vaughan - loopnet · 2018. 12. 10. · location east side of huntington road, south of langstaff...
TRANSCRIPT
AvailableDecember 2018
LocationHuntington Road, south of Langstaff Road
FOR LEASE1 Keyes Court, Unit 2
Vaughan
AVAILABLE
John Powell Executive Vice President*
+1 416 791 [email protected]
20,290 SF
Location East side of Huntington Road, south of Langstaff Road
Total Area 20,290 SF
Office Area Built to suit (5% included in lease rate)
Clear Height 32 feet
Shipping Doors 4 truck level and 1 drive in
Zoning EM1
Power 600 volts, 400 amps (tbc)
Bay Sizes 35’ x 40’
TMI $3.25 PSF (2018)
Lease Rate $8.25 PSF net
Available December 2018
Comments New industrial space within larger building Excellent amenities within immediate area Excellent access to Highways 427, 407 & 7 All information to be confirmed and subject to change
SPECIFICATIONSPROPERTY1 Keyes Court, Unit 2, Vaughan
(CLOSED BY BY-LAW No. 2012-73, INST. No. YR1903403)
H/C SIGN DETAIL - TYPE "A" VAN ACCESSIBLENUTS WITH FLAT WASHERS ON BOTH SIDES.ANCHORS WITH TWO GALVANIZED 12mm HEX HEAD BOLTS ANDTHE SIGN FACE MUST BE SECURED TO A POST OR WALL
SPACIFICATIONSIGN BLANK WITH TOP AND BOTTOM MOUNT HOLES. TO MTO0.064 INCH GAUGE ALUMINUM OR 15 GAUGE GALVANIZE STEEL
MOUNTING
SIGNAGE FACE
THE HEAD OR TOP END OF EACH SPACE.NOT MORE THAN 2.0m FROM THE FACE OF THE CURB OR ATTHE REQUIRED SIGN MUST BE MOUNTED AT LEAST 0.6m ANDAPPLICABLE. SUCH AS OPEN ROW IN PARKING LOT.
ALL HANDICAPPED PARKING STALLS SHALL BE DESIGNATED BYONE SIGN PER SPACE, BACK TO BACK MOUNTED WHERE
WHERE AN UNOBSTRUCTED BIULDING FACE IS LOCATED NOT MORESIGNS MUST NOT OBSTRUCT THE SIDEWALK.
THAN 2.50m FROM THE FACE OF THE CURB AT THE HANDICAPPEDSPACE. THE SIGNS MAY BE MOUNTED ON THE BUILDING FACE.
REQUIREMENTSDISABLED PARKING PERMIT SIGN
THAN 2% ACROSS THE STALL WIDTH.* SURFACE SLOPE LESS THAN 5% LONGITUDINALLY AND LESS
OR
AS
PER
CIT
Y R
EQU
IRM
ENT
OR AS PER CITY REQUIRMENT3400
6000
STRIPEAMBER PAINT100 WIDE OR
SIDEWALK
WHEECHAIR WHITE WHEELCHAIR
SILHOUETTE ONLIGHT BLUEBACKGROUNDSQUARE 1400x1400
Rb-93 SIGN
NEAR A BUILDING FRONT
(other open lot stalls near doorways-mark simular)
TYPICAL MARKINGS ILLUSTRATED FOR STALL & SIDEWALK
CONDENSED.
BORDER.
SPACE LOCATIONS.DISABLED PARKINGASSOCIATED WITHAND CURB CUT,
BUILDING FACESSWHEECHAIR RAMP
30mm BLACK LEGENDHELVETICA BOLD
BACKGROUND ANDOUTLINE.
125mm BLUE SQUAREREFLECTIVE
WHITE REFLECTIVESYMBOL AND
ENGINEERING GRADESCOTCHLITE FILM.
WHITE REFLECTIVEBACKGROUND E.G.
