v community of innovation · 2020. 12. 17. · ai - autodesk inventor format .idw page - 1...

11
CHANDLER gar1zona j\V Community of Innovation December 17, 2020 Mr. Dick Shear WFI LLC 2609 Strozier Avenue El Monte, CA 91733 Via Email: wfi.shear@gmail.com And First Class US Mail Re: Irrigation Booster Pump Substitution Request Project Name: Lantana Ranch Park Phase I Improvements City of Chandler Project No.: PR1905.401 Dear Mr. Shear: The City of Chandler's project design consultants have reviewed the submittal by WFI LLC to accept the Tigerflow Irrigation Booster Pump as an 'or equal' substitute request for the above referenced project. The City's consultants have found that the proposed substitution does not contain the essential characteristics required for this project. Consequently, the City of Chandler accepts our consultant's recommendation and the requested substitution may not be a part of a proposal for this project. Thank you for your interest in our project. Sincerely, Andy Goh, P.E. CIP City Engineer Capital Projects Division Public Works & Utilities Department Enclosure: Notice of Rejection of an Alternate Proposal; Substitution Request Review letter dated December 17, 2020 CC: John Griffin, EPG City of Chandler* Capital Projects * PO Box 4008 MS 407 * Chandler AZ 85244

Upload: others

Post on 08-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • �CHANDLERg..:;.ar1zonaffjj\V Community of Innovation

    December 17, 2020

    Mr. Dick Shear

    WFI LLC

    2609 Strozier Avenue

    El Monte, CA 91733

    Via Email: [email protected]

    And First Class US Mail

    Re: Irrigation Booster Pump Substitution Request

    Project Name: Lantana Ranch Park Phase I Improvements

    City of Chandler Project No.: PR1905.401

    Dear Mr. Shear:

    The City of Chandler's project design consultants have reviewed the submittal by WFI LLC to accept

    the Tigerflow Irrigation Booster Pump as an 'or equal' substitute request for the above referenced

    project. The City's consultants have found that the proposed substitution does not contain the

    essential characteristics required for this project. Consequently, the City of Chandler accepts our

    consultant's recommendation and the requested substitution may not be a part of a proposal for

    this project.

    Thank you for your interest in our project.

    Sincerely,

    Andy Goh, P.E.

    CIP City Engineer

    Capital Projects Division

    Public Works & Utilities Department

    Enclosure: Notice of Rejection of an Alternate Proposal; Substitution Request Review letter dated

    December 17, 2020

    CC: John Griffin, EPG

    City of Chandler* Capital Projects * PO Box 4008 MS 407 * Chandler AZ 85244

  • December 17, 2020

    To: Hafiz Noor, Project ManagerPublic Works & Utilities Department215 E Buffalo Street, Suite 101Chandler, AZ 85244-4008(480) 782-3324

    PROJECT: LANTANA RANCH PARK PHASE 1Project Number: PR1905.401

    EPG Project No. JT197006

    The design team has reviewed the following items submitted for consideration as an “as equal”alternative for Bid Item 440.6000 LANDSCAPE IRRIGATION PREFABRICATED BOOSTER PUMPSTATION.

    Specified Product: Munro Custom Pump Station System, Model SCSUL08-100-200-15-C-F-G-X-SP-4-SP-X-X rated for 200 GPM, compatible with Baseline 3200 Irrigation Controller and BaselineFlow Sensor/Master Valve.

    Proposed “As Equal”: Tigerflow D3030-DVMV, DESH Enclosure, and MarkV Controller.

    Review: The design team recommends rejecting this submittal based on the following findings andrequirements:

    1. Although Tigerflow appears to be a well-established and capable company the submittalmaterials provided failed to include project specific information to support approval for use onthis project.

    2. The City of Chandler uses the Baseline irrigation controllers and central control managementsystems in their Parks system.

    3. Required in the project documents and Addendum 1 is the ability of the pump station tocommunicate with the Baseline Manager Web, via ethernet, detailed pump status and alertinformation. Documentation from Tigerflow, including correspondence from Baseline assuringthat this communication compatibility exists, was not provided nor was it indicated in thesubmittal that the system is compatible with the Baseline Manager Web.

    4. The example pump stations do not show the integration of the Baseline controller andhydrometer as part of the station as required per the Technical Specifications and as noted inAddendum 1.

