Use of GGBS Precast Plank with OPC Insitu Concrete Topping in Construction of Semi-Precast Slab Chi Sun POON Department of Civil and Environmental Engineering The Hong Kong Polytechnic University 1

Upload: others

Post on 02-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Use of GGBS Precast Plank with OPC Insitu Concrete Topping

in Construction of Semi-Precast Slab

Chi Sun POON

Department of Civil and Environmental Engineering

The Hong Kong Polytechnic University

1

Page 2: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Outline Background – GGBS in Concrete

Laboratory Scale Casting & Testing

Mechanical Properties

Drying shrinkage – standard prisms testing

Drying shrinkage – slab testing

Bonding strength – pull off testing

Scaled-up Casting & Testing

Load bearing shrinkage

Non-Destructive Testing (NDT)

Bonding strength – cored specimens

Highlights

2

Page 3: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Ground Granulated Blastfurnace Slag (GGBS)

by-product of steel manufacturing

Iron ore + Coke

Sinter

Limestone

Blast

Furnace

16000C

Slag

Molten Iron Alloying Elements

Electric

Arc

Furnace

Steel Ingots

Rolling and Casting

Page 4: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Chemical Composition

Compounds Content (%)

Silicon dioxide (SiO2) 30 - 40

Aluminum oxide (Al2O3) 8 - 18

Calcium oxide (CaO) 40 - 50

Magnesium oxide (MgO) 0 - 8

Ground Granulated Blastfurnace Slag (GGBS)

• Average particle size = 10 - 20 mm

• Surface area = 350-500 m2/kg

• Bulk density = 600 kg/m3

• Specific gravity = 2.9

Physical Characteristics

Particle size distribution

(mm) Dv10

Dv50

Dv90

Dvmean

0.81

9.07

32.36

13.66

Chemical composition (% by

mass)

MgO

Al2O3

SiO2

CaO

6.88

16.9

31.7

40.1

Page 5: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

• Benefit of GGBS:

– increase long-term concrete strength

– lower heat of hydration and reduce cracking

– better water impermeability and improved resistance to corrosion and sulphate attack

extend Service Life and reduce Maintenance Cost

5

Reference:

GEO Report No. 258 – Final Report on Durability

and Strength Development of GGBS Concrete

Page 6: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Properties of GGBS Hardened Concrete

Development of compressive strength of ggbs concrete

Page 7: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Background

7

Housing Authority (HA) encourages the use of GGBS in precast

concrete components (e.g. facades, staircases)

Semi-precast floor slabs investigated

precast base (OPC/GGBS) + in-situ cast upper layer (OPC)

Major issue to be tackled – Compatibility (shrinkage & bonding)

Page 8: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

8

PolyU Consultancy Study for HKHA • Two Series of test were conducted:

1. Laboratory Tests

2. Full-scale Mock-up

A) Three types of concrete were adopted

1. C35 OPC (for Insitu Topping)

2. C45 OPC (for Precast Plank as control)

3. C45 GGBS (for Precast Plank)

B) Five Combinations:

Single concrete type

1. C35 OPC Specimen

2. C45 OPC Specimen

3. C45 GGBS Specimen

Composite concrete:

4. C35 OPC + C45 OPC

5. C35 OPC + C45 GGBS

Page 9: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Mix Proportions Used

kg/m3 L/m3

Concrete type cement GGBS 20mm 10mm crush fine water admixture(D17D) admixture(QL-5)

C45/20 OPC 450 770 325 600

175

(w/c

=0.388)

5.34 litres

C45/20 GGBS 292 158 785 325 585 170

(w/b=0.377 6.86 litres

C35/20 420 690 285 710

205

(w/c=0.488

)

2.52 litres

9

Page 10: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

10

Laboratory Tests Six tests were conducted:

1. 28-day Compressive Strength Test for 100mm x 100mm x 100mm Cube (Normal and Steam Curing)

