  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    1/33

    Useof3DLaserScanningDuringUseof3DLaserScanningDuring

    ConstructionConstruction

    StructuralSurveyandFloorFlatnessStructuralSurveyandFloorFlatness

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    2/33

    ProjectIntroduction

    LifeCycleFlowofInformation

    ChangeManagement

    TrimbleProject

    Control

    StructuralSurvey

    FloorFlatness

    Field

    Verifications

    ummary

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    3/33

    KAISER OAKLAND MEDICAL CENTER

    REPLACEMENT HOSPITAL PROJECT

    VIRTUAL DESIGN & CONSTRUCTION

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    4/33

    CONTROL&LAYOUT

    CHANGEMANAGEMENT

    FABRICATION FIELD VERIFICATIONS

    MODELREPOSITORY

    (2D,3D,

    4D,

    5D,

    6D)

    VIRTUALTRADE

    COORDINATIONMODEL

    ASBUILTSURVEYING

    COMMISSIONING

    (IFC,COBie,Models,Database)

    VIRTUALDESIGNMODEL

    CAFMCMMS

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    5/33

    CONTROL&LAYOUTCONTROL&LAYOUT

    CHANGEMANAGEMENTCHANGEMANAGEMENT

    FABRICATION FIELD VERIFICATIONSFIELD VERIFICATIONS

    MODELREPOSITORY

    (2D,3D,

    4D,

    5D,

    6D)

    VIRTUALTRADE

    COORDINATIONMODEL

    ASBUILTSURVEYING

    COMMISSIONING

    (IFC,COBie,Models,Database)

    VIRTUALDESIGNMODEL

    CAFMCMMS

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    6/33

    ModelingtheIdealProcesstoensure

    op m ze

    wor

    ow

    or

    a

    par es

    Providesuniversalconfidenceincurrentstate

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    7/33

    Hospitalsarecontinuallychanging

    Essentialtoplanforchanges

    Owner

    expectations

    of

    incorporating

    changes

    Minimizeimpactstoscheduleandcosts

    pro ects avet mecomponenttoevo v ng a r cat on

    models

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    8/33

    Realigned expectations across project participants

    Better informed and timely decisions

    Prioritization of changes/scope

    Smoother production cycle work flow Incor oration of chan es as the ha en

    Balance limited resources, production and field installation

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    9/33

    Originalanges

    anges

    TeklaConstructionManagementModule

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    10/33

    Aligninteresttoonecommonoutcome

    Providestandardizedtrainingforall,

    addressedrisks

    and

    concerns

    MBCparticipationandsupport,skininthe

    game,garnere rus w su s

    Clear

    path

    of

    transition

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    11/33

    AbsoluteonSite,RelativeonFloor

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    12/33

    Pointsfrom

    the

    sight

    plans

    and

    buildingmodelsaregeneratedinTekla

    Standardizedprogram,GCleadandperformed

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    13/33

    Standardizedprogram,GCleadandperformed

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    14/33

    Providementoring,training,support

    , , ,

    betteraccuracy

    Backcheck subtrades layout,avoidconflict

    FieldverificationsandAsBuilts

    Expandon

    capabilities

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    15/33

    StructureSurvey

    PrePour,PostPour,andPostShoringRemoval

    Monitors dis lacement not

    originalrequirement

    FloorProfileTestin

    ASTM1155M

    FloorFlatness

    FloorLevelness

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    16/33

    Schedule Constructionwellunderway,andcouldnotdelayprogress

    Costs

    Additionalsurveying

    not

    originally

    budgeted,

    exceeded

    contractedscope

    Qualityofsurvey

    Hadto

    be

    equal

    or

    greater

    than

    traditional

    methods

    Experiencelimitedtotraditionalmethods

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    17/33

    TrimbleRealworks todevelopsteelmeasurements

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    18/33

    Accuracyisachievedbyintegrationoftechnologywithprocess

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    19/33

    PrePourandPostPourSurve

    Accuracyisachievedbyintegrationoftechnologywithprocess

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    20/33

    Beamcamber,preandpostplacementofconcrete

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    21/33

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    22/33

    ProjectminimumFFof28,ASTM1155M

    Desi n ConstructionConsiderations

    Slabthickness,

    overloading

    during

    pour

    Grind/FillConsiderations,flooringsubtrade

    Framinganddoorheaderplacement,fixtureplacement

    Qualityof

    final

    conditions

    OwnerSatisfaction

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    23/33

    LocationofTestRuns

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    24/33

    Exceededprojectrequirements,great!Right?

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    25/33

    Createtopo plansofconcrete,exporttoCAD

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    26/33

    Topo WithArchitecturalOverlay

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    27/33

    Interiorbuildoutimpacts

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    28/33

    Qualityofsurveyvalidated

    c e u e re uc onover ra ona

    Traditional3xmoreforPrePour,1.5xPostPour

    Fieldconflict

    mitigation,

    better

    planning

    Enhancedcustomersatisfaction

    Netresult eliminationofwasteincostandschedule,hi hersatis action

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    29/33

    A3ofFieldConflictandResolution BuildingtotheModel

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    30/33

    ASBUILTSURVEYING

    Capturesuper

    accurateAs

    Builts during

    construction

    remodel

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    31/33

    Capturein

    wallconditions

    for

    follow

    on

    facilitiesuse,

    . .

    location

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas

    32/33

    Change Management

    Optimized management of changes

    Control and Layout

    Control of schedule and accuracyFloor Monitoring Program

    Enhanced QC program, higher satisfaction

    Field Verifications Building to model plan, build, verify

  • 7/27/2019 Use of 3D Laser Scanning During Construction - Chris Pechacek - Firas