Vapor Lock Project Synopsis
Project: Casey’s Pizza & Bar, Vapor Lock enhanced concrete
Project Location: Port Huron, Michigan
A/E/GC: East Lake Builders, Port Huron, Michigan
Concrete Contractor: Nutech Services, Michigan
Batch Plant: Port Huron Building Supply, Port Huron, Michigan
Project Description: Three separate pours, two at 2,000 sqft colored concrete, one pour
was 300 sqft colored in-laid bar top
Project Date: June 2013
Product’s used: Vapor Lock 20/20 WVRA
Notes: First pour 2,000 sqft colored in-laid concrete, second pour 2,000 sqft colored
stamped concrete, third pour 300 sqft colored in-laid bar top. First pour “washout” cost
was cut in half because how quickly truck cleaned-up.
Both the Batch Plant and the flatwork contractor have been certified by Specialty
Products Group. Concrete was epoxy coated in 14 days !