STROKE.15 RED REFLECTIVE
(150mm O.D.)BACKGROUNDCIRCULAR20 RED REFLECTIVE
AND BLACK BORDERBLACK LETTER `P'75 mm HEIGHT
(300X450)SINGLE FACE
Rb-93 SIGN
150
300
300
(NO
T LE
SS T
HAN
600
WH
EN B
UIL
DIN
G F
ACE
MO
UN
TED
1000
MIN
IMU
M -
1500
MAX
IMU
M
450
ONLYBY PERMIT
TIMREPYBYLNO
G35
10
25
30
15
M DTO S 3I N -9CO E Rb
TYPICAL SUPPORT AND BASE
SUPPORT)FOOTING (OR EQUIVALENT FIRMPLACE IN 300mm DIA. CONCRETEPIPE. POST TO BE CAST INGALVANISED STANDARD STEEL SIGN POLE OR 75mm DIA. TREATED WOOD. U-CHANEL100mm X 100mm PRESSURE
AROUND FOOTINGEXPANSION JOINT
Maximum Fine$5000
For Enforcement call:(905)-458-3424 BLACK LETTERING
WHITE REFLECTIVEBACKGROUND AND
Maximum Fine$5000
For Enforcement call:(905)-458-3424
1500
VAN ACCESSIBLE
VAN ACCESSIBLE
HU
NTI
NG
TON
RO
AD 6.00 [19'-8"]
MD
DR
IVE
IN
MD
DR
IVE
IN
59.40[194'-11"]
37.19 [122'-0"]
ONE STOREYPROPOSED
(FOOTPRINT)
INDUSTRIAL BUILDING
56,499.98 sq.ft.
7.50[24'-7"]
LAN
DSC
APE
SETB
ACK
11.00[36'-1"]
3,500.00 sq.ft.
MD
KEYES COURT
3.00[9'-10"]
32.02 [105'-0"]
6.50[21'-4"]
8
24
25
1 2 3 4 5 6 7 8 9
5,249.02 sq.m.
2.75[9'-0"]
A B
AB
6.00[19'-8"]
6.00[19'-8"]
6.00[19'-8"]
FIRE ROUTE
FIRE ROUTE
42.00 sq.m.(452.08 sq.ft.)
BULKMD
FIRE ROUTESIGNAGE
FIRE ROUTESIGNAGE
RB-93 HANDICAPPARKING SIGN
DEPRESSEDCURB
RB-93 HANDICAPPARKING SIGN
DEPRESSEDCURB
RAM
P D
N
LAN
DSC
APE
SETB
ACK
LANDSCAPE SETBACK
STOP SIGN
STOP SIGN
R=12.00mR=9.00m
R=12.00mR=9.00m
R=9.00m
BUILDING LINE
BUILDING LINE
RAM
P D
N
MD
DEPRESSEDCURB
MEZZANINE
MD
9.00[29'-6"]
MD
MD
R=12.00
m
R=12.00m
86.86[285'-0"]
64.72[212'-4"]
MD
22.05[72'-4"]
2.00[6'-7"]
1.98[6'-6"]
325.16 sq.m.
X
AREA=31827.5 m
AREA=10948.4 m
6.15[20'-2"]
SNOW STORAGEAREA
70m
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
BLOCK 2
BLOCK 11
BLOCK 10
6
8
8 8
9.95[32'-8"]
6.00[19'-8"]
6.00[19'-8"]
6.00[19'-8"]
6.00[19'-8"]
6.00[19'-8"]
6.00[19'-8"]
6.00[19'-8"]
10.00[32'-10"]
45.62[149'-8"]
13.50[44'-3"]
2.40[7'-10"]
1.50 [4'-11"]
3.40[11'-2"]
3.40[11'-2"]
1.50 [4'-11"]
2.40[7'-10"]
22.97[75'-4"]
HEAVY D
UTY PVM
T
HEAVY DUTY PVMT
3.00[9'-10"]
STO
P SI
GN
1.50 [4'-11"]
6.60[21'-8"]
5.88[19'-4"]
5.00 [16'-5"]
16.15[53'-0"]
UNIT #2
20,289.97 sq.ft.1,885.00 sq.m.
UNIT #1
36,210.00 sq.ft.3,364.02 sq.m.
SNO
W S
TOR
AGE
AREA
5.00 [16'-5"]
SCALE:
1 SITE PLAN1:300
File:H:\Acad SRN Projects\S17039 ZZEN Campio Keyes Ct\ACAD Drawings\04 ACAD ISSUED\TENDERING\S17039 - A100 Site plan (Mar 1, 2018).dwg Plotted: Mar 14, 2018 By:georgea
C SRN ARCHITECTS INC. 2018
ADDITIONAL NOTES:
ISSUED FOR:DATE:NO:
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR PRIORTO COMMENCEMENT OF ANY WORK. ANY DISCREPANCIESMUST BE REPORTED DIRECTLY TO SRN ARCHITECTS INC.
