utilities_building_blocks_china_profitability analysis _168_bb_configguide.doc
TRANSCRIPT
![Page 1: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/1.jpg)
SAP ECC 6.0 EhP3
August 2008
English
Profitability Analysis (168)
SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany
Building Block Configuration Guide
![Page 2: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/2.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Copyright
© Copyright 2008 SAP AG. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.
Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, OS/2, Parallel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, System i, System i5, System p, System p5, System x, System z, System z9, z/OS, AFP, Intelligent Miner, WebSphere, Netfinity, Tivoli, Informix, i5/OS, POWER, POWER5, POWER5+, OpenPower and PowerPC are trademarks or registered trademarks of IBM Corporation.
Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
SAP, R/3, xApps, xApp, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.
© SAP AG Page 2 of 45
![Page 3: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/3.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Icons
Icon Meaning
Caution
Example
Note
Recommendation
Syntax
External Process
Business Process Alternative/Decision Choice
Typographic Conventions
Type Style Description
Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.
Cross-references to other documentation.
Example text Emphasized words or phrases in body text, titles of graphics and tables.
EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.
Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.
EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.
Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.
© SAP AG Page 3 of 45
![Page 4: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/4.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Contents
1 Purpose................................................................................................................................... 6
2 Preparation.............................................................................................................................. 6
2.1 Prerequisites..................................................................................................................6
3 Structures................................................................................................................................ 6
3.1 Creating Operating Concern (Enterprise Structure).......................................................6
3.2 Maintaining Characteristics – Transferring from SAP Table..........................................6
3.3 Maintaining User-Defined Characteristics......................................................................7
3.4 Maintaining Value Fields...............................................................................................8
3.5 Creating Operating Concern........................................................................................10
3.6 Setting Operating Concern..........................................................................................11
3.7 Assigning Controlling Area to Operating Concern.......................................................11
4 Master Data CO-PA...............................................................................................................12
4.1 Derivation & Valuation.................................................................................................12
4.1.1 Derivation................................................................................................................12
4.1.2 Maintaining Characteristic Value.............................................................................13
4.1.3 Valuation................................................................................................................. 14
5 Planning................................................................................................................................. 20
5.1 Initial Planning steps....................................................................................................20
5.1.1 Maintaining Versions...............................................................................................20
5.1.2 Planing Settlement: Receiving Version in CO-PA...................................................21
5.1.3 Maintaining Revaluation Keys.................................................................................21
5.1.4 Defining Planning Layout.........................................................................................22
5.1.5 Defining Planning Levels.........................................................................................22
5.1.6 Defining Planning Packages....................................................................................23
5.1.7 Defining Planning Methods (Parameter Set)...........................................................24
5.1.8 Creating Plan Assessment......................................................................................25
6 Flows of Actual Values..........................................................................................................30
6.1 Transfering of Billing Documents.................................................................................30
6.1.1 Assigning Value Fields............................................................................................30
6.1.2 Assigning Quantity Fields........................................................................................31
6.2 Order and Project Settlement......................................................................................31
6.2.1 Defining PA Transfer Structure for Settlement........................................................31
6.2.2 Assigning PA Transfer Structure to Settlement Profile............................................33
6.3 Settlement of Production Variances............................................................................34
© SAP AG Page 4 of 45
![Page 5: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/5.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
6.3.1 Defining PA Transfer Structure for Settlement........................................................34
6.4 Transfering of Overhead..............................................................................................35
6.4.1 Creating Actual Assessments CCA to CO-PA.........................................................35
6.5 Activating Profitability Analysis....................................................................................40
7 Information System................................................................................................................41
7.1 Defining Variables for Reports.....................................................................................41
7.2 Defining Forms for Profitability Reports.......................................................................41
7.3 Creating Profitability Report.........................................................................................43
8 Providing Country Specific Texts...........................................................................................44
9 Troubleshooting in CO-PA.....................................................................................................44
9.1 General Troubleshooting – Regenerating the Operating Concern...............................44
© SAP AG Page 5 of 45
![Page 6: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/6.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Profitability Analysis
1 PurposeThis configuration guide provides the information that you need to manually set up configuration of this building block.
If you do not want to configure manually and prefer to use an automated installation process using BC sets and other tools, refer to the installation guide for this building block.
2 Preparation
2.1 PrerequisitesBefore you start installing this building block, you must install prerequisite building blocks. For more information, see the building block prerequisite matrix (Prerequisites_Matrix_[xx]_EN_CN.xls; the placeholder [xx] depends on the SAP Best Practices version you use, for example, BL refers to the SAP Best Practices Baseline Package: Prerequisites_Matrix_BL_EN_CN.xls). This document can be found on the SAP Best Practices documentation DVD in the folder ..\BBLibrary\General\.
3 Structures
3.1 Creating Operating Concern (Enterprise Structure)
Procedure
1. Access the activity using one of the following navigation options:
Transaction code SM30 (enter table name V_TKEB2 and choose Maintain.)
IMG menu Enterprise Structure Definition Controlling Create Operating Concern
2. On the Change View’ Define Operating Concern’ :Overview screen, choose New Entries.
3. In the Operating Concern field, enter your Operating concern (for example: 1028, , BPAT, BPFR).
4. In the Name of Operating Concern field, enter Best Practices.
5. Choose Save.
© SAP AG Page 6 of 45
![Page 7: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/7.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
3.2 Maintaining Characteristics – Transferring from SAP Table
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEA5
IMG menu Controlling Profitability Analysis Structures Define Operating Concern Maintain Characteristics
2. On the Edit Characteristic: Start screen:
a. Choose All Characteristics.
b. Choose Change.
3. On the Caution: You are processing Cross client data structures dialog box, choose Continue.
4. On the Change Characteristic: Overview screen, choose Create.
5. On the Creat Char: Assignment dialog box:
a. Select the Transfer from SAP Table option.
b. In the Table field, enter PAPARTNER.
c. Choose Create.
