Page 1: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Using PIUsing PIas aas a

Transitioning Tool to RTPM Transitioning Tool to RTPM

A presentation by Calpine Geothermal for A presentation by Calpine Geothermal for the 2004 OSI Users Conferencethe 2004 OSI Users Conference

Page 2: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Introducing - Calpine GeysersIntroducing - Calpine Geysers

Page 3: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

1922 - First Electrical Generation From Geothermal Steam in the U.S.

First Electricity Generated at First Electricity Generated at GeysersGeysers

Page 4: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

1960 - Pacific Gas and Electric Company Begins Commercial Operation of the First Geothermal Electric Generating Station Run by a Utility in the U.S.

Commercial Operations Begin

Page 5: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Geysers Becomes Largest Geothermal Geysers Becomes Largest Geothermal Power FacilityPower Facility

• 1973

The Geysers Becomes the Largest Geothermal Power Facility in the World, Surpassing Larderello, Italy

• 1984

Calpine Founded

Page 6: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

1989 – Calpine Acquires 5% Interest in the 20-mw Aidlin Plant (First Megawatt)

Calpine Acquires First Megawatt

Page 7: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

By 2000 Calpine had Acquired Freeport McMoRan’s, Thermal’s, Unocal’s, PG&E’s, SMUD’s, FPL’s and Mission Energy’s Interests in Plants and Wells at the Geysers

Calpine Expands Interest

Page 8: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

The Geysers TodayThe Geysers Today

• 21 Power Plants

• 425 Production Wells, 53 Injection Wells

• 30 Square Miles in Lake and Sonoma Counties

• Approx 350 Employees

Page 9: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

The Geysers Geothermal FieldThe Geysers Geothermal Field

Page 10: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

ObjectivesObjectives

• Integrate Operations and Processes developed by five different companies without disruption

• Automate and streamline processes where possible to increase accuracy, reduce cost, decrease delay of information, and increase information access for Decision Makers

• Develop and Implement an Integrated Centralized Operations Capability for all Generation and Production Assets

Page 11: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Original SituationOriginal Situation

Calpine Information Services

SCADA

Calistoga

TANAO

Honeywell System13&16 Steam Field Data

AidlinWFF

DNA

USRS

Steam ProdData

exported totext

Steam Prod Dataimported intospecial apps

Results ofdata reviewexported to

text

Plant GenerationData

MW Data fromCal, WFF, BC

Steam Field Data

MW Data fromSon, Aid

Manual Data InputUnit Events andOperations Log

Unit MWand KWH

Data

RoyaltySystem

Steam ProdData exported

to text &manually

transferred toLAN

Manual Entry Injection Data Other Data

Remaining Royaltypayment processes

handled thru externalspreadsheets and text

files

SQL Server dB RMR Warehouse APX Invoicing

Marketing InformationData Sources: ISO, APX & ADSapplication. Imported using localapps.

Air Emissions datamanually entered

Steam ProdData

importedinto Excel

BC

Steam Prod Data enteredinto Excel spreadsheets

ETGraphic Displays

Trending

CH

EM

DB

AC

CE

SS

ADS Application

ADSResponse

Files

NERC/GADSInformation Entered

Manually

NE

RC

Da

tab

ase

InC

olo

rad

o

VariousAccess DB’s

Page 12: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

ChallengesChallenges

• Multi-Vendor Environment

• Must Not Disrupt Data Flow or Accuracy

• Processes must be approved by outside Agencies

• Training and Operational Understanding

• Collection and Reporting Systems are Changing

Page 13: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Keys to SuccessKeys to Success

• Reliability

• Accessibility

• Solid Communication Infrastructure

• Central Repository

• Easy to Use

• Customizable

• Flexible

Page 14: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Solution PISolution PI

• Used initially as a bridge between data collection and SCADA to reporting systems

• Transition to the Central Data Repository

• Not a SCADA or DCS System!– Used for Historical Data

Page 15: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

ProcessProcess

• Implemented PI server in between the data collection systems and the reporting systems

• Develop non-standard PI interfaces if required

• Created Process Book Displays to mimic existing Operational Displays

• Redirect Reporting Systems to retrieve data from PI

Page 16: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Interim SolutionInterim Solution

SCADA

Calistoga

TANAO

Honeywell System13&16 Steam Field Data

DNA

USRS

Steam Prod Data exported

to text

Steam Prod Data imported into special

apps

Results of data

review exported

to text

Manual Data Input

Unit Events and Operations Log

Unit MW and KWH

Data

Royalty System

SQL Server dB· RMR Warehouse· APX Invoicing

Marketing InformationData Sources: ISO, APX & ADS application. Imported using local apps.

