11 PROJECT DEVELOPMENT PLAN
VISION
TO BE THE PREMIER FULLY AUTOMATED SHIPYARD IN THE WORLD AND THE LEADING SHIPBUILDER IN THE REGION.
MISSION
TO ACQUIRE THE TECHNOLOGICAL TRANSFER BY USING THE LATEST STATE OF THE ART MACHINERIES THROUGH EXTENSIVE RESEARCH AND DEVELOPMENT
1. Company Vision & Mission
VANTECH DOCKYARD ( M) SDN BHD
Company name : Vantech Dockyard(M) Sdn Bhd Registered No : 848690-T Established year : 4th March 2009 Authorized Capital : RM 100,000.00 Business field : Ship repair & Building, Offshore
Fabrication
VANTECH DOCKYARD ( M) SDN BHD
2.0 COMPANY BACKGROUND
16th Feb 2009 : Official Launching and contract signing Ceremony officiated by Royal state of Pahang Sultan Ahmad Shah at Mandarin Hotel KL
25th March 2009: Meeting with Korean ShipbuilderDSME & Design consultant Handong E&C for possible joint venture
20th June 2009 : Ground Breaking Ceremony officiated by Royal State of Pahang Sultan Ahmad Shah at Tg Agas, Pekan
VANTECH DOCKYARD ( M) SDN BHD
2.0 COMPANY BACKGROUND
20th June 2009 : Signing MOU with DSME and Handong E&C on Joint Venture with Vantech Dockyard (M) Sdn Bhd
21st July 2009 : Master Plan & conceptual design, land survey and soil test.
1st June 2010 : Commencement construction
VANTECH DOCKYARD ( M) SDN BHD
2.0 COMPANY BACKGROUND
Address : No 47, Jalan Wawasan 4/6, Bandar Baru Ampang, 68000 Selangor Darul Ehsan.
Tel : 03-42784494 Fax : 03-42784495 Website : www.vantech.com.my E-mail : [email protected]
VANTECH DOCKYARD ( M) SDN BHD
3.0 CORPORATE OFFICE
Chairman
Managing Director/ CEO
Deputy Managing Director/ COO
GM Engineering & Construction
GM Marine Repair &Conversion
GM Marketing GM Finance
SecretaryAdvisor
VANTECH DOCKYARD ( M) SDN BHD
Secretary
GM Procurement GM Tender &Contract
GM Yard Management
GM Human Resource
4.1 ORGANISATION CHART
5.0 BUSINESS SUMMARY
BUSINESS NAME VANTECH DOCKYARD (M) SDN . BHD
BUSINESS ADDRESS NO 47, JALAN WAWASAN 4/6, BANDAR BARU AMPANG 68000, SELANGOR DARUL EHSAN
BUSINESS AREA 800 ACRES
BUSINESS CONDITION AREA TG AGAS, PEKAN PAHANG
CONSTRUCTION METHODS PHASES
CONSTRUCTION DURATION 8 YEARS
BUSINESS INVESTMENT RM 4.795 BILLIONS
VANTECH DOCKYARD ( M) SDN BHD
2. LOCATION CONDITION ANALYSIS
SATELITE VIEWROAD MAPS
VANTECH DOCKYARD ( M) SDN BHD
6.0 SHIPYARD LOCATION
8.1 FINANCIAL ANALYSIS
VANTECH DOCKYARD ( M) SDN BHD
A) PROJECTION PROFIT
1) FABRICATION PROJECT - RM 10,000,000.00 / UNITFOR 1 ~ 5 YEARS , 20 UNITS (TOPSITE, JACKET, & RIGS)/YR - RM 200,000,000.00AFTER 5 YEARS , 50 UNITS / YR - RM 500,000,000.00
2) MARINE REPAIRS - RM 3,500,000.00 / UNITFOR 1 ~ 5 YEARS, 60 UNITS (VLCC, LNG, RIGS & OTHERS)/YR- RM 210,000,000.00AFTER 5 YEARS, 100 UNITS / YR - RM 350,000,000.00
3) SHIPBUILDING - RM 180,000,000.00 / UNITFOR 1 ~ 4 YEARS, 20 UNITS (VLCC AND LNG OR WAR SHIP) - RM 3,600,000,000.00AFTER 4 YEARS, 50 UNITS / YR - RM 9,000,000,000.00
B) FOREIGN COMPANY INVESTMENT (30% EQUITY) - RM 2,055,000,000.00
C) PROJECT INVESTMENT - RM 4,795,000,000.00
8.2 FINANCIAL ANALYSIS
VANTECH DOCKYARD ( M) SDN BHD
The NPV and IRR from the original estimate costof RM4.795 billion investments, is RM 1.27billion and 13% for 9 years Payback period asper the detailed analysis.
9.0 DEVELOPMENT PROCEDURE
1st Stage: Industrial development specification stage
Establish Industrial developmentconstruction plan (1)
Register name of industrial development company
Revision report of relationship and resident
Consultation relationship between a couple
Making strong resolution in industrial surroundingarea, consideration of policy regulation
Industrial development authorization approval
Industrial development authorization notice
Basic Plan reflection acceptance or rejection report
Reclamation basic pelan (modification) notice
Reflection decision consideration
Property surface of water reclamation basic planreflection decision (Marine Investigation department)
Advance environment analysis(administration plan ), Traffic analysis,Advance disaster affection analysis, landaptitude valuation, culture investigation
VANTECH DOCKYARD ( M) SDN BHD
9.1 DEVELOPMENT PROCEDURE
2nd Stage: Operation Plan Stage
Register operation plan approval
Industrial development operation approval registration
Relationship an engine consultation
Industrial development operation pelan approval
Operation plan . Topography drawing notice
Property surface of water reclamation license registration
Property surface of water reclamation license notice
Property surface of waterconstruction . Operation plan
approval registration
Property surface of waterconstruction operation plan
approval
3rd Stage: Industri Operation Stage
Consideration
Construction start work
Completion approval registration
Completion Inspection
Completion Inspection
Completion approval,.announcement
Industrial complex management an engine report
Industrial complex management an engine report
Environment, traffic, disaster effect valuation ,Energy usage plant consultation
Sea water Usage charge, damage effect valuation
VANTECH DOCKYARD ( M) SDN BHD