6. On the Reference table dialog box, select the KUNWE field and choose the Confirm button.
7. In the Warning dialog box, choose Enter.
8. On the Save Inspite of Warnings dialog box, choose OK.
9. On the Change Characteristic: Overview screen:
a. Choose Save.
b. Select KUNWE and choose Activate.
Repeat the steps above to create the following characteristics:
Characteristic Table
KUNRE PAPARTNER
VRTNR PAPARTNER
PAPH1 MVKE
PAPH2 MVKE
PAPH3 MVKE
BESKZ MARC
PSTYV VBAP
© SAP AG Page 7 of 45
![Page 8: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/8.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
3.3 Maintaining User-Defined Characteristics
Procedure
1. Access the activity using one of the following navigation options:
Transaction code KEA5
IMG menu Controlling Profitability Analysis Structures Define Operating Concern Maintain Characteristics
2. On the Edit Characteristic: Start screen:
a. Choose All Characteristics.
b. Choose Change.
3. On the Caution: You are processing Cross client data structures dialog box, choose Continue.
4. On the Change Characteristic: Overview screen, choose Create.
5. On the Creat Char: Assignment dialog box:
a. Select the User defined radio button.
b. Enter WWCST in the Char. Field.
c. Select the Without value maint. radio button
d. Choose OK.
6. On the Create WWCST screen:
a. Enter Country Ship-to in the Description field.
b. Enter CST in the Short text field.
c. Enter Country Ship-to in the Heading field.
d. Enter CHAR 3 in the Data type/length field.
e. Choose Save.
7. On the Change Characteristic: Overview screen:
a Choose Save.
b Select WWCST and choose Activate.
3.4 Maintaining Value Fields
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEA6
IMG menu Controlling Profitability Analysis Structures Define Operating Concern Matain Value Fields
© SAP AG Page 8 of 45
![Page 9: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/9.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
2. On the Edit Characteristic: Start screen:
a Select Value fields from operating concern radio button.
b Choose Create/Change .
3. Accept the info message.
4. On the Change Value Fields: Overview screen, make the following entries, activate and save each value field:
Value Field Description Amount Quantity
VVFES R&D Cost Center X
VVFGS Free Goods X
VVFGS Free Goods X
VVSKO Cash Discount X
VVMAT Material Costs X
VVMEPMaterial external Procurement
X
VVLCV Labor Costs variable X
VVMCV Manufact. costs variable X
VVOCV Overhead costs variable X
VVLCF Labor Costs fix X
VVMCF Manufact. costs fix X
VVOCF Overhead costs fix X
VVHKV COGM variable X
VVIPV Input Price Variance X
VVIQV Input Quantity Var. X
VVRES Resource usage var. X
VVREM Remaining input var. X
VVLSV Lot Size Variance X
VVMDI Inventory Difference X
VVMPV Mixed-Price Variance X
VVOPV Output Price Var. X
VVRIV Remaining Input Var. X
VVRUV Resource-Usage Var. X
VVRVA Remaining Variance X
VVSCR Scrap X
VVMSK Marketing X
VVRDC R&D X
VVN10 Non Operating Income X
© SAP AG Page 9 of 45
![Page 10: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/10.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
VVN20 Non Operating Expens X
VVN30 Taxes X
VV910 Rev. for Exp/Travel X
VV950 Travel expenses X
VV970 Costs third party X
3.5 Creating Operating Concern
Procedure Carry out the following steps:
1. Access the activity using one of the following navigation options:
Transaction code KEA0
IMG menu Controlling Profitability Analysis Structures Define Operating Concern Maintain Operating Concern
2. On the Maintain operating Concern screen:
a Enter your Operating concern (e.g. BPDE, BPAT, BPFR) in the Operating Concern field.
b Choose Create.
c Confirm the dialog box.
d In the Description field, enter the description for the Operating Concern.
e For Type of Profitability Analysis choose Costing-based.
f Choose Save.
g Choose Create data structure.
3. On the Create Data Structure: Characteristic screen:
a Select the following characteristics and transfer them from the Transfer from pane to the Data structure pane by choosing the left arrow button:
BESKZ, KDGRP, KUNRE, KUNWE, LAND1, PAPH1, PAPH2, PAPH3, PSTYV, VKBUR, VRTNR, WWCST
b Choose the Value field tab page.
c To transfer the following fields from the Transfer from box to the Data structure box, select the field and choose the left arrow button:
ABSMG, ERLOS, KWKDRB, KWMARB, MRABA, KWMKPR, VVFGS, RABAT, KWSKTO, VVMAT, VVMEP, VVLCV, VVMCV, VVOCV, VVLCF, VVMCF, VVOCF, VVIPV, VVIQV, VVRES, VVREM, VVLSV, VVMDI, VVMPV, VVOPV, VVRVA, VVSCR, VWGK, VTRGK, VVMSK, VVRDC, VVN10, VVN20, VVN30, VRPRS, VV910, VV950, VV970, KWBONI
d Choose Activate.
e Choose Back.
© SAP AG Page 10 of 45
![Page 11: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/11.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
4. On the Generate Environment dialog box, choose Yes to generate the Operating Concern Environment.
5. On the Maintain operating Concern screen:
a Choose the Attributes tab page.
b Choose Change.
c In the Operating concern currency field, enter your Currency (e.g. CNY, CHF).
d In the Fiscal Year Variant field, enter K4.
e Choose Save.
f Choose the Environment tab page.
g Activate the client-specific part.
6. To confirm the activation, go to transaction KEA0. Enter your Operating concern (e.g. BPDE, BPAT, BPFR) for operating concern and press Enter.
7. Choose the Environment tab page and make sure that client-specific and cross-client activation indicators are green.
3.6 Setting Operating Concern
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEBD
IMG menu Controlling Profitability Analysis Structures Set Operating Concern
2. On the Set Operating Concern screen, enter the necessary data.
Field name Description User action and values Comment
Operating Concern Your Operating concern (for example: BPDE, BPAT, BPFR)
Type of Profit. Analysis costing-based
3. Choose Enter.
3.7 Assigning Controlling Area to Operating Concern
UseThe purpose of this activity is to allocate the controlling areas that you want to be able to analyze together in Profitability Analysis to an operating concern.
