uws amended plans landscape
DESCRIPTION
CLIENT: UWS CAPITAL WORKS AND FACILITIES FOR this page L01/6 - R 160 L02/6 - R 160 L03/6 - R 160 L04/6 - R 160 L05/6 - R 160 L06/6 - R 160 00/6 Cover Page and Drawing Schedule University Western Sydney Bankstown for UWS Capital Works and Facilities Proposed Student Accommodation and Common Facilities Michael SiuLandscape Architects Scale NTS@A1, Dg No 00/6 17 Mar 2011 NSW 2220 c 2011 Msiu Phone: (02) 9557 9833 Level 5, 34 MacMahon Street Hurstville Fax: (02) 9557 9311TRANSCRIPT
Michael Siu Landscape Architects Level 5, 34 MacMahon Street Hurstville
Phone: (02) 9557 9833 NSW 2220
Fax: (02) 9557 9311
Proposed Student Accommodationand Common FacilitiesUniversity Western Sydney
Bankstown
forUWS Capital Works and Facilities
c 2011 Msiu
Cover Page and Drawing Schedule
Scale NTS@A1, Dg No 00/6 17 Mar 2011
00/6
PROPOSED STUDENT ACCOMMODATION
AND COMMON FACILITIES FOR
UNIVERSITY OF WESTERN SYDNEY
BANKSTOWN CAMPUS
STAGE 1 - LANDSCAPE
CLIENT: UWS CAPITAL WORKS AND FACILITIES
DRAWING SCHEDULE
COVER and DRAWING SCHEDULE
LANDSCAPE SURFACE TREATMENT
LANDSCAPE PLANTING PLAN
LANDSCAPE PLANTING PLAN
LANDSCAPE PLANTING PLAN
LANDSCAPE SPECIFICATIONS, DETAILS, SCHEDULES
IRRIGATION PLAN
this page
L01/6 - R 160
L02/6 - R 160
L03/6 - R 160
L04/6 - R 160
L05/6 - R 160
L06/6 - R 160
FH
51 2 3 4 6 7 8 9 10 11
FH
FH
FH
FH
WWWco cd
+ RL 10.350
EHP
EHP
UW
S #
14B
27 (
BLO
CK
C)
UWS #14B26 (B
LOCK B)
UWS #14B25 (B
LOCK A)
Stage 1 Stage 2
ASHFORD AVENUE
SO
UT
H W
ES
TE
RN
MO
TO
RW
AY
(M5)
N
Michael Siu Landscape Architects Level 5, 34 MacMahon Street Hurstville
Phone: (02) 9557 9833 NSW 2220
Fax: (02) 9557 9311
Proposed Student Accommodationand Common FacilitiesUniversity Western Sydney
Bankstown
forUWS Capital Works and Facilities
c 2011 Msiu
Landscape Surface Treatment
Scale 1:500@A1, Dg No L01/6 - R 160 17 Mar 2011
L01/6
L02/6 L03/6 L04/6
LEGEND
GARDEN BED REFER DETAIL 3 / L05/6
AREA TO BE TURFED REFER DETAIL 2 / L05/6
FH
51
23
4
67
89
0
WW
Wco
cd
N
DE
AS
EH
AM
DCB
EHDCB
DS
DCBAS
EHAM
DO
AM
CLJ
LI
PX
AM
LTAEH
DS
AM
DS
MPDE
DS JM
DS
LM
GT
JMBA
GE
GE
BE
BE
FH
51
23
4
67
89
1011
FH
FH
FH
FH
WW
Wco
cd
+ RL 10.350
EH
P
EH
P
UWS #14B27 (BLOCK C)
UWS #14B26 (B
LOCK B)
UWS #14B25 (BLO
CK A)
Michael Siu Landscape Architects Level 5, 34 MacMahon Street Hurstville
Phone: (02) 9557 9833 NSW 2220
Fax: (02) 9557 9311
Proposed Student Accommodationand Common FacilitiesUniversity Western Sydney
Bankstown
forUWS Capital Works and Facilities
c 2011 Msiu
Landscape Planting Plan
Scale 1:200@A1, Dg No L02/6 - R 160 17 Mar 2011
L02/6
LEGEND