THESE DRAWINGS ARE NOT TO BE SCALED:
DRAWING NUMBER:
REVISION COMMENT:DATE:NO:
DATE:
CLIENT:
PROJECT NUMBER:
PROJECT:
DRAWING TITTLE:
CHECKED BY:DRAWN BY:
SCALE:
8395 JANE STREET, Suite 202VAUGHAN, ONTARIO. L4K 5Y2
PHONE: 905.417.5515 FAX: 905.417.5517
J.S.F.C.
INDUSTRIAL BUILDINGHUNTINGTON RD. COR. KEYES COURT
VAUGHAN, ONTARIO
CAMPIO GROUP OF COMPANIES5770 HWY 7, UNIT 1
WOODBRIDGE, ONTARIO, CANADA. L4L 1T8TEL: (905) 850-6636 FAX: (905) 850-6640
1 Jan 18, 2018 ISSUED FOR TENDERING
A100
J.S.F.C.
MAR 14, 2018 1:300
SITE PLAN
.\SRN images\SRN-Long-Logo.JPG
944.60
-
Ontario Building Code Data Matrix - Part 3 & 9 OBC ReferenceITEM
1 Project Description: Part 11
11.1 to 11.4
New
Addition
AlterationChange of Use
Part 3
1.1.2. [A]
2 Major Occupancy(s)
3 Building Area (m )2
3.1.2.1.(1)
1.4.1.2 [A] 1
4 Gross Area (m )2
5 Number of Storeys Above Grade: 1 1.4.1.2 [A] & 3.2.1.1.
6 Number of Streets/Fire Fighter Access: 1 3.2.2.10 & 3.2.5.
7 3.2.2.67
8 Sprinkler System Proposed entire building
selected compartments
selected floor areas
basement
3.2.2.67
3.2.1.5
3.2.2.17
Standpipe required9 Yes No 3.2.9.
3.2.4.10 Fire Alarm required NoYes
Water Service/Supply is Adequate11 Yes No 3.2.5.7.
NoYes 3.2.612 High Building
Construction Restrictions13 Non-combustibleCombustible Both
BothCombustible Non-combustibleActual Construction
3.2.2.67
Second floor(s) Area (m ):14 2 3.2.1.1.(3)-(8)
15 Occupant load based on m /person design of building2 3.1.17
Occupancy: Office
16 Barrier-free Design Yes No (Explain): 3.8
17 Hazardous Substances Yes No 3.3.1.2. & 3.3.1.19
18 RequiredFire
ResistanceRating(FRR)
Horizontal Assemblies
FRR (Hours)
Listed Design No.
or Description (SB-3)
Roof:
Members
FRR of Supporting Listed Design No.
or Description (SB-3)
Spatial Separation - Construction of Exterior Walls - Existing Building19 3.2.3
Name of Project:INDUSTRIAL BUILDING
Location:
VAUGHAN, ONTARIO
References are to Division B unless noted[A] for Division A or [C] for Division C
in lieu of roof rating
not required
Permitted Required
1.4.1.2 [A]
INDEX
Load: 15 persons
Hours
Roof: Hours
Floor: Hours
Floor: Hours
-
2
-
2
Group F2 - Medium hazard industrial occupancies
Building Classification: 3.2.2.67. Group F, division 2, any height, any area, sprinklered.
Huntington Road cor. Keyes court
EXISTING NO CHANGE
Part 9
1.1.2.9.10.1.3.
9.10.2.
9.10.4.
N/A
1.4.1.2 [A]
1.4.1.2 [A]
1.4.1.2 [A]
9.10.20.
9.10.2.
9.10.8.2.
INDEX
9.10.18.
N/A
N/A
9.10.6.
9.10.4.1.
9.9.1.3.
9.5.2.
9.10.1.3.(4)
9.10.8.9.10.9.
9.10.14.
3.2.2.20.-.83 &3.2.1.4
Wall
East
North
West
South
Area of
EBF (m )2
L.D.
(m ) H/L
L/H or PermittedMax. % ofOpenings
Proposed% of
Openings
FRR(Hours)
ListedDesign or
Description
Comb
Const
Comb.Constr. Nonc.