Procedure1. Access the activity using one of the following navigation options:
© SAP AG Page 11 of 45
![Page 12: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/12.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Transaction code SPRO
IMG menu Enterprise Structure Assignment Controlling Assign Controlling Area to Operating Concern
2. In the Enter Field Values screen, make the following entries:
Field name Value
Controlling Area Your controlling area (e.g. 1000)
Operating concern your Operating concern (e.g. BPDE, BPAT, BPFR)
4 Master Data CO-PA
4.1 Derivation & Valuation
4.1.1 DerivationIn this step, you set up the derivation of characteristic values. Derivation lets you find values for certain characteristics automatically based on the known values of other characteristics, where these characteristics are logically dependent on one another.
When an operating concern is generated, the system produces a standard derivation strategy containing all known dependencies between characteristics. You can display these by choosing View Display all steps.
4.1.1.1 Defining Characteristic Derivation
UseThe purpose of this activity is to define the characteristic derivation for the characteristics Item Category Dummy and Intercompany Indicator.
PrerequisitesAll characteristics values have been entered and operating concern has been generated successfully.
Procedure1. Access the activity using one of the following navigation options:
Transaction code KEDR
IMG menu Controlling Profitability Analysis Master Data Define Characteristic Derivation
2. In Operating concern, enter your Operating concern (e.g. BPDE, BPAT, BPFR) choose Enter.
3. In the Characteristic Derivation: Display Strategy screen, choose Change.
4. Choose Create.
Ship-to party
© SAP AG Page 12 of 45
![Page 13: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/13.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
5. On the Characteristic Derivation: Change Strategy, choose Create.
6. On the Create Step dialog box, select Move and choose Enter.
7. On the Characteristic Derivation: Change Assignment screen:
a) In Step Description, enter Ship-to party.
b) In Source field enter KNDNR and choose Enter
c) In Target field enter KUNWE and choose Enter.
d) Choose Save and Back.
Ship-to party --> Country Ship-to
8. Choose Create.
9. On the Create Step dialog box, select Table lookup and choose Enter.
10. On the Enter table name dialog box, enter KNA1 and choose Enter.
11. On the Characteristic Derivation: Change Table Lookup screen:
a) Enter Ship-to party --> Country Ship-to in the Step description field.
b) In the Source Fields for Table Lookup section, make the following settings (Settings in italics to be entered):
Origin Field Name Name Origin Field Name
KNA1 KUNNR Customer Number 1 CO-PA KUNWE
a) Enter LAND1 in the first Field name field inthe Assignment of Table Fields to Target fields section.
b) Enter WWCST in the second Field Name field in the same line.
c) Choose Save.
d) Choose Back.
4.1.2 Maintaining Characteristic Value
Procedure1. Access the activity:
Transaction code KES1
IMG menu Controlling Profitability Analysis Master Data Characteristic Value Maintain characteristic value
2. If the Dialogbox ‘Set Operating Concern’ pops up, enter the following data:
- Operating Concern 10**
(If you are installing using personalized values then enter here the personalized operating
concern ID or ** for the country code. Example: 1028)
© SAP AG Page 13 of 45
![Page 14: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/14.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
- Type of Profit. Analysis Costing-based
3. On the Change Characteristic Values screen, select the line with Country Ship-to CST
4. On the Change View ‘Values for Characteristc ...’ screen, select ‘New entries’ and enter the following data:
EL. Description
CN China
US United States
5. Select Save (Ctrl+S) and Back.
4.1.3 Valuation
4.1.3.1 Setting up Conditions and Costing Sheets
4.1.3.1.1 Creating Condition Types and Costing Sheets
Use The purpose of this activity is to define condition types to use in Profitability Analysis (CO-PA) and CO-PA-specific costing sheets.
Procedure 1. Access the activity using one of the following navigation options:
Transaction code 8KEV
IMG menu Controlling Profitability Analysis Master Data Valuation Set Up Conditions and Costing Sheets Create Condition Types and Costing Sheets
2. On the Pricing: Maintain Condition Type – Condition types screen, double-click Create and then enter the folowing data:
Field name Description User action and values Comment
Condition type YB01
Description Prices
Access sequence
no value
Prices X set Flag
Mat.Master – Standard Price
X set Flag
3. Choose Save and make the following entries.
Field name Description User action and values Comment
Surcharge / Reduction
X
© SAP AG Page 14 of 45
![Page 15: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/15.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Overhead Type Percentage
Scales W/o Scale
4. Choose Save.
5. On the Pricing: Maintain Condition Type – Pricing procedure screen, double-click Create and then enter the following data in the Pricing procedures section:
Field name Description User action and values Comment
Pricing Procedure
YB1000
BP Pricing Procedure
6. Maintain the following entries:
Step CnTr CTyp From To Long field label
010 00 YB01 000 000 Prices
7. Choose Save.
4.1.3.1.2 Assigning Value Fields
Use
In this IMG activity, you assign the CO-PA condition types you have defined to the corresponding value fields. This determines which condition types are used to value those value fields.
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KE45
IMG menu Controlling Profitability Analysis Master Data Valuation Set Up Conditions and Costing Sheets Assign Value Fields
2. Make the following entries:
OpCo CTyp Name Field name Description
Your Operating concern (for example: BPDE, BPAT, BPFR)
YB01 Prices VVMEP Material external Pr
4.1.3.2 Valuation Strategies
4.1.3.2.1 Defining and Assigning Valuation Strategy
Use The purpose of this activity is to define valuation strategies and assign them to a point of valuation. The quantities transfered from the invoice are valuated with the costs calculated in the product cost estimate. If a valuation strategy calls for valuation using material costing, the system
© SAP AG Page 15 of 45
![Page 16: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/16.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
uses the point of valuation to control which cost estimate is read and how the cost components are assigned to value fields in CO-PA.