EXISTING TREES
EXISTING TREES TO BE REMOVED
BUILDING EDGING REFER DETAIL 1/L06/6
GARDEN EDGING REFER DETAIL 5/L06/6
GE
BE
FH
78
91 0
1 1
FH
FH
+ RL 10.350
EH
P
UW
S #14B26 (BLOC
K B)
UW
S #14B25 (BLOC
K A)
N
1 01 1
FH
FH
+ RL 10.350
EH
P
UW
S #14B26 (BLOC
K B)
UW
S #14B25 (BLOC
K A)
N
DCB
EH
AS
PX
EH
LTA
AMDO
LTA
AM
DO
AM
DO
EH
CLJDO
DCB
AM
MP
DO
DS
LEG
MPASWZ
MQ
PX
LMLIPX
FJ
LM
MP EH
PX
AM
DO
MP
PX
LM
LM
DS
LI
DCB
CLJ
DS
LI
DS
LI
XA
AS
JM
AM
DS
WZ
GH
PX
PX
WZ
DCBDO
LIJM
DE
AM
DO
MQ
GE
GE
GE
GE
GE
BE
BE
BE
BE
BE
BE
BE
BE
BE
FH
51
23
4
67
89
1011
FH
FH
FH
FH
WW
Wco
cd
+ RL 10.350
EH
P
EH
P
UWS #14B27 (BLOCK C)
UWS #14B26 (B
LOCK B)
UWS #14B25 (BLO
CK A)
Michael Siu Landscape Architects Level 5, 34 MacMahon Street Hurstville
Phone: (02) 9557 9833 NSW 2220
Fax: (02) 9557 9311
Proposed Student Accommodationand Common FacilitiesUniversity Western Sydney
Bankstown
forUWS Capital Works and Facilities
c 2011 Msiu
Landscape Planting Plan
Scale 1:200@A1, Dg No L03/6 - R 160 17 Mar 2011
L03/6
LEGEND
EXISTING TREES
EXISTING TREES TO BE REMOVED
BUILDING EDGING REFER DETAIL 1/L06/6
GARDEN EDGING REFER DETAIL 5/L06/6
GE
BE
FH
FH
EH
P
UWS #14B27 (BLOCK C)
NFH
FH
EH
P
UWS #14B27 (BLOCK C)
N
LEG
DCB
LTA
DS
AM
MP
DEMP
MP
DS
MQ
AS
EH
CP
MP
PX
PX
LI
MP DS
AMMP
PC
FJDODS
WZ
FJ
DO
PC
MP
MQ
LG
FJ
GH
DOMPLIDE
CLJLTA
JM
DO
LTA
MQMP
WZ
AM
DCB
WZ
DS
LI
AMXA
DE
MQ
DCB
AM
LEG
PX
MP
AMLI
LM
DE
DE
LI
XA
GE
GE
GE
GE
GE
GE
BE
BE
BE
BE
BE
BE
BE
BE
BE
FH
51
23
4
67
89
1011
FH
FH
FH
FH
WW
Wco
cd
+ RL 10.350
EH
P
EH
P
UWS #14B27 (BLOCK C)
UWS #14B26 (B
LOCK B)
UWS #14B25 (BLO
CK A)
Michael Siu Landscape Architects Level 5, 34 MacMahon Street Hurstville
Phone: (02) 9557 9833 NSW 2220
Fax: (02) 9557 9311
Proposed Student Accommodationand Common FacilitiesUniversity Western Sydney
Bankstown
forUWS Capital Works and Facilities
c 2011 Msiu
Landscape Planting Plan
Scale 1:200@A1, Dg No L04/6 - R 160 17 Mar 2011
L04/6
LEGEND
EXISTING TREES
EXISTING TREES TO BE REMOVED
BUILDING EDGING REFER DETAIL 1/L06/6
GARDEN EDGING REFER DETAIL 5/L06/6
GE
BE
1.0Surface Preparation: Garden Bed Areas All garden bed subgrade areas shall be cultivated to a depth of 300mm, adjust depth of cultivation above underground services and beneath canopies of existing trees to be retained to avoid damage. Apply a minimum of 600 layer imported topsoil mix (type A) and evenly spread throughout garden bed area while ensuring overland storm water flow paths are directed towards drainage swales and grated storm water pits. Do not alter existing surface levels beneath existing trees to be retained. Refer Detail 3.
