validation in a seamless environment jonathan holmes ordnance survey gb 21 st october 2013

22
Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Upload: frederick-freeman

Post on 18-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Validation in a seamless environment

Jonathan Holmes

Ordnance Survey GB

21st October 2013

Page 2: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Editing solution

CentralDatabase Products

Object Editor

Page 3: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Validation

Object Editor Validation Unmarshaller Heighting Validation Life Cycles CommitCentral Database

Page 4: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Validation

Page 5: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Invalid turn restrictions

Route restrictions shown are invalid when both links are coincident and neither restriction feature is qualified Thus error where: Connectivity (A-1-B-2-C) on feature with function No Turn For Vehicular Traffic is the same as the connectivity (A-1-B-2-C) on feature with function Vehicular Traffic Must Turn and neither has a Physical user qualifier, Purpose user qualifier or temporal qualifier

No Turn Must turn

1

2 B C

A

Page 6: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Invalid turn restrictions

Page 7: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Invalid turn restrictions

Page 8: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Links that should be navigable

Page 9: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Isolated road classifications

Page 10: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Short links at junctions

Page 11: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Invalid levels

Page 12: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Missing one ways

Page 13: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Boundary links must be valid

Page 14: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Roundabout links must form a clockwise loop

Page 15: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Invalid overhead data

Page 16: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Invalid overhead data

Page 17: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Topo Tests

• Slopes not valid in water• Construction area outline must bound construction area• Building division must have building area on both sides• Water culvert must be coincident with end of a water line• Top of cliff or slope always has cliff or slope area to the right• Check Combination Of Form, Function And Geometry Is Valid

• (Letter box cannot have a function of supermarket)

Page 18: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Continuity of tide lines

Page 19: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Topo tests

• Check that mean low water has intertidal on one side and tidal on the other

• High tide line must contain tidal water• Check for small gaps• Height vertices are in range

Page 20: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Address tests

• Address state combinations must be valid• Address with a primary structure must sit within it.

Page 21: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013

Post Commit tests

• National tests for network connectivity

Page 22: Validation in a seamless environment Jonathan Holmes Ordnance Survey GB 21 st October 2013