Procedure1. Access the activity using one of the following navigation options:
Transaction code KE4U
IMG menu Controlling Profitability Analysis Master Data Valuation Valuation Strategies Define and Assign Valuation Strategy
2. Make the following entries:
Valuation Strategy
Val.strat. Name
YG1 BP val. stand. cost estimate
3. Choose Details and make the following entries:
Operating Concern Val. strategy
Sequence Appl. Costg sheet
Mat. stg
Qty Field
your Operating concern (for example: BPDE, BPAT, BPFR)
YB1 10 X ABSMG
your Operating concern (for example: BPDE, BPAT, BPFR)
YB1 20 KE YG1000 ABSMG
Assignment of Valuation Strategy
Operating Concern PV Rec. Plan ver. Val.strat.
your Operating concern (e.g. BPDE, BPAT, BPFR)
01 F YB1
02 F YB1
03 F 1 YB1
03 F 2 YB1
04 F 1 YB1
04 F 2 YB1
4.1.3.3 Setting up Valuation Using Material Cost Estimate
4.1.3.3.1 Defining Access to Standard Cost Estimates
Use Product Cost Planning is used to determine the planned cost of goods manufactured for a product. In Profitability Analysis (CO-PA), you can access these material cost estimates to valuate the data in CO-PA. This includes cost estimates both with and without quantity structures.
© SAP AG Page 16 of 45
![Page 17: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/17.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Procedure 1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Controlling Profitability Analysis Master Data Valuation Set Up Valuation Using Material Cost Estimate Define Access to Standard Cost Estimates
2. On the Change view ‘Costing Key’: Overview screen, enter the necessary data
Field name Description User action and values Comment
New entries Select
Costing key Current standard cost estimate
Enter YB1
BP standard cost estimate
3. Double-click on costing key YB1. On the ‘Change view costing keys: Details’ screen, enter the following data
Field name Description User action and values Comment
Transfer standard cost estimate
Select
Costing variant
YPC1
Costing version
1
Period indicator
Released standard cost estimate matching goods issue date
Use line item plant as cost est. plant
Select
4. Choose Save and Back.
5. On the Change view ‘Costing Key’: Overview screen, enter the necessary data
Field name Description User action and values Comment
New entries Select
Costing key Current standard cost estimate
Enter YB2
BP Plan cost estimate
4. Double-click on costing key YB2. On the ‘Change view costing keys: Details’ screen, enter the following data
Field name Description User action and values Comment
Transfer standard cost estimate
Select
Costing variant
YPC2
© SAP AG Page 17 of 45
![Page 18: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/18.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Costing version
1
Period indicator
Released standard cost estimate matching goods issue date
Use line item plant as cost est. plant
Select
6. Choose Save.
4.1.3.3.2 Assigning Value Fields
Use The purpose of this activity is to assign the components of a cost component structure from Product Cost Controlling to the value fields of your operating concern.
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KE4R
IMG menu Controlling Profitability Analysis Master Data Valuation Set Up Valuation Using Material Cost Estimate Assign Value Fields
2. Enter operating concern your Operating concern (for example: BPDE, BPAT, BPFR) and cost component structure Y1.
3. Make the following entries:
PV CCo F/V Fld name 1
01 10 1 VVMAT
01 10 2 VVMAT
01 20 1 VVOCF
01 20 2 VVOCF
01 30 1 VVMAT
01 40 1 VVLCF
01 40 2 VVLCV
01 50 1 VVMCF
01 50 2 VVMCV
01 80 1 VVOCF
01 80 2 VVOCV
01 90 3 VTRGK
01 100 1 VVOCF
© SAP AG Page 18 of 45
![Page 19: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/19.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
01 100 2 VVOCV
03 10 1 VVMAT
03 10 2 VVMAT
03 20 1 VVOCF
03 20 2 VVOCF
03 30 1 VVMAT
03 40 1 VVLCF
03 40 2 VVLCV
03 50 1 VVMCF
03 50 2 VVMCV
03 60 1 VVMCF
03 60 2 VVMCV
03 80 1 VVOCF
03 80 2 VVOCV
03 90 3 VTRGK
03 100 1 VVOCF
03 100 2 VVOCV
04 10 1 VVMAT
04 10 2 VVMAT
04 20 1 VVOCF
04 20 2 VVOCF
04 30 1 VVMAT
04 40 1 VVLCF
04 40 2 VVLCV
04 50 1 VVMCF
04 50 2 VVMCV
04 60 1 VVMCF
04 60 2 VVMCV
04 80 1 VVOCF
04 80 2 VVOCV
04 90 3 VTRGK
04 100 1 VVOCF
04 100 2 VVOCV
© SAP AG Page 19 of 45
![Page 20: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/20.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
4. Choose Save.
5 Planning
5.1 Initial Planning steps
5.1.1 Maintaining Versions
Procedure 1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Controlling General Controlling Organization Maintain Versions
3. On the General Version Definition screen, mark the line 0 Plan/actual version and double click Settings in Operating Concern.
4. In the Settings in Operating Concern: Details, make the following entries, choose Save and Back (2X):
Version Operating Concern
Exch. Rate Type
Derivation Date Currency Type
0 Your Operating concern
M 01/01/2008 B0
5. On the General Version Definition screen, mark the line 1 Plan Version: Forecast and double click Settings in Operating Concern.
6. In the Settings in Operating Concern: Details, make the following entries, choose Save and Back (2X):
Version Operating Concern
Exch. Rate Type
Derivation Date Currency Type
1 Your Operating concern
M 01/01/2008 B0
7. On the General Version Definition screen, mark the line 2 Plan Version: AOP and double click Settings in Operating Concern.
8. In the Settings in Operating Concern: Details, make the following entries, choose Save and Back (2X):
Version Operating Concern
Exch. Rate Type
Derivation Date Currency Type
2 Your Operating concern
M 01/01/2008 B0
© SAP AG Page 20 of 45
![Page 21: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/21.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
5.1.2 Planing Settlement: Receiving Version in CO-PA
Procedure
1. Access the activity using one of the following navigation options:
Transaction code KEPV
IMG menu Controlling Profitability Analysis Planning Integrated Planning Transfer Cost Center Planning/Process Planning Initial Steps Assign Receiver Plan Version
2. Make the following entries:
Vsn Version Description Year Receiver Vers.
