use of geothermal resources in the azores islands · use of geothermal resources in the azores...

17
Use of geothermal resources in Use of geothermal resources in The Azores islands The Azores islands Green Green Islands Islands : : identify identify means means to to increase increase RES RES penetration penetration in in small small islands islands systems systems

Upload: lamnhu

Post on 05-Dec-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Use of geothermal resources in Use of geothermal resources in

The Azores islandsThe Azores islands

““GreenGreen IslandsIslands””: : identifyidentify meansmeans to to increaseincrease RES RES penetrationpenetration inin

smallsmall islandsislands systemssystems

610 km

Flores

Corvo

Terceira

Graciosa

São Jorge

Faial

PicoSão Miguel

Santa Maria

Azores archipelagoAzores archipelago

MixMix of sources per islandof sources per island

0 100 200 300 400 500

S.Miguel

Terceira

GWh

Fuel Gasóleo

Geotérmica Hídrica

0 10 20 30 40 50 60

S.Maria

Graciosa

S.Jorge

Pico

Faial

Flores

Corvo

GWh

Fuel Gasóleo

Hídrica Eólica

79 % da produ79 % da produçção ão da EDAda EDA

21 % da produ21 % da produçção ão da EDAda EDA

2008

Conceptual model of the geothermal projectConceptual model of the geothermal project

Production wells

Geothermal reservoir

Injection wells

Separation stations

Generation units

Transmission grid

GEO - DOE

ExtractionExtractionofof

geofluidgeofluid

InjectionInjectionofof

effluenteffluent

ConversionConversion ofof energyenergy

GEOTHERMAL GEOTHERMAL →→ ELECTRICELECTRIC

History of geothermal developmentHistory of geothermal development

São MiguelSão Miguel

•• 19741974--1980: Exploration of 1980: Exploration of RibeiraRibeira Grande field, pilot Grande field, pilot plant at Pico plant at Pico VermelhoVermelho (3 MW)(3 MW)

•• 19881988--1994: Development and start1994: Development and start--up of the up of the RibeiraRibeiraGrande plant (5 MW) Finance:Grande plant (5 MW) Finance:POSEIMAPOSEIMA-- energieenergie et et

REGIS IIREGIS II

•• 19961996--2000: Expansion of the 2000: Expansion of the RibeiraRibeira Grande plant Grande plant (to 13 MW)(to 13 MW)

•• 20022002--2006: Development and start2006: Development and start--up of new Pico up of new Pico VermelhoVermelho plant (10 MW) Finance: plant (10 MW) Finance: PRODESA & EIBPRODESA & EIB

New investment projects

20092009--20142014São MiguelSão Miguel

•• 20092009--2010: Drilling of new geothermal wells for production, 2010: Drilling of new geothermal wells for production,

injection and evaluationinjection and evaluation

•• 20102010--2012: Detailed testing of the geothermal wells and fluid 2012: Detailed testing of the geothermal wells and fluid

circulation studiescirculation studies

•• 20112011--2014: Expansion of the Pico 2014: Expansion of the Pico VermelhoVermelho plant (+10 MW) plant (+10 MW)

or development and construction of the new or development and construction of the new CaldeirasCaldeiras plant plant

(12 MW)(12 MW)

Recent evolution

PRODUCTION OF ELECTRIC ENERGY (kWh)

TOTAL RAA

28,4 %16,6 %15,5 %20,1 %20,1 %21,2 %24,5 %19 %

%

Renewables

10.502.72016.397.00614.551.15011.766.13010.253.1604.358.4702.431.3702.189.960WIND

117.639.05083.842.25970.668.75783.969.62088.870.50095.718.600105.288.60079.598.100GEOTHER

MAL

22.710.06029.723.49130.869.66230.408.45529.827.76027.892.59729.748.59219.048.468HYDRO

379.797.768650.353.266633.502.501576.310.414512.286.234472.920.253421.733.779419.245.827THERMAL

530.711.122780.699.610750.076.045702.686.404641.237.654600.889.920559.202.401520.082.355TOTAL

2007 (Jan/ Août)2006200520042003200220012000Annual

values

Geothermal resources on São MiguelGeothermal resources on São Miguel

Ponta Delgada

Ribeira Grande

Vila Franca do Campo

Povoação

Nordeste

Lagoa

SeteSete CidadesCidades

LagoaLagoa do do FogoFogoFurnasFurnas

GEOTHERMAL

Recent development

PICO VERMELHO

RIBEIRA GRANDE

POWER

700 kW 10 MW Nov.2006

2x 2,5 MW in 1994 + 2x 4 MW in 1998

Total power in 2007 – 23 MW

Pico Pico VermelhoVermelho pilot power plantpilot power plant

Pico Pico VermelhoVermelho project areaproject area

RibeiraRibeira Grande power plantGrande power plant

RibeiraRibeira Grande power plantGrande power plant

Geothermal power generationGeothermal power generation

0

20

40

60

80

100

120

140

160

180

200

1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008

Energ

ia pro

duzida (GWh)

Ribeira Grande

Pico Vermelho

Geothermal power contributionGeothermal power contribution

São Miguel 20082008

Hydro

4,4%

Geothermal

38,6%

Fuel

56,9%

São Miguel - renewables

47%25%23%27%31%35 %41%Renewables

16.502.70021.563.53021.826.780 22.935.230 23.439.02020.777.28420.838.662Hydro

117.639.05083.842.25970.668.75783.969.62088.870.50095.718.600105.288.600Geothermal

282.241.595413.136.995400.109.134386.699.705353.827.574330.572.062 304.645.051TOTAL

2007

Jan / Août200620052004200320022001Annual values

Production (kWh)

The future

1- New Geothermal Plant of 12 MW in

Terceira

2 – New Wind Farm of 4,5 MW in

Terceira

3 – New group of 10 MW in central

Geothermal Plant of São Miguel

The objective

Reach about 50 % of RES- electricity production

The strategy

Follow an ideal “ mix ” which allows the maximum use of RES in all ACORES islands.