    5. With the exception of the VFD Controller there was no information on the materials proposedto be used on this project including the enclosure, valves, piping, pumps and pumpperformance curves, sound insulation and appurtenances. Due to the incompleteness of thesubmittal it is not possible to confirm this submittal would provide an as equal product.

    Notice of Rejection of Alternative Proposal

    Enclosure

    Substitution Request Review

  • Lantana Ranch Park 12.17.20 1 of 1

    Carl Kominsky Landscape Architect, Inc. (520) 740-07005609 N. Camino Del Sol, Tucson, AZ 85718 cell (520) 403-5969

    December 17, 2020

    Hafiz NoorProject ManagerPublic Works & Utilities DepartmentPO Box 4008, MS 407215 E Buffalo Street, Suite 101Chandler, AZ 85244-4008Re: Lantana Park Pump Submittal Review- Tigerflow Pump

    Hafiz,

    I have reviewed the booster pump submittal and reject the submittal as providedfor the following reasons:

    1. Although Tigerflow appears to be a well-established and capablecompany the submittal materials provided failed to include project specificinformation to support approval for use on this project.

    2. The City of Chandler uses the Baseline irrigation controllers and centralcontrol management systems in their Parks system.

    3. Required in the project documents and Addendum 1 is the ability of thepump station to communicate with the Baseline Manager Web, viaethernet, detailed pump status and alert information. Documentation fromTigerflow, including correspondence from Baseline assuring that thiscommunication compatibility exists, was not provided nor was it indicatedin the submittal that the system is compatible with the Baseline ManagerWeb.

    4. The example pump stations do not show the integration of the Baselinecontroller and hydrometer as part of the station as required per theTechnical Specifications and as noted in Addendum 1.

    5. With the exception of the VFD Controller there was no information on thematerials proposed to be used on this project including the enclosure,valves, piping, pumps and pump performance curves, sound insulationand appurtenances. Due to the incompleteness of the submittal it is notpossible to confirm this submittal would provide an as equal product.

    Please let me know if I can provide additional information.

    Carl Kominsky, RLA, ASICPresident

  • DETAIL A

    (2X)

    A

    926-107-PTD-4COUPLING, ZERO-FLEX LT WGT, GRVD

    W/EPDM GSKT, MAX PRES 300# - 4"

    223

    ELECTRICAL-VFDDANFOSS VFD, 208V, NEMA 1

    ENCLOSURE W/PWM, 5% LINE

    REACTOR, OPERATOR INTERFACE &

    THRU DOOR FU

    222

    ELECTRICAL-ICE

    QUBE

    AIR CONDITIONING UNIT, NEMA 4, ICE

    QUBE

    121

    986-4C555SHUTTER, WALL, 10" DAYTON120

    986-1HLA1EXHAUST FAN, 10", 115V, 1/25 HP, 1550

    RPM, SHUTTER MOUNTED

    119

    986-D303ENCLOSURE, FIBERGLASS, MODEL

    D-303, DYER

    118

    ELECTRICAL-CP36x

    30x14

    CONTROL PANEL 36X30X14 w/HMI

    TOUCH SCREEN PAD

    117

    965-NSF61GASKET MATERIAL, NSF-61816

    776-00250150NIPPLE, BRS, 1/4" X 1-1/2"215

    695-0002500TEE, THRD, BRS, STD - 1/4"214

    825-0006635VAL, TEST COCK - 1/4"413

    827-1402A3VAL, 125# / 250# WAFER SILENT CK,

    STAINLESS TRIM - 2"

    212

    824-31-02002" BRAY, 31H, LUG STYLE, BFV, LEVER

    HANDLE

    411

    PAGE 10ASSEMBLY, HEADER, 4" (SUCTION &

    DISCHARGE)

    210

    050-TP2-SSASSEMBLY, DUPLEX, TEMP PROBE AND

    PURGE LINE, STAINLESS

    19

    PAGE 8ASSEMBLY, PANEL STAND18

    PAGE 7ASSEMBLY, SPOOL, 2" (DISCHARGE)27

    PAGE 6ASSEMBLY, SPOOL DBL FLG, 2"

    (DISCHARGE)