2. Flexural Test for 150mm x 150mm x 750mm Composite Beams

3. Pull-off for 100mm x 100mm x 60mm Composite Sample

4. Pull-off for coring sample of 45.7mmf on 2m x 1m Composite Panels

5. 56-day Shrinkage for 75mm x 75mm x 285mm Concrete Specimens (Normal and Steam Curing)

6. 90-day Shrinkage for 2m x 1m Composite Panel

Page 11: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

11

1) 28-day Compressive Strength Test • 100mm x 100mm x 100mm Cube

Laboratory Tests

Sample Normal Curing (MPa)

C35 OPC C45 OPC C45 GGBS

1 59.7 71.8 71.9

2 59.5 72.7 70.7

3 57.7 73 72.6

mean 59.0 72.5 71.7

Sample Steam Curing (MPa)

C35 OPC C45 OPC C45 GGBS

1 -

65.5 71.1 2 64.4 70.7 3 66.3 67.4

mean - 65.4 69.7

Page 12: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

12

2) 28-day Flexural Strength Test • 150mmx150mmx750mm Composite Beam

Laboratory Tests

Sample C35 OPC+C45 OPC C35 OPC+C45 GGBS (MPa)

1 6.01 5.91 2 6.32 5.93 3 5.57 6.21 4 5.61 6.98

mean 5.88 6.26

75mm

75mm

150mm

150mm

C35 OPC

C45 OPC / C45 GGBS

C35

OPC

C45

OPC /

C45

GGBS

A

A

Section A-A 150mm 150mm 150mm 150mm

Load

Page 13: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

13

3) Pull-off Strength • 100mm x 100mm x 60mm Composite Sample

Laboratory Tests

Sample C35 OPC+C45 OPC C35 OPC+C45 GGBS MPa MPa

1 2.43 C45 OPC 2.03 C45 GGBS 2 2.37 C45 OPC 2.19 C35 OPC 3 2.33 C45 OPC 1.78 C45 GGBS 4 2.13 C45 OPC 1.75 C45 GGBS 5 2.17 C45 OPC 2.11 C45 GGBS 6 2.28 C45 OPC 1.91 C45 GGBS 7 1.96 C45 OPC 1.7 C45 GGBS

Mean 2.24 1.92

30mm

30mm

100mm

C35 OPC C45 OPC /

C45 GGBS

Pull-out load

Page 14: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

14

4) Pull-off Strength • 45.7mmf on 1m x 2m Composite Panel

Laboratory Tests

Sample C35 OPC+C45 OPC C35 OPC+C45 GGBS

MPa MPa 1 2.19 at C45 2.36 at C35 2 2.78 interface 2.27 at C35 3 2.33 at C45 1.52 at C35 4 2.51 at C45 1.86 interface 5 2.23 interface 1.83 interface 6 2.38 at C45 2.33 at C35 7 2.99 at C45 2.01 at C35

Mean 2.49 2.03

Page 15: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

15

5) 56-day Shrinkage • 75mm x 75mm x 285mm Concrete Specimens

Laboratory Tests

Sample Strain (10-6)

Normal Curing

Steam Curing

C35 OPC 411 -

C45 OPC 356 325

C45 GGBS 309 301

Page 16: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

16

6) 90-day Shrinkage • 2m x 1m Composite Panel

Laboratory Tests

Sample Strain (10-6)

C35 OPC+C45 OPC C35 OPC+C45 GGBS

C35 OPC 492 298

C45 OPC 340 -

C45 GGBS - 155

Difference 152 143

Page 17: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

17

Laboratory Tests

Test Concrete Grade

C35 OPC

C45 OPC

C45 GGBS

C35 OPC + C45 OPC

C35 OPC + C45 GGBS

1 28-day Compressive strength (MPa)

normal curing

59 72.5 71.7 - -

steam curing - 65.4 69.7 - -

2) 28-day Flexural Strength (MPa)

- - - 5.88 6.26

3) Pull off strength for 100mm x 100mm x 60mm (MPa)

- - - 2.24

(No Interface Failure)

1.92 (No Interface

Failure)