0 Plan/actual version 2007 0
1 Plan Version: Change 1 2007 1
2 Plan Version: Change 2 2007 2
0 Plan/actual version 2008 0
1 Plan Version: Change 1 2008 1
2 Plan Version: Change 2 2008 2
0 Plan/actual version 2009 0
1 Plan Version: Change 1 2009 1
2 Plan Version: Change 2 2009 2
3. Choose Save and Back.
5.1.3 Maintaining Revaluation Keys
Use Revaluation keys are necessary to change specified value fields by certain percentages.
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEF1
IMG menu Controlling ® Profitability Analysis ® Planning ® Planning Aids ® Revaluation Key ® Maintain Revaluation Keys
2. Make the following entries:
Rev Name
YB1 Revaluation (05%)
Field Name Name Percentage
ABSMG Sales quantity 5 %
© SAP AG Page 21 of 45
![Page 22: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/22.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
5.1.4 Defining Planning Layout
Procedure
1. Access the activity using one of the following navigation options:
Transaction code KE14
IMG menu Controlling Profitability Analysis Planning Manual Entry of Planning Data Define Planning Layout
2. On the Report Painter: Create Planning Layouts for Sales & Profit Planning screen, enter the necessary data.
Field name Description User action and values Comment
Planning Layout YG100
Description Plan Sales per Brand
3. Choose Enter and create the following layout:
Product Group Product Customer Sales Quantity Revenue
Characteristic Characteristic Characteristic Value field Value field
5.1.5 Defining Planning Levels
Procedure
1. Access the activity using one of the following navigation options:
Transaction code KEPM
IMG menu Controlling Profitability Analysis Planning Planning Framework Set Up Planning Framework
2. On the Planning Framework: Overview screen, right click Planning levels and choose Create Planning Level.
3. On the Create Planning Level dialog box:
a. Make the following entries:
Field name User action and values
Key YB100
Description Sales Planning
b. Choose Enter to continue.
4. On the Planning Framework: Overview screen:
a. Choose the Charact. Tab.
© SAP AG Page 22 of 45
![Page 23: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/23.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
b. Drag the following characteristics from the Characteristic list section and drop them into the Planning level section:
Description Field name
Company Code BUKRS
Customer KNDNR
Period/year PERIO
Plant WERKS
Procurement BESKZ
ProdHier01-3 PAPH3
Product ARTNR
Record Type VRGAR
Sales Org. VKORG
Unit Sales qty ABSMG_ME
Version VERSI
c. Select the Selection tab and make the following entries:
Characteristic From
Record type F
Unit Sales qty PC
d. Choose Save.
5.1.6 Defining Planning Packages
Procedure
1. Access the activity using one of the following navigation options:
Transaction Code KEPM
IMG Menu Controlling Profitability Analysis Planning Planning Framework Set Up Planning Framework
2. On the Planning Framework: Overview screen, right click the planning level YB100 Sales Planning and choose Create Planning Package.
3. On the Create Planning Package dialog box:
a. Make the following entries:
Field name User action and values
Key YB100
Description Sales Planning
© SAP AG Page 23 of 45
![Page 24: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/24.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
b. Choose Enter to continue.
4. On the Planning Framework: Overview screen, choose Save.
5.1.7 Defining Planning Methods (Parameter Set)
Procedure
1. Access the activity using one of the following navigation options:
Transaction code KEPM
IMG menu Controlling Profitability Analysis Planning Planning Framework Set Up Planning Framework
2. On the Planning Framework: Overview screen:
a. Double click the Planning level YB100 Sales Planning.
b. In the Planning methods section, right click Enter planning data and choose Create Parameter Set.
3. On the Parameter Set: Create dialog box:
a. Make the following entries:
Field name User action and values
Key YB100
Description Sales Planning
b. Choose Enter to continue.
4. On the Planning Framework: Overview screen:
a. Choose the Settings tab.
b. Make the following entries:
Field name User action and values
Layout YG100
Currency Your currency
Distribution key currency 2
Distribution key quantities 2
Integrated Excel
Active X
9. Choose Save to save the entries.
© SAP AG Page 24 of 45
![Page 25: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/25.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
10. Repeat these steps to create Parameter sets for the methods Copy (Enter period shift 12), , Display Planning Data, Revaluation (Enter Revaluation Key Y01), Valuation (select Valuation using Valuation Customizing) and Top-down distribution (Receiver characteristics: Product and Customer, Reference value field Sales quantity and Revenue).
5.1.8 Creating Plan Assessment
UsePlanned data are transferred through cycles from cost center accounting.
Procedure
1. Access the activity using one of the following navigation options:
Transaction code KEU7
IMG menu Controlling Profitability Analysis Planning Integrated Planning Transfer Cost Center Planning/Process Planning Assess Cost Center Costs / Process Costs Define Structure of Cost Center Assessment/Process Cost Assessment
2. On the CO-PA Create Plan Assessment Cycle: Initial Screen view:
a. Enter YB1 in the Cycle field.
b. Enter 01.01.2007 in the Start Date field.
c. Choose Execute.
3. On the CO-PA Create Plan Assessment Cycle:Header Data view:
o Make the following entries:
Field name Value
To 31.12.9999
Text BP Plan Assessment CO-PA
CO-Area 1000 (or your CO Area)
TF basis 1 Costing-based Profitability Analysis
Sender version 0 Plan/actual version
o Choose Attach segment.
