valsir references
TRANSCRIPT
P.O. Box: 48432, Abu Dhabi, United Arab Emirates, Tel: +971 (0)2 667 0622 Fax: +971 (0)2 667 0621 Email: [email protected]
References Catalog
Sustainable Engineering Solutions
Sustainable Engineering Solutions
Marina Hotel
2008
Yas Island – Abu Dhabi
HDPE and TRIPLUS pipes and fittings
Sets the standard for exceptional service
throughout its 499 impeccable rooms and
suites, 12 innovative dining venues and
lounges. Formula 1 track built to pass
through the hotel, Watch high-speed races
and practices from the hotel daily.
Alloft Hotel
2009
ADNEC – Abu Dhabi
PP & TRIPLUS Pipes and Fittings
408 spacious loft-inspired rooms &
suites.
Crown Plaza Hotel
2008
Yas Island – Abu Dhabi
HDPE Pipes and Fittings
428 stylish guest rooms and
suites
AL Raha Beach Development-Al
Muneera Project
2009
AL Raha Beach - Abu Dhabi
TRIPLUS Pipes and Fittings & PP Pipes
and Fittings
A neighborhood offering a mix of
luxury living in magnificent villas with
waterfront views, as well as
distinctively designed multi-storey
apartment buildings
Some of our Landmark Projects
Sustainable Engineering Solutions
Abu Dhabi Investment Council
2010
Abu Dhabi
HDPE Pipes and Fittings
An innovative honeycomb structure
was designed following the analysis
of high-efficient load paths.
Nation Towers
2009
Abu Dhabi
TRIPLUS Pipes and Fittings
Tower 1 will be made up of 64 stories, and
Tower 2 will feature 51 stories, with each
tower offering its own unique blend of
luxurious facilities. The loft apartments will
be located in Tower 1, offering 360
residential units.
Dubai University Hospital
2009
Dubai
HDPE Pipes and Fittings
Providing a range of services for a 400-
bed tertiary care teaching hospital
development in Dubai
Central Market Tower T2 & T3
2010
Abu Dhabi
Tallest building in Abu Dhabi –
88 storey
HDPE Pipes and Fittings
Some of our Landmark Projects
Sustainable Engineering Solutions
Presidential Palace
2011
Abu Dhabi
Multilayer, HDPE & Silere Pipes and
Fittings
Made up of a main building and four
wings
The main palace itself will be 160,000
square meters
Arzanah Medical Complex
2010
Abu Dhabi
HDPE Pipes and Fittings
The Complex house three specialist
healthcare facilities: Wordily Spine
Centre, the Abu Dhabi Knee and Sports
Medicine Centre and a wellness and
diagnostic center
Abu Dhabi Court House Complex
2011
Abu Dhabi
PP & TRIPLUS Pipes and Fittings
The 40,000 sm (430,600 sf) 7-story
complex is a programmatically complex
facility, containing 37 courtrooms and
housing 16 major functional components
Capital Gate Hotel
2009
Abu Dhabi
TRIPLUS & SILERE Pipes and Fittings
167 guestroom and 22 suites, Guinness
Book of World Records certified Capital
Gate as the "World’s furthest leaning
man-made tower."
Some of our Landmark Projects
Sustainable Engineering Solutions
Al Ain Oasis Hospital
2010
Abu Dhabi
HDPE Pipes and Fittings
1st private hospital accredited in
the emirate of Abu Dhabi joint
commission international
Muscat International Airport project -
MC-1, Mc-3, & Mc-5
2011
Muscat - Oman
HDPE & PP Pipes and Fittings
The new terminal at Muscat
International Airport would be
completed by 2014 and will have the
capacity to handle 12 million
passengers annually.
Dubai International Airport C3
2011
Dubai
HDPE Pipes and Fittings
Expanded airport’s overall
capacity of 60 million passengers
City of lights plot
2010
Abu Dhabi
TRIPLUS Pipes and Fittings
Located on Al Reem Island, 600 meters
off the coast of Abu Dhabi, the City of
Lights shines as a new residential,
commercial and business district
Some of our Landmark Projects
Sustainable Engineering Solutions
Project Date Location Product
Burj Al Salam Mixed Used Development 2011 Dubai-UAE HDPE Pipes and Fittings
Latifa Tower 2011 Sharjah-UAE HDPE Pipes and Fittings
Guardian Tower 2010 Abu Dhabi-UAE TRIPLUS Pipes and Fittings
Island City 2009 Abu Dhabi-UAE HDPE Pipes and Fittings
Al Gurair City Expansion Ph.2 2011 Dubai-UAE HDPE Pipes and Fittings
Fujairah Commercial Complex 2011 Fujairah-UAE HDPE Pipes and Fittings
Al Ruwais Housing Complex 2010 Abu Dhabi-UAE HDPE Pipes and Fittings
Royal Car Parking Building 2011 Abu Dhabi-UAE PP and Pex Pipes & fittings
Emirates National Schools 2011 Abu Dhabi-UAE PP Pipes and Fittings
Sofitel Hotel Staff Accomodations 2011 Dubai-UAE PP Pipes and Fittings
6 Villas for Shk. Al Qasimi 2011 Sharjah-UAE TRIPLUS Pipes and Fittings
Habtoor Grand Resort & Spa 2011 Dubai - UAE PP Pipes and Fittings
Deerfield Square Center 2011 Abu Dhabi-UAE PP Pipes and Fittings
Bloom Central Hotel 2012 Abu Dhabi-UAE PP Pipes and Fittings
Centro Hotel-Capital Center
2010
Abu Dhabi
PP & TRIPLUS Pipes and Fittings
Hotel building comprising 4 basement
levels, 2 podium levels, a ground floor
and 26 additional floors that will offer
400 rooms
More References
Some of our Landmark Projects
Aviation Club Hotel
2011
Dubai
PEXAL Pipes and Fittings
291 Rooms
The 1st Under floor cooling
project
Sustainable Engineering Solutions
Contacts
P.O. Box 48432, Abu Dhabi UAE
Telephone: +971 2 6811023
Telephone: +971 4 8847433
Fax: +971 2 6811238
Fax: +971 4 8847432
Website: www.richmondses.com