US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 1
Agenda Project Goal
Project Scope – Phase 1
Project Information
ORS366.215 Impacts
• Traffic Signal
• Enhanced Crossings
Seeking Mobility Stakeholder’s
Record of Support
Project Goal Improve mobility, access and
safety for motorists, transit riders,
pedestrians and bicyclists on
US20 through Bend, while
upgrading and replacing
infrastructure within the corridor.
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 2
Project Scope – Phase 1
Repaving US20: Mervin Sampels to Greenwood and replace signs
Sidewalks, bike lanes, new curbs and ADA curb ramps on 3rd Street
Enhanced Crossings with Rectangular Rapid Flashing Beacons (RRFBs) @
• 3rd/Vail
• 6th/Greenwood
Enhanced Pedestrian Crossings @
• 3rd/Seward Avenue
• 4th/Greenwood (next phase)
Replacing/Rebuild signals and signs at OB Riley and River Mall.
New signal at US20/Mervin Sampels
Removal of Right Turn Lanes between Mervin Sampels and Butler Mkt
Intelligent Transportation System (ITS) Upgrades
Stormwater/Drainage features
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 3
Project Information Pavement Preservation, Bike/Ped Safety Enhancements, Traffic Signal
Installation/Improvements and ITS Project
US20 is a primary Arterial running through City of Bend
18,300 – 22,900 vehicles/day and 4.7 – 18.6% trucks
Statewide Highway, Federally Designated Truck Route, and Reduction
Review Route on National Highway System
US20/Greenwood section is also a designated Oregon Freight Route
Currently at DAP, PS&E June 2020 and Bid Let July 2020
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 4
ORS366.215 Impacts: Signal @ US20/Mervin Sampels and Rebuilds @ Bend River Mall & OB Riley Installing a new Traffic Signal @ MP 19.03 and replacing span wire signals @ other
2 locations will impact vertical clearance
Existing Conditions: Overhead utility lines @ Mervin Sampels (see photo below)and existing span wire @ rebuilds min 17’-11”
Proposed Change: Minimum 18ftvertical clearance (standard signal height)
US20/Mervin Sampels
US20/Bend River Mall
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 5
ORS366.215 Impacts: Signal @ US20/Mervin Sampels and
Rebuilds @ Bend River Mall & OB Riley Nearby Pinch Point to the South Traffic Signal @ US20/Butler Market (MP 19.35)
Sign Bridge and Bridge Structure near Division St
Vertical Clearances:
New Signal
Nearby Pinch Points
Nearby Pinch Points
Signal Rebuilds
NB ThruLane
NB Thru Lane
NB Left Lane
SB Thru Lane
SB Thru Lane
Exit Lane
US20/Butler Market Signal 18’-7” 18’-2” 18’-10” 18’-11” 18’-11” ----
Sign Bridge 22’-5” 22’-1” ---- 18’-4” 18’-5” 18’-10”
Bridge Structure 22’-2” 21’-2” ---- 19’-7” 17’-10” ----
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 6
ORS366.215 Impacts: Signal @ US20/Mervin Sampels and Rebuilds @ Bend River Mall & OB Riley Nearby Pinch Point to the North Traffic Signal @ US20/Empire (MP 18.80)
US97 SB Exit 135A onto US20 Bridges (MP 134.99 and MP 135.04)
Southbound• Left & Center Thru 17’-4”• Right Thru 17’-8”Northbound• Thru Lanes 18’-1”• Left & Right Lanes 18’-0”
17’-4”
16’-0”
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 7
ORS366.215 Impacts: Removal of Right Turn Lanes between Mervin Sampels and Butler Market Removal of 5 right turn lanes which reduces horizontal clearance at these
locations to match existing curb to curb width of the corridor
• Burger King/Dutch Bros./Chevron • Bend River Mall/Mobil Station
• Sugar Loaf/Conoco Station • OB Riley/Mall Entrance
• Shopko
Proposed Change: Maintain 4 lanes bi-directional
traffic with two-way left turn
lane similar to north and south
Curb to curb of pavement width will be 70 feet wide
Existing Conditions: 4 lanes bi-directional traffic with a
two-way left turn lane and occasional right turn lanes
Curb to curb of pavement where right turn lanes is 86 feet wide
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 8
ORS366.215 Impacts: 3rd @ Vail Crossing (MP 20.22) Installation of a raised pedestrian
refuge island with RRFBs on north
side of 3rd/Vail intersection will
impact horizontal clearance
Existing Conditions• 4 lanes bi-directional traffic with
a two-way left turn lane
• Curb to curb of pavement is
67.5 feet wide
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 9
ORS366.215 Impacts: 3rd/Vail Crossing (MP 20.22) Proposed Changes
• Pedestrian refuge island will be in center median allowing
pedestrians and cyclists to make a two-stage crossing
• Horizontal clearance of 30ft from curb to curb.
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 10
ORS366.215 Impacts: 3rd @ Seward (MP 20.40) Installation of a raised pedestrian
refuge island with marked crosswalk
on north side of 3rd/Seward
intersection will impact horizontal
clearance
Existing Conditions• 4 lanes bi-directional traffic
with a two-way left turn lane
• Curb to curb of pavement is
63.5 feet wide
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 11
ORS366.215 Impacts: 3rd @ Seward (MP 20.40)
Proposed Changes• Pedestrian refuge island will be in center median allowing
pedestrians and cyclists to make a two-stage crossing
• Horizontal clearance of 26ft from curb to curb.
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 12
ORS366.215 Impacts: 6th/Greenwood (MP 0.77) Installation of a raised pedestrian
and bicyclist refuge island with
RRFBs at the intersection of
6th/Greenwood will impact
horizontal clearance
Existing Conditions• 4 lanes bi-directional traffic
with a two-way left turn lane
and bike lanes
• Curb to curb of pavement is
67.5 feet wide
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 13
ORS366.215 Impacts: 6th/Greenwood (MP 0.77) Proposed Changes
• Pedestrian and bicycle refuge island w/RRFB will be in center median
allowing pedestrians and cyclists to make a two-stage crossing
• Horizontal clearance of 28ft from curb to curb.
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 14
ORS366.215 Impacts: 4th/Greenwood (MP 0.0.60) Installation of a raised pedestrian
and bicyclist refuge island with
marked crossing at the intersection
of 4th/Greenwood will impact
horizontal clearance
Existing Conditions• 4 lanes bi-directional traffic
with a two-way left turn lane
and bike lanes
• Curb to curb of pavement is
67.5 feet wide
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 15
ORS366.215 Impacts: 4th/Greenwood (MP 0.0.60) Proposed Changes
• Pedestrian and bicycle refuge island with marked crossings will
be in center median allowing pedestrians and cyclists to make a
two-stage crossing
• Horizontal clearance of 28ft from curb to curb.
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 16
ORS366.215 Impacts:Nearby Horizontal
Clearance Pinch Points North End
21ft to 26ft from edge of
pavement to edge of
pavement
Southeast End30ft curb to curb
US20: Empire-Greenwood (3rd Street, Bend)K20391 US20/3rd MP 19.03-20.99 and US20/Greenwood MP 0.51-1.55 Phase 1
Region 4 – Presentation to Mobility Advisory Committee
July 11, 2019 17
Questions?
Seeking From Mobility Advisory Committee
Record of Support for ORS366.215 Impacts