uwi west stand 3d sl

1
Cold Water Hot Water Sanitary Condensate Drain Vent Pipe GENERAL NOTES Scale Project number Date Drawn by Checked by LEGEND Grafton Cot #2 , Holetown St.James DESIGN ENGINEERS. Consultant LTD UWI ATHLETICS & FOOTBALL STADIUM. WEST STANDS Cave Hill Campus St. Michael 1/8" = 1'-0" 06/17/2014 3:32:13 PM A106 PLUMBING 3D SEATING LEVEL 01 06/13/14 Author DH No. Description Date 1/8" = 1' 0" 1) All 3D Drawings to be used in Conjunction with Auto-Cad Drawings.

Upload: damian-harper

Post on 13-Apr-2017

63 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UWI West Stand 3D SL

Cold WaterHot WaterSanitaryCondensate DrainVent Pipe

GENERAL NOTES

Scale

Project number

Date

Drawn by

Checked by

LEGEND

Grafton Cot #2 , Holetown St.James

DESIGN ENGINEERS.Consultant LTD

UWI ATHLETICS &FOOTBALL STADIUM.WEST STANDSCave Hill Campus St.Michael

1/8" = 1'-0"

06/1

7/20

14 3

:32:

13 P

M

A106

PLUMBING 3DSEATING LEVEL

0106/13/14

AuthorDH

No. Description Date

1/8" = 1' 0"

1) All 3D Drawings to be used in Conjunction with Auto-Cad Drawings.