    26

    PAGE 5ASSEMBLY, SPOOL, 2" (SUCTION)25

    PAGE 4ASSEMBLY, HEADER, 4"x2" (DISCHARGE)14

    PAGE 3ASSEMBLY, HEADER, 4"x2" (SUCTION)13

    PAGE 2ASSEMBLY, SKID12

    CS-PUMPPUMP, GOULDS SERIES eSV, MODEL

    10SV-06, MOTOR 5 HP, 3600 RPM,

    208/3/60, TEFC PREMIUM EFFICIENT

    MOTOR (NSF-61 CERTIFIED)

    21

    BILL OF MATERIALS

    PART NUMBERDESCRIPTIONQTYSYM

    P:\JOBS\2015\510000120 - 510000149\510000148 Central Maui Sports Complex\Workspace\510000148 Central Maui Sports Complex.idw

    4034 Mint Way

    Dallas, TX. 75237

    PHONE: (800) 783-6756

    FAX: (214) 333-2742

    E-MAIL: [email protected]

    WEB SITE: www.tigerflow.com

    DATE

    DATE

    DWN

    CHK

    PRODUCTION #

    NAME

    PAGE #

    DRAWING # REV

    THIRD ANGLE PROJECTION

    SCALE

    THIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO

    TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE

    UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE

    COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW,

    WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND

    ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.

    L. MONTEMAYOR 2/11/2015

    L. AMPARANO 2/12/2015

    510000148

    2

    SUBMITTAL DRAWING

    - ALL DIMENSIONS ARE

    FOR REFERENCE ONLY

    - DO NOT SCALE DRAWING

    PROJECT NAME

    AI - AUTODESK INVENTOR FORMAT .IDW

    PAGE - 1

    MANUFACTURING DRAWING

    - LINEAR TOLERANCE 1/8"

    - ANGULAR TOLERANCE 5

    - DO NOT SCALE DRAWING

    - ALL DIMENSIONS ARE IN

    INCHES

    - DIMENSIONS ARE PER

    ANSI Y14.5

    NTS

    X

    SEE NOTE 8

    18

    NOTES:

    1. FINISH: ___________________________ PAINT.

    2. CONDITION POINT: _______ GPM @ _______ PSI

    SUCTION PRESSURE: _______ PSI MIN. / _______ PSI MAX

    3. ALL DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE:

    DO NOT USE FOR CONSTRUCTION PURPOSED UNLESS CERTIFIED.

    4. (XX) INDICATE REFERENCE DIMENSIONS.

    5. PIPE SUPPORTS NOT SHOWN FOR CLARITY.

    6. ALL STRUCTURAL WELDING SHALL BE PERFORMED BY AWS D1.1

    QUALIFIED WELDERS.

    ORANGE

    140 65

    0 2

    CON'T

    7. ALL PIPE WELDING SHALL BE PERFORMED BY ASME SECTION 9 QUALIFIED WELDERS.

    8. 48" CLEARANCE (CLEAR TO GROUND) REQUIRED IN FRONT OF CONTROL PANELS

    PER 2011 NEC TABLE 110-26 (A) (1).

    9. 12" MINIMUM CLEARANCE AROUND SYSTEM FOR SYSTEM SERVICEABILITY.

    10. SCHEDULE 40 COMPONENTS MAY BE SUBSTITUTED FOR SCHEDULE 10 COMPONENTS.

    11. STAINLESS STEEL SENSING LINES.

    12. NFS-61 COMPLIANT SYSTEM.

    19

    20

    2

    21

    17

    1

    4

    3

    10

    10

    23

    11

    11

    5 1 6 12

    9

    21

    17

    5

    10

    1 6 12

    10

    23

    3

    8

    (59 1/2)

    OA

    HEIGHT

    (90 1/2) OA LENGTH

    (63)

    (65 3/4) OA WIDTH

    1415

    13

    PRESSURE

    TRANSDUCER

    CONNECTION

    SYSTEM

    AIR VENT

    10

    23

    1

    21

    8

    9

    11

    11

    11

    (52)

    9

    REV DESCRIPTION DWN CHK DATE

    1

    ADDED DIMENSIONS FROM THE EDGE OF THE SKID TO THE PUMP

    CENTER (OUTLINE PUMP)

    LM RM 02/20/2015

    2

    ADDED PAGE 10, HEADER EXTENSION DETAIL (ALL DOCUMENT)

