L. 110‐244, Sec 105(a)(69)]
366,361.00 SR‐68; Saratoga Springs to Stillwater Parkway 366,361.00
UT UT053 Expand Redhills Parkway from 2 to 5 lanes and improve alignment within
rights‐of‐way in St. George , St. George [ref P.L. 110‐244, Sec 105(a)(48)]
406,686.00 I‐15; Washington County Line to Hamilton Fort 406,686.00
UT UT057 Add lighting on Highway 262 on the Navajo Nation in Aneth. Roadway
improvements on Highway 262 on the Navajo Nation in Aneth [ref P.L. 110‐
244, Sec 105(a)(103)]
17,776.00 US‐491; Monticello to Colorado State Line 17,776.00
UT UT058 SR 158 Improvements, Pine View Dam, Weber County, Utah [ref P.L. 110‐
244, Sec 105(a)(330)]
170,968.00 US‐91; 10th North to S. Smithfield 170,968.00
UT UT059 Construct pedestrian safety project and roadway improvements on the
Navajo Nation in Montezuma Creek. [ref P.L. 110‐244, Sec 105(a)(53)]
33,012.40 US‐491; Monticello to Colorado State Line 33,012.40
UT UT063 Reconstruct 500 West/Kane Creek Boulevard, including pedestrian and
bicycle access, in Moab. [ref P.L. 110‐244, Sec 105(a)(63)]
25,442.20 US‐191; Monticello to Wilson Arch 25,442.20
UT UT072 I‐15 Reconstruction; Salt Lake County. 356,532.97 SR‐67; 500 South to I‐15 356,532.97
UT UT073 I‐15 North and Commuter Rail Coordination, Davis County 1,782,011.75 SR‐67; 500 South to I‐15 1,782,011.75
UT UT095 Construction of 200 North Street highway‐rail graded crossing separation.
Kaysville.
508,834.00 SR‐67; 500 South to I‐15 508,834.00
UT UT097 Bear River Migratory Bird Refuge Access Road Improvements, Box Elder
County
558,662.30 US‐91; 10th North to S. Smithfield 558,662.30
Total Amount Repurposed 5,802,188.60Total # of Earmarks Repurposed 15
ToFrom
111
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Vermont
State Demo ID Project Description Amount Project Description Amount
VT VT027 Main Street Bridge, Johnson 497,417.31 Johnson BF 0248(7) ‐ Rehab Br2 on VT 100C 497,417.31
VT VT036 Design and construction of dry span bridge in Swanton 3,710,405.50 Georgia IM Culvert(25) ‐ Replace Culvert Br Nos. 83‐1 N&S ON I‐89 in Georgia 3,710,405.50
VT VT051 Vermont Institute of Natural Science turning lane on U.S. Rt. 4 in Woodstock 300,702.00 Rockingham‐Clarendon NH SURF(49) ‐ Resurface VT 103 Rockingham to
Clarendon
300,702.00
Total Amount Repurposed 4,508,524.81
Total # of Earmarks Repurposed 3
ToFrom
112
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Virginia
State Demo ID Project Description Amount Project Description Amount
VA VA007 Danville: Replace bridges on Main and Worsham Streets 219,877.29 Mt Cross Road Widening in Danville 219,877.29
VA VA018 Fairfax County expressway 3,989,015.51 Widen Rt. 28 in Fairfax County 3,989,015.51
VA VA026 Widen I‐64 Bland Boulevard Interchange 106.35 Longhill Road Widening in James City County 106.35
VA VA029 Upgrade Virginia Route 10, Surrey Co. 281,064.00 I‐564 Intermodal Connector in Norfolk 281,064.00
VA VA030 Improve Harrisonburg East Side roadways in Harrisonburg 34,057.00 I‐81 Interchange Improvements in Harrisonburg 34,057.00
VA VA031 Repair historic wooden bridges along portion of Virginia Creeper Trail
maintained by Town of Abingdon
163,257.00 Widen Rt. 11 in Bristol 163,257.00
VA VA032 Construct road improvement, trailhead development and related facilities for
Haysi to Breaks Interstate Bicycle and Pedestrian Trail between Haysi and
Garden Hole area of Breaks Interstate Park
177,580.78 Widen Rt. 11 in Bristol 177,580.78
VA VA033 Conduct Williamsburg 2007 transportation study 8,158.00 I‐564 Intermodal Connector in Norfolk 8,158.00
VA VA036 Replace Shore Drive Bridge over Petty Lake, Norfolk 873,908.00 Longhill Road Widening in James City County 873,908.00
VA VA037 Downtown Staunton Streetscape Plan ‐ Phase I in Staunton 38,157.47 I‐81 Interchange Improvements in Harrisonburg 38,157.47
VA VA038 Upgrade Route 501 in the counties of Bedford, Halifax, and Campbell 95,120.00 Rt 460 Improvements in Bedford County 95,120.00
VA VA042 Construct the Lynchburg/Madison Heights bypass in Lynchburg 252,394.00 Rt 501 Safety and Operational Improvements in Campbell County 252,394.00
VA VA045 Conduct preliminary engineering on I‐73 between Roanoke and
Virginia/North Carolina State line
4,957,167.00 Rt. 220 Corridor Safety Improvements in Botetourt County 4,957,167.00
VA VA046 Conduct historic restoration of Roanoke Passenger Station in Roanoke 12,550.00 Rt. 122 and Rt 636 Intersection Improvements in Franklin County 12,550.00
VA VA048 Enhance Maple Avenue streetscape in Vienna, Virginia 127,697.00 Widen Rt. 28 in Fairfax County 127,697.00
Rt. 52 Improvements in Carroll County 298,079.00
Rt. 52 Improvements in Carroll County 928,102.53
VA VA054 Construct Southeastern Parkway and Greenbelt in Virginia Beach 4,473,020.15 Lynnhaven Parkway Widening in Virginia Beach 4,473,020.15
VA VA064 Route 7 and 123 Improvements in Northern Virginia 5,000,000.00 Widen Rt. 28 in Fairfax County 5,000,000.00
VA VA065 Analysis and improvements on consistent shoulder width on Route 9, Virginia 15,322.28 Widen Rt. 28 in Fairfax County 15,322.28
VA VA083 Lombardy Street Renovation between Route 1 and Admiral Street (Richmond,
VA)
2,755.98 Bus Rapid Transit (BRT) in Richmond and Henrico County 2,755.98
VA VA090 Truck Inspection pull‐off on Route 9 in Loudon County, Virginia 4,262.56 Widen Rt. 28 in Fairfax County 4,262.56
I‐564 Intermodal Connector in Norfolk 797,710.00
Longhill Road Widening in James City County 3,470.00
VA VA119 Upgrade DOT crossing #467662S to constant warning time devices 65,783.48 I‐564 Intermodal Connector in Norfolk 65,783.48
VA VA122 Liberty Street Construction in Martinsville, Virginia 25,080.40 Rt. 122 and Rt 636 Intersection Improvements in Franklin County 25,080.40
VA VA123 High Knob Horse Trails Construction of horse riding trails and associated
facilities in High Knob area of Jefferson National Forest
61,002.00 Widen Rt. 11 in Bristol 61,002.00
VA VA124 Construction of Virginia Blue Ridge Trail in Amherst County, VA 230,354.00 Rt 501 Safety and Operational Improvements in Campbell County 230,354.00
VA VA128 Craig County Trail Improvements to trail in Craig County 17,981.80 Rt 460 Improvements in Bedford County 17,981.80
VA VA130 Widen Route 820 in Bergton, Virginia 171,216.71 I‐81 Interchange Improvements in Harrisonburg 171,216.71
VA VA136 Town of St. Paul Restoration of historic Hillman House to serve as trail system
information center and construction of stations on trails
15,486.00 Widen Rt. 11 in Bristol 15,486.00
Bus Rapid Transit (BRT) in Richmond and Henrico County 115,826.00
I‐95/64 Overlap Improvements in Richmond 3,470.00
VA VA139 Mill Road Slip Ramp 400,590.00 Widen Rt. 28 in Fairfax County 400,590.00
VA VA141 Install Transpiration Critical Incident Mobile Data Collection Device in
Charlottesville.
50,415.90 Fontaine Avenue Improvements in Charlottesville 50,415.90
VA VA143 Bristol Train Station‐‐ Historic preservation and rehabilitation of former
Bristol, VA train station.
52,617.00 Widen Rt. 11 in Bristol 52,617.00
To
801,180.00Final Design and Construction for improvements at I 64 and City Line Road,
Virginia Beach and Chesapeake
VA117VA
1,226,181.53Construct connector road from the proposed U.S. 58 Stuart bypass to Route 8
South beginning at the intersection of Johnson Street in Stuart to Route 652.
VA049VA
From
VA 119,296.00Construction of transportation related enhancements and infrastructure of
the VMFA project.
VA137
113
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Virginia
State Demo ID Project Description Amount Project Description Amount
ToFrom
I‐564 Intermodal Connector in Norfolk 1,196,567.00
Longhill Road Widening in James City County 5,203.00
VA VA148 Upgrade DOT crossing #467665M to constant warning time devices 16,084.64 Longhill Road Widening in James City County 16,084.64
VA VA151 National Park Service transportation improvements to Historic Jamestowne,
Virginia
2,153,815.00 Longhill Road Widening in James City County 2,153,815.00
Construct Connector Road in Wytheville 106,203.12
Construct Connector Road in Wytheville 12,190.00
VA VA156 Construct South Airport Connector, Richmond International Airport. 40,704.00 Bus Rapid Transit (BRT) in Richmond and Henrico County 40,704.00
VA VA162 Halifax Co: Upgrade DOT Crossing #470515 To Constant Warning Devices PE
for upgrade of Rail Road Crossing
35,091.96 Rt 501 Safety and Operational Improvements in Campbell County 35,091.96
Bus Rapid Transit (BRT) in Richmond and Henrico County 477,143.00
I‐95/64 Overlap Improvements in Richmond 423,809.00
VA VA172 Improve transportation infrastructure for visitors to Jamestown 2007 269,557.00 Longhill Road Widening in James City County 269,557.00
VA VA173 Route 11 improvements in Maurertown, Virginia 331,062.00 Rt. 11 Intersection Improvements in Frederick County 331,062.00
I‐564 Intermodal Connector in Norfolk, VA 1,595,422.00
Longhill Road Widening in James City County 6,938.00
VA VA176 Construct 3.6 miles of Interstate 73 near Martinsville 616,588.64 Rt. 581 – Valley View Interchange in Roanoke 616,588.64
VA VA178 Engineering and Right‐of‐ Way for Interstate 73 in Roanoke County 1,201,770.00 Rt. 220 Corridor Safety Improvements in Botetourt County 1,201,770.00
I‐564 Intermodal Connector in Norfolk 33,644.28
Longhill Road Widening in James City County 596.46
VA VA184 Chestnut Mountain Road‐‐ Feasibility study, design, and construction start for
road improvement on National Forest lands.
132,213.00 Widen Rt. 11 in Bristol 132,213.00
VA VA188 Replacement of Robertson Bridge in Danville 1,131,738.36 Rt. 501 Operational and Safety Improvements in Halifax County 1,131,738.36
VA VA190 Construct improvements at I‐ 264 interchange in Virginia Beach 3,170,062.49 Longhill Road Widening in James City County 3,170,062.49
I‐564 Intermodal Connector in Norfolk 254,550.00
Longhill Road Widening in James City County 47,273.55
VA VA202 I‐264/Lynnhaven Parkway/ Great Neck Road Interchange. 1,153,457.00 Longhill Road Widening in James City County 1,153,457.00
VA VA205 National Park Service transportation improvements to Historic Jamestowne in
FY 2006.