Cladding
Non-comb
Const
49.80 %
EXISTING: 0 TOTAL: 5,249.02
_
_
_
_
100 %
100 %
Mezzanine Area (m ): 325.162
11.50 m/12.375m
NO YES
NO YES
NO YES
NO YES
_ CONC. PANEL_ CONC. PANEL_ CONC. PANEL
22.12
CONC. PANEL
_
_
_
_
NEW: 5,249.02 (Footprint)
22.0 %
22.0 %
Occupancy: Warehouse Load: 30 person
8395 JANE STREET, SUITE 202VAUGHAN, ONTARIO. L4K 5Y2
PHONE: 905.417.5515 FAX: 905.417.5517
EXISTING: 0
944.60
705.24
705.24
37.16
6.00
6.15
15.5 %
18.5 %
10.0 %
.\Acad SRN Projects\SRN Seal 4.jpg
CONSTRUCTION NORTH
TRUE NORTH
150
300
150
5050
450
100100
50
SCALE:
3 TYPICAL CONCRETE CURB1:10
15050
5050
450
25 M
AX.
150
300
100100
SCALE:
4 DEPRESSED CONCRETE CURB1:10
1000
1200
500
SCALE:
6 TYPICAL STEEL BOLLARDS1:10
100100
5050
300
150
15050
450
SCALE:
5 SECTION: CONCRETE CURB/SIDEWALK1:10
TOTAL: 5,574.18NEW: 5,574.18
0.1500HIGHWAY 7HIGH
WAY
50
ISLI
NGTO
N AV
ENUE
WES
TON
ROAD
KIPL
ING
AVEN
UE
427
LANGSTAFF ROAD
HIGH
WAY
27
ZENWAY BLVD
407
400
FLOOR PLANPROPERTY1 Keyes Court, Unit 2, Vaughan
LEASED UNIT 2
ELEVATIONSPROPERTY1 Keyes Court, Unit 2, Vaughan
SignageSignage
SignageSignage
File:H:\Acad SRN Projects\S17039 ZZEN Campio Keyes Ct\ACAD Drawings\04 ACAD ISSUED\TENDERING\S17039 - A500 Elevation (Mar 12, 2018).dwg Plotted: Mar 27, 2018 By:georgea
C SRN ARCHITECTS INC. 2018
ADDITIONAL NOTES:
ISSUED FOR:DATE:NO:
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR PRIORTO COMMENCEMENT OF ANY WORK. ANY DISCREPANCIESMUST BE REPORTED DIRECTLY TO SRN ARCHITECTS INC.
THESE DRAWINGS ARE NOT TO BE SCALED:
DRAWING NUMBER:
REVISION COMMENT:DATE:NO:
DATE:
CLIENT:
PROJECT NUMBER:
PROJECT:
DRAWING TITTLE:
CHECKED BY:DRAWN BY:
SCALE:
8395 JANE STREET, Suite 202VAUGHAN, ONTARIO. L4K 5Y2
PHONE: 905.417.5515 FAX: 905.417.5517
S17039
J.S.F.C.
INDUSTRIAL BUILDINGHUNTINGTON RD. COR. KEYES COURT
VAUGHAN, ONTARIO
CAMPIO GROUP OF COMPANIES5770 HWY 7, UNIT 1
WOODBRIDGE, ONTARIO, CANADA. L4L 1T8TEL: (905) 850-6636 FAX: (905) 850-6640
1 Jan 18, 2018 ISSUED FOR TENDERING
2 Mar 28, 2018 ISSUED FOR PERMIT
3 Mar 29, 2018 ISSUED FOR CONSTRUCTION
A500
J.S.F.C.
Mar 28, 2018 1:150
ELEVATIONS
NOTE:BIRD SAFE TREATMENTSCLEAR GLASS, ANY GLASSTHAT EXCEED 2sm(PER MNRF GUDELINES)
PROGRESSCONSTRUCTION1 Keyes Court, Unit 2, Vaughan
PRECAST GOING UP!
photo: August 2018
RENDERINGPROPERTY1 Keyes Court, Unit 2, Vaughan
SignageSignage
SignageSignage
File:H:\Acad SRN Projects\S17039 ZZEN Campio Keyes Ct\ACAD Drawings\04 ACAD ISSUED\TENDERING\S17039 - A500 Elevation (Mar 12, 2018).dwg Plotted: Mar 27, 2018 By:georgea
C SRN ARCHITECTS INC. 2018
ADDITIONAL NOTES:
ISSUED FOR:DATE:NO:
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR PRIORTO COMMENCEMENT OF ANY WORK. ANY DISCREPANCIESMUST BE REPORTED DIRECTLY TO SRN ARCHITECTS INC.