4. On the CO-PA Create Plan Assessment Cycle:Segment view:
a. Create the segments according to the following table:
Tab Segment Header:
Field name Value
Segment Name YB01-01 Stores
© SAP AG Page 25 of 45
![Page 26: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/26.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Assessment CElem 94220000
Fixed value field VVOCF
Val.Fld Var.Cst VVOCF
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed portions
o Tab Senders/Receivers (if the product groups are not implemented, do this step later)
Field name Value
Sender, Cost Center Group 120
Receiver, ProdHier01-3 from 000010000100000001 to 000020000300000002
o Tab Receiver Tracing Factor
Field name Value
Reveivers always 1
5. Choose Save.
Field name Value segment 2
Segment Name YB01-02 Marketing
Assessment CElem 94220000
Fixed value field VVMSK
Val.Fld Var.Cst VVMSK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 160
Receiver Company Code such as 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 3
Segment Name YB01-03 R&D
Assessment CElem 94220000
Fixed value field VVRDC
Val.Fld Var.Cst VVRDC
© SAP AG Page 26 of 45
![Page 27: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/27.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 150
Receiver Company Code such as 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 4
Segment Name YB01-04 Admin. Overhead
Assessment CElem 94220000
Fixed value field VWGK
Val.Fld Var.Cst VWGK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 110
Receiver Company Code such as 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 5
Segment Name YB01-5 Sales
Assessment CElem 94220000
Fixed value field VTRGK
Val.Fld Var.Cst VTRGK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 170
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 6
© SAP AG Page 27 of 45
![Page 28: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/28.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Segment Name YB01-6 Quality Management
Assessment CElem 94220000
Fixed value field VWGK
Val.Fld Var.Cst VWGK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 140
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 7
Segment Name YB01-7 Manufacturing OH
Assessment CElem 94220000
Fixed value field VVOCF
Val.Fld Var.Cst VVOCF
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 130
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 8
Segment Name YB01-8 Non-Operating Expense
Assessment CElem 94220000
Fixed value field VVN20
Val.Fld Var.Cst VVN20
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 180
© SAP AG Page 28 of 45
![Page 29: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/29.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Sender Cost Element 6200_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 9
Segment Name YB01-9 Non-Operating Income
Assessment CElem 94220000
Fixed value field VVN10
Val.Fld Var.Cst VVN10
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 180
Sender Cost Element 6100_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 10
Segment Name YB01-10 Taxes
Assessment CElem 94220000
Fixed value field VVN30
Val.Fld Var.Cst VVN30
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 180
Sender Cost Element 6300_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 11
Segment Name YB01-11 Cash discount
© SAP AG Page 29 of 45
![Page 30: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/30.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Assessment CElem 94220000
Fixed value field KWBONI
Val.Fld Var.Cst KWBONI
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center 1801
Sender Cost Element 2100_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
6 Flows of Actual Values
6.1 Transfering of Billing Documents
6.1.1 Assigning Value Fields
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KE4I
IMG menu Controlling Profitability Analysis Flows of Actual Values Transfer of Billing Documents Assign Value Fields
2. Make the following entries (XXXX, your Operating concern):
OpCo CTyp Name Val. fld Description Transfer +/-
XXXX K004 Material KWMARB Material discount
XXXX K007 Customer Discount KWKDRB Customer Discount
XXXX KP00 Pallet Discount RABAT Other Discounts
XXXX KP02 Mixed Pallet Disc. RABAT Other Discounts
XXXX PI02 Inter-company % ERLOS Revenue
XXXX PR00 Price ERLOS Revenue
XXXX R100 100% discount VVFGS Free Goods
XXXX RB00 Discount (Value) RABAT Other Discounts
XXXX RC00 Quantity Discount MRABA Quantity discount
XXXX SKTO Cash Discount KWSKTO Cash discount
© SAP AG Page 30 of 45
![Page 31: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/31.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
XXXX VPRS Internal price VVMEP Material external Pr
XXXX YB01 Special Surcharge KWMKPR Promotion
XXXX YB31 KWMARB Material discount
6.1.2 Assigning Quantity Fields
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KE4M
IMG menu Controlling Profitability Analysis Flows of Actual Values Transfer of Billing Documents Assign Quantity Fields
2. Make the following entries (XXXX, your Operating concern):
Operating Concern SD qty field Name CO-PA qty field Name
XXXX FKIMG Billed Quantity ABSMG Sales Quantity
6.2 Order and Project Settlement
6.2.1 Defining PA Transfer Structure for Settlement
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEI1
IMG menu Controlling Profitability Analysis Flows of Actual Values Order and Project Settlement Define PA Transfer Structure for Settlement
