USPS TECHNICAL CONFERENCE
PRESENTATION
OCTOBER 21, 2016
1
Postal Regulatory CommissionSubmitted 11/28/2016 4:29:15 PMFiling ID: 97967Accepted 11/28/2016
®
2
Flats Processing Impacts to Cost and Service
*Source: PRC ACD Report FY2015 -- page 166
®
3
Factors Contributing to Cost and Service Issues
1. Bundle Processing
2. Low Productivity on Automated Equipment
3. Manual Sorting
4. Productivity and Service Issues in Allied Operations
5. Increased Transportation and Cost
6. Last Mile / Delivery
®
4
1. Bundle Processing
AFSM100APPS/APBS/SPSS
FSS
pallets sacks
staging
SAMP
Flat Mail Prep
(AI/035)
Manual Bullpen/
Opening Unit
Manual Cases
DBCS
rejects
rejects
Post Office/BMEU
Co-located
BMEU
Non
Co-located
Current Service Performance Diagnostics measure cycle times, of bundles, observed through scanning and USPS automation equipment.
dispatch
Elapsed time from
Acceptance scan to
Container Distributed
scan at Delivery Unit
To Bundle
Sorter and
Automation
Piece
Processing
DDU
Entry
DMU
Mailer
In/Out
of Manual
Elapsed
Time from
Entry to
Bundle or
Piece scan
®
5
Data currently provides insights into the percentage of bundle breakage by class, entry location, and mailer.
Logic: A bundle is deemed broken if multiple pieces from a single eDoc bundle are scanned on APPS/APBS
1. Bundle Processing
AFSM100APPS/APBS/SPSS
FSS
pallets sacks
staging
SAMP
Flat Mail Prep
(AI/035)
Manual Bullpen/
Opening Unit
Manual Cases
DBCS
rejects
rejects
dispatch
Currently available, only for Full-Service mailers, providing associated tray and bundle IDs through eDoc.
In September 2016, 61% of all flats entered were full service
Potential to add Bundle
Breakage metric on
Mailer Scorecard (Full
Service)
Potential to apply
similar logic for Non-Full
Service mailings with
electronic manifest and
accurate nesting
Post Office/BMEU
Co-located
BMEU
Non
Co-located
DMU
Mailer
®
6
Can produce a metric based on weighted median throughput and work hours leveraging End-of-Run and Management Operating Data System (MODS)
BMEU
DU
No
n C
o-lo
ca
ted
2. Low Productivity on Automated Equipment
pallets sacks
staging
SAMP
Flat Mail Prep
(AI/035)
Manual Bullpen/
Opening Unit
Manual Cases
rejects
rejects
DDU
allied
allied
allied
distribution
dispatch
Co-located
FSS
AFSM100APPS/APBS/SPSS
DBCS
Measured
throughput
against
work hours
®
7
3. Manual Sorting
AFSM100APPS/APBS/SPSS
FSS
pallets sacks
staging
SAMP
Flat Mail Prep
(AI/035)
Manual Bullpen/
Opening Unit
Manual Cases
DBCS
rejects
rejects
Post Office/BMEU
Co-located
BMEU
Non
Co-located
dispatch
DMU
Mailer
In/Out
of Manual
Potential metric using total manual volume and total work hours spent to determine productivity.
®
8
4. Productivity and Service in Allied Operations
AFSM100
FSS
Manual Bullpen/
Opening Unit
Manual Cases
DBCS
Post Office/BMEU
Non
Co-located
DMU
Mailer
APPS/APBS/SPSS
pallets sacks
stagingrejects
rejects
dispatch
SAMP
Flat Mail Prep
(AI/035)
Co-located
BMEU
Can measure total volume processed.
Can measure and record total work hours spent on allied operations.
No clear line-of-sight in allied operation to specific products. Allied
operations
is a challenge
®
9
5. Increased Transportation Time and Cost
Can measure cycle times of bundles, nested to containers, observed through scanning.
Currently available, only for Full-Service mailers, providing associated tray and bundle IDs through eDoc.
pallets sacks
staging
DBCS
rejects
allied
AFSM100
Manual Cases
distribution
Manual Bullpen/
Opening Unit
Flat Mail Prep
(AI/035)
allied
allied
Processing Plant 2
Processing Plant 1
FSSSAMP
Air- FC Flats per the mode matrix
FedEx
Dest.
Facility
NDC NDC
STC STC (optional)
THS
THS
Commercial
APPS/APBS/SPSS
rejects
THS
THS
dispatch
Co-located
BMEU
DMU
Mailer
Commercial
Post Office/BMEU
Non Co-located
Dependent
on accurate
nesting
®
10
Post Office/BMEU
Non
Co-located
Co-located
BMEU
DMU
Mailer
6. Last Mile / Delivery
pallets sacks
staging
DBCS
rejects
rejects
allied
distribution
SAMP
Manual Cases
Manual Bullpen/
Opening Unit
Flat Mail Prep
(AI/035)
allied
allied
AFSM100APPS/APBS/SPSS
FSS
Distributed
Scan
dispatch
Days in transit
from Last
Processing scan
to on street/in-
office carrier
sampling scan.
®
11
Last Mile-Legacy vs Internal SPM
FY16 Q4 Measured Flats Last Mile Flat Samples
EXFC Flats 28,996
Presort FCM Flats 6,560
Standard/BPM flats 226,096
Periodicals Flats 95,789
Total 357,441
Legacy Measurement Through Third Party
FY16 Q4 Measured Flats Last Mile Flat Samples
Single Piece First-Class 166,231
Presort First-Class 75,396
Standard/BPM Flats 2,011,271
Periodicals 655,459
Total 2,908,357
Proposed Internal SPM
®
12
Questions