Suspend topsoil operations when soil is wet or during frost periods.
Type A Topsoil Mix: Australian Native Landscapes, Greenlife Garden Mix
2.0Surface Preparation: Areas to be turfedAll turfed subgrade areas shall be cultivated to a depth of 300mm, adjust depth of cultivation above underground services and beneath canopies of existing trees to be retained to avoid damage. Apply a minimum of 150 layer imported topsoil mix (type B) and evenly spread throughout turfed area while ensuring overland storm water flow paths are directed towards drainage swales and grated storm water pits. Do not alter existing surface levels beneath existing trees to be retained Refer Detail 2.
Suspend topsoil operations when soil is wet or during frost periods.
Type B Topsoil Mix: Australian Native Landscapes, Turf Underlay
3.0Concrete Garden EdgingAll garden bed edging is to be set out and constructed in accordance with the specifications, landscape plans and details Refer Detail 3, Detail 5. Garden edging shall be pegged out, inspected and approved by landscape architect prior to installation of form work. Concrete edging shall be constructed insitu, 150 deep x 100 wide with a 15mm radius tooled edge and saw cuts at 2.0m intervals Garden edging is to finish flush with adjacent turf and pavement levels.
4.0Building EdgingAll building edging is to be set out and constructed in accordance with the specifications, landscape plans and details Refer Detail 1. Timber edging shall be H4 rated treated pine 100 x 50 with hardwood pegs at 1.0m intervals. Timber edging to be offset 200mm from face of building and backfilled using decorative pebble mulch to a depth of 300mm.
Decorative Pebble: Australian Native Landscape, Nepean River Pebble 20mm
5.0Plant MaterialAll plant material delivered to the site shall be in the numbers, species, variety and sizes as specified on the plant schedule. The plants are to be healthy nursery stock in good form, consistent with the species and variety, free from pest /disease, injury or weed growth. All trees delivered to site shall have a single leading shoot unless specifically required to be multi-stemed. No plant is to be delivered to site which has not been hardened off or is otherwise inferior in quality. No plant shall be "potted on" to meet scheduled pot sizes. Plant substitutions or other modification will not be acceptable without prior written approval. All plants material shall be delivered with durable readable labels indicating type and variety.
6.0Garden Mulch / PlantingInstall shrub and ground cover planting as per specifications, landscape plans and details Refer Detail 3. Prior to planting into ground, all plants are to be laid out in the required locations and densities for inspection and approval by the landscape architect. Where layouts require adjustment due to service locations or other factors, modify density and layout accordingly to ensure an even coverage of planted areas. All plants are to be thoroughly watered prior to planting, immediately after and as required to maintain growth rates and minimize planting stress.
During planting procedure carefully remove container with minimal disturbance to root ball and place in its final position, in the centre of the hole and plumb and with topsoil level of root ball matching finished garden bed topsoil levels. Remove any air pockets while backfilling by lightly tamping down and watering the topsoil.
At the completion of planting operations apply a 75mm layer Mulch (Type A) to all massed planted garden bed areas, reduce depth of mulch layer around the stem of plant to form shallow depression.
Do not plant in unsuitable weather conditions such as extreme heat, cold, wind or rain.
Type A Mulch: Australian Native Landscapes, 10mm High Grade Pine Bark (Playground Mulch)
200
300
EDGE OF BUILDING GARDEN BED
20mm NEPEAN RIVER PEBBLE AS SUPPLIED BY AUSTRALIAN NATIVE LANDSCAPES
100x50 TREATED TIMBER EDGING AS SPECIFIED
BUILDING EDGING
DETAIL NTS
TURF
DETAIL NTS
TURF (REFER TO SPECIFICATION)
150mm (min.) IMPORTED TOPSOIL TYPE B
CULTIVATED SUBGRADE 300
600
(min
.)