THESE DRAWINGS ARE NOT TO BE SCALED:
DRAWING NUMBER:
REVISION COMMENT:DATE:NO:
DATE:
CLIENT:
PROJECT NUMBER:
PROJECT:
DRAWING TITTLE:
CHECKED BY:DRAWN BY:
SCALE:
8395 JANE STREET, Suite 202VAUGHAN, ONTARIO. L4K 5Y2
PHONE: 905.417.5515 FAX: 905.417.5517
S17039
J.S.F.C.
INDUSTRIAL BUILDINGHUNTINGTON RD. COR. KEYES COURT
VAUGHAN, ONTARIO
CAMPIO GROUP OF COMPANIES5770 HWY 7, UNIT 1
WOODBRIDGE, ONTARIO, CANADA. L4L 1T8TEL: (905) 850-6636 FAX: (905) 850-6640
1 Jan 18, 2018 ISSUED FOR TENDERING
2 Mar 28, 2018 ISSUED FOR PERMIT
3 Mar 29, 2018 ISSUED FOR CONSTRUCTION
A500
J.S.F.C.
Mar 28, 2018 1:150
ELEVATIONS
NOTE:BIRD SAFE TREATMENTSCLEAR GLASS, ANY GLASSTHAT EXCEED 2sm(PER MNRF GUDELINES)
407
407
427400
401401
403
QEWDVP
VAUGHAN
MISSISSAUGA
OAKVILLEGardiner Express Way
The Gore Road
Queen Street E High
way 27
High
way
50
Islington Avenue
Kiplin
g Ave
nue
Bloor Street
Steeles Avenue WSteeles Avenue W
Highway 7
Finch Avenue Albion Road
Rutherford Road
Highway 427Extension Vaughan Enterprise
Zone (VEZ)
PEARSON AIRPORT12.9 km | 10 Mins
CN INTERMODAL8.4 km | 10 Mins
CP INTERMODAL4.3 km | 7 Mins427 HIGHWAY 427
2.4 km | 3 Mins 407 HIGHWAY 4074 km | 5 Mins 400 HIGHWAY 400
10 km | 13 Mins
401 HIGHWAY 401 15.4 km | 12 Mins410 HIGHWAY 410
15 km | 15 Mins 403 HIGHWAY 403 31.5 km | 15 Mins
CAD/US BORDER135 km | 90 Mins
TORONTO30 km | 27 Mins
The property is close to the major 400 series highways, intermodal terminals, and other major transportation hubs.
LOCATIONSTRATEGIC1 Keyes Court, Unit 2, Vaughan
1 KEYES COURT
1
1
1
34
5
2
1
32
1
23
4
5
2
4
5
3 2
4
67
7
10
89
5
1. Costco2. Country Style3. Spitfile Bar & Grll4. LCBO5. The Beer Store
6. A&W7. Tim Hortons8. On the Rocks Grill9. Food Basics10. Wendys
1. Scotia Bank2. Royal Bank of Canada3. Wild Water Kingdom4. Humber Nurseries5. Bank of Montreal
1. Hampton Inn2. Martin Grove Mall3. SVP Sports4. Holiday Inn5. Condor Plaza
1. Petro Canada2. Esso Gas3. Shell4. Pioneer Energy5. Canadian Tire Gas
The property is situated by a variety of surrounding amenities. Enjoy being minutes from a host of area food, service and entertainment amenities.
Food/Drink/GroceriesBank/Services Retail/Hotel Gas/Convenience
407
427
AMENITIESSURROUNDING1 Keyes Court, Unit 2, Vaughan
1 KEYES COURT
High
way
50
The Gore Road
Steeles Avenue W
Rutherford Road
Queen Street East
Highway 7
Hunti
ngton
Road
Highway
27
This property is an integral part of an emerging industrial hub in the Vaughan market, with many high-profile global brands as corporate neighbours.