1,266,950.00 Longhill Road Widening in James City County 1,266,950.00
VA VA208 Smart Road Research and Operations, Blacksburg 895,290.00 Rt. 52 Improvements in Carroll County 895,290.00
VA VA209 Replacement of Robertson Bridge in Danville 1,561,825.30 Rt. 501 Operational and Safety Improvements in Halifax County 1,561,825.30
VA VA210 I‐64/City Line Road Interchange. 5,007,375.00 I‐564 Intermodal Connector in Norfolk 5,007,375.00
VA VA214 Construct I‐73 near Martinsville. 7,010,325.00 Rt. 581 – Valley View Interchange in Roanoke 7,010,325.00
VA VA224 Route 11 improvements in Maurertown (Shenandoah County). 187,405.00 Rt. 11 Intersection Improvements in Frederick County 187,405.00
VA VA227 Engineering and right‐of‐ way for Interstate 73 in Roanoke County 1,001,475.00 Rt. 220 Corridor Safety Improvements in Botetourt County 1,001,475.00
VA VA230 Route 221 improvements in Forest 51,536.00 Rt 460 Improvements in Bedford County 51,536.00
I‐564 Intermodal Connector in Norfolk 4,992,430.31
Longhill Road Widening in James City County 19,276.69
VA VA251 Property acquisition and improvements for public access and viewshed
protection for the Cedar Creek Vermont Monument at the Cedar Creek and
Belle Grove National Historical Park in Virginia.
192,396.00 Rt. 11 Intersection Improvements in Frederick County 192,396.00
VA VAF01 Mid‐Chesapeake Bay Ferry, Virginia (6) 173,472.00 Longhill Road Widening in James City County 173,472.00
VA VAF02 Ferry for Jamestown 2007 Festivities, Virginia ‐ Project will not advance (6) 173,472.00 Longhill Road Widening in James City County 173,472.00
Total Amount Repurposed 60,907,566.99
34,240.74Upgrade DOT crossing #467661K to constant warning time devicesVA183VA
118,393.12VA155VA
900,952.00Construct I‐95 Interchange at Temple Ave, Colonial Heights.VA167VA
Ceres Recreation Trail and Center‐‐Design and construct pedestrian/ bicycle
trail in community of Ceres and establish trail center
1,602,360.00Construct Maersk Terminal interchange in Portsmouth. Construct sound walls
on Route 164 at and near the Maersk interchange
VA174VA
1,201,770.00Eastern Seaboard Intermodal Transportation Applications Center (ESITAC) in
Hampt
VA144VA
301,823.55Purchase specialized tunnel fire safety equipment, Hampton Roads.VA196VA
5,011,707.00I‐64/City Line Road Interchange in Virginia BeachVA237VA
114
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Virginia
State Demo ID Project Description Amount Project Description Amount
ToFrom
Total # of Earmarks Repurposed 63
115
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Washington
State Demo ID Project Description Amount Project Description Amount
WA WA007 Snohomish Co: HOV lanes 740.96 SR 96/Seattle Hill Rd Intersection Vic to SR 9 Vic ‐ Paving 740.96
WA WA010 Bellevue: Conduct Phase I design study for I‐405 interchange at NE 8th Street
(WSDOT PIN 140541D, 140541E)
106,452.91 I‐405/SB SR 900 to Coal Creek Pkwy SE ‐ Paving
(WSDOT PIN 140504E)
106,452.91
WA WA015 Bainbridge Island, State Road 305 Improvements 0.92 Roxbury Street Sidewalks in Seattle ‐ Construct sidewalks, curb, and gutter. 0.92
WA WA024 Construct I‐5 Interchanges in Lewis Country 5.84 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new
bridge and associated approach work.
5.84
WA WA026 Widen SR‐99 between 148th Street and King County Line in Lynnwood 178.00 Woods Creek Road Phase 1 in Monroe ‐ Construct sidewalk and shared
pedestrian/bicycle path.
178.00
WA WA031 Undertake SR 166 slide repair 30,886.48 SR 160/Ramsey Rd SE to E of Estonia CT SE ‐ Paving 30,886.48
112th Street E. & A Street E. Signal in Pierce Co ‐ Install signal system and
turn lanes.
142,448.98
SR 99/Roy St to N 60th St ‐ Paving 2,333,728.70
WA WA037 Edmonds Crossing multi‐modal transportation project 3,432,188.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated
improvements.
3,432,188.00
WA WA039 Widen SR 522 in Snohomish County: $3,650,000 for phase 1 from SR 9 to
Lake Road; $1,550,000 to construct segment from Paradise Lake Road to
Snohomish River Bridge
564,790.29 SR 96/Seattle Hill Rd Intersection Vic to SR 9 Vic ‐ Paving 564,790.29
WA WA043 Construct Peach Arch Crossing of Entry (PACE) lane in Blaine 14.07 Anderson Creek Bridge in Whatcom County ‐ Replace bridge and associated
approach work.
14.07
WA WA044 Widen SR‐543 from I‐5 to International Boundary, Washington 0.03 I‐5/SB North Fork Lewis River Bridge ‐ Resurfacing 0.03
WA WA046 Reconstruct I‐82/SR‐24 intersection and add lanes on SR 24 to Keys Rd 0.70 I‐82/SR 821/Thrall Road Bridge EB ‐ Deck Rehabilitation 0.70
WA WA048 Conduct feasibility study of State Route 35 Hood River bridge in White
Salmon.
0.64 SR 14/SE 164th Ave to NW 6th Ave ‐ Paving 0.64
WA WA049 Construct Sequim/Dungeness Valley trail project 1.00 Bremerton Highway Safety Improvements in Bremerton ‐ Safety
improvements.
1.00
WA WA050 Construct SR 167 Corridor, Tacoma 27.97 SR 509/NB S 160th St to S 112th St Vic, Paving 27.97
WA WA051 Design and implement report and environmental study of the I‐5 corridor in
Everett, Washington
20,725.33 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new
bridge and associated work.
20,725.33
WA WA055 For the costs associated with the long term improvement, restoration, or
replacement for damage to the Magnolia Bridge in Seattle
5,125.82 Woods Creek Road Phase 1 in Monroe ‐ Construct sidewalk and shared
pedestrian/bicycle path.
5,125.82
WA WA065 Sunnyside South First St Reconstruction 1.26 North Meyers Road Bridge in Yakima County ‐ Replace bridge and associated
approach work.
1.26
WA WA102 Bellevue Access Downtown, Phase Two, Washington 1,608.62 120th NE Corridor Stage 2 in Bellevue ‐ Widen and re‐align roadway. 1,608.62
WA WA103 Bellevue Access Downtown, Phase Two, Washington 52,997.95 120th NE Corridor Stage 2 in Bellevue ‐ Widen and re‐align roadway. 52,997.95
WA WA140 Interstate 5 and 41st Street/Broadway Interchange and Arterial Improvement
Project, Everett
323,009.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new
bridge and associated work.
323,009.00
WA WA141 SR 704 Cross‐Base Highway, Spanaway Loop Road to SR 7 747,807.31 SR 512/E of Pacific Ave S to E of Canyon Rd E ‐ Paving 747,807.31
WA WA142 Plan to relieve traffic until North‐South freeway Hwy 2 440,649.00 I‐90/Sprague Ave I/C to Argonne Rd I/C ‐ PCCP Rehabilitation Grinding 440,649.00
WA WA143 Widening SR 527 from 2 lanes to 5 from Bothell to Mill Creek 121,890.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated
improvements.
121,890.00
WA WA145 Coal Creek Parkway Bridge Replacement, Newcastle WA 81,259.00 Redmond Central Connector in Redmond ‐ Construct path and associated
improvements.
81,259.00
WA WA146 SR 9 and 20th St. SE Intersection Reconstruction in Snohomish County 25,393.00 US 2/Bickford Ave Vic ‐ Stormwater Pipe Replacement 25,393.00
ToFrom
2,476,177.68Undertake FAST Corridor improvements with the amounts provided as
follows $12,000,000. To construct the North Duwamish Intermodal Project,
$3,375,000. For the Port of Tacoma Road Project, $2,250,000 for the SW
WA034WA
116
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Washington
State Demo ID Project Description Amount Project Description Amount
ToFrom
WA WA147 Issaquah Historical Society, Issaquah Valley Trolley Project 20,315.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new
bridge and associated work.
20,315.00
27th Street Overpass in Washougal, WA ‐ All activities related to the
construction of an overpass.
863,178.00
NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new
travel lanes, bike lanes, and sidewalks.
152,362.00
WA WA149 Port of Tacoma Rd. Construct a second left turn lane for traffic from
westbound Pac. Hwy E. to Port of Tacoma Rd. and I 5
40,630.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐
time travel information.
40,630.00
WA WA150 Granite Falls Alternate Freight Route in Granite Falls 287,863.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF
bridge.
287,863.00
WA WA151 Auburn, Washington M Street SE rehabilitation between 29th Street SE and
37th Street SE
40,630.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐
time travel information.
40,630.00
WA WA152 Tukwila Urban Access Improvement Project Address necessary improvements
to Southcenter Parkway in Tukwila to relieve congestion
81,259.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐
time travel information.
81,259.00
WA WA153 Design and construct improved I 182 interchange ramps at Broadmoor Blvd.
in Pasco, WA
162,521.26 I‐182/SR 240 and George Washington Way Interchange ‐ Paving 162,521.26
WA WA154 Conduct route analysis for community pathway through Chehalis 7,349.33 Lincoln Creek Bridge in Lewis County ‐ Replace bridge and associated
approach work.
7,349.33
WA WA155 Construct a multi‐jurisdictional non‐motorized transportation project parallel
to SR 99 called the Interurban Trail
162,521.00 Redmond Central Connector in Redmond ‐ Construct path and associated
improvements.
162,521.00
WA WA156 SR 2/Main Street/Old Owen Road Intersection in Monroe 40,538.00 Chain Lake Road Phase 2A in Monroe ‐ Construction of a pedestrian/bicycle
path.
40,538.00
WA WA157 Congestion relief on I 405 with added lanes from SR 520 SR 522 including 2
lanes each way from NE 85th‐NE 124th
81,259.00 I‐405/SB SR 900 to Coal Creek Pkwy SE ‐ Paving 81,259.00
WA WA158 Buckley, WA; New Road alignments on 112th Street Corridor 162,521.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
162,521.00
WA WA159 Extension of Waaga Way west to Old Frontier Rd 355,512.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new
bridge and associated work.
355,512.00
WA WA161 The West Corridor Coalition in Washington State 57,077.84 SR 539/I‐5 to Kellogg Road ‐ Paving 57,077.84
WA WA163 Widen I‐5 through Lewis County 397,784.14 Lincoln Creek Bridge in Lewis County ‐ Replace bridge and associated
approach work.
397,784.14
WA WA164 Redmond, WA City‐wide ITS 81,259.00 Redmond Central Connector in Redmond ‐ Construct path and associated
improvements.
81,259.00
Bingen/White Salmon Circulation Study ‐ Traffic analysis in the SR 14 corridor. 23,835.76
NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new
travel lanes, bike lanes, and sidewalks.
65,009.00
WA WA166 Pedestrian Sidewalk Construction in Snohomish. 14,221.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF
bridge.