3 No. 50x50x2500 HARDWOOD STAKES IN TRIANGULAR ARRANGEMENT, POINTED AT ONE END AND FREE OF KNOTS, SPLINTERS AND CRACKS
LOOSELY TIED 50mm HESSIAN
STAKES ARE TO BE DRIVEN 900mm INTO THE GROUND, CLEAR OF THE ROOTBALL
VARIES
PLANTING SPECIES AND SPACING, REFER PLANTING PLAN
75mm TYPE A MULCH
600mm IMPORTED SOIL MIX TYPE A
TREE AND SHRUB PLANTING / GARDEN BED
DETAIL NTS
VARIES
1 2 3
CULTIVATED SUBGRADE 300
4000
(ap
prox
.)
1500 (approx.)
200 200
100
75mm LAYER MULCH TYPE A TO EXTENT OF EXCAVATED AREA 1500mm DIA (min.) (400LT)1000mm DIA (75LT or less)
ROOTBALL 1100x700 DEEP (approx.)
BACKFILL 50% TYPE A TOPSOIL50% SITE TOPSOIL BLEND
CULTIVATE BASE AND SIDE 100mm
NOTE: 75LT TREES TO BE STAKED: 3 No. 50x50x2500 HARDWOOD STAKES IN TRIANGULAR ARRANGEMENT. POINTED AT ONE END AND FREE OF KNOTS, SPLINTERS AND CRACKS. TIE TREE TO STAKE LOOSELY WITH 50mm HESSIAN.
TREE PLANTING IN GRASS
DETAIL NTS
100
150
TURFGARDEN BED
CONCRETE EDGE SAW CUTS AT 2.0m INTERVALS
15mm RADIUS TOOLED EDGE
INSITU CONCRETE GARDEN EDGE
DETAIL NTS4 5
7.0 Turf
All turfing is to be carried out and laid in accordance with the specifications,
landscape plans and details Refer Detail 2. Turf used for this project shall be
Kikuyu supplied in Maxi-rolls. Prior to turfing, the prepared surface shall be
watered to ensure topsoil is moist and ready to accept the placement of turf
rolls. Watering is not to cause scouring or erosion of topsoil surface.
Turf shall be harvested, delivered and laid within a twelve (12) hour period.
Turfing is to be carried out to ensure the integrity of all overland flows paths,
drainage swales or finished grades. To avoid compaction and disruption of
finished grades, only specialized Maxi-roll handling and installation equipment
shall be used for this process. No heavy machinery such as tractors or
delivery trucks etc. shall be allowed on the prepared surface.
Turf rolls shall be laid in a stretcher bond pattern, butt jointed and parallel to
the contour lines of the prepared surface. Gaps between turf rolls shall not to
exceed 5mm.
Do not schedule turf laying operation when unsuitable weather conditions such
as extreme heat, cold, wind or rain has been forecast.
Turf: Kikuyu ( Maxi Rolls 21.0m x 1.2m)
8.0Tree Planting
Plant trees to locations in accordance with the specifications, landscape
plans and details, Refer, Detail 3 and Detail 4.
All trees are to be thoroughly watered prior to planting, immediately after
and as required to maintain growth rates and minimize planting stress.
During planting procedure carefully remove container with minimal
disturbance to root ball and place in its final position, in the centre of the
hole and plumb and with topsoil level of root ball matching finished turf /
garden bed topsoil levels. Remove any air pockets while backfilling by
lightly tamping down and watering the topsoil. Prior to backfilling, break
up base and sides of hole a further 100mm to prevent confinement of
root growth.
Do not plant in unsuitable weather conditions such as extreme heat, cold,
wind or rain.
9.0 Irrigation
All massed planted garden bed areas and individual trees in grass shall
be irrigated by an automatic drip irrigation system. Refer Drawing L06/6
for scope and detail specifications. Refer Hydraulic engineers drawings
for all information regarding water supply and connections. Water for
irrigation purposes to be sourced from a potable water supply.
10.0Existing Trees
Existing trees identified for retention shall be protected and managed
during the course of construction in accordance with consulting arborist
recommendations and instructions.