COMPANYBE IN GOOD1 Keyes Court, Unit 2, Vaughan
1 KEYES COURT
Rutherford Road
Hunti
ngton
Road
Steeles Avenue W407
427
Langstaff Road
High
way
50
Highway 7
Queen Street East
Highway
27
The Gore Road
VAUGHAN DEMOGRAPHICS | One of Canada’s Fastest Growing Cities
WHY VAUGHAN?
Young Population
41 YRS
Post SecondaryEducation
70.3%
Total Households
94,934
Median MalePopulation Age
40 YRS
Population Change (2011-2016)
14.2%
Median FemalePopulation Age
42.1 YRS
Total Population
MAJOR EMPLOYMENT SECTORS (as of 2016)
Average Household Income
308,747 $108,748Labour Force
208,827
Manufacturing23%
Wholesale Trade10%
Transportation & Warehouse 6%
Construction13%
Retail Trade12%
CP Rail’s largest intermodal terminal onsite with handling capacity of more than 600,000 containers annually, offers direct non-stop connections to the Port of Vancouver, as well as CN Rail’s MacMillan Yard, its largest rail classification facility
Toronto Pearson International Airport, Canada’s busiest passenger and cargo airport, is located within 12 minutes of the property
Major city-building initiatives underway, including the Mackenzie Vaughan Hospital, Highway 427 expansion, the new downtown Vaughan Metropolitan Centre, and the Toronto-York Spadina subway extension
Source: City of Vaughan website / market intelligence application “Piinpoint”
MARKET AT A GLANCEVAUGHAN1 Keyes Court, Unit 2, Vaughan
SignageSignage
SignageSignage
File:H:\Acad SRN Projects\S17039 ZZEN Campio Keyes Ct\ACAD Drawings\04 ACAD ISSUED\TENDERING\S17039 - A500 Elevation (Mar 12, 2018).dwg Plotted: Mar 27, 2018 By:georgea
C SRN ARCHITECTS INC. 2018
ADDITIONAL NOTES:
ISSUED FOR:DATE:NO:
ALL DIMENSIONS MUST BE VERIFIED BY CONTRACTOR PRIORTO COMMENCEMENT OF ANY WORK. ANY DISCREPANCIESMUST BE REPORTED DIRECTLY TO SRN ARCHITECTS INC.
THESE DRAWINGS ARE NOT TO BE SCALED:
DRAWING NUMBER:
REVISION COMMENT:DATE:NO:
DATE:
CLIENT:
PROJECT NUMBER:
PROJECT:
DRAWING TITTLE:
CHECKED BY:DRAWN BY:
SCALE:
8395 JANE STREET, Suite 202VAUGHAN, ONTARIO. L4K 5Y2
PHONE: 905.417.5515 FAX: 905.417.5517
S17039
J.S.F.C.
INDUSTRIAL BUILDINGHUNTINGTON RD. COR. KEYES COURT
VAUGHAN, ONTARIO
CAMPIO GROUP OF COMPANIES5770 HWY 7, UNIT 1
WOODBRIDGE, ONTARIO, CANADA. L4L 1T8TEL: (905) 850-6636 FAX: (905) 850-6640
1 Jan 18, 2018 ISSUED FOR TENDERING
2 Mar 28, 2018 ISSUED FOR PERMIT
3 Mar 29, 2018 ISSUED FOR CONSTRUCTION
A500
J.S.F.C.
Mar 28, 2018 1:150
ELEVATIONS
NOTE:BIRD SAFE TREATMENTSCLEAR GLASS, ANY GLASSTHAT EXCEED 2sm(PER MNRF GUDELINES)
This document has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers International and /or its licensor(s). © 2018. All rights reserved. This communication is not intended to cause or induce breach of an existing listing agreement. Colliers Macaulay Nicolls Inc., Brokerage *Sales Representative
For more information, please contact: 245 Yorkland Boulevard, Suite 200 Toronto, Ontario M2J 4W9
P: +1 416 777 2200F: +1 416 492 0100
www.collierscanada.com
John Powell EXECUTIVE VICE PRESIDENT*
P: +1 416 791 7235C: +1 416 617 2907F: +1 416 607 4311E: [email protected]
FOR LEASE1 Keyes Court, Unit 2
Vaughan
AVAILABLE