![Page 1: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/1.jpg)
Value-based Transmission Investment and Operations
Marija Ilic [email protected]
Invited Panel, IEEE PES 2014
Washington DC
![Page 2: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/2.jpg)
Outline
• The evolving role of on-line T&D management
• Basic definition of an optimal grid
• Valuing transmission value –an example [1]
• Valuing flexible transmission in systems with intermittent resources [2]
2
[1] Yoon, Y. T., "Electric Power Network Economics: Designing Principles for a For-Profit
Independent Transmission Company and Underlying Architectures for Reliability”, PhD
thesis, June 2001, EECS, MIT (thesis advisor: M. Ilic)
[2] C. Tee and M. Ilic, "Optimal Investment Decisions in Transmission Expansion," in
Proceedings of the 44th North American Power Symposium, Urbana-Champaign, 2012
.
![Page 3: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/3.jpg)
The evolving role of on-line T&D management
• T&D as the enabler of T&D users’ (generation and demand) needs
• Time-varying needs require dynamic adjustments of T&D resources to maximize the ATC for least constraining delivery
• Examples of thermally- and voltage-limited ATC delivery (steady state; non-time critical congestion); key role of T&D grid optimization
• Examples of small signal- and transient stability-limited ATC (dynamic; time critical); key role of automation
• GROWING ROLE OF ON-LINE INFORMATION PROCESSING
![Page 4: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/4.jpg)
Optimal grid for congestion relief
• Hard to design T&D grid ``optimally” because conditions vary; need to rely on T&D management to optimize use of existing asset capacity
• ``optimal grid”—any grid design break-even point between the incremental capital cost and annual cumulative cost of unserved/expensive power delivery
• Becoming possible to utilize T&D assets more ``optimally”; new technologies provide shorter-term solutions/lower risks than large capital investments;
• The challenge—framework to use new technologies; hardware limits (thermal) and systems limits (voltage, stability) can be co-optimized
![Page 5: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/5.jpg)
Transmission Congestion
Bus 1
Bus 2
PL = 100 MW
Marginal Cost = 30 $/MWh Marginal Cost =
10 $/MWh
• Some Causes: • Thermal limit of the line • Voltage drop in the line
![Page 6: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/6.jpg)
Causes of Transmission Congestion: Thermal Limits of Lines
• Determined by the conductor’s material properties and the weather
• The higher the voltage, the greater the thermal limit
• If exceeded, can harm line
Voltage (kV) Rating (MW) With DLRs
230 400 420
345 1200 1270
500 2600 2550
765 5400 5800
1100 24000 24500 [1]
![Page 7: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/7.jpg)
Short-term value of relieving congestion
• Reliability
• Economic Value
Value of New Transmission Capacity = (MC2 – MC1) * Additional Power Flow
Bus 1 Bus 2
PL = 100 MW
Marginal Cost = 30 $/MWh
Marginal Cost = 10 $/MWh
Transmission Limit After Upgrade/ON-LINE DLR
Transmission Limit Before Upgrade
![Page 8: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/8.jpg)
Optimal Grid for Congestion Relief—Value vs Cost
![Page 9: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/9.jpg)
![Page 10: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/10.jpg)
![Page 11: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/11.jpg)
![Page 12: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/12.jpg)
![Page 13: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/13.jpg)
![Page 14: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/14.jpg)
Summary of Charges
In Millions In 100,000
![Page 15: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/15.jpg)
Motivation for valuing flexible transmission in systems with intermittent resources
• Increased variability and intermittency in the power system due to: – Renewable energy integration – Distributed generation and load resources
• Greater variety of technologies that can supplement
conventional AC transmission lines: – Flexible AC Transmission System Devices (FACTS) – Controllable DC Lines
• How do we value the flexibility provided by flexible
transmission devices in making investment decisions?
15
![Page 16: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/16.jpg)
Flexibility in Transmission
• Operational Flexibility: – Is the operational capability of the system flexible enough to
efficiently and effectively manage a variety of short-run system conditions and uncertainties?
• Investment Flexibility
– Is the long-run investment plan for the system flexible enough to efficiently adapt to changes in long-run system conditions and forecasts?
• Institutional Flexibility – Is the regulatory and market framework flexible enough to
accommodate and incentivize a wide variety of currently available and future technology?