11.0Establishment Period / Turf Maintenance
Handover of all planted garden bed areas and tree planting shall take
place after all landscape work has been completed. Handover shall not
occur before completion of all turfing operations or prior to building works
reaching a stage of Practical Completion.
All turfed areas shall be maintained by the contractor to ensure full
establishment for a period of six (6) weeks. During this period, contractor
shall be responsible for all turf maintenance. Maintenance shall include
but not be limited to: watering, mowing, top dressing, weeding and
replacement of any failed sections or sections in poor condition. At time
of hand over all turfed areas shall show signs of healthy even and dense
growth free of weeds bare patches or other deleterious material. Last
mowing shall take place seven (7) days prior to handover inspection.
12.0Inspections by University Nominated Representative
The following project milestones shall be inspected by landscape
architect and signed off prior to proceeding with next stage of works.
1. Completion of all surface preparation prior to installation of garden
edging
2. Layout of all garden bed edging before installation of formwork
3. Tree and Plant layouts prior to planting
4.Completion of all planting and mulching
5. Final handover Inspection (Planting)
6. Final Handover Inspection (Turfing)
LANDSCAPE SPECIFICATION
PLANTING SCHEDULE
Michael Siu Landscape Architects Level 5, 34 MacMahon Street Hurstville
Phone: (02) 9557 9833 NSW 2220
Fax: (02) 9557 9311
Proposed Student Accommodationand Common FacilitiesUniversity Western Sydney
Bankstown
forUWS Capital Works and Facilities
c 2011 Msiu
Specifications, Details, Schedules
Scale NTS@A1, Dg No L05/6 - R 160 17 Mar 2011
L05/6
Acmena Allyns Magic
Acmena Smithii. Hedgemaster (1.0m)
Callistemon Little John
Coleonema pulchellum 'Sunset Gold' (1.0m)
Dianella caerulea Breeze
Doryanthes excelsa
Duranta Sheenas Gold
Dwarf Oleander
Fatsia japonica
Gazania hybrid
Gazania tormentosum
Liriope evergreen giant
Liriope muscari
Lomandra Tanika
Murraya paniculata "Min-A-Min" (1.0m)
Phillodendron Xanadu
Westringia Zena
Xanthorrhea
Eucalyptus haemostoma ( Scibbly Gum)
Melaleuca quinquenervia ( Broad Leaved Paper bark)
Jacaranada mimosifolia ( Jacaranda)
Brachychiton acerifolia ( Illawarra Flame Tree)
Lagerstroemia indica ( Crepe Myrtle)
Pyrus calleryana Chanticleer ( Ornamental Pear)
PROPOSED UWS SPECIES LIST - Bankstown
AM
AS
CLJ
CP
DCB
DE
DS
DO
FJ
GH
GT
LEG
LM
LTA
MP
PX
WZ
XA
density size
3/sqm
3/sqm
3/sqm
3/sqm
6/sqm
1/sqm
3/sqm
3/sqm
3/sqm
6/sqm
6/sqm
4/sqm
6/sqm
6/sqm
3/sqm
3/sqm
3/sqm
1/sqm
200mm
200mm
200mm
200mm
75mm
300mm
200mm
200mm
200mm
75mm
75mm
150mm
75mm
75mm
200mm
200mm
200mm
35litre
EH
MQ
JM
BA
LI
PC
tag plant species tag tree species size
75litre
75litre
400litre
400litre
75litre
200litre
NOTE:CONFIRM LOCATION OF
ALL UNDERGROUND
SERVICES PRIOR TO
CULTIVATION AND / OR
EXCAVATION
FH
51 2 3 4 6 7 8 9 10 11
FH
FH
FH
FH
WWWco cd
+ RL 10.350
EHP
EHP
UW
S #
14B
27 (
BLO
CK
C)
UWS #14B26 (B
LOCK B)
UWS #14B25 (B
LOCK A)
Stage 1 Stage 2
ASHFORD AVENUE
SO
UT
H W
ES
TE
RN
MO
TO
RW
AY
(M5)
N
Michael Siu Landscape Architects Level 5, 34 MacMahon Street Hurstville
Phone: (02) 9557 9833 NSW 2220
Fax: (02) 9557 9311
Proposed Student Accommodationand Common FacilitiesUniversity Western Sydney
Bankstown
forUWS Capital Works and Facilities
c 2011 Msiu
Irrigation Plan
Scale 1:500@A1, Dg No L06/6 - R 160 17 Mar 2011
L06/6
GENERAL
This technical specification related to the supply and installation of a drip-line irrigation system for all garden beds.