14,221.00
WA WA167 Alaskan Way Viaduct and Seawall 1,137,639.00 SR 99/Roy St to N 60th St ‐ Paving 1,137,639.00
WA WA168 Improve I‐5 interchange at 134th Street in Clark County 1,094,165.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new
bridge and associated approach work.
1,094,165.00
WA WA169 SR 167‐‐Right‐of‐way acquisition for a new freeway connecting SR 509 to SR
161.
203,150.00 SR 7/SR 507 to 114th St S ‐ Paving 203,150.00
College Way SR 538 @ I‐5 in Mount Vernon ‐ Add lanes beneath the I‐5
overpass at College Way.
800,000.00WA
88,844.76Complete final Columbia River crossing Environmental Impact Statement for
SR 35
1,015,540.00Complete preliminary engineering and environmental analysis for SR 14
through Camas and Washougal
WA148WA
3,204,720.00
WA165WA
Roosevelt Extension at Urban Avenue to Cameron Way in Mount VernonWA171
117
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Washington
State Demo ID Project Description Amount Project Description Amount
ToFrom
College Way/30th Street Signal in Mount Vernon ‐ Install signals. 850,000.00
College Way Signal System Improvements in Mount Vernon ‐ Upgrade signal
system.
1,229,681.00
Woods Creek Road Phase 1 in Monroe ‐ Construct sidewalk and shared
pedestrian/bicycle path.
325,039.00
WA WA172 Design and construct pedestrian land bridge spanning SR 14 203,150.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new
bridge and associated approach work.
203,150.00
WA WA173 Install dual left turn lanes and intersection signal modifications at SR 432 and
Columbia Blvd.
177,756.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new
bridge and associated approach work.
177,756.00
Newport Way, Maple to Sunset Way in Issaquah ‐ Roadway construction. 3,599,601.00
East Lake Sammamish Trail near Sammamish ‐ Trail construction. 406,299.00
WA WA175 Reconstruction of SR 99 (Aurora Ave. N) between N 145th St. and N 205th St 162,521.00 Redmond Central Connector in Redmond ‐ Construct path and associated
improvements.
162,521.00
WA WA179 Restore and construct historic Naches Depot and Trail project 60,590.00 Cheyne Road in Yakima County ‐ Reconstruct roadway. 60,590.00
WA WA180 Kent‐‐Construct a single point urban interchange (SPUI) under I‐5 at South
272nd St
623,770.23 SR 99/N 60th St to N 145th St ‐ Paving 623,770.23
WA WA182 Tacoma‐‐Lincoln Avenue Grade Separation 81,259.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
81,259.00
Kent Regional Trail in Kent ‐ Construct trail with associated safety
improvements.
300,000.00
SR 515/SE 208th I/S Safety in Kent ‐ Construct safety improvements at the
intersection.
59,960.00
Puyallup River Bridge in Tacoma ‐ Replace segments of the Puyallup River
Bridge.
40,630.00
WA WA184 Terry's Corner Park and Ride on Camano Island. 159,007.14 New County Road on Whidbey Island ‐ Construction of new roadway. 159,007.14
WA WA186 SR 538 (College Way) and North 26th St. Signal in Mount Vernon 14,221.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF
bridge.
14,221.00
WA WA188 Extension of Waaga Way west to Old Frontier Rd 40,630.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
40,630.00
WA WA189 Purchase of scenic easement or site at I‐90 and Highway 18 134,806.83 Roxbury Street Sidewalks in Seattle ‐ Construct sidewalks, curb, and gutter. 134,806.83
WA WA190 Fife‐‐Widen 70th Ave. East and Valley Ave. East 81,259.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐
time travel information.
81,259.00
WA WA191 I‐90 Two‐Way Transit‐HOV Project 325,039.00 SR 99/Roy St to N 60th St ‐ Paving 325,039.00
WA WA192 U.S. 12 Burbank to Walla Walla: Construct new four lane highway for portion
of U.S. 12
349,418.00 SR 125/Oregon State Line to 12th Ave N ‐ Paving 349,418.00
WA WA193 Construct an off‐ramp from I‐5 to the intersection of Alderwood Mall Blvd.
and Alderwood Mall Pkwy.
363,405.00 Poplar Way Overcrossing in Lynnwood ‐ Construct bridge over I‐5 in vicinity of
Alderwood Mall.
363,405.00
WA WA194 Improve Willapa Hills bicycle and pedestrian trail between Chehalis and
Pacific County
71,383.84 2016 Mason County Overlays in Mason County ‐ Overlay and/or pavement
repair.
71,383.84
WA WA196 SR 543 Interstate 5 to International Boundary Enhancement in Blaine (WSDOT
PIN 154302E)
304,726.00 SR 539/I‐5 to Kellogg Road ‐ Paving(WSDOT PIN 153900P) 304,726.00
WA WA199 Complete analysis, permitting and right‐of‐ way procurement for I‐5/SR 501
Interchange Replacement in Ridgefield.
60,945.00 Pioneer Street Rail Overpass in Ridgefield ‐ Construct overpass and associated
approach work.
60,945.00
Kent, WA Willis Street BNSF Railroad Grade Separation ProjectWA183
4,005,900.00Issaquah SE BypassWA174WA
400,590.00WA
118
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Washington
State Demo ID Project Description Amount Project Description Amount
ToFrom
WA WA200 Cultural and Interpretive Center (Hanford Reach National Monument) facility,
Richland, WA
130,016.00 N. 20th Ave. Safety in Pasco ‐ Includes access management, pedestrian
signals, and curb ramps.
130,016.00
WA WA201 Federal Way Triangle‐‐ Conduct final engineering work for the reconstruction
of the I‐5‐‐ SR 18 interchange.
162,521.00 SR 99/N 60th St to N 145th St ‐ Paving 162,521.00
WA WA203 SR 18 Widening, Maple Valley to I‐90 609,449.00 SR 516/102nd Pl SE Vic to 132nd Ave SE ‐ Paving 609,449.00
WA WA204 Improvements in the SR 9 corridor in Snohomish County 121,891.00 I‐5/Southbound SR 531 Interchange ‐ Paving 121,891.00
WA WA205 Continuing construction of I‐90, Spokane to Idaho State Line 268,158.41 I‐90/Sprague Ave I/C to Argonne Rd I/C ‐ PCCP Rehabilitation Grinding 268,158.41
WA WA206 Rebuild and widen Cemetery Road bridge over U.S. Bureau of Reclamation
canal near Othello, WA
23,194.53 McManamon Road Bridge, near Othello ‐ Replace existing bridge and
associated approach work.
23,194.53
WA WA207 SR 2/Kelsey Street Intersection Improvements in Monroe. 84,510.00 Chain Lake Road Phase 2A in Monroe ‐ Construction of a pedestrian/bicycle
path.
84,510.00
Enumclaw Foothills Trail in Enumclaw ‐ Construct Trail. 492,000.00
Battersby Trail in Enumclaw ‐ Construct Trail. 587,879.00
Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
121,891.00
WA WA209 Expand size and improve safety Lewis and Clark Discovery Trailhead and
Scenic Overlook.
14,829.00 Elochoman Valley and Beaver Creek Roads in Wahkiakum Co ‐ Safety
improvements.
14,829.00
Witte Road, Phase 4 in Maple Valley ‐ Roadway improvements. 39,658.36
Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
81,259.00
WA WA211 SR 28 and SR 285 Sellar Bridge Improvements: ramp and roadway network
improvements at the west end and a new lane on the Sellar Bridge.
406,299.00 SR 285/Wenatchee Area ‐ Paving 406,299.00
WA WA212 International Mobility and Trade Corridor Project for Whatcom County 105,638.00 Anderson Creek Bridge in Whatcom County ‐ Replace bridge and associated
approach work.
105,638.00
WA WA213 Conduct study for I‐5 and SR 503 Interchange 139,468.72 I‐5/SR 503 Interchange Improvements in Woodland ‐ Relocation of
intersection and signalization.
139,468.72
WA WA214 Implement Red Mountain Area Vision transportation plan, includes Webber
Canyon Road realignment at existing I‐82 Kiona‐Benton interchange and new
Red Mountain I‐82 interchange at SR 224.
492,883.19 I‐82/Red Mountain Vicinity ‐ Construct Interchange 492,883.19
WA WA215 Renton, WA SR 167 HOV, Strander Boulevard Connection 81,259.00 Redmond Central Connector in Redmond ‐ Construct path and associated
improvements.
81,259.00
WA WA216 Extend 18th Street between 87th Avenue and NE 192nd Avenue in
Vancouver.
325,039.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new
bridge and associated approach work.
325,039.00
WA WA217 U.S. 2/Sultan Basin Road Improvements in Sultan 48,756.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated
improvements.
48,756.00
WA WA218 Construct SR 9 Pedestrian Overpass in Arlington. 881,298.00 Arlington Valley Road in Arlington ‐ Construct new roadway. 881,298.00
WA WA219 Engineering and Construction of the Centennial Trail in Snohomish. 81,259.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF
bridge.
81,259.00
Barker Road/BNSF Grade Separation in Spokane Valley ‐ Construct grade
separation over BNSF tracks.
719,921.00
Ben Burr Trail Connections in Spokane ‐ Construct trail and associated
amenities.
81,259.00
WA WA221 267th Street NW Pedestrian Path in Stanwood 48,756.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF
bridge.
48,756.00
WA210
1,201,770.00Enumclaw, WA Welcome CenterWA208
120,917.36Maple Valley SR 169 and SR 516 Improvements
801,180.00Development of highway‐rail crossings in Spokane County, WA and Kootenai
County, ID
WA220WA
WA
WA
119
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Washington
State Demo ID Project Description Amount Project Description Amount
ToFrom
WA WA223 Improve Wahkiakum County Ferry landing. 25,393.00 Pacific Ave. N. Half Bridge in Cowlitz Co ‐ Replace existing structure with new
bridge and associated approach work.
25,393.00
WA WA224 116th St/Interstate 5 Interchange Reconstruction in Marysville. 142,205.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new
bridge and associated work.
142,205.00
WA WA225 Guard Street Reconstruction Project in Friday Harbor 65,009.00 Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF
bridge.
65,009.00
WA WA226 5th Street/US 2 Signalization Improvements in Sultan. U.S. 2/Sultan Basin
Road improvements in Sultan [ref P.L. 110‐244, Sec 105(a)(54)]
8,126.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated
improvements.
8,126.00
SR 515/SE 208th I/S Safety in Kent ‐ Construct safety improvements at the
intersection.
359,960.00
Puyallup River Bridge in Tacoma ‐ Replace segments of the Puyallup River
Bridge.
40,630.00
WA WA230 I‐405‐SR 167 interchange‐‐ Rebuild the interchange and add additional lanes
to relieve congestion.
162,521.00 I‐405/SB SR 900 to Coal Creek Pkwy SE ‐ Paving 162,521.00
WA WA231 SR 704 Cross‐Base Highway, Spanaway Loop Road to SR 7 930,265.70 SR 7/SR 507 to 114th St S ‐ Paving 930,265.70
WA WA233 Fruitdale and McGarigle Arterial Improvements Project in Sedro Woolley,
Washington
77,196.54 Anderson Creek Bridge in Whatcom County ‐ Replace bridge and associated
approach work.
77,196.54
WA WA234 Realign Airport Road/ Springhetti Ave./Marsh Road in Snohomish County,
Washington
25,393.00 SR 96/Seattle Hill Rd Intersection Vic to SR 9 Vic ‐ Paving 25,393.00
WA WA235 Olympia Infrastructure Enhancement Project. 69,477.00 Bremerton Highway Safety Improvements in Bremerton ‐ Safety
improvements.
