Uttar Pradesh State Roads Project Government of Uttar Pradesh
(Public Works Department)
Environmental Enhancement &
Monitoring Management
Environmental Enhancement
• OP 4.01 Additional positive actions are encouraged
• Why Road not as an Isolated entityAdd value to the Environment Enhance Environmental Quality of corridor/usersEnhance visual quality Generate goodwill amongst local community towardsthe project by enhancement of common property resourcesG.T. Road still a living example
• WhatPonds at RoadsideMore attractive & useful to local population
Road users who may take break from driving/Traveling
Temples/Shrines• Underlines the importance the project attaches to
the sentiments of host population
Environmental Enhancement
• HowIdentification at Design stageJoint Inspection by Deptt., NGO & Consultant
- Preliminary Assessment Public consultation by NGO
- Utility, willingness, ownership, suggestionsDesign , Drawing , Estimate by Supervision ConsultantExecution carried out by the contractors
Environmental Enhancement
Enhancements Sites in UPSRPUPG/01 UPG/02 UPG/03 UPG/04
Schools 1 2 1 2
Enhancement - - - 1
Relocation 13 2 3 6
Ponds 1(under
construction)
2(to be started)
-(recently dropped)
2(completed)
Shrines/Temples
Environmental EnhancementPONDS
UPG/04
Pond at km
21+648
Before Enhancement
Enhancement Under Progress
Environmental EnhancementPONDS
UPG/04
Pond at km
70+120
Before Enhancement
Enhancement Under Progress
Renovation of Sorahi Temple
The Sorahi Temple is said to be 350 years old built by DatiaNaresh. Presently, the GaytriPariwar, Jahanabad is looking after the Temple.
The Sorahi Temple is located at Ghatampur –Chudagarha Project Road (UPG 04) near Jahanabad at km 55+950
At Present
Environmental Enhancement
School before Boundary wall School after Boundary wall
School before Boundary wall School after Boundary wall
UPG/02UPG/02
UPG/03UPG/03
SCHOOL
Reaction of people about Enhancements
• Initially people were apprehensive at consultation stage about the enhancements.
• With subsequent consultations they agreed for the proposal.
• They provided all the support e,g, in storage of construction material in their premises and in removal of structures.
• Good rapport has been developed between people and PWD.
Environmental Monitoring
• WhatAir (SPM, RSPM, Lead,NOx,Sox,Co etc)Noise (Day , night)Water (pH, SS, BoD, CoD,TDS,Oil & grease, DO etc.)
• HowData sourcesData collection (Meteorological conditions, Methods , Accuracy)Presentable formats
Environmental Monitoring
• Objectives/Purpose
To know the Baseline (Air, water, Noise, soil, Flora, Fauna etc.)To observe the trendTo draw inferences (reduction in Sulphur in Diesel, Lead content, Technological substitutions)
Environmental MonitoringA
mbient A
ir Monitoring: UPG
/01
* One hourly value
At Construction Sites
March 2005 December 2005Parameters
NAAQS for Residential &
Rural and Other Areas
SPM (µg/m3) 200 µg/m3
100 µg/m3
80 µg/m3
80 µg/m3
-
4ppm
1 µg/m3
RSPM (µg/m3)
SO2 (µg/m3)
NOx (µg/m3)
HC (ppm)*
CO (ppm)*
Pb (µg/m3)
Near Madanapur
Village
Near Malawan
Camp
At Madanapur (km 17 –
18)
At GanjMoradab
ad (km 148-149)
324 372 378 401 411
- 122 115 139 152
79 10 8 9 8
68 16 15 14.5 13.6
- < 0.1 < 0.1 < 0.1 < 0.1
- < 0.1 < 0.1 < 0.1 < 0.1
- ND ND ND ND
Pre Construction Monitoring(Bilgram)
Environmental MonitoringSpecifications Locations
Drinking Water
(IS-10500)
Waste Water
(IS-3025)
Sample 1
Sample 2
Sample 3
Sample 4
pH 6.5 - 8.5 5.5 - 9.0 7.41 7.32 7.64 7.53
TDS (mg/l) 2000 --- 591 578 651 421
TSS (mg/l) --- 100 4 3 3 19
COD (mg/l) --- 250 5 6 8 25
DO (mg/l) --- --- 4.2 4.4 4.2 6.9
Oil & Grease (mg/l) --- 10 < 1 < 1 < 1 < 1
BOD, 3 days at 27oC, mg/l --- 30 < 1 < 1 < 1 7.6
Parameters
Sample 1 Katra (Ground Water from Hand Pump) Sample 2 Jalalabad (Ground Water from Hand Pump)Sample 3 Malawan (Ground Water from Bore well) Sample 4 Kalyani River (Surface Water)
Water QualityUPG/01
Environmental Monitoring UPG/01
0
10
20
30
40
50
60
70
Daytime Night time Daytime Night time
Leq dB(A), March 2005 Leq dB(A), December 2005
Bachelor Hostels Construction Site Near HMP & CrusherNear WMM Plant Limit
Am
bient Noise M
onitoring: UPG/01
Contract wise Performance on Environmental Management Plan
0
50
100
150
200
250
300
350
400
Dec 2004 Mar 2005 Jun 2005 Sep 2005 Dec 2005
Quarter Ending
Scor
e
UPG/01 UPG/02 UPG/03 UPG/04
Activities involved & Time frame for main module
# Requirement gathering from end user 1 months
# System Design 1 months
# System Development 1.5 months
# Testing 15 days
# Deployment 5 days
# Training 7days
# Updating Continuous process
Activities involved & Time frame for any additional module
# Requirement gathering from end user 3 days
# System Design 3 days
# System Development 7 days
# Testing 3 days
# Deployment 2 days
# Training 2 days
# Updating Continuous process
Utility of Information system
• Planning• Monitoring• Impact assessment• Analyzing data• Forecasting• Caters the need of end users