using a collaboration platform to manage inspections on an ... panel 10-denerolle.pdfcapture and...
TRANSCRIPT
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Using a collaboration platform to manage inspections on an IPD project.
Thursday, October 19th 2017
Stéphane Denerolle, FieldwireJames Pease, Sutter Health
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
About us
2
James Pease, Sutter Health (Regional Manager)Editor: http://leanipd.comUC San Diego BS
Stéphane Denerolle, Fieldwire (Product Development)Ex-Bouygues Innovation, Ex-DPR PEBerkeley MS CEE, Ecole Polytechnique BS Engineering
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Agenda
3
1. Project Details & Problem Statement
2. Roll-out of collaboration platform
3. First Results & Future State
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Project Details & Problem Statement
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Sutter Roseville Medical Center (SRMC) Expansion
5
§ Contract value: ~$112M
§ 4 year duration (2016 – 2020)§ 99,000 sq.ft.; 3 levels
§ Triage rooms – 7§ ED Exam rooms – 35§ ICU rooms – 24§ Cath Labs – 3
§ IPD project
§ Co-located construction trailer with all design, construction & owner personnel (approx. 50 people onsite)
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
The Permitting Process
6
• OSHPD• 6 Increment Permits (New Building)• 5 Separate Remodel Permits
• City of Roseville• 4 Utility Permits• 1 Building Permit
• OSHPD / City of Roseville• Overlapping Inspections of Permits
• PGE • Electrical and Gas Utility Permits
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Multiple Jurisdictions - Negotiations
7
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Inspections – Developing a process
8
• Team collaboratively develops a process• Design Team• Construction Team• Inspector of Record
• Fieldwire Partnership Proposal• Plan Viewer• Tasks Linked to Plans (like RFIs)• Inspections Linked to Plans• Color Ups of Approved Areas
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
LCI CONGRESS PRESENTATION STYLE GUIDERoll-out of collaboration platform
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Background on Fieldwire
10
§ Started in 201325 employees in San Francisco
§ Core use cases:ØMobile plan viewingØTask managementØ Issue tracking
§ Available on web, iOS and Android
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Current State: using Fieldwire to manage inspections
11
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Step 1: GC plans the inspection request (IR)
12
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Step 2: GC prefills the IR
13
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Step 3: GC notifies the inspector of record (IOR)
14
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Step 4: IOR inspects work
15
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Step 5: IOR fills out the form
16
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Step 6: GC verifies the IR
17
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
LCI CONGRESS PRESENTATION STYLE GUIDEFirst Results & Future State
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
First Results
19
Total IR Open Approved Approved as noted
Not approved
Passed first time
Average turnaround
(days)
Increment #1 (March - October 2017) 195 0 185 9 1 98% 3.8
Increment #2 (June - October 2017) 45 2 40 2 1 98% 6.5
Increment #6 (April - July 2017) 24 0 24 0 0 96% 10.0
Inspection Requests (IR) data, as of Oct. 5, 2017.
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
What’s Working Well
20
• Ability to assign inspections to different members of the team (from trade partner to general contractor to IOR) – extremely useful – always know whose court it is in.
• Ability to type notes in the task (inspection) for various reasons. • It is nearly impossible to forget about an
inspection that does not pass, as the status should not go to “complete” or “verified” if not passed.
• Fieldwire team is continuing to work with the team to implement features we see necessary or useful.
• 5AM Monday Reminders of Open Inspections
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Lessons learned
21
• Have to import Inspection Request Forms• Have to open in third party PDF viewer to see
markups (on mobile version).• The numbering system is easily messed up – should
not be up to user to create the consecutive number. Does not allow you to delete once created, without messing up numbering. The numbering is actually one of the largest hurdles.
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
Future improvements
22
• Have the trade partners issue the inspection request to GC through Fieldwire.
• Product improvements for the project:• Custom forms• Improved data analytics & metrics
• The program allows us to pull a lot of data, just not necessarily useful data to create charts. Some useful data stats would be related to: Approved first try, Approved, Approved with comments, Not Approved, sorted by week, month, year, contractor, etc.
© LEAN CONSTRUCTION INSTITUTE
C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E
In the spirit of continuous improvement, we would like to remind you to complete this session’s survey in the Congress app! We look forward to receiving your feedback.