69,477.00
WA WA236 Improve Mill Plain Blvd. between SE 172nd and SE 192nd in Vancouver 1,251,844.00 NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new
travel lanes, bike lanes, and sidewalks.
1,251,844.00
WA WA237 Improve signage along scenic highways in Clark, Skamania and Pacific
counties
6,095.00 Elochoman Valley and Beaver Creek Roads in Wahkiakum Co ‐ Safety
improvements.
6,095.00
WA WA238 Widen SR 503 through Woodland 115,090.32 I‐5/SR 503 Interchange Improvements in Woodland ‐ Relocation of
intersection and signalization.
115,090.32
WA WA240 Design and construct pedestrian land bridge spanning SR 14 in Vancouver 253,938.00 NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new
travel lanes, bike lanes, and sidewalks.
253,938.00
WA WA242 Hanford Reach National Monument Road Improvement. 152,362.00 N. 20th Ave. Safety in Pasco ‐ Includes access management, pedestrian
signals, and curb ramps.
152,362.00
WA WA243 Town Square Roadway and Pedestrian Improvements, Burien 253,938.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated
improvements.
253,938.00
WA WA244 SR 704 Cross‐Base Highway Improvements, Spanaway Loop Road to SR 7. 2,002,950.00 SR 7/SR 507 to 114th St S ‐ Paving 2,002,950.00
WA WA245 Tukwila Southcenter Parkway Improvements, Tukwila. 304,726.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐
time travel information.
304,726.00
WA WA246 Federal Way Triangle‐‐ Conduct final engineering work for the reconstruction
of the I‐5‐‐ SR 18 interchange.
406,387.38 SR 99/N 60th St to N 145th St ‐ Paving 406,387.38
WA WA247 U.S. 12 Burbank to Walla Walla: Construct new four lane highway for portion
of U.S. 12
253,938.00 SR 125/Oregon State Line to 12th Ave N ‐ Paving 253,938.00
WA WA248 Reconstruction of SR 99 (Aurora Ave. N) between N 145th St. and N 205th St 101,576.00 Redmond Central Connector in Redmond ‐ Construct path and associated
improvements.
101,576.00
Granary Avenue & Laurel Street in Bellingham ‐ Construct new and
reconstruct existing roadways.
1,676,514.69
400,590.00
1,930,452.69Port of Bellingham Transportation Enhancement ProjectsWA251WA
Kent, WA Willis Street UP Railroad Grade Separation ProjectWA228WA
120
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Washington
State Demo ID Project Description Amount Project Description Amount
ToFrom
Burlington Northern Overpass, north of Burlington ‐ Replace existing BNSF
bridge.
253,938.00
WA WA252 Toroda Creek Road Improvements, Ferry County 240,905.00 Ferry/River Street Overlay project in Ferry County ‐ Roadway overlay and
storm drainage improvements.
240,905.00
WA WA253 Toroda Creek Road Improvements, Okanogan County 100,176.20 North Star Park City Lower Bridge B‐3 in Okanogan County ‐ Replace bridge
and associated approach work.
100,176.20
WA WA254 Conduct preliminary engineering and EIS for Columbia River Crossing in WA
and OR.
101,576.00 SR 501/I‐5 to SW 26th St Ext Vic Including Couplet ‐ Paving 101,576.00
WA WA255 U.S. 395, North Spokane Corridor Improvements. 203,150.00 US 2/Division Wye to Farwell Rd ‐ Paving 203,150.00
WA WA256 116th St/Interstate 5 Interchange Reconstruction in Marysville. 101,576.00 W. Sammamish R. Bridge in Kenmore ‐ Replace existing structure with new
bridge and associated work.
101,576.00
WA WA257 SR 167‐‐Right‐of‐way acquisition for a new freeway connecting SR 509 to SR
161.
761,812.66 SR 512/Golden‐Givens Rd to Jct SR 167 ‐ Paving 761,812.66
WA WA258 Roadway and Pedestrian Improvements at Burien Town Square, Burien 152,362.00 City Center Bike Lane in Seattle ‐ Construct bike lane and associated
improvements.
152,362.00
WA WA259 Complete analysis, permitting and right‐of‐ way procurement for I‐5/SR 501
Interchange Replacement in Ridgefield.
853,272.43 Pioneer Street Rail Overpass in Ridgefield ‐ Construct overpass and associated
approach work.
853,272.43
WA WA261 Construct Intermodal Transit Facility, City of University Place 330,119.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
330,119.00
WA WA262 Streetscape University Place Downtown, City of University Place 284,410.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
284,410.00
WA WA263 Plan and Improve freight and goods transport‐‐The West Coast Corridor
Coalition in Washington State.
50,787.00 I‐5/Stillaguamish River Br to Hill Ditch Br ‐ Concrete Pavement Rehab 50,787.00
WA WA265 Tukwila Urban Access Improvement Project Address necessary improvements
to Southcenter Parkway in Tukwila to relieve congestion
177,757.00 South Michigan Street ITS in Seattle ‐ Install ITS components and provide real‐
time travel information.
177,757.00
WA WA266 Tacoma‐‐Lincoln Avenue Grade Separation 152,362.00 Pacific Highway South Phase 5 in Federal Way ‐ Reconstruct and widen
highway.
152,362.00
WA WA267 Widen SR 202/SR 520 to Sahalee Way, King County 244,471.00 SR 202/Snoqualmie Falls Park to Boalch Ave NW Vic ‐ Paving 244,471.00
WA WA268 Improve Vancouver traffic management ‐ Vancouver Advanced Traffic
Management System, Vancouver
50,788.00 NE 18th St, NE Four Seasons Ln to NE 138th Ave in Vancouver ‐ Add new
travel lanes, bike lanes, and sidewalks.
50,788.00
Queensgate Drive Improvements, I‐182 to Keene Road in Richland ‐ 2,356,344.88
North Meyers Road Bridge in Yakima County ‐ Replace bridge and associated
approach work.
279,331.00
Total Amount Repurposed 46,319,394.16Total # of Earmarks Repurposed 126
WA 2,635,675.88SR 240/Stevens Drive Corridor Improvements, interchange construction and
graded rail crossing separation at intersection of SR 240 and Van Giesen
Street.
WA269
121
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
Wyoming
State Demo ID Project Description Amount Project Description Amount
WY WY004 #165. Jackson‐Teton Pathway ‐ HPP TEA‐21 ‐ 1998 177,706.00 Hoback Jct.‐ Jackson, Snake River North Section Pathway 177,706.00
WY WY005 #629 Cheyenne Norris Viaduct ‐ HPP TEA‐21 ‐ 1998 304,249.00 Cheyenne Streets ‐ Intersection of Prairie Ave. and Frontier Mall Drive
Roundabout
304,249.00
WY WY017 #2508 US 85 Passing Lanes (Sec 1702) ‐ HPP SAFETEA‐LU ‐ 2005 24,081.47 Cheyenne South Greeley Highway, US 85 and I‐80 Ramps Left Turn Signal and
Striping
24,081.47
WY WY019 #2781 Projects on or near Highway 26 in Riverton ‐ Section 1702 HPP
SAFETEA‐LU ‐ 2005
11,986.57 Riverton Streets North Federal Blvd. Reconstruction 11,986.57
WY WY023 #5168 WYO 59 Douglas‐ Gillette Add Lanes‐ Sec 1702 HPP SAFETEA‐LU ‐ 2005 57,328.58 Gillette Streets Intersection of Warlow Drive and US 14/16 Traffic Signal
Replacements
57,328.58
WY WY025 #5170 Rock Springs Marginal ‐ Section 1702 HPP SAFETEA‐LU ‐ 2005 1,266.50 Rock Springs‐ Rawlins Point of Rocks West Resurfacing 1,266.50
WY WY027 #5172 I‐90/Burma Road Overpass ‐ Section 1702 HPP SAFETEA‐LU ‐ 2005 11,745.91 Buffalo‐ Gillette Lowery Section Mill and Overlay 11,745.91
WY WY028 #5173 US 85 Passing Lanes Newcastle‐ Lusk ‐ Section 1702 HPP SAFETEA‐LU ‐
2005
0.45 Newcastle‐ 4 Corners Mill and Overlay 0.45
Total Amount Repurposed 588,364.48Total # of Earmarks Repurposed 8
From
122
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
American Samoa
State Demo ID Project Description Amount Project Description Amount
AS AS001 AS: Rehabilitation 8 miles of Tau Road from Falessao to Ftuita 9,375.21 Construct Roadway Projects on the Island of Tau, AS 9,375.21
AS AS007 Shoreline Protection and Drainage Mitigation for Nuuuli Village Roads 15,555.29 Construct Roadway Projects on the Island of Tutuila, AS 15,555.29
AS AS008 Village Road Improvements for Tau, Ofu, and Olosega‐Sili counties in Manua
District
375,452.46 Construct Roadway Projects on the Island of Tau, AS 375,452.46
AS AS009 Shoreline Protection and Drainage mitigation for Aua Village Roads 8,583.80 Construct Roadway Projects on the Island of Tutuila, AS 8,583.80
AS AS015 Drainage Mitigation for Pago Pago village Roads 323,095.45 Construct Roadway Projects on the Island of Tutuila, AS 323,095.45
Total Amount Repurposed 732,062.21Total # of Earmarks Repurposed 5
ToFrom
123
Repurposed Earmarks
FY 2016 4th Quarter Report to Congress
U.S. Virgin Islands
State Demo ID Project Description Amount Project Description Amount
VI VI003 Construction of Raphune Hill Bypass Project, Route 38, St. Thomas, USVI 1,673,972.00 Turpentine Run Bridge Approaches project, route 30, project no. VI‐A30(1) 1,673,972.00
Total Amount Repurposed 1,673,972.00Total # of Earmarks Repurposed 1
ToFrom
124
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Summary
State # of Earmarks Repurposed Total Amount Repurposed
Idaho 1 2,403,540.00
Kansas 1 2,004,683.00
Maryland 1 4,005,900.00
Michigan 1 238,956.92
Minnesota 1 154,291.17
New Jersey 41 49,577,132.55
North Carolina 1 514,861.40
South Dakota 8 7,551,711.26
Tennessee 99 74,090,597.77
Vermont 15 8,671,887.81
West Virginia 2 577,222.00
Total 171 149,790,783.88
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Idaho
State Demo ID Project Description Amount Project Description Amount
ID ID034 Widen US 95 in Idaho from Jct SH 1 to Canadian Border 2,403,540.00 US 95, Alderson Ln to Madison St., Bonners Ferry ID 2,403,540.00
Total Amount Repurposed 2,403,540.00Total # of Earmarks Repurposed 1
ToFrom
2
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Kansas
State Demo ID Project Description Amount Project Description Amount
KS KS097 Construction of South Bypass for Highway 56 in Great Bend 2,004,683.00 US‐56 from West City Limits of Garfield NE to East City Limits of Garfield 2,004,683.00
Total Amount Repurposed 2,004,683.00
Total # of Earmarks Repurposed 1
ToFrom
3
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Maryland
State Demo ID Project Description Amount Project Description Amount
Widening I‐81 to six lanes in the existing median, and
reconstructing/reconfiguring
800,000.00
Interchanges at US 11 (VA Avenue) and at I‐70 3,205,900.00
Total Amount Repurposed 4,005,900.00
