1 V Konferencja Ewaluacyjna V Konferencja Ewaluacyjna Warszawa, 23.10.2009 Warszawa, 23.10.2009 Werner Schmidt Werner Schmidt O O perations perations Evaluation Evaluation The role of ex-post evaluation The role of ex-post evaluation an EIB perspectiv an EIB perspectiv e e

Upload: seven

Post on 10-Jan-2016

28 views

Category:

Documents


0 download

DESCRIPTION

V Konferencja Ewaluacyjna Warszawa, 23.10.2009. Werner Schmidt O perations Evaluation The role of ex-post evaluation an EIB perspectiv e. The role of ex-post evaluation an EIB perspective Werner Schmidt – Operations Evaluation. Presentation outline. EIB STRUCTURE, OBJECTIVES & LENDING - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

1

V Konferencja EwaluacyjnaV Konferencja EwaluacyjnaWarszawa, 23.10.2009Warszawa, 23.10.2009

Werner SchmidtWerner Schmidt OOperationsperations EvaluationEvaluation

The role of ex-post evaluation The role of ex-post evaluation an EIB perspectivan EIB perspectivee

Page 2: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

The role of ex-post evaluation an EIB perspective

Werner Schmidt – Operations Evaluation

Page 3: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

35th Evaluation Conference - Warsaw23/10/2009

Presentation outline

EIB STRUCTURE, OBJECTIVES & LENDING

EX-POST EVALUATION AND THE PROJECT CYCLE

EV Scope and objectives

Methodology and criteria

Impact on the Bank and future trends

Page 4: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

45th Evaluation Conference - Warsaw23/10/2009

The European Investment Bank (EIB)Long-term Finance Promoting European Objectives

European Union’s long-term lending bank set up in 1958 by the Treaty of Rome.

Shareholders: 27 EU Member States

Objectives within the Union:Cohesion and convergence

Small and medium-sized enterprises (SMEs)

Environmental sustainability

Knowledge Economy

Trans-European Networks (TENs)

Sustainable, competitive and secure energy

Objectives outside the Union – support EU policy

Page 5: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

55th Evaluation Conference - Warsaw23/10/2009

2008 Key Figures

European Union: EUR 51.5bnPartner countries: EUR 6.1bnTotal lending: EUR 57.6bn

Borrowings: EUR 59.5bn

Subscribed capital EUR 232.4bn(at 01/04/2009)

Lending target 2009 EUR 70 bn

Page 6: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

65th Evaluation Conference - Warsaw23/10/2009

EIB Lending 1958-2008

Page 7: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

75th Evaluation Conference - Warsaw23/10/2009

Loan signatures in the EU in 2008 (EUR m)

Page 8: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

85th Evaluation Conference - Warsaw23/10/2009

Ex-post evaluation at the EIB

EV Scope and objectives

Methodology and criteria

Impact on the Bank and future trends

Page 9: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

95th Evaluation Conference - Warsaw23/10/2009

The European Investment Bank (EIB)Ex-post Evaluation and the project cycle

EV is independent and carries out ex-post evaluations, focusing on how the Bank conducts its operations within the framework of EU policies ( the Treaty, Directives, Council decisions, mandates etc.) and the decisions of the EIB Governors.

The ultimate objective is to identify aspects, which could improve :

the accountability (EIB management),

transparency (stakeholders)

and operational performance (lessons learned) of the Bank’s activities in future projects.

Page 10: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

105th Evaluation Conference - Warsaw23/10/2009

Ex post evaluation feeding back into the project cycle

Lending Strategy

Identification

Selection AppraisalContract

negotiations

ImplementationMonitoring

Self-evaluation

IndependentEx-post

Evaluation

Time frame:

self evaluation, ex post, ongoing evaluation, mid term

Page 11: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

115th Evaluation Conference - Warsaw23/10/2009

Individual and/or thematic evaluations Strategy / mandate evaluations Mid-term reviews Joint donor evaluations Scope of activities

Type of evaluations and activities

Page 12: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

125th Evaluation Conference - Warsaw23/10/2009

OECD/DAC criteria ECG Standards Illustration of evaluation criteria used

Relevance (first pillar of value added) Project performance (second pillar) = Effectiveness,

Efficiency, Sustainability and environmental impact EIB contribution (third pillar) EIB management of the project cycle EIB’s Investment Profitability

Evaluation methodologies and results

Page 13: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

135th Evaluation Conference - Warsaw23/10/2009

Relevance

EffectivenessEfficiency

Sustainability

Environmental impact

MDB’s Investment Profitability

MDB’s contribution

MDB’s Work Quality

Selective use

Performance

of the

operation

oradditionality

Illustration of main criteria used

Page 14: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

145th Evaluation Conference - Warsaw23/10/2009

EU policies – EU objectives Country objectives

EIB strategies

Project objectives

Relevance

Page 15: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

155th Evaluation Conference - Warsaw23/10/2009

Second pillar of value added

1. Effectiveness2. Efficiency3. Sustainability4. Environmental and social impact

Project performance

Page 16: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

165th Evaluation Conference - Warsaw23/10/2009

How do we measure project results ?Effectiveness – work duration

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Project 1 ex-anteex-post

Project 2 ex-anteex-post

Project 3 ex-anteex-post

Project 4 ex-anteex-post

Project 5 ex-anteex-post

Project 6 ex-anteex-post

Project 7 ex-anteex-post

Project 8 ex-anteex-post

Project 9 I ex-anteex-post

Project 9 II ex-anteex-post

Project 10 ex-anteex-post

ex-anteex-postExtension of works/expected completion

1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010

Project 1 ex-anteex-post

Project 2 ex-anteex-post

Project 3 ex-anteex-post

Project 4 ex-anteex-post

Project 5 ex-anteex-post

Project 6 ex-anteex-post

Project 7 ex-anteex-post

Project 8 ex-anteex-post

Project 9 I ex-anteex-post

Project 9 II ex-anteex-post

Project 10 ex-anteex-post

ex-anteex-postExtension of works/expected completion

Page 17: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

175th Evaluation Conference - Warsaw23/10/2009

How do we measure project results ?Efficiency - Economic Rate of Return (ERR)

-202468

101214161820

-2 0 2 4 6 8 10 12 14 16 18 20

ERR ex-ante (%)

ERR

ex-

post

(%)

11

3

2110

65

4

9

Page 18: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

185th Evaluation Conference - Warsaw23/10/2009

Contribution of the EIB

1. Financial contribution Financial terms Catalytic effects

2. Institutional and technical contribution Conditions Technical assistance Expertise: financial and/or technical

Project performance

Page 19: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

195th Evaluation Conference - Warsaw23/10/2009

Type of reporting Internal dissemination External dissemination :

Disclosure and confidentiality Annual reporting

Communication: EV website: intranet and internet

And use: Follow-up on recommendations

Reporting, Communication, Dissemination

Page 20: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

205th Evaluation Conference - Warsaw23/10/2009

Evaluation activity – impact on Bank operations

Revision/Update of EIB strategies in specific sectors

Improved dissemination of EIB expertise

Improved management of the project cycle:ensure strict handling of contractual clauses

ensure quality of PCR

respect of guidelines on environment

Page 21: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

215th Evaluation Conference - Warsaw23/10/2009

More on the Role of the EIBMore on joint evaluationsMore on learning/dissemination

Evaluation trends for the future

Page 22: V Konferencja Ewaluacyjna Warszawa, 23.10.2009

225th Evaluation Conference - Warsaw23/10/2009

http://www.eib.org/evaluation

Further information under