4) Pull off strength 2m x 1m Composite Panels (MPa)

- - - 2.49

(Interface Failure = 2 of 7)

2.03 (Interface

Failure = 2 of 7)

5) 56-day Shrinkage (10-6)

normal curing

411 356 309 - -

steam curing - 325 301 - -

6) 90-day Shrinkage (10-6) - - - C35 OPC: 492 C45 OPC: 340

Diff: 152

C35 OPC: 298 C45 GGBS: 155

Diff: 143

Summary:

Page 18: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

18

Laboratory Tests 1. Compressive strength:

a. Normal Curing: C45 OPC > C45 GGBS (72.5MPa vs 71.7 MPa)

b. Steam Curing: C45 OPC < C45 GGBS (65.4MPa vs 69.7 MPa)

2. Flexural strength:

• OPC+OPC < OPC+GGBS (5.88MPa vs 6.26MPa)

3. Pull off tests (Specimens):

• OPC+OPC > OPC+GGBS (2.24MPa vs 1.92MPa)

• No Interface Failure

4. Pull off tests (Panel):

• OPC+OPC > OPC+GGBS (2.49MPa vs 2.03 MPa)

• Interface Failure = 2 of 7 for both OPC and GGBS Panels

5. Shrinkage:

a. Normal Curing: C45 OPC < C45 GGBS (356x10-6 vs 309 x10-6)

b. Steam Curing: C45 OPC < C45 GGBS (325x10-6 vs 301 x10-6)

6. Differential Shrinkage:

• OPC+OPC vs OPC+GGBS (Same order) (152x10-6 vs 143 x10-6)

Page 19: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

19

Full-scale Mock-up

• Based on the laboratory tests, the differential shrinkage

did not have significant effects on the interfacial bond of

OPC+GGBS

• Full scale mock-up was recommended to further verify

the technical viability under the actual loading and

workmanship on site

Plan View of Mock-

up

Page 20: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Full-scale mock up monitoring

20

Page 21: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

21

Full-scale Mock-up

• Six tests were conducted:

1. 28-day Compressive Test for 100mm x 100mm x 100mm Cube

2. 56-day Drying Shrinkage of Concrete Prism

3. 180-day Drying Shrinkage of Mock-up Panels

4. Deflection of Panels

5. Pull-off Test for through core

6. Ultra Pulse Velocity (UPV) Test

• Similar to laboratory test, 3 types of

concrete and 5 different specimens were

adopted.

• Design Load on the semi-precast slab:

1. Partition Load = 2.14kPa

2. Finished Load = 0.84kPa

3. Live Load = 2.0kPa Section A-A

Page 22: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Full-scale mock up monitoring

22

Date Works Description

18/07/2016 Casting of bottom layer (C45OPC & C45GGBS)

25/07/2016 Casting of upper layer and upper wall (C35OPC)

26-27/07/2016 Installation of strain gauges at both sides of the top and bottom slabs

05/08/2016 Removal of supporting racks

12/08/2016 Installation of 2 strain gauges at mid-span and 1/4L on bottom of both slabs

26/08/2016 Setup of 2 dial gauges at mid-span on bottom of both slabs

17/06/2017 After one year casting, applied 4.98kPa (5.5 ton) loading

29/9/2017 Carrying out the first Ultrasonic test

15/12/2017 Carrying out the second Ultrasonic test & removal of load. The strain and deflection

were measured before unloading

22/12/2017 Conducting 12 pcs through cores for two panels

08/01/2018 Conducting Pull off test of cores (total 12 pcs at PolyU)

Page 23: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

23

1) 28-day Compressive Strength Test • 100mm x 100mm x 100mm Cube

Full-scale Mock-up

Sample Compressive Strength

(MPa)

C35 OPC 59.3

C45 OPC 72.5

C45 GGBS 79.4

Page 24: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

24

Full-scale Mock-up

Sample Strain (1x10-6)