Total # of Earmarks Repurposed 1
To
4,005,900.00US 40 Alternate, Middletown BypassMD MD085
From
4
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Michigan
State Demo ID Project Description Amount Project Description Amount
MI MI193 City of Negaunee, Croix Street reconstruction‐Streetscape and resurfacing
from U.S. 41 to Maas Street
238,956.92 Croix Street reconstruction and resurfacing from west of Baldwin Ave to US 41 238,956.92
Total Amount Repurposed 238,956.92
Total # of Earmarks Repurposed 1
ToFrom
5
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Minnesota
State Demo ID Project Description Amount Project Description Amount
Feasibility Study for Proposed Mille Lacs Scenic Byway 61,240.00
Construct Cuyuna Lake Trail, Crow Wing CSAH 31 to TH6/Crow Wing CSAH 10
in Deerwood
93,051.17
Total Amount Repurposed 154,291.17
Total # of Earmarks Repurposed 1
To
154,291.17Construct Bicycle and Pedestrian Trails in Cuyuna Recreation AreaMN173MN
From
6
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
New Jersey
State Demo ID Project Description Amount Project Description Amount
NJ NJ004 Corridor Safety Improvement; US Route 1 (NJ) 1,366,021.40 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 1,366,021.40
NJ NJ011* Route 70/38 Circle Elimination 1,500,000.00 Route 70, Route 38 to Cropwell Road Roadway construction, Culvert
Replacement, MP 0.0‐7.7
1,500,000.00
NJ NJ018 Middlesex: Route 1 widening in Middlesex Co. from Raritan River to Rahway
River
154,923.62 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 154,923.62
NJ NJ029 Widen Route 1 from Pierson Avenue to Inman Avenue in Middlesex County 1,816,414.06 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 1,816,414.06
NJ NJ041 Construct Route29/129 Bicycle, Pedestrian and landscape improvement plan 53,431.87 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐MP7.9‐14.5 53,431.87
NJ NJ057 Construct, reconstruct and integrate multi‐transportation modes ‐‐
international airport and seaport, rail, national highway system and
brownfields ‐‐ to establish an international intermodal transport
14,385.21 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐9.22 14,385.21
NJ NJ059 Construct Rt 17 bridge over the Susquehana and Western rail line in Rochelle
Park
98,393.27 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.2 98,393.27
NJ NJ073 Reconstruction of Institute Street, Lockwood Avenue, First Street, Second
Street, Third Street, Ford Avenue, Liberty Street, and Bond Avenue in the
Borough of Freehold, New Jersey
58,545.05 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐9.22 58,545.05
NJ NJ093 Route 17 congestion improvements from Route 3 to Linwood Avenue, Bergen
Co. NJ
60,267.93 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
60,267.93
NJ NJ094 Route 17 improvements from Route 3 to Linwood Avenue, Bergen Co, New
Jersey
637.62 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
637.62
NJ NJ108 Pompton Lakes Downtown Streetscape 584,260.77 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
584,260.77
NJ NJ115* Delsea Drive Rt 47 Timber Creek 787,000.00 Route 47, Grove St. to Route 130, Mill, Resurface Pavement & Sidewalk
Re[!lacement‐MP62. 3‐75.2
787,000.00
Route 34, CR 537 to Washington Ave., Mill, Resurfacing & ADA Improvements‐
MP13.2‐26.5
719,921.00
Route 34, CR 537 to Washington Ave., Mill, Resurfacing & ADA Improvements‐
MP13.2‐26.6
81,259.00
Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93
bridges over Rt 3, MP 5.67 and MP 5.93
3,959,560.00
Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93
bridges over Rt 3, MP 5.67 and MP 5.94
446,930.00
Route 295/42/1‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐ ‐‐‐
MP26.42‐27.8
863,904.00
Route 295/42/1‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐ ‐‐‐
MP26.42‐27.9
97,512.00
NJ NJ145 Construction Route 46 and Main Street intersection in Lodi 1,602,360.00 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93
bridges over Rt 3, MP 5.67 and MP 5.95
1,602,360.00
NJ NJ147 Intermodal Access Improvements to the Peninsula at Bayonne Harbor 1,602,360.00 Route 40 Access Rd/40th Street to Mina Drive‐Aerial Photos for Base Mapping
& Traffic Control‐21.5‐24.9
1,602,360.00
Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.2 1,439,840.00
Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.3 162,520.00
961,416.00Safety and operation improvements on Route 73 in Berlin, Voorhees and
Evesham
NJ129NJ
1,602,360.00Rehabilitate Route 193 in New Jersey PortwayNJ152NJ
4,406,490.00Bergen County, NJ On Route 17, address congestion, safety, drainage,
maintenance, signing, access, pedestrian circulation and transit access
NJ128NJ
To
801,180.00Laurel Avenue Bridge replacement in Holmdel
Township
NJ118NJ
From
7
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
New Jersey
State Demo ID Project Description Amount Project Description Amount
ToFrom
Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rte 3
719,921.00
Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rte 4
81,259.00
Route 27 ADA Ramps Improvements, Evergreen St to Elizabeth River‐MP23.B‐
33.41
719,921.00
Route 27 ADA Ramps Improvements, Evergreen St to Elizabeth River‐MP23.B‐
33.42
81,259.00
Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
8,639,042.00
Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 4
975,119.00
NJ NJ173 Construct Sparta Stanhope Road Bridge (AKA Bridge K‐07) 229,181.40 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
229,181.40
Route 47, Grove St. to Route 130, Mill, Resurface Pavement & Sidewalk
Replacement‐MP62. 3‐75.3
431,952.00
Route 47, Grove St. to Route 130, Mill, Resurface Pavement & Sidewalk
Replacement‐MP62. 3‐75.4
48,756.00
NJ NJ186 Passaic‐Bergen intermodal transportation deployment initiative 1,218,900.00 Route 20 Paterson Safety, Drainage and Resurfacing‐MPO. 00‐4. 00 1,218,900.00
NJ NJ187 Construct 1‐195 Noise Barrier, Hamilton Township, Mercer County 2,002,950.00 Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement
Resurfacing‐?. 9‐14. 5
2,002,950.00
NJ NJ190 Construction of new access roads along route 42/Blackhorse Pike in
Washington Township
801,180.00 Route 295/42/I‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐
MP26.42‐28.8
801,180.00
NJ NJ193 Replacement and Alignment of Amwell Road Bridge over Neshanic River 339,871.00 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 339,871.00
NJ NJ195 Replace Route 7‐Wittpem Bridge, Hudson County 801,180.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab.‐MP13.8‐15.2 801,180.00
Route 295/42/1‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐
26.42‐27.8
287,968.00
Route 295/42/1‐76, Direct Connection, Contract 3‐Design‐Reconstruction‐
26.42‐27.9
32,504.00
Route 15, Bridge over Paulins Kill. Replace Superstructure, and Scour. MP
17.45‐17.65
2,519,721.00
Route 15, Bridge over Paulins Kill. Replace Superstructure, and Scour. MP
17.45‐17.66
284,409.00
NJ NJ217 Improvements to implement the Readington Tewksbury Transportation
Improvement District
189,512.00 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 189,512.00
NJ NJ218 Replacement of the Magnolia Avenue Bridge over Routes 1 & 9 379,024.00 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 379,024.00
Route 206 Bypass, Mountain View Rd to Old Somerville Rd (Sections 14A &
15A) MP 63.4‐66.4
759,515.00
Route 206 Bypass, Mountain View Rd to Old Somerville Rd (Sections 14A &
15A) MP 63.4‐66.5
85,730.00
NJ NJ220 Upgrade of Turnpike/Route 440 Interchange in Bayonne 3,204,720.00 Route 40 Access Rd/40th Street to Mina Drive‐Aerial Photos for Base Mapping
& Traffic Control‐21.5‐24.9
3,204,720.00
NJ NJ236 Construct Hudson River Waterfront Walkway over Long Slip Canal‐‐Hoboken
and Jersey City
81,259.00 Route 280, Route 21 Interchange Improvements & Bridge Rehab‐MP13.8‐15.2 81,259.00
845,245.00Separation of the intersection of 13th Street and the Lehigh Rail Line through
bridge or tunnel in Manville, NJ
NJ219NJ
320,472.00Rehabilitation of Benigno Boulevard from 1295 to Route 168 in BellmawrNJ203NJ
2,804,130.00 Sussex County, NJ, Vernon Township, Mountain Creek Rt. 94 Traffic Calming,
Ped. Safety and Traffic Congestion, Circulation Improvement
NJ209NJ
NJ NJ153
480,708.00Construction of Rowan Boulevard from US Route 322
to Main Street, Glassboro
NJ183NJ
801,180.00
9,614,161.00
East Coast Greenway bicycle and pedestrian path from New Brunswick to
Hudson River
Route 17 Congestion Improvements and Widening, from Williams Avenue to
the Garden State Parkway and Route 4 in Bergen County
NJ156NJ
NJ159NJ
801,180.00Rte 605 extension to U.S. 206
8
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
New Jersey
State Demo ID Project Description Amount Project Description Amount
ToFrom
NJ NJ241 Jersey City 6th Street Viaduct Pedestrian and Bicycle Pathway Project 1,602,360.00 Partway, Fish House/Pennsylvania Avenue, CR 659, Roadway Reconstruction‐
MP 0.5‐1.4
1,602,360.00
NJ NJ251 Widening of Route 1 and intersection improvements in South Brunswick 2,287,975.15 Route 1, CR533 (Quakerbridge Road) to Ridge Road‐Design‐7.9‐14.5 2,287,975.15
NJ NJ255 Route 9W operational and safety improvements, including I‐95 Southbound
entrance alterations
407,332.49 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
407,332.49
NJ NJ263 Route 46 Corridor upgrades 302,429.23 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
302,429.23
NJ NJ266 Widening of Rt. 1 and intersection improvements in South Brunswick 2,505,854.00 Route 1, CR 533 (Quakerbridge Road) to Ridge Road‐Design for Pavement
Resurfacing‐?. 9‐14. 5
2,505,854.00
NJ NJ270 Route 9W operational and safety improvements, including I‐95 Southbound
entrance alterations
85,881.48 Ridge Rd & Orient Way replace two bridges over Rt 3, MP 5.67 and MP 5.93 on
Rt 3
85,881.48
*Subject to availability of funds upon additional research.