2. Make the following entries (XXXX, your Operating concern):
PA Text
YR BP Research&Development
YS Services
PA PAA Text
YR 10 R&D Expenses
YS 0 Revenue
YS 10 Revenues Travel Expenses
YS 20 Labor Costs
YS 30 Travel Expenses
© SAP AG Page 31 of 45
![Page 32: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/32.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
YS 40 Third Party Costs
YS 50 Sales Deductions
YS 60 Material Costs
FI 100 Scrap
PA PAA CO Area Cost Element (Group) Source
YR 10 1000 YB_ALL Costs/revenue
YS 0 1000 93300000 Costs/revenue
YS 10 1000 93301000 Costs/revenue
YS 20 1000 93302000 Costs/revenue
YS 30 1000 93303000 Costs/revenue
YS 40 1000 93304000 Costs/revenue
YS 50 1000 93305000 Costs/revenue
YS 60 1000 93306000 Costs/revenue
FI 100 1000 50010601 Costs/revenue
FI 100 1000 60010101 Costs/revenue
PA PAA Operating Concern Quantity / Value
Fixed / variable
Value fld
YR 10 XXXX Value field 3 VVRDC
YS 0 XXXX Value field 3 ERLOS
YS 10 XXXX Value field 3 VV910
YS 20 XXXX Value field 3 VVLCV
YS 30 XXXX Value field 3 VV950
YS 40 XXXX Value field 3 VV970
YS 50 XXXX Value field 3 RABAT
YS 60 XXXX Value field 3 VVMAT
FI 100 XXXX Value field 3 VVSCR
FI 100 XXXX Value field 3 ERLOS
© SAP AG Page 32 of 45
![Page 33: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/33.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
6.2.2 Assigning PA Transfer Structure to Settlement Profile
Procedure 1. Access the activity using one of the following navigation options:
Transaction code SPRO
IMG menu Controlling Profitability Analysis Flows of Actual Values Order and Project Settlement Assign PA Transfer Structure to Settlement Profile
2. Make the following entries:
Field name Entry
Settlement Profile YB00R1
To Be Settled in Full X
Allocation structure YR
PA transfer structure YR
Default object type PSG
IndicatorsMark 100% Valuation, %Settlement and Equivalance numbers
Document type SA
Max.no.dist.rls 3
Residence time 3
Field name Entry
Settlement Profile YBSV01
To Be Settled in Full X
Allocation structure YL
PA transfer structure YS
Default object type PSG
IndicatorsMark 100% Valuation, %Settlement and Equivalance numbers
Document type SA
Max.no.dist.rls 10
Residence time 3
Field name Entry
Settlement Profile YBSV02
To Be Settled in Full X
© SAP AG Page 33 of 45
![Page 34: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/34.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Allocation structure YS
PA transfer structure YS
Default object type PSG
IndicatorsMark 100% Valuation, %Settlement and Equivalance numbers
Document type SA
Max.no.dist.rls 10
Residence time 3
6.3 Settlement of Production Variances
6.3.1 Defining PA Transfer Structure for Settlement
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEI1
IMG menu Controlling Profitability Analysis Flows of Actual Values Settlement of Production Variances Define PA Transfer Structure for Settlement
2. Make the following entries:
PA Text
Y1 BP Production Variances
PA PAA Text
Y1 10 Input Price Variance
Y1 20 Input Quantity Variance
Y1 30 Resource-Usage Variance
Y1 40 Remaining Input Variance
Y1 50 Mixed-Price Variance
Y1 60 Output Price Variance
Y1 70 Lot Size Variance
Y1 80 Remaining Variance
Y1 90 Scrap
PA PAA CO Area Group name Source category
© SAP AG Page 34 of 45
![Page 35: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/35.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Y1 10 1000 YB_ALL Variances on production orders PRIV
Y1 20 1000 YB_ALL Variances on production orders QTYV
Y1 30 1000 YB_ALL Variances on production orders RSUV
Y1 40 1000 YB_ALL Variances on production orders INPV
Y1 50 1000 YB_ALL Variances on production orders MXPV
Y1 60 1000 YB_ALL Variances on production orders OPPV
Y1 70 1000 YB_ALL Variances on production orders LSFV
Y1 80 1000 YB_ALL Variances on production orders REMV
Y1 90 1000 YB_ALL Variances on production orders SCRP
PA PAA Operating Concern Quantity / Value Fixed / variable Value field
Y1 10 XXXX 1 3 VVIPV
Y1 20 XXXX 1 3 VVIQV
Y1 30 XXXX 1 3 VVRES
Y1 40 XXXX 1 3 VVREM
Y1 50 XXXX 1 3 VVMPV
Y1 60 XXXX 1 3 VVOPV
Y1 70 XXXX 1 3 VVLSV
Y1 80 XXXX 1 3 VVRVA
Y1 90 XXXX 1 3 VVSCR
6.4 Transfering of Overhead
6.4.1 Creating Actual Assessments CCA to CO-PA
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEU1
IMG menu Controlling Profitability Analysis Flows of Actual Values Transfer of Overhead Assess Cost Center Costs / Process Costs Define Structure of Cost Center Assessment / Process Cost Assessment
© SAP AG Page 35 of 45
![Page 36: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/36.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
2. On the CO-PA Create Actual Assessment Cycle: Initial Screen view:
a. Enter YB2 in the Cycle field.
b. Enter 01.01.2007 in the Start Date field.
c. Choose Execute.
3. On the CO-PA Create Plan Assessment Cycle:Header Data view:
o Make the following entries:
Field name Value
To 31.12.9999
Text BP Actual Assessment CO-PA
CO-Area 1000 (or your CO Area)
TF basis 1 Costing-based Profitability Analysis
o Choose Attach segment.
4. On the CO-PA Create Plan Assessment Cycle:Segment view:
d. Create the segments according to the following table:
Tab Segment Header:
Field name Value
Segment Name YB02-01 Stores
Assessment CElem 94220000
Fixed value field VVOCF
Val.Fld Var.Cst VVOCF
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed portions
o Tab Senders/Receivers (if the product groups are not implemented, do this step later)
