variant configuration 3
TRANSCRIPT
1
Object Variables used in Multi level configurations
Vari
ant
Con
figu
rati
on
Source: SAP
2
Allowed Dependency TypesV
ari
ant
Con
figu
rati
on
Source: SAP
• Preconditions are allowed for characteristics and characteristic values.
• Selection conditions are allowed for characteristics, BOM items, operations, and production resources/tools.
• Procedures & Actions are allowed for characteristics, characteristic values, BOM items, operations, and configuration profiles.
• Constraints can only be linked to a configuration profile via dependency nets.
3
Processing Sequence for DependenciesV
ari
ant
Con
figu
rati
on
Source: SAP
• Each time you enter a value for a characteristic on the value assignment screen and confirm the value, the system processes all the dependencies.
• The dependencies are processed in the following sequence:
1. All actions several times, until no more values can be inferred.
2. All procedures exactly once in the following sequence:
a) Procedures for the configuration profile in the order you defined
b) Procedures for characteristics
c) Procedures for characteristic values
The procedures for each characteristic or value are processed in the order you defined.
3. Actions
Values set by procedures can also trigger actions. For this reason, all actions are processed again.
4. Preconditions
5. Selection conditions for characteristics
Constraints are processed in parallel with points 1–3, if all the objects in the OBJECTS
section are present, and if all the conditions in the CONDITIONS section are fulfilled
4
• Transfer to Production Planning (Demo)
5
2. Checking Requirements Using MRP (T Code :MD04)
Vari
ant
Con
figu
rati
on
Source: SAP
Step1 to create sales order has already been discussed earlier.
2. Stock Requirements List: • The sales order is displayed as a separate planning segment (sales
order stock required on material availability date and sales order).
6
3. Requirements Planning (T Code :MD50)V
ari
ant
Con
figu
rati
on
Source: SAP
The sales order will now be converted into a planned order. Planned Orders represent the first step toward an actual production schedule for the Shop Floor.
7
4. Convert the Planned Order into a Production Order (MD04)
Vari
ant
Con
figu
rati
on
Source: SAP
• Planned Orders are a result of MRP run and serve to provide an initial Production Schedule. • Production Orders contain comprehensive information to support a shop floor schedule and provide a method to confirm operations performed. • Production orders can be created with reference to a Planned Order.
8
4. Convert the Planned Order into a Production Order (MD04)
Vari
ant
Con
figu
rati
on
Source: SAP
Object Dependency:BoM Selection Condition ensures only necessary material components are taken.
9
4. Convert the Planned Order into a Production Order (MD04)
Vari
ant
Con
figu
rati
on
Source: SAP
Object Dependency:Routing Selection Condition ensures only necessary operations are taken.
10
4. Convert the Planned Order into a Production Order (MD04)
Vari
ant
Con
figu
rati
on
Source: SAP
Prior to release of order, it is not possible for anyone to enter confirmations for the operations in the order.
Release the Order and Save it.
Display the operation scheduling overview, choose Goto ® Graphic ® Gantt chart.
11
4. Convert the Planned Order into a Production Order (MD04)
Vari
ant
Con
figu
rati
on
Source: SAP
Display the planned costs, choose Goto Costs Analysis
12
5. Confirming Production Order (CO11N)V
ari
ant
Con
figu
rati
on
Source: SAP
Production Control Confirmation Enter For Operation Time Ticket
13
5. Confirming Production Order (CO11N)V
ari
ant
Con
figu
rati
on
Source: SAP
• Back flushing (posting of an issue of components or material withdrawals)
• Storage of the finished product in the warehouse to sales order stock• Goods Movements are posted (errors if any can be corrected in COGI)• Actual costs are calculated• Just in case, to close the order without yielding a product, perform
Restrict Processing -> Technical Completion for Production Order in CO02.
14
5. Confirming Production Order (CO11N)V
ari
ant
Con
figu
rati
on
Source: SAP
• Sample Material Document and FI document entries are shown below
15
6. Checking the Settlement of the Production Order
Vari
ant
Con
figu
rati
on
Source: SAP
From the Production Control node, choose Period-End Closing Settlement Individual Processing (KO88)
Perform order settlement to transfer the costs of the production order to sales order.
Analyze the current cost situation for the Production Order
16
7. Creating a Delivery (VL10G for delivery due list, VL01N for single delivery)
Vari
ant
Con
figu
rati
on
Source: SAP
Assign a serial number to the material. Pick and post the goods issue.Movement type will be 601 E indicating delivery from sales order stock.Accounting document will be generated to capture the change in inventory.
17
8. Creating Billing Document (VF04/VF06 for due list, VF01 for single invoice)
Vari
ant
Con
figu
rati
on
Source: SAP
VF01: Create the invoice – sample accounting entries (without tax) are shown belowF-28: Receive the payment from the customer
18
Other Information V
ari
ant
Con
figu
rati
on
Source: SAP
• CRM: It is possible to have configurable products among your Online Store offerings using the IPC (Internet Pricing and Configurator). It allows customers to interactively choose product options via an easy-to-use interface. Customers can mix-and-match these options to build the exact product they wish to purchase.
• ECC 5.0: Single transaction PMEVC – Modeling Environment for VC
19
Thank YouThank You