Total Amount Repurposed 49,577,132.55
Total # of Earmarks Repurposed 41
9
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
North Carolina
State Demo ID Project Description Amount Project Description Amount
NC NC089 Downtown Redevelopment Project, City of Rocky Mount 514,861.40 US 301 Bypass from NC 43/48 to SR 1836 in Rocky Mount (U‐3330) 514,861.40
Total Amount Repurposed 514,861.40Total # of Earmarks Repurposed 1
From
10
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
South Dakota
State Demo ID Project Description Amount Project Description Amount
SD SD121 Construct an interchange on I‐90 at Marion Road west of Sioux Falls 568,820.00 SD115 Near Dell Rapids; Reconstruction & Replace Structure, P 0115(47)102
PCN 025C
568,820.00
SD SD123 Design and construct new Meridian Bridge across the Missouri River at
Yankton
1,000,024.81 SD17 ‐ SD44 Junction to Near Lennox; Municipal Reconstruction ‐ P 0017(08)42
PCN 028V
1,000,024.81
SD SD124 Resurface 10 miles of U.S. 18 from Okreek to Carter on the Rosebud Indian
Reservation
151,486.75 I‐90 Vivian to Oacoma; Asphalt Surface Treatment and Joint Reseal ‐ IM
0904(59)210 PCN 04D
151,486.75
SD SD128 Design and construct new Meridian Bridge across the Missouri River south of
Yankton, South Dakota
325,039.00 SD17‐SD44 Junction to near Lennox; Municipal Reconstruction ‐ P 001(08)42
PNC 028V
325,039.00
SD SD136 Construct Rush Lake Crossing US 12 near Webster 1,497,256.71 US81 ‐ from 3rd Ave. NE to 18th Ave. NE in Watertown; Urban Reconstruction ‐
NH 0081(93)157 PCN 026X
1,497,256.71
SD SD142 Purchase critical conservation easements along the Heartland Expressway
(Highway 79) adjacent to Custer State Park and Wind Cave National Park
2,002,950.00 I‐190 Exit 1 to Jct of US16/SD44 in Rapid City; Urban Reconstruction; IM
1902(61)0 PCN 1162
2,002,950.00
SD44 ‐ from SD47 to the Platte/Winner Bridge; Mill & AC Resurfacing ‐ P
0044(191)274 PCN 04X2
932,615.36
I‐90 Vivian to Oacoma; Asphalt Surface Treatment & Joint Reseal ‐ IM
0904(59)210 PCN 04D4
1,000,000.00
SD SD164 Asphalt overlay to extend Lewis and Clark Highway 1804 in Charles Mix County
leading to Platte Creek Recreation Area.
73,518.63 US281 ‐ from the W Jct with SD44 to S of the Jct with SD42; AC Resurfacing ‐ NH
0281(111)48 PCN 04WF
73,518.63
Total Amount Repurposed 7,551,711.26
Total # of Earmarks Repurposed 8
To
1,932,615.36To replace bridge over Missouri River, I‐90 in Chamberlain.SD151SD
From
11
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Tennessee
State Demo ID Project Description Amount Demo ID Project Description AmountTN021 Rutherford Co., TN, Intersection Improvement on SR‐2, At Dilton‐Mankin
Road
464,800.00
TN021 Rutherford Co., TN, Resurfacing & Safety Improvements on SR‐266, From
ramp to SR‐840 WB to SR‐10
423,710.24
TN TN026 Reconstruct Old Walland Highway Bridge over Little River in Townsend in
Blount County, Tennessee.
146,039.00 TN026 Roane Co., TN, Intersection Improvement on SR‐1, At SR‐29 in Harriman. 146,039.00
TN TN035 SR‐22 Bypass, North Fork Obion River to SR‐3 in Union City, Tennessee 20,000.00 TN035 Lake Co., TN, Bridge Replacement on SR‐21, Bridge over Branch at LM 1.20 20,000.00
TN048 Dekalb and Wilson Cos., TN, Safety Improvements on SR‐26, From W. of
Wilson County line to near SR‐96.
118,000.00
TN048 Davidson Co., TN, Safety Improvements on SR‐155, From Glastonbury Drive
to N. of Karen Drive
160,170.00
TN TN066 SR‐21, From LM 7.00 to the Obion County line. 469,936.92 TN066 Lake Co., TN, Bridge Replacement on SR‐21, Bridge over Branch at LM 1.20. 469,936.92
TN TN080 Plough Boulevard Interchange at Winchester Road ‐ City of Memphis,
Tennessee
491,964.00 TN080 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to
SR‐385 (Paul Barrett Parkway)
491,964.00
TN TN086 Improve circuitry on vehicle protection device installed at highway R/R
crossing in Athens, Tennessee.
47,269.60 TN086 McMinn Co., TN, Safety Improvements on SR‐305, From SR‐30 to Mt. Verd
Road.
47,269.60
TN087 Pickett Co., TN, Resurface. & Safety Improvement. On SR‐28, From S. of
Bridge over Holbert Creek to Kentucky State line
497,033.00
TN087 Anderson Co., TN, Bridge Replacement on SR‐9, Bridge over Clinch River at
LM 10.71
3,822,487.00
TN087 Anderson Co., TN, Bridge Replacement on SR‐9, Bridge over Clinch River at
LM 10.72
487,560.00
TN TN089 Addition of an interchange on I‐40 at Buttermilk Road in Roane County,
Tennessee.
243,780.00 TN089 Blount Co., TN, Resurfacing & Safety Improvements on SR‐35, From SR‐115 to
north of Ellis Avenue
243,780.00
TN TN091 Cessna Road, improve at‐grade highway‐railroad crossing in Knoxville,
Tennessee.
76,913.40 TN091 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road and
Thompson School Road
76,913.40
TN TN093 Develop trails, bike paths and recreational facilities on Bird Mountain for
Cumberland Trail State Park in Morgan County, Tennessee
186,295.00 TN093 Cumberland Co., TN, Reconstruction of SR‐101, From Lakeview Drive to E. of
Westchester Dr./Catoosa Blvd.
186,295.00
TN TN094 Widen Campbell Station Road in Knoxville, Tennessee. 146,268.00 TN094 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road and
Thompson School Road
146,268.00
TN TN095 Improve vehicle efficiencies at highway At‐Grade railroad crossing in Athens,
Tennessee.
79,316.60 TN095 Blount Co., TN, Intersection Improvement on SR‐35, At Lincoln Road in Alcoa. 79,316.60
TN096 Cocke Co., TN, Safety Improvements on SR‐9, From LM 5,80 to LM 6.30 in
Newport.
576,000.00
TN096 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road &
Thompson School Road.
225,180.00
TN TN098 Plan and construct improvements, Livingston Public Square in Overton
County, Tennessee.
12,641.66 TN098 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From W. of
Old Kentucky Road to Hitchcock Drive
12,641.66
TN104 Meigs Co., TN, Safety Improvements on SR‐304, From SR‐68 to near Euchee
Road.
6,937.00
TN104 Meigs Co., TN, Safety Improvements on SR‐304, From SR‐68 to near Euchee
Road.
17,441.00
TN TN109 Construction of Elizabethton Connector in Carter County, Tennessee. 801,180.00 TN109 Washington Co., TN, Intersection Improvement on SR‐34, At SR‐354 (Boones
Creek Road) in Jonesborough.
801,180.00
TN TN112 Acquire and construct trail and bikeway along South Chickamauga Creek in
Chattanooga
130,016.00 TN112 Hamilton Co., TN, Intersection Improvement on SR‐58, At Champion Road in
Chattanooga
130,016.00
TN TN114 Conduct study for SR‐45 to SR‐386 Connector in Davidson and Sumner
Counties, Tennessee
400,590.00 TN114 Macon Co., TN, Bridge Replacement on SR‐151, Bridge over Salt Lick Creek 400,590.00
801,180.00SR‐31 Reconstruction in Hawkins County, Tennessee.TN096TN
24,378.00TN TN104 Improve streetscape and pavement repair in Monroe County, Tennessee
4,807,080.00Add third lane on US‐27 (SR‐29) for truck‐climbing lane and realignment of
roadway at Wolf Creek Road to old US‐27 north of Robbins in Scott County,
Tennessee
TN087TN
To
888,510.24Stones River Greenway in Davidson County, TennesseeTN021TN
278,170.00Greenway and Bicycle Path Corridor in City of White House, Tennessee.TN048TN
From
12
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Tennessee
State Demo ID Project Description Amount Demo ID Project Description Amount
ToFrom
TN TN115 Bristol, TN highway‐R/R grade crossing improvement, Hazelwood Street in
Sullivan County, Tennessee
80,118.00 TN115 Sullivan Co., TN, Intersection Improvements on SR‐36, At Moreland Drive and
Hemlock Road in Kingsport
80,118.00
TN TN116 Construct new lighting on Veterans Memorial Bridge in Loudon County,
Tennessee
20,315.00 TN116 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 20,315.00
TN119 Blount‐Monroe‐Loudon Cos., TN, Safety Imp. on SR‐33, From
McMinn/Monroe CoL to Blount/Knox Co.
1,160,000.00
TN119 Knox‐Sevier Cos., TN, Safety Improvements on SR‐71, From Evans Road to
Burnett Lane
4,047,670.00
TN TN122 Plan and Construct Rutherford County Visitor's Center/Transportation
Information hub in Murfreesboro, Tennessee.
40,630.00 TN122 Wilson Co., TN, Safety Improvement on SR‐26, At Bluebird Road/C.L. Manier
Street in Lebanon.
40,630.00
TN TN124 North Second Street Corridor Upgrade in Memphis, Tennessee 1,602,360.00 TN124 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to
SR‐385 (Paul Barrett Parkway)
1,602,360.00
TN TN125 Bristol, TN Highway R/R Grade Crossing Improvement, Cedar Street in
Sullivan County, Tennessee
40,059.00 TN125 Sullivan Co., TN, Resurfacing & Safety Improvements on SR‐126, From SR‐93
to SR‐36
40,059.00
TN TN126 Construct Transportation and Heritage Museum in Townsend, Tennessee. 81,259.00 TN126 Blount Co., TN, Resurfacing & Safety Improvements on SR‐35, From SR‐115 to
north of Ellis Avenue.
81,259.00
TN TN127 Widen SR‐4 (US‐78) from Mississippi State line to Getwell Road (SR‐176) in
Memphis, Tennessee
801,180.00 TN127 Fayette Co., TN, Resurfacing & Safety Improvements on SR‐15, From the 5‐
lane section to near Tomlin Road
801,180.00
TN128 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From Miller
Road to West 4th Street
427,200.00
TN128 Jackson Co., TN, Resurfacing & Safety Improvements on SR‐135, From S. of
Spring Creek Road to SR‐53
1,012,000.00
TN128 Hamilton Co., TN, Resurfacing & Safety Improvements on SR‐60, From Meigs
County line to Meigs County line
285,600.00
TN128 Meigs Co., TN, Resurfacing & Safety Improvements on SR‐60, From Bradley
County line to Hamilton County line
13,674.58
TN128 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From W. of
Old Kentucky Road to Hitchcock Drive
626,400.00
TN TN129 Improve Vehicle Efficiencies at At‐Grade highway‐railroad crossing in Lenoir
City, Tennessee.
83,322.60 TN129 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old
Knoxville Pike.
83,322.60
TN TN132 Plan and construct a bicycle and pedestrian trail in Springfield, Tennessee 200,295.00 TN132 Robertson Co., TN, Safety Improvement. on SR‐76, From W. of Industrial Rd.
to E. of Hester Dr. in White House.
200,295.00
TN TN133 Reconstruct connection with Hermitage Avenue to Cumberland River Bluff in
Nashville, Tennessee.
41,512.13 TN133 Montgomery Co., TN, Intersection Improvement on SR‐13, At Wylma Van
Allen Place in Clarksville.
41,512.13
TN TN134 Plan and construct a bicycle and pedestrian trail in Lewisburg, TN 8,126.00 TN134 Marshall Co., TN, Intersection Improvement on SR‐373, At Heil Quaker
Avenue in Lewisburg
8,126.00
TN TN136 Construct and improve intersections in Niota, Tennessee. 80,118.00 TN136 McMinn Co., TN, Safety Improvements on SR‐2, From SR‐30 to SR‐305 80,118.00TN TN139 Construct interpretive visitor center for the Cherokee Removal Memorial
Park Trail of Tears site in Meigs County, Tennessee
81,259.00 TN139 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 81,259.00
TN TN140 Provide Streetscape Improvements and Pavement Repair in Greenback,
Tennessee.
200,295.00 TN140 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old
Knoxville Pike.
200,295.00
TN TN141 Improve vehicle efficiencies at highway At‐Grade railroad crossing in Niota,
Tennessee
45,666.80 TN141 McMinn Co., TN, Safety Improvements on SR‐305, From SR‐30 to Mt. Verd
Road.