Cross reference: PART 2 Planning and Design Controls, Landscape Master Plans Vol 1 and Vol 2.
SYSTEMS · Irrigation = install Netafim pipe @ 13mm (brown) to all garden beds
· Install Toro battery operated timer
SCOPE OF IRRIGATION WORKS
All garden bed areas and trees planted in grass to be supplied with drip irrigation. Refer Irrigation Plan. · Supply and install drip-line irrigation system, Toro battery operated timer · Supply and install the underground mainline and lateral piping, irrigation cables, automatic valves, drip line, coupling valves · Supply and install conduits for irrigation pipes and cables under pathways · Commission and testing of irrigation system · Supply of as-built hydraulic and electrical drawings together with maintenance and operating manuals
Irrigation coverage: as shown on Irrigation Plan.
Defects Liability Period: 6 Months
Underground Irrigation Piping, Connections & Fittings
The following irrigation design parameters are based upon UWSs irrigation standards & requirements.
Battery Timer: TORO Waterproof battery powered operated timer DDCWP-2-9V, 2 Station waterproof battery operated DDC controller. NOTE: The in-ground water proof controller box needs to be accessible for UWS grounds staff.
Mainline Piping: Provide minimum 450mm soil cover. DN50 PN12.5 PE piping manufactured to comply with AS4130. Pipe to be lilac striped.
Isolation valves:DN50 1600 KPA rated brass or stainless steel bore valves (full bore).
Laterals and headers: DN32 PN6.3 PE piping manufactured to AS4130. Lateral fittings shall be PN12.5 rated compression fittings.
Drip Line system: The drip line for garden beds shall be "BFW460 safety flow" as manufactured by "IWT" (or equivalent). It shall be 16mm OD with 2.3 litres p/hour pressure compensated drippers at 0.5 spacing. Drip line to be installed sub-surface to a depth of 150mm below finished ground level. Garden drip line shall be installed 50mm under the garden mulch. The drip line to be installed by use of the ploughing or trenching method, as recommended by the Manufacturer.
Fittings: PE piping fittings shall be PN16 compression fittings. No tapping saddles shall be used on the main line. Mainline isolation valves shall be DN50 1600 KPA rated brass or stainless steel bore valves (full bore). The isolation valves shall be centrally located in lockable green coloured 1419 valve boxes with a concrete support pad.
Piping: All piping shall be DN32 PN6.3 PE piping manufactured to AS4130. All piping to be installed to minimum soil depth of 50mm.
Sleeving: Where pipe-work is installed under the existing stairs, the Contractor shall install pipe work inside PN12 PVC-u pipe sleeves. Taps: Allow for a minimum number of two (2) taps to planting areas for irrigation system, or as nominated by CWF Project Manager.
Back Flow Prevention: All taps must be fitted with back flow prevention devices that comply with Australian Standard AS3500.1
Commissioning and Testing
Conduct progressive testing as appropriate, with final testing and commissioning of the irrigation system for operation upon completion of the irrigation system installation.
As installed documentation
Provide as installed documents in two identical ring binder folders containing:· hard copy of drawings· CD with electronic copy of drawings in DWG format and PDF format · maintenance and operation manuals · warranties for the system.
NOTE: All required DWG files shall be sent as compressed ZIP files created via the AutoCAD eTransmit process to the CWF Project Manager for transmittal to CWF Technical Systems.
DRIP IRRIGATION POTABLE WATER SUPPLY SPECIFICATIONS LEGEND
GARDEN BED AREAS TO BE IRRIGATED
TREES TO BE IRRIGATED
GRASSED AREA NOT TO BE IRRIGATED
WATER MAINS CONNECTION