16
![Page 17: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/17.jpg)
Overview of Case Studies
• Two key questions answered: – What is the optimal investment in flexible transmission devices
considering the value of short-run operational flexibility? – What is the value of long-run investment flexibility that can be
brought about by flexible transmission devices?
• General framework demonstrated using simple 3-bus examples
• Technology considered: Thyristor-Controlled Series Compensator (TCSC) – Control real power flow in system by changing reactance in the line – Better utilize existing transmission capacity – Case studies demonstrates: Value of TCSC in providing short-run
operational flexibility and long-run investment flexibility
17
![Page 18: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/18.jpg)
INVESTMENTS IN TCSC AND SHORT-RUN OPERATIONAL FLEXIBILITY What is the optimal investment in TCSC considering the value of short-run operational flexibility?
18
![Page 19: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/19.jpg)
Optimal Investment Model (Minimize Operational and
Investment Cost)
(DC Power Flow and
Thermal Line Constraints)
(Line Investment Min)
(Power Balance in System)
(Power Injection Min/Max)
(TCSC Investment Min/Max)
(TCSC Operational Range)
Optimality Conditions for Investments in TCSC:
Marginal Cost of
Investment
Cumulative Sum of
the Additional
Congestion Rent
Brought About by
TCSC
19
![Page 20: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/20.jpg)
Base Case Test System and Parameters
Technology Scaled and Annualized
Investment Cost
New Line Capacity $20 thousand per MW
New TCSC Capacity $20 million per p.u. flexible reactance
Load Profile:
20
![Page 21: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/21.jpg)
Results: Optimal Investments With and Without Wind
Case Optimal Investment Decision
Investment Cost
($ thousand)
Savings in Operational Cost ($ million)
(1) No Wind 22.5 MW of New Line Capacity at Line 2
450 1.6
(2) With Wind
0.0025 pu of Flexible Reactance at Line 1
50 0.12
S
S
COSTG1=
$100/MWh
COSTG2=
$300/MWh
Xbase,1= j0.01 pu
Kbase,1=150MW
S
COSTG3=
$400/MWh
Lower Load
Xbase,2= j0.02 pu
Kbase,2=122.5MW
Xbase,2= j0.03 pu
Kbase,2=100MW
Higher Load
Line 1 Line 2
Line 3
COSTG1=
$100/MWh
S
S
COSTG2=
$300/MWh
Xbase,1= j0.01 pu
Kbase,1=150MW
S
COSTG3=
$400/MWh
Lower Load
Xbase,2= j0.02 pu
Kbase,2=100MW
Xbase,2= j0.03 pu
Kbase,2=100MW
Higher
Load
Line 1
Line 2
Line 3
No wind: With wind:
21
![Page 22: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/22.jpg)
Results: Different Investment Scenarios with Wind Scenarios Optimal Investment
Decision Investment
Cost ($ thousand)
Operational Cost ($ million)
(a) No Investment - - 6.5
(b) New Line Capacity
4.6 MW of New Line Capacity at Line 2
92 6.4
(c) New TCSC/Line Capacity
0.0025 pu of Flexible Reactance at Line 1
50 6.3
Scenarios Percentage of Time Congested (%)
Line 1 Line 2 Line 3
(a) No Investment 1.3 24 0
(b) New Line Capacity 3.7 0 0
(c) New TCSC/Line Capacity 17 25 0
Policy question: Should we redefine what it means to “relieve
congestion”? 22
![Page 23: Value-based Transmission Investment and Operations...Value-based Transmission Investment and Operations Marija Ilic milic@ece.cmu.edu Invited Panel, IEEE PES 2014 Washington DCOutline](https://reader033.vdocument.in/reader033/viewer/2022060813/609158f29303ff3fb2493178/html5/thumbnails/23.jpg)
Conclusion and Future Work • Possible to have a general framework to evaluate how flexible
transmission devices add value to a system particularly in system with high renewable resources
• Future work: – What kind of tools do we need to apply proposed methods to
larger system and models with stochasticity? • Decomposition approaches, dynamic programming with
heuristics, Markov modeling etc. – How do we develop institutional flexibility?
• Market and regulatory design • Centralized vs decentralized planning approaches • Multi-time scale contracts for distributed risk management • What do we really mean when we want to “relieve congestion”?
23