45,666.80
TN TN142 Construct and Widen SR‐33 in Monroe County, Tennessee. 507,875.00 TN142 Rhea Co., TN, Resurface. & Safety Imp. on SR‐29, From the Hamilton County
line to N. of Black Oak Estates Road
507,875.00
TN TN143 Improving vehicle efficiencies at At‐Grade highway‐railroad crossing in
Philadelphia, Tennessee
79,316.60 TN143 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old
Knoxville Pike
79,316.60
TN TN147 For each rail‐highway crossing: Improve circuitry on vehicle protection
devices installed at crossing in Knoxville, Tennessee.
45,666.80 TN147 Knox Co., TN, Intersection Improvements on SR‐131, At Fairview Road and
Thompson School Road
45,666.80
2,364,874.58Widen SR‐101, from two lane highway to five lanes between SR‐282 (Dunbar
Road) and SR‐392 in Crossville, Tennessee
TN128TN
5,207,670.00Construct overpass at Highway 321 and Highway 11 in Loudon County,
Tennessee.
TN119TN
13
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Tennessee
State Demo ID Project Description Amount Demo ID Project Description Amount
ToFrom
TN TN148 Complete construction and landscaping of visitor center on Cherohala
Skyway in Monroe County, Tennessee
80,118.00 TN148 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 80,118.00
TN TN149 Improve circuitry on vehicle protection device installed at highway‐railroad
crossing in Knoxville, Tennessee
126,586.20 TN149 Knox Co., TN, Intersection Improvement on SR‐169, At Weisgarber Road. 126,586.20
TN TN151 Cocke County, Tennessee, SR‐32 Reconstruction. 801,180.00 TN151 Cocke County, Tennessee, Resurfacing & Safety Improvements on SR‐9, From
SR‐107 to the North Carolina State line.
801,180.00
TN TN152 Retrofit Noise Abatement Walls in Davidson County, Tennessee. 203,150.00 TN152 Marshall Co., TN, Intersection Improvement on SR‐373, At Heil Quaker
Avenue in Lewisburg.
203,150.00
TN TN154 Improve Streetscape and Pavement Repair in Blount County, Tennessee. 240,354.00 TN154 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old
Knoxville Pike.
240,354.00
TN156 Hamilton Co., TN, Resurfacing & Safety Improvements on SR‐29, From N. of
Signal Mtn. Road of SR‐29
1,401,880.00
TN156 Hamilton Co., TN, Resurfacing & Safety Improvements on SR‐29, From N. of
Signal Mtn. Road of SR‐30
208,520.00
TN156 Bradley Co., TN Resurfacing and Safety Improvement on SR‐2, From S. Lee
Highway and Grove to the int. of 25th St.
683,200.00
TN156 Sequatchie Co. TN. Resurfacing and Safety Improvement on SR‐28. From S. of
Br. Over Woodcock Creek to SR‐8
782,200.00
TN156 Sequatchie Co. TN. Resurfacing and Safety Improvement on SR‐28. From S. of
Br. Over Woodcock Creek to SR‐9
162,600.00
TN156 Marion Co. TN. Resurfacing and Safety Improvements on SR‐27, From N. of
Big Fork Road to Suck Creek
360,220.00
TN156 Monroe Co., TN, Resurfacing on I‐75, From the McMinn County line to the
Loudon County line
3,612,000.00
TN TN159 Restoration of historic L & N Depot in McMinn County, Tennessee. 16,024.00 TN159 Meigs Co., TN, Resurfacing & Safety Improvements on SR‐60, From Hamilton
County line to Horner Hollow Road.
16,024.00
TN TN160 Construct welcome center in Macon County, Tennessee 16,252.00 TN160 Wilson Co., TN, Intersection improvement on SR‐10, At the entrance to Flea
Market.
16,252.00
TN TN166 Construct interchange on I‐40 in Wilson County, Tennessee 81,259.00 TN166 Wilson Co., TN, Intersection improvement on SR‐10, At the entrance to Flea
Market.
81,259.00
TN TN167 Construct and widen underpass at intersection of Boydstation, Harvey and
McFee Roads in Knox County, Tennessee
396,023.12 TN167 Knox Co., TN, Resurfacing & Safety Improvements on SR‐62, From Texas
Avenue to SR‐1
396,023.12
TN TN168 Construct SR‐1 (US‐70) to a four lane divided highway on new alignment
from Centertown to McMinnville in Warren County, Tennessee
934,489.00 TN168 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐
24, Bridge over Caney Fork River.
934,489.00
TN TN169 Develop historic preservation transportation enhancement project in Sumner
and surrounding Counties in Tennessee
108,159.00 TN169 Dekalb Co., TN, Br. Replacement advance construction conversion on SR‐56,
Br. Ov Caney Fork River
108,159.00
TN TN170 Develop trails, bike paths and recreational facilities on the Crest of Black
Mountain for Cumberland Trail State Park in Cumberland County, Tennessee
186,295.00 TN170 Cumberland Co., TN, Reconstruction of SR‐101, From Lakeview Drive to E. of
Westchester Dr./Catoosa Blvd.
186,295.00
TN TN172 Improving vehicle efficiencies at highway At‐Grade railroad crossing in
Loudon, Loudon County, Tennessee
45,666.80 TN172 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old
Knoxville Pike
45,666.80
TN TN173 Plan and construct a bicycle and pedestrian trail in Eagleville, in Rutherford
County, Tennessee
160,236.00 TN173 Lincoln Co., TN, Resurfacing & Safety Improvements on SR‐50, From SR‐273
to SR‐10 in Fayetteville
160,236.00
TN TN174 Continue Shelby Avenue ‐ Demonbreun Street project in Nashville, Tennessee 528,190.00 TN174 Marshall‐Maury Cos., TN, Br. Replacement Adv. Const. conversion on SR‐106,
Br. Ov Duck River
528,190.00
TN TN176 Plan and Construct a Bicycle and Pedestrian Trail, Cannon County. 80,118.00 TN176 Cannon County, Tennessee, Resurfacing & Safety Improvements on SR‐281,
From west of SR‐1 to SR‐146.
80,118.00
TN TN178 Construct streetscape improvements near TN. Theater in Knoxville,
Tennessee
162,521.00 TN178 Knox Co., TN, Intersection Improvement on SR‐169, At Weisgarber Road. 162,521.00
7,210,620.00Engineer, design and construction of connector road from I‐75 interchange
across Enterprise South Industrial Park to SR‐58 in Hamilton County,
Tennessee.
TN156TN
14
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Tennessee
State Demo ID Project Description Amount Demo ID Project Description Amount
ToFrom
TN TN179 SR‐35 near SR‐449 intersection in Sevier County, Tennessee 801,180.00 TN179 Sevier Co., TN, Resurfacing & Safety improvement on SR‐35, from near
Foothills Drive to Fred king lane.
801,180.00
TN TN180 Improving vehicle efficiencies at At‐Grade highway railroad crossing in
Loudon, Tennessee
45,666.80 TN180 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 45,666.80
TN TN183 Improve streetscape and pavement repair in Loudon County, Tennessee 24,378.00 TN183 Knox Co., TN, Safety Improvements on SR‐33, From near Edington Road to
near Doyle Street.
24,378.00
TN TN186 Replace Unitia Bridge in Loudon County, Tennessee 73,134.00 TN186 Loudon Co., TN, Resurfacing & Safety Improvements on SR‐95, From SR‐33 to
SR‐73
73,134.00
TN TN187 Highway railroad crossing grade improvement in Bristol (USDOT #731120J),
Sullivan County, Tennessee.
80,118.00 TN187 Sullivan Co., TN, Resurfacing & Safety Improvements on SR‐126, From SR‐93
to SR‐36.
80,118.00
TN TN188 Improving vehicle efficiencies at At‐Grade highway railroad crossings in
Niota, Tennessee
79,316.60 TN188 McMinn Co., TN, Safety Improvements on SR‐305, From SR‐30 to Mt. Verd
Road.
79,316.60
TN TN189 Develop trails, bike paths and recreational facilities on Brady Mountain for
Cumberland Trail State Park in Cumberland County, Tennessee
186,295.00 TN189 Cumberland Co., TN, Reconstruction of SR‐101, From Lakeview Drive to E. of
Westchester Dr./Catoosa Blvd.
186,295.00
TN TN190 Plan and construct a bicycle and pedestrian trail in Shelbyville, Tennessee 300,236.71 TN190 Williamson Co., TN, Intersection Improvement on SR‐11, At SR‐96. 300,236.71
TN TN191 Upgrade lights/gates/sensor controlling circuitry at the hwy. rail grade
crossing located on Wenasoga Road/FAS8224 in Middleton, in Hardeman
County, Tennessee.
160,236.00 TN191 Hardeman Co., TN, Safety Improvements on SR‐15, From Tate Road to Polk
Street in Bolivar
160,236.00
TN TN192 Design, purchase land and construct sound walls along west side of I‐65 from
approximately 950' south of Harding Place interchange south to Hogan Road
in Davidson County, Tennessee
664,979.00 TN192 Rutherford Co., TN, Interchange improvements on SR‐96, At the I‐24
Westbound Exit Ramp
664,979.00
TN TN194 Construct system of greenways in Nashville, Tennessee 90,289.63 TN194 Rutherford Co., TN, Interchange improvements on SR‐96, At the I‐24
Westbound Exit Ramp
90,289.63
TN TN195 Improve existing two lane highway to a five lane facility on SR‐53, From south
of I‐24 to near Parks Creek Road in Coffee County, Tennessee.
446,930.00 TN195 Coffee County, Tennessee, Resurfacing & Safety Improvements on SR‐16,
From east of SR‐269 to SR‐130/SR‐55.
446,930.00
TN197 Sevier Co., TN, Intersection Improvement on SR‐338 at Pitner Road. 320,000.00TN197 Loudon Co., TN, Resurfacing & Safety Improvements on SR‐95, From SR‐33 to
SR‐73.
1,157,599.80
TN197 McMinn Co., TN, Safety Improvements on SR‐30, From Denso Drive to Park
Street.
320,000.00
TN197 Knox Co., TN, Resurfacing & Safety Improvements on SR‐1, From Towanda
Trail (Sequoya Hills) to SR‐158.
256,147.79
TN199 Monroe Co., TN, Resurfacing & Safety Improvements on SR‐33, From Ramp
at Warren Street to Stinnett Ridge Road
576,800.00
TN199 Blount Co., TN, Intersection Improvement on SR‐115, At Louisville Road 235,800.00TN TN201 North Second Street Corridor Upgrade in Memphis, Tennessee 10,014,750.00 TN201 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to
SR‐385 (Paul Barrett Parkway)
10,014,750.00
TN TN205 Plan and construct Rutherford County Visitor's Center/Transportation
Information Hub in Murfreesboro, Tennessee
315,844.96 TN205 Lincoln Co., TN, Resurfacing & Safety Improvements on SR‐15, From SR‐244
to east of Old Bethel Road
315,844.96
TN TN206 Reconstruct Hermitage Avenue and pedestrian connection in Davidson
County, Tennessee
569,290.65 TN206 Montgomery Co., TN, Intersection improvement on SR‐76, At Fire Station
Road/Vaughn Road in Clarksville.
569,290.65
TN TN208 Plough Boulevard Interchange with Winchester Road in Memphis, Tennessee 2,503,688.00 TN208 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to
SR‐385 (Paul Barrett Parkway)
2,503,688.00
TN TN210 Construct visitor interpretive center at the Gray Fossil Site in Gray,
Tennessee.