    LM LA 03/02/2015

    34 9/16

    22 9/16

    1

    1

    2

    NOTE: FOR EXAMPLE PURPOSES ONLY, NOT TO BE USED FOR CONSTRUCTION

    INCOMPLETE

  • TENACIOUS BY NATURE

    4034 Mint Way Dallas TX 75237 Mark V – E Series Controller

    The E-Series - Mark V is a variable speed booster system with a PLC based controller. This system can control up to a four-pump package system utilizing a user-friendly color touchscreen HMI (Human Machine Interface) to monitor the system conditions, and adjust the system settings. This system monitors the system discharge pressure via a 4-20 mA signal pressure transducer. This provides a precise pressure control and user flexibility. In addition to this sensor, a suction pressure transducer and/or a flow meter can be added to extend the control and flexibility of the system. The main objective of this pumping package is to maintain a constant pressure, adjusting the speed and number of pumps to run according to the building’s demand. The system is capable of staging pumps on and off based on pressure and/or flow, while alternating pumps to keep the run times balanced between them. The Mark V controller uses the TIGERFLOW “TAP” Technology, ASHRAE 90.1 compliant, to adjust the pressure setpoint and reduce the energy consumption. BAS integration with the E-Series controller is possible through Modbus or BACnet communication protocols. See the HMI’s specification for further details. Standard Features:

    • System control based on PLC/HMItechnology

    • Non-volatile memory for all user setpoints• 6” Color touch screen HMI (Schneider or Red

    Lion)• “TAP” Technology Setpoint adjustment• Individual HOA pump operation and

    monitoring• Pump sequencing based on pressure and/or

    flow

    • Field adjustable settings including:o Pump Start/Stop pressure setpointso Pump ON and OFF time delayso Low suction pressure set pointo Low system/discharge pressure set

    pointo High system/discharge pressure set

    pointo Individual alarm ON/OFF time

    delayso Manual/Automatic alarm reset

    • Pump alternation:o Automatic on lead pump shutdowno Daily / weekly / monthlyo Manual alternation

    • Event history records up to 100 past eventsthat include:

    o Pump starts / stopso Triggered alarmso Alarm acknowledgementso Alarm reseto Pump alternationo Date and Time of each event

    • Suction & discharge pressure read out in PSI• High suction economy mode• 7 Password protected levels of security• Field adjustable passwords• Touch safe DC power supply• 24 VDC digital I/O• BAS Communication:

    o Modbus RTUo BACnet UDP/IP - BACnet MS/TP

    • Thru door disconnect(s) with individualmotor fused protection

    • Alarm horn

    INCOMPLETE

  • TENACIOUS BY NATURE

    4034 Mint Way Dallas TX 75237 SPECIFICATIONS M172 PLC

    • 24 VDC (± 10%) Power supply voltage • 3.5 W Max power consumption • 0-55 ˚C Operation ambient temperature • UL Listed • 24 VDC Digital I/O • Analog modules with 0/4-20 mA and/or 0/2-

    5/10 VDC signal I/O

    MAGELIS STU HMI • 24 VDC (± 10%) Power supply voltage • 3.0 W Power consumption • 0-50 ˚C Operation ambient temperature • UL Listed • Nema 4x / IP65 • RS-232 Serial Communication port • Modbus RTU Communication

    o RO Monitoring Information o R/W System setpoint

    • See Modbus point list for specifics

    RL CR3000 HMI • 24 VDC (± 20%) Power supply voltage • 8 W Power consumption • 0-50 ˚C Operation ambient temperature • UL Listed • Nema 4x / IP66 • RS485 Serial communication port • Ethernet Port • Modbus RTU Communication

    o RO Monitoring Information o R/W System setpoint

    • BACnet MS/TP or UDP/IP o RO Monitoring Information o R/W System setpoint

    • See Modbus/BACnet point list for specifics • Full remote control over Ethernet IP

    Pressure Transducers • Pressure ranges from 0-15 psi up to 0-500 psi • 8-30 VDC Power supply • 4-20 mA signal output • ¼ NPT process connection • Accuracy ≤ ± 1.0 (with 0.5% non-linearity) • UL Listed

    Variable Frequency Drives Control • 0-10 VDC Speed signal reference • 24 VDC Discrete run command signal • 24 VDC Discrete run feedback signal

    Additional Options: • 4-20 mA or pulse output flow meter • Flow switch • Level switch • Individual alarm dry contacts • Pump run validation DP switches • Telemetry - Local / Remote • Pressure signal retransmission 4-20 mA • Flow signal retransmission 0-10 V DC • Power monitor w/ alarm • Surge suppression • Multiple power feeds • Data Logging • Wire to water efficiency • Custom programmed features • Phase Monitor • Lightning arrestor • Circuit Breakers • Motor Overload Alarm • NEMA 4X – Stainless Steel Enclosure • NEMA 4X – Fiberglass Enclosure • 8”, 10” HMI