C35 OPC 417

C45 OPC 461

C45 GGBS 529

2) Drying Shrinkage of Concrete Prisms

Page 25: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

25

Full-scale Mock-up

3) 180-day Shrinkage

Sample Strain (10-6)

C35 OPC + C45 OPC C35 OPC + C45 GGBS

C35 OPC -53 11

C45 OPC -2 -

C45 GGBS - 66

Difference 51 55

Note:

Negative means

shrinkage

Positive means expansion

Page 26: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

26

Full-scale Mock-up 4) Deflection at mid-span

Sample Deflection (mm)

C35 OPC+C45 OPC 1.4410

C35 OPC+C45 GGBS 2.1055

• Design Load on the semi-precast

slab:

1. Partition Load = 2.14kPa

2. Finished Load = 0.84kPa

3. Live Load = 2.0kPa

Total = 4.98kPa

Page 27: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

27

Full-scale Mock-up

5) Pull-off test for through core Sample

C35 OPC+ C45 OPC C35 OPC+ C45 GGBS

MPa MPa 1 0.553 C35 1.814 C35

2 0.999 C35 1.251 C35

3 1.337 C35 2.070 C45

4 1.731 C45 1.187 interface fail

5 1.567 C35 1.645 interface fail

6 1.416 C35 1.286 interface fail

Mean 1.267 1.542

Page 28: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

28

Full-scale Mock-up

6) Ultra Pulse Velocity (UPV) Test

• UPV test: based on BS EN 12504-4 and

ASTM C597-16 (BSI, 2004; ASTM, 2016)

• Results: No delamination was detected

Page 29: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

Test Concrete Grade

C35 OPC

C45 OPC

C45 GGBS

C35 OPC + C45 OPC

C35 OPC + C45 GGBS

1) 28-day Compressive strength (MPa)

59.3 72.5 79.4 - -

2) 56-day Shrinkage of concrete prism (10-6)

417 461 529

3) 180-day Shrinkage of concrete prism (10-6)

- - - C35 OPC: -53 C45 OPC: -2

Diff: 51

C35 OPC: 11 C45 GGBS: 66

Diff: 55 4) Deflection (mm) - - - 1.4410 2.1055

5) Pull off strength (Panel) (MPa)

- - - 1.267

(No Interface Failure)

1.542 (Interface

Failure = 3 of 6)

6) Ultra Pulse Velocity (UPV) Test

- - - No

delamination No delamination

29

Full-scale Mock-up Summary:

Page 30: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

30

Full-scale Mock-up 1. Compressive strength:

• C45 OPC < C45 GGBS (72.5MPa vs 79.4 MPa)

2. Shrinkage:

• C45 OPC < C45 GGBS (Same order) (461x10-6 vs 529 x10-6)

3. Differential Shrinkage:

• OPC+OPC vs OPC+GGBS (Same order) (51x10-6 vs 55 x10-6)

4. Deflection:

• OPC+OPC < OPC+GGBS (1.441mm vs 2.1055mm)

5. Pull off tests:

• OPC+OPC < OPC+GGBS (1.267MPa vs 1.542MPa)

Interface Failure = 3 of 6 for OPC+OPC

No Interface Failure for OPC+GGBS

6. Ultra Pulse Velocity (UPV) Test:

• No lamination detected

Page 31: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

• The structural performance of OPC+GGBS system was in general similar to that of OPC+OPC system.

• There is no delamination between the two layers of OPC + GGBS concrete and no significant differential shrinkage.

• Some interface failures in the core test in both laboratory and full scale mock-up, the average strength of OPC+GGBS was higher than OPC+OPC system in the pull-off test in full scale mock-up.

• Given to the above test results, GGBS precast plank can be safely adopted in the construction of semi-precast slab in HA’s building.

31

Conclusion

Page 32: Use of GGBS Precast Plank with OPC Insitu Concrete ...Secure Site 2019/06/22  · 1. C35 OPC (for Insitu Topping) 2. C45 OPC (for Precast Plank as control) 3. C45 GGBS (for Precast

32

Thank You! Email: [email protected]