182,835.00 TN210 Sullivan Co., TN, Resurfacing & Safety Improvements on SR‐126, From SR‐93
to SR‐36.
182,835.00
2,053,747.79University of Tennessee Joint Institute for Advanced Materials in Knoxville,
Tennessee.
TN197TN
TN199TN 812,600.00College Street Corridor, Phase II, Great Smoky Mountains Heritage Hwy.
Cultural & Visitors Center in Maryville, Tennessee
15
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Tennessee
State Demo ID Project Description Amount Demo ID Project Description Amount
ToFrom
TN215 Montgomery Co., TN, Resurfacing & Safety Improvements on SR‐76, From SR‐
374 to SR‐12
935,370.00
TN215 Cheatham Co., TN, Resurfacing & Safety Improvements on SR‐12, From SR‐
455 to Bruce Bradley Road
834,981.00
TN215 Robertson Co., TN, Resurfacing & Safety Improvements on SR‐161, From SR‐
25 to the Kentucky State line
432,894.00
TN TN218 Warren County Mountain View Industrial Park Access Road in Warren
County, Tennessee
341,207.01 TN218 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐
24, Bridge over Caney Fork River.
341,207.01
TN TN221 Construct interpretive visitor center for the Cherokee Removal Memorial
Park Trail of Tears site in Meigs County, Tennessee
56,937.52 TN221 Rhea Co., TN, Intersection Improvement on SR‐29, At SR‐378 in Dayton. 56,937.52
TN222 Campbell Co., TN, Resurfacing & Safety Improvements on SR‐9, From Stinking
Creek Road to Duff Road
617,820.00
TN222 McMinn Co., TN, Resurfacing & Safety Improvements on SR‐305, From SR‐30
to SR‐2
472,968.37
TN TN225 Construct the Melton Lake Greenway in Oak Ridge, Anderson County,
Tennessee.
66,025.00 TN225 Blount County, Tennessee, Resurfacing & Safety Improvements on SR‐35,
From SR‐115 to north of Ellis Road.
66,025.00
TN TN230 Acquire and construct trail and bikeway along South Chickamauga Creek in
Chattanooga, Tennessee
50,787.00 TN230 Hamilton Co., TN Resurfacing and Safety improvement on SR‐153, From S of
SR‐319 underpass to N. of Grubb Road
50,787.00
TN TN233 Improve streetscape and pavement repair in Maury County, Tennessee 500,738.00 TN233 Williamson Co., TN, Resurface. & Safety Imp. on SR‐6, From Maury CoL to N.
of Thompsons Ridge Road/Buckner Road
500,738.00
TN TN234 Improve streetscape and pavement repair in Lincoln County, Tennessee. 50,787.00 TN234 Lincoln Co., TN, Resurfacing & Safety Improvements on SR‐50, From SR‐273
to SR‐10 in Fayetteville.
50,787.00
TN TN236 Improve streetscape and pavement repair in Smith County, Tennessee. 245,769.95 TN236 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐
24, Bridge over Caney Fork River.
245,769.95
TN237 Humphreys Co., TN, Safety Imp. on SR‐1 & E. Railroad Rd., At Clydeton Rd., N.
Cooley Ave., N. Powers Blvd. in Waverly
194,734.00
TN237 Carroll Co., TN, Bridge Replacement on SR‐424, Bridge over Roan Creek at LM
11.61.
306,004.00
TN TN240 Replace Unitia Bridge in Loudon County, Tennessee 20,315.00 TN240 Loudon Co, TN, Resurfacing and Safety Improvement on SR‐95. From SR‐33‐
to SR‐73
20,315.00
TN TN247 Construct Transportation and Heritage Museum in Townsend, Blount County,
Tennessee.
50,630.58 TN247 Blount Co., TN, Intersection Improvement on SR‐33, At Defoe Circle and Old
Knoxville Pike.
50,630.58
TN TN248 Plan and construct access road for the Overton County Industrial Park in
Overton County, Tennessee
300,442.00 TN248 Smith Co., TN, Bridge Replacement Advance Construction Conversion on SR‐
24, Bridge over Caney Fork River.
300,442.00
TN TN249 Construct system of greenways in Nashville, Tennessee 243,822.99 TN249 Williamson Co., TN, Resurfacing & Safety Improvements on SR‐397, From SR‐
6 to SR‐96 in Franklin.
243,822.99
TN TN250 Improve streetscape and pavement repair in Roane County, Tennessee. 203,059.28 TN250 Meigs Co., TN, Resurfacing & Safety Imp. on SR‐60, From the Hamilton
County line to Horner Hollow Road
203,059.28
TN TN252 Improve streetscape and pavement repair in Morgan County, Tennessee 142,227.08 TN252 Fentress Co., TN, Resurfacing & Safety Improvements on SR‐28, From N. of
Old SR‐28 to S. of Bridge over Dry Branch
142,227.08
TN TN253 Improve streetscape and pavement repair in Fentress County, Tennessee 50,787.00 TN253 Putnam Co., TN, Resurfacing & Safety Improvements on SR‐24, From W. of
Old Kentucky Road to Hitchcock Drive
50,787.00
TN215TN 2,203,245.00Develop intelligent transportation signage for access points at Fort Campbell
in Tennessee
1,090,788.37Construct overpass at Highway 321 and Highway 11 in Loudon County,
Tennessee
TN222TN
500,738.00Improve Streetscape and Pavement Repair in Henry County, Tennessee.TN237TN
16
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Tennessee
State Demo ID Project Description Amount Demo ID Project Description Amount
ToFrom
TN254 Williamson Co., Resurface. & Safety Imp. on SR‐6, From N. of Thompsons
Ridge Road/Buckner Road to S. of SR‐840
535,200.00
TN254 Davidson Co., Resurface. & Safety Imp. on SR‐45, From SR‐24 to N. of ramp
from I‐40 EB
1,176,000.00
TN254 Sumner Co., Resurface. & Safety Imp. on SR‐25, From Halltown Road to West
of Bradford Drive
734,400.00
TN254 Cannon Co., Resurface. & Safety Imp. On SR‐145, From SR‐1 to N. of Locke
Creek Road overpass
300,000.00
TN254 Smith Co., Bridge Replacement Advance Construction Conversion on SR‐24,
Bridge over Caney Fork River
3,263,250.00
TN255 Blount Co., TN, Intersection improvement on SR‐115, At SR‐73 (US‐321, W.
Lamar Alexander Pkwy.)
1,120,000.00
TN255 Knox Co., TN, SR‐115, Widening of SR‐115, From Woodson Drive to Cherokee
Trail Interchange
4,888,850.00
TN TN256 North Second Street Corridor Upgrade in Memphis, Tennessee 2,004,683.00 TN256 Shelby Co., TN, Reconstruction of SR‐14, From east of Old Covington Pike to
SR‐385 (Paul Barrett Parkway)
2,004,683.00
TN TN258 Plan and construct Rutherford County Visitor's Center/Transportation
Information Hub in Murfreesboro, Tennessee
453,260.80 TN258 Rutherford Co., TN, Resurfacing & Safety Improvements on SR‐266, From
Nolan Drive to SR‐102
453,260.80
TN TN259 Warren County Mountain View Industrial Park Access Road in Warren
County, Tennessee
1,002,341.00 TN259 Dekalb Co., TN, Br. Replacement Advance Const. conversion on SR‐56, Br. Ov
Caney Fork River
1,002,341.00
TN TN264 Construct Transportation and Heritage Museum in Townsend, Tennessee. 48,102.00 TN264 Blount Co., TN, Resurfacing & Safety Improvements on SR‐35, From SR‐115 to
north of Ellis Avenue.
48,102.00
Total Amount Repurposed 74,090,597.57Total # of Earmarks Repurposed 99
6,008,850.00Improvements to the Blount/Sevier Corridor in Knoxville to support the South
Waterfront Redevelopment project in Knox County, Tennessee
TN255TN
6,008,850.00Street improvements, streetscape features, signals & signage along 3rd
Avenue North & Union Street in Nashville, Tennessee
TN254TN
17
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Vermont
State Demo ID Project Description Amount Project Description Amount
VT VT001 Vermont Certification of State Procedures Demo 9.24 Essex Junction STP 2956(1) 9.24
VT VT008 Construction of, and improvements to, Route 2 between St. Johnsbury,
Vermont and the New Hampshire State Line
1,397.56 St. Johnsbury BRO 1447(30) 1,397.56
VT VT010 Marsh‐Billings‐Rockefeller Park Pedestrian Walkway, Vermont 297.02 Rockingham ‐ Clarendon NH SURF (49) 297.02
VT VT015 Vermont Covered Bridges 54,882.26 Rockingham‐Clarendon NH SURF(49) 54,882.26
VT VT018 Vermont Police and Fire Academy Training Skid Pad 1,396.51 Rockingham‐Clarendon NH SURF(49) 1,396.51
VT VT028 Pearl Street Bridge, Johnson 122,373.03 Montgomery BHO 1448(42) 122,373.03
VT VT029 Church Street improvements in Burlington 608,236.69 Burlington MEGC M 5000(1) 608,236.69
VT VT032 Essex Junction Downtown Transportation Improvements 151,475.00 Essex Junction STP 2956(1) 151,475.00
Jay BHF 0278(3) 950,000.00
St. Johnsbury BF 7000(20) 1,650,000.00
Johnson BF 0248(4) 1,550,000.00
Johnson BF 0248(7) 950,000.00
St. Johnsbury BRO 1447(30) 521,459.38
VT VT038 St. Lawrence and Atlantic Railroad Upgrades in Northeastern Vermont 507,876.00 St. Johnsbury BRO 1447(30) 507,876.00
VT VT047 Transportation Improvements to Bellows Falls Tunnel 342,954.16 Rockingham‐Clarendon NH SURF(49) 342,954.16
VT VT054 Improvements to the E. Alburg Railroad Trestle Swing Span 481,012.00 Georgia IM CULV(25) 481,012.00
VT VT055 Rehabilitation of Hartford Northbound and Southbound rest areas 223,947.00 Rockingham‐Clarendon NH SURF(49) 223,947.00
VT VT061 Streetscape and road improvements in the Village of Enosburg Falls 102,341.98 Georgia IM CULV (25) 102,341.98
To
5,621,459.38I‐91 Reconstruction at Derby Line, VT Port of Entry.VT034VT
From
18
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
Vermont
State Demo ID Project Description Amount Project Description Amount
ToFrom
VT VT062 Signalization and storm drainage improvements to Main Street in Brattleboro 452,229.98 Rockingham‐Clarendon NH SURF(49) 452,229.98
Total Amount Repurposed 8,671,887.81
Total # of Earmarks Repurposed 15
19
Repurposed Earmarks
FY 2016 3rd Quarter Report to Congress
West Virginia
State Demo ID Project Description Amount Project Description Amount
WV WV036 US Route 33, West Virginia 450,054.00 Pendleton County, WV. US33, resurfacing, Bennett Gap‐Roots Run, CR5/6‐
CR9/5 STP‐0033(389)
450,054.00
WV WV037 US Route 220 Upgrade‐Pendleton county, West Virginia 127,168.00 Pendleton County, WV. US33, resurfacing, Bennett Gap‐Roots Run, CR5/6‐
CR9/5 STP‐0033(389)
127,168.00
Total Amount Repurposed 577,222.00Total # of Earmarks Repurposed 2