USING BIM TO CLOSE THE PERFORMANCE GAP

Upload: others

Post on 12-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

USING BIM TO CLOSE THE PERFORMANCE GAP

Page 2: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Introduction

Page 3: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

There is a gap in performance!

There is a mismatch between the expectations around the performance of new buildings and the reality of utility bills. This difference between expected and realised energy performance has come to be known as the « performance gap »

Page 4: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

There is a gap in performance!

There are many reasons for this: 1. Building energy modelling difficulties during design

2. Changes to the specification during construction

3. Squeezed commissioning period leading to incomplete work

4. Unanticipated occupant behaviour or changes in building use

Page 5: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Strategies

Make more realistic expectations Build closer to design

Actual Building

BEM Actual Building

BEM

Page 6: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Agenda

1. BIM and design (BEM) a) Using BIM to populate BEM b) Feeding back BEM results to BIM

2. Updating BEM with BMS (model calibration)

3. Improving actual building with BEM conclusions

4. Using newly acquired knowledge for design

Building Energy Model

Building Management System

Page 7: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

BIM and Design

Page 8: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

VIRTUAL ENVIRONMENT

Page 9: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

BIM 4 Analysis

Actual Building

BEM BIM

Page 10: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

BIM 4 Analysis

gbXML,

Excel

Page 11: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

BIM 4 Analysis

Page 12: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Model calibration

Page 13: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly
Page 14: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly
Page 15: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly
Page 16: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Model calibration

Page 17: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Model calibration

Goes up to 65% in offices

30% Reduction in Lighting Load

Goes up to 65% in offices

62% Reduction in Equipment Load

Page 18: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Model calibration

The combined impact of the actual equipment on the annual boiler energy compared with the Compliance profiles is shown below

Compliance model predicted 34% less heating energy when compared to the calibrated model

Page 19: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Bridging the Discrepancy

Dynamic Simulation Model + Operational Data

Actual Building

Gap between predicted and actual performance can be closed

to 5-10%

Page 20: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

• Measured consumption data compared to results from initial Enhanced Model

• Electricity Usage from Motor Control Centres (MCCs) and per floor panels & Half Hourly gas data

• Simulation parameters in the Enhanced Model were tweaked to provide a close match to measured consumption

Simulated Electrical Consumption against measured electrical consumption – Nov 2015.

Case study: NHS Trust in London

Page 21: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Case study: NHS Trust in London

End Use CVRMSE NMBE

Electricity (Monthly) 2.1 -0.4

Electricity (Hourly) 14.3 -0.8

Gas (Monthly) 8.6 0.4

HVAC (Monthly) 6.1 -3.4

Small Power (Monthly) 2.5 2.2

Model calibrated to a Monthly level, but IES was also able to calibrate the Electricity to an Hourly level

Benchmark Model Results

ASHRAE Guideline 14: Model is “calibrated” when the Coefficient of Variance Root Mean Square Error (CVRMSE) is below 15% and Net Mean Bias Error (NMBE) is ± 5% for monthly calibration. If hourly calibration data is used, these requirements shall be 30% and 10% respectively.

Page 22: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Improving actual building

Page 23: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

• Identify underperforming parameters

• Detect faults

• Test possible improvements (retrofit)

Using Calibrated BEM

Page 24: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Build deeper knowledge

Page 25: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

• To make better BEM at design stage

• Occupancy

• Equipment

• Imperfect controls

• To investigate so far neglicted improvement areas

Using acquired knowledge

Page 26: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

SUMMARY

Page 27: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Using BIM to close the performance gap • BIM is used to populated initial BEM

• BEM updates BIM on critical points

• BMS used to calibrate BEM

• Calibrated BEM used to control building operation, investigate options for

improvements

• More reliable information used for initial BEM at design stage

Page 28: USING BIM TO CLOSE THE PERFORMANCE GAPb) Feeding back BEM results to BIM 2. Updating BEM with BMS (model calibration) 3. Improving actual building with BEM conclusions 4. Using newly

Johan Haeberle

[email protected] +33 610 533 265 www.iesve.com www.iesve.com/DiscoverIES