Field name Value
Sender, Cost Center Group 120
Receiver, ProdHier01-3 from 000010000100000001 to 000020000300000002
o Tab Receiver Tracing Factor
Field name Value
Reveivers always 1
5. Choose Save.
Field name Value segment 2
© SAP AG Page 36 of 45
![Page 37: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/37.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Segment Name YB02-02 Marketing
Assessment CElem 94220000
Fixed value field VVMSK
Val.Fld Var.Cst VVMSK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 160
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 3
Segment Name YB02-03 R&D
Assessment CElem 94220000
Fixed value field VVRDC
Val.Fld Var.Cst VVRDC
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 150
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 4
Segment Name YG02-04 Admin. Overhead
Assessment CElem 94220000
Fixed value field VWGK
Val.Fld Var.Cst VWGK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 110
© SAP AG Page 37 of 45
![Page 38: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/38.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 5
Segment Name YB02-5 Sales
Assessment CElem 94220000
Fixed value field VTRGK
Val.Fld Var.Cst VTRGK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 170
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 6
Segment Name YB02-6 Quality Management
Assessment CElem 94220000
Fixed value field VWGK
Val.Fld Var.Cst VWGK
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 140
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 7
Segment Name YB02-7 Manufacturing OH
Assessment CElem 94220000
Fixed value field VVOCF
Val.Fld Var.Cst VVOCF
© SAP AG Page 38 of 45
![Page 39: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/39.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 130
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 8
Segment Name YB02-8 Non-Operating Expense
Assessment CElem 94220000
Fixed value field VVN20
Val.Fld Var.Cst VVN20
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 180
Sender Cost Element 6200_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 9
Segment Name YB02-9 Non-Operating Income
Assessment CElem 94220000
Fixed value field VVN10
Val.Fld Var.Cst VVN10
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 180
Sender Cost Element 6100_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
© SAP AG Page 39 of 45
![Page 40: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/40.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Field name Value segment 10
Segment Name YB02-10 Taxes
Assessment CElem 94220000
Fixed value field VVN30
Val.Fld Var.Cst VVN30
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center Group 180
Sender Cost Element 6300_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
Field name Value segment 11
Segment Name YB02-11 Cash discount
Assessment CElem 94220000
Fixed value field KWBONI
Val.Fld Var.Cst KWBONI
Sender values, Rule Posted amounts
Sender values, Share in % 100
Receiving tracing factor, Rule Fixed percentages
Sender, Cost Center 1801
Sender Cost Element 2100_CE
Receiver Company Code e.g. 1000
Reveiver Tracing Factor, Receivers Portion/Percent
100
6.5 Activating Profitability Analysis
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KEKE
© SAP AG Page 40 of 45
![Page 41: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/41.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
IMG menu Controlling Profitability Analysis Flows of Actual Values Activate Profitability Analysis
2. Make the following entries (XXXX, your Operating concern):
COAr Name From FY Op.Concern Active Status
1000 Best Practices 2007 XXXX 2
7 Information System
7.1 Defining Variables for Reports
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KE3E
IMG menu Controlling Profitability Analysis Information System Report Components Define Variables for Reports
2. Choose New entries.
3. Make the following entries and choose Save.
Type Variable name
Replac. type
Field name
Opt. Entry
Para-meters
Description
Characteristic Value
&BISGJAHR
Entry GJAHR Req. Para. To Fiscal Year
Characteristic Value
&VONGJAHR
Entry GJAHR Req. Para. From Fiscal Year
Characteristic Value
&BISPER Entry PERDE Req. Para. To Period
Characteristic Value
&VONPER
Entry PERDE Req. Para. From Period
7.2 Defining Forms for Profitability Reports
Procedure
1. Access the activity using one of the following navigation options:
Transaction code KE34
IMG menu Controlling Profitability Analysis Information System Report Components Define Forms Define Forms for Profitability Reports
© SAP AG Page 41 of 45
![Page 42: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/42.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
2. On the Report Painter: Create Forms screen, enter the necessary data.
Field name Description
Forms YBP100
Description Detail Actual/Plan/Diff
3. Choose Enter.
4. Build up the form with the Report Painter.
Actual data Planning data Diff. Diff.%
Sales quantity
Revenue
Rev. for Exp/Travel
Customer Discount
Material discount
Qty discount
Promotion
Free goods
Discount
Bonuses
Net Sales
Material Costs
Material external Pr
Costs third party
Labor Costs variable
Travel expenses
Manufact. costs vari
Overhead costs varia
CM I
Labor Costs fix
Manufact. costs fix
Overhead costs fix
CM II
Scrap
Variances
CM III
Bonuses
Admin. Overhead
© SAP AG Page 42 of 45
![Page 43: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/43.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Sales Overhead
Marketing
R&D Cost Center
CM IV
Non Operating Income
Non Operationg Expen
P&L before Tax
Taxes
P&L after Tax
Actual data:
Plan/Actual Indicator 0
Planning data:
Plan/Actual Indicator 1
Version variable
Diff.:
Actual data - Plan data
Diff.%:
Diff. / Actual data *100
The key figures are linked directly to the value fields.
Net Sales, CMI..CMIV are calculated by subtracting the former values.
Variances are calculated by adding all single variance value fields.
7.3 Creating Profitability Report
Procedure 1. Access the activity using one of the following navigation options:
Transaction code KE31
IMG menu Controlling Profitability Analysis Information System Create Profitability Report
2. On the Create Profitability Report: initial screen:
a. Enter the following data:
Report YBR1040
Text Plan/Actual comparison
Report with form x
© SAP AG Page 43 of 45
![Page 44: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/44.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
Form YBF140
b. Choose Create in Line ‘Report with form’.
2. In the Characteristics view select the following characteristics:
Characteristics
Country
Customer
Customer group
Plant
Product
ProdHier01-3
3. In the Variables view maintain the following values:
To Fiscal Year 2007
From Fiscal Year 2007
To Period 12
From Period 1
Sales Org. 1000
4. In the OutputType view, select Classic drilldown and Basic list: Detail.
5. Choose Save.
8 Providing Country Specific Texts To translate the configuration settings, check the external files in the translation part of the master list and enter the data accordingly.
9 Troubleshooting in CO-PA
9.1 General Troubleshooting – Regenerating the Operating Concern
Use Regenerating the operating concern is a useful instrument in all kinds of troublesome situations in profitability analysis. While regenerating the operating concern, the system automatically provides for data consistency, which makes it possible to use this instrument of trouble shooting even after transaction data has been created.
Procedure1. Access the activity using one of the following navigation options:
Transaction code KEA0
© SAP AG Page 44 of 45
![Page 45: Utilities_Building_Blocks_China_Profitability Analysis _168_BB_ConfigGuide.doc](https://reader031.vdocument.in/reader031/viewer/2022020417/5695cfad1a28ab9b028f0cbd/html5/thumbnails/45.jpg)
SAP Best Practices Profitability Analysis (168): Configuration Guide
IMG menu Controlling Profitability Analysis Master Data Define Characteristic Derivation
2. On the Maintain Operating Concern screen, in the Data Structure tab, choose Display <-> Change and confirm the message regarding cross-client-settings.
3. In area Data structure, choose Change.
4. On the Edit Data Structure: Characteristics screen, choose Extras Characteristics Unlock and confirm when the dialog box appears.
5. Choose Save.
6. Choose Activate.
7. Choose Back.
8. Confirm pop-up regarding regeneration of operating concern.
ResultThe operating concern has been regenerated.
© SAP AG Page 45 of 45