  • TENACIOUS BY NATURE

    4034 Mint Way Dallas TX 75237

  • TENACIOUS BY NATURE

    4034 Mint Way Dallas TX 75237

    HMI Technical Information:

    MAGELIS HMI RED LION HMI STU 855 CR3000-07 CR3000-10

    Screen Size 5.7" 7" 10.4"

    Scree Type TFT LCD (65k Colors) TFT LED (16M Colors) TFT LED (16M

    Colors) Resolution 320 x 240 800 x 480 800 x 600 Voltage 24 VDC Memory 16 MB Flash EPROM 512 Non-Volatile Memory + SD Slot

    Ethernet Port (1) 10/100 RJ-45 PORT (1) 10/100 RJ-45 PORT (2) 10/100 RJ-45

    PORT

    USB Ports (1) USB Host V1.1 / (1) USB Client V1.1 (1) Host Client V1.1 Type B

    Serial Comm. Ports (1) RS232/485 (2) RS232 and (2) RS232/485 Operating Temperature 0 - 50 ͦC -10 - 50 ͦC

    Dimensions (W) x (H) x (D) 184 x 144 x 50 mm

    7.63" x 5.43" x 2.00"

    10.78" x 8.50" x 2.00"

    Communication Protocols

    Modbus RTU & IP / BACNet MSTP & IP Modbus RTU & IP / BACNet MSTP & IP

    Approvals NEMA 4X* / UL / cUL NEMA 4X / UL / Cl.1 Div.2 A, B, C and D

  • TENACIOUS BY NATURE

    4034 Mint Way Dallas TX 75237 MARK V - Constant Pressure Variable Pump Speed Booster System Sequence of Operation

    The Mark V, E-Series controller is intended for a variable speed booster pumping package system. The controller consists of a PLC (Programmable Logic Controller) and HMI (Human Machine Interface). The system can control 3 pumps in a skid. The system is designed to maintain a constant pressure. The controller will command the pumps to stage on and off based on pressure. The controller will regulate the speed of the pumps to maintain a constant pressure. If the pressure is below the lag pump pressure setpoint, for a time delay, the controller will command the lag pump to start. If the pressure increases above the stop lag pump pressure setpoint, for a time delay, the pump will be commanded to stop. This is true for all lag pumps. On/Off time delays and setpoints are field adjustable. The controller will monitor the system (discharge) and suction pressure, and it will generate an alarm in any of the following events:

    • High System pressure • Low System Pressure • Low Suction Pressure

    On/Off time delays and setpoints are field adjustable, and the alarms can be configured to be manual or auto reset. The suction pressure transducer can be replaced with a level switch (optional) to indicate that enough water is available for the pumps to run in ideal conditions. The PLC will also have Modbus communication with the VFD to monitor the run status. If the communication is lost, or a fault occurs in the VFD the pump will be considered failed and locked out until the alarm is reset. The next auto available pump will be commanded to run. The alarms will generate an event description on the HMI as well as an audio alarm (Horn). The alarms can be silenced/acknowledged from the HMI. The system is capable of storing up to 100 events, including alarms, pump run status, alternation, etc. The system is capable of alternating the pumps to keep the run times balanced between pumps. There are three configurable alternation types:

    • Auto alternation: When all pumps are shut down, the lead pump will rotate to the next available auto pump.

    • Manual alternation: The alternation will be generated through a button on the HMI display.

  • TENACIOUS BY NATURE

    4034 Mint Way Dallas TX 75237 • Scheduled alternation: The alternation will occur at a specified time on a daily/weekly/monthly

    basis. The pump speed will be controlled using a polynomial equation control method. The algorithm takes the instantaneous difference between the measured pressure and the pressure setpoint and calculates the speed response accordingly. The parameters for adjusting the control are field-adjustable. The runtimes of all pumps will be monitored and can be individually reset in case needed. The system will be protected with 7 levels of password security.