Air Emissions / Chemical data some manually

entered

CH

EM

DB

AC

CE

SS

ADS Application

ADS Response

Files

NERC/GADS Information Entered

Manually

NE

RC

D

atabase

In C

olorado

OSI PI

Intellution

Graphic DisplaysTrending

Data Retreval

AidlinBailey

WFFBailey

BCBailey

Developed Driver

Various Access

DB’s

New PLC’s

OPC Server

Page 17: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensOLD

Page 18: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensNEW

Page 19: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensOLD

Page 20: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensNEW

Page 21: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensOLD

Page 22: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensNEW

Page 23: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensOLD

Page 24: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Sample ScreensSample ScreensNEW

Page 25: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Next StepsNext Steps

• Retire Legacy Systems• Transition PI from Data Bridge to Total

Data Repository• Automate while Maintaining Data

Accuracy• Import Legacy Data• Remember Don’t Break Anything!!!!

Page 26: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Data Accuracy IssuesData Accuracy Issues

• Historically some data verification

wasn’t accomplished

until the Analyze and Distribute Phases on a

Monthly basisGather

Assign Context

Analyze

Distribute

Visualize

Act

Page 27: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Data Accuracy SolutionData Accuracy Solution

• To obtain desired accuracy level all

data must be initially checked as close to the

Gather stage as possible!

Gather

Assign Context

Analyze

Distribute

Visualize

Act

Page 28: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Today’s SnapshotToday’s Snapshot

Calistoga

Honeywell System13&16 Steam Field Data

USRS

Development

Manual Data Input

Unit Events and Operations Log

Royalty System

SQL Server dB· RMR Warehouse· APX Invoicing

Marketing InformationData Sources: ISO, APX & ADS application. Imported using local apps.

Air Emissions / Chemical data some manually

entered

CH

EM

DB

AC

CE

SS

ADS Application

ADS Response

Files

NERC/GADS Information Entered

Manually

NE

RC

D

atabase

In C

olorado

Geysers PIServer

Intellution

Graphic DisplaysTrending

Data Retreval

AidlinBailey

WFFBailey

BCBailey

Historical Access DB

New PLC’s

OPC Server

Calpine Corporate Pi Servers

Page 29: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Current SnapshotCurrent Snapshot• PI Tag count = 10,320

• Average Scan Rate = 5 Seconds

• PI interfaces – DCS to PI– PI to PI collecting data into PI test server from PI production

• Archives– Count = 204– Date Range = From Jan 1, 1990 to present (includes data

backfilled from production archives)

Page 30: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Future VisionsFuture Visions

• Assign Context – Transition to Modular Database

• Analyze & Distribute– Transition PI from One to Many Data Bridge to Total

Data Repository– Continue to Automate while Maintaining Data

Accuracy

• Visualize– Increase Accessibility and Flexibility of Reporting

Tools (WEB Based)

Page 31: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Future VisionFuture Vision

DCS Systems

Manual Data Input

Unit Events and Operations Log

Royalty System

Non-DCS &

Manual Information

SQL Server dB· RMR Warehouse· APX Invoicing· Summary Data

ADS Application

Ca

lpin

eN

ER

C

Da

taba

se In

Co

lorad

o

Geysers PI Server

Intellution

Graphic DisplaysTrending

Data RetrevalReports

ISO

Geysers IntranetWEB Based Information

Agency Reports

Corporate PI Servers

Page 32: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

Observed Benefits - ACTObserved Benefits - ACT

• Ability to see the whole picture with one view• Ability to View Geothermal Plants as part of the

entire Calpine Fleet• Able to quickly react to changing conditions in

resources or market ($$$)• Able to improve performance and monitor or

improve environmental effects while reducing cost of operations

• Enable decision-makers to make more informed decisions

Page 33: Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for

SummarySummary

• PI met our needs based on our requirements

• PI not only allowed us to transition but also positioned us to reap further benefits for years to come utilizing the exact same technology.