Using NERC’s SAFNRv2
Application to Maintain
Situational Awareness
Sam Chanoski, Manager of BPS Awareness
12th International Workshop on Electric Power Control Centers
June 4, 2013
2 RELIABILITY | ACCOUNTABILITY
Agenda
• NERC’s Bulk Power System Awareness Group
• What We Do
• What We DON’T Do
• How We Do It
• SAFNRv2 – About
• SAFNRv2 – Capabilities
3 RELIABILITY | ACCOUNTABILITY
BPSA - What We Do
• Monitor conditions affecting the bulk power system • Operational • Weather • Other (droughts, space weather, cyber and physical
security, wildfires, fuel supply, labor issues, industry trends, policy)
• Identify and communicate possible near term threats to the continued reliable operation of the BPS
• During crisis events, facilitate communications • Common Operational Picture with the Regions and RCs • Inform government agencies • Work with ES-ISAC to support their government sector
coordination
4 RELIABILITY | ACCOUNTABILITY
BPSA - What We DON’T Do
• Operate
• Control
• Intervene in anyone’s real-time operations
• Anything involving compliance
• 24/7 shift work
• Stare at screens waiting for something to happen
5 RELIABILITY | ACCOUNTABILITY
BPSA - How We Do It
• Analysis of a high volume of disparate and sometimes conflicting information
• Human SMEs provide the “so what?” from the tools’ data • Inherently an art and a science
• Learn something from every report and every event to build organizational memory
• Lots of automated tools…
6 RELIABILITY | ACCOUNTABILITY
SAFNRv2: About
• Three distinct components
• Sharepoint-based home page
• PowerWorld Retriever-based Visualization Client
• eDNA Trending Client
• >200kV transmission facilities, >500 MW generators
• MW, MVAR, bus voltages (maintains 7-day history)
• ICCP data streams from Reliability Coordinators
• Not a conventional power system model
• No individual substation topologies
• No state estimation or contingency analysis capability
7 RELIABILITY | ACCOUNTABILITY
SAFNRv2: Voltage Contour
US voltage contour (200kV+), May 29, 2013, 1116 EDT
8 RELIABILITY | ACCOUNTABILITY
SAFNRv2: Details
Pittsburgh, PA - May 29, 2013, 1119 EDT
9 RELIABILITY | ACCOUNTABILITY
SAFNRv2: Line Trending
Jacksons Ferry-Broadford 765kV line outage, May 27, 2013
10 RELIABILITY | ACCOUNTABILITY
SAFNRv2: Voltage Trending
Chief Joseph Power Station 500kV Bus Voltage, May 29, 2013
11 RELIABILITY | ACCOUNTABILITY
SAFNRv2: WECC Paths
WECC Rated Paths (200kV+), May 29, 2013, 1330 EDT
12 RELIABILITY | ACCOUNTABILITY
Questions
Sam Chanoski
Manager, BPS Awareness
w: 404-446-9706
c: 404-904-2480