  • DETAIL A(2X)

    \\DC01\Data\Departments\Jobs\2015\510000350 - 510000399\510000357 Gardendale\07-Engineering\Mechanical\Workspace\510000357 Gardendale.idw

    4034 Mint WayDallas, TX. 75237PHONE: (800) 783-6756FAX: (214) 333-2742E-MAIL: [email protected] SITE: www.tigerflow.com

    DATE

    DATE

    DWN

    CHK

    PRODUCTION #

    NAME

    PAGE #

    DRAWING # REVTHIRD ANGLE PROJECTION SCALE

    THIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.

    E. KUREK 9/14/2015

    L. AMPARANO 9/14/2015

    510000357

    Gardendale

    1

    SUBMITTAL DRAWING - ALL DIMENSIONS ARE FOR REFERENCE ONLY- DO NOT SCALE DRAWING

    PROJECT NAME

    AI - AUTODESK INVENTOR FORMAT .IDW

    DESH-50PC-C-S8-CC-M-VFD-NSF

    PAGE - 1

    MANUFACTURING DRAWING

    - LINEAR TOLERANCE 1/8"

    - ANGULAR TOLERANCE 5- DO NOT SCALE DRAWING- ALL DIMENSIONS ARE IN INCHES- DIMENSIONS ARE PER ANSI Y14.5

    NTS

    A

    X

    NOTES: 1. FINISH: ___________________________ PAINT. 2. CONDITION POINT: _______ GPM @ _______ PSI SUCTION PRESSURE: _______ PSI MIN. / _______ PSI MAX 3. ALL DIMENSIONS SUBJECT TO CHANGE WITHOUT NOTICE: DO NOT USE FOR CONSTRUCTION PURPOSED UNLESS CERTIFIED. 4. (XX) INDICATE REFERENCE DIMENSIONS. 5. FILL BASE WITH NON-SHRINKING, NON-FERROUS GROUT: FAILURE TO DO SO VOIDS TIGERFLOW WARRANTY.

    BLUE1200 75

    30 62

    CON'T 6. ALL STRUCTURAL WELDING SHALL BE PERFORMED BY AWS D1.1 QUALIFIED WELDERS. 7. ALL PIPE WELDING SHALL BE PERFORMED BY ASME SECTION 9 QUALIFIED WELDERS. 8. 48" CLEARANCE (CLEAR TO GROUND) REQUIRED IN FRONT OF CONTROL PANELS PER 2011 NEC TABLE 110-26 (A) (1). 9. 12" MINIMUM CLEARANCE AROUND SYSTEM FOR SYSTEM SERVICEABILITY.10. SCHEDULE 40 COMPONENTS MAY BE SUBSTITUTED FOR SCHEDULE 10 COMPONENTS.11. STAINLESS STEEL SENSING LINES.12. NFS-61 COMPLIANT SYSTEM.

    9'-4"

    8'-0

    "

    (9'-7

    ") O

    A H

    EIG

    HT

    (8'-7 1/2") OA WIDTH

    (8'-0

    ")

    19

    18

    812

    47 12

    34

    21

    1

    ***SOME ITEMS NOT SHOWN IN VIEWSFOR CLARITY.***

    ITEM DESCRIPTION PRECEDED WITHAN ASTERISK (*) ARE SUPPLIED BY

    DYER.

    ****BOM ON PAGE 2****

    24 34

    23

    31

    22

    20

    24

    14

    13

    34

    1532

    33

    16

    SYSTEMAIR VENT

    30

    17

    26

    35

    18

    35

    (11'-6 3/4") OA LENGTH

    8'-0" 8'-0"

    2

    36

    8" GROOVEDSUCTIONCONNECTION

    8" GROOVEDDISCHARGE

    CONNECTION

    REV DESCRIPTION DWN CHK DATE1 CHANGED CUSTOMER CONNECTIONS TO 8" GROOVED. EJK MM 10/15/2015

    1

    1

    REVIEWED .........................................................................................REVIEWED: INCORPORATE CHANGES................................................REVIEWED: ONLY FOR CHANGES TO PREVIOUS SUBMITTAL .............REVISE AND RESUBMIT .....................................................................Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of the general conformance with the design concept of the project and general compliance with the information given to the contract documents. The contractor is responsible for: confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his or her work with that of all other trades, and performing all work in a safe and satisfactory manner.

    Environmental Planning Group, LLC

    By: __________________________________ Date:________________

    X

    John Griffin, PLA 12/17/20

    20201217152702370PR1905_Notice of Rejection of Alternate Proposal_20201217