veolia bingara licence plan audit 2015 v5 · water futures. abn 97109956961. 66 merrivale rd,...

20
Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. [email protected] t-cAM Consulting. ABN 76559967228. 15 Kim Marie Mew, Moriac 3240. 0412 540 187. [email protected] Report on the Followup Licence Plan Audit of the Bingara Gorge Recycled Water Scheme Independent Pricing and Regulatory Tribunal Water Industry Competition Act 2006 Network Operator's Licence Audit Report (Followup Licence Plan Audit) Licence No. 10_012: Bingara Gorge Water Recycled Scheme, NSW Veolia Water Solutions and Technologies (Australia) Pty Ltd (ACN 055254003) Final Report 12 th July 2015

Upload: hamien

Post on 09-Apr-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

 

Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. [email protected]

t-cAM Consulting. ABN 76559967228. 15 Kim Marie Mew, Moriac 3240. 0412 540 187. [email protected]

                           

Report  on  the  Follow-­‐up  Licence  Plan  Audit  of  the    Bingara  Gorge  Recycled  Water  Scheme    

Independent  Pricing  and  Regulatory  Tribunal  Water  Industry  Competition  Act  2006    

   

     

Network  Operator's  Licence  Audit  Report  (Follow-­‐up  Licence  Plan  Audit)  

 Licence  No.  10_012:  Bingara  Gorge  Water  Recycled  Scheme,  NSW  

 Veolia  Water  Solutions  and  Technologies  (Australia)  Pty  Ltd  (ACN  055254003)  

         

Final  Report  12th  July  2015  

     

Page 2: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  2  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

Table  of  Contents  1.   EXECUTIVE  SUMMARY  ...............................................................................................................................  3  2.   INTRODUCTION  ...........................................................................................................................................  4  2.1   OBJECTIVE  ........................................................................................................................................................................  4  2.2   LICENSEE’S  INFRASTRUCTURE,  SYSTEMS  AND  PROCEDURES  ..................................................................................  4  2.3   AUDIT  METHOD  ...............................................................................................................................................................  4  Audit  scope  .................................................................................................................................................................................  4  Audit  standard  .........................................................................................................................................................................  4  Audit  steps  ..................................................................................................................................................................................  4  Audit  team  ..................................................................................................................................................................................  5  Acknowledgements  ................................................................................................................................................................  5  Audit  grades  ..............................................................................................................................................................................  5  

2.4   REGULATORY  REGIME  ....................................................................................................................................................  5  2.5   QUALITY  ASSURANCE  PROCESS  ....................................................................................................................................  5  2.6   AUDIT  FINDINGS  .............................................................................................................................................................  6  2.7   SITE  AUDIT  AGENDA  FOR  THURSDAY  11TH  JUNE  2015  ...........................................................................................  6  

3.   INFRASTRUCTURE  OPERATING  PLAN  –  OUTSTANDING  ISSUES  ................................................  11  3.1   SUMMARY  OF  FINDINGS  ..............................................................................................................................................  11  3.2   REVIEW  OF  ACTIONS  ...................................................................................................................................................  11  3.3   OPPORTUNITIES  FOR  IMPROVEMENT  ......................................................................................................................  11  

4.   WATER  QUALITY  PLAN  (NON-­‐POTABLE  WATER)  (WQP  (NPW))  –  OUTSTANDING  ISSUES   12  4.1   SUMMARY  OF  FINDINGS  ..............................................................................................................................................  12  4.2   REVIEW  OF  ACTIONS  ...................................................................................................................................................  12  4.3   OPPORTUNITIES  FOR  IMPROVEMENT  ......................................................................................................................  12  

5.   SEWAGE  MANAGEMENT  PLAN  (SMP)  –  OUTSTANDING  ISSUES  .................................................  13  5.1   SUMMARY  OF  FINDINGS  ..............................................................................................................................................  13  5.2   REVIEW  OF  ACTIONS  ...................................................................................................................................................  13  5.3   OPPORTUNITIES  FOR  IMPROVEMENT  ......................................................................................................................  13  

APPENDICES  

Page 3: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  3  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

1. Executive  Summary  

This  report  sets  out  the  findings  of  a  Follow-­‐up  Licence  Plan  Audit  completed  in  respect  of  the  Network  Operator’s  Licence  (Licence  No.  10_012)  for  the  Bingara  Gorge  Recycled  Water  Scheme,  NSW.    An  Operational  Audit,  which  is  reported  separately,  was  undertaken  in  conjunction  with  this  audit.  

The  auditors  were  provided  with  sufficient  and  appropriate  evidence,  as  described  in  the  IPART  Audit  Guideline  for  Greenfield  Schemes,  Water  Industry  Competition  Act  2006  (NSW),  July  2013  (the  Audit  Guideline),  on  which  to  base  the  conclusions  reached  during  the  audit.    The  auditors  have  observed  the  requirements  of  the  Audit  Guideline  and  the  Audit  Deed  in  conducting  the  audit,  determining  audit  findings  and  preparing  the  report.  

The  reported  audit  findings  accurately  reflect  the  professional  opinion  of  the  auditors.    The  findings  have  not  been  unduly  influenced  either  by  the  Licensee  or  any  of  its  associates  and  express  the  auditors’  opinions  as  to  whether  the  Licensee  has  met  the  regulatory  requirements  as  specified  in  the  scope.    A  summary  of  the  audit  findings  is  given  in  the  following  chapters  and  a  detailed  breakdown  of  the  full  audit  findings  against  the  audited  criteria  is  given  in  the  detailed  Audit  Tables  in  Appendices  A  (Infrastructure  Operating  Plan),  B  (Water  Quality  Plan  (non  potable  water))  and  C  (Sewage  Management  Plan).  

The  audited  infrastructure  substantially  complied  with  the  audited  requirements  of  the  Regulation  and  Licence  conditions  and  was  found  to  be  operating  safely.  The  Licensee,  Veolia  Water  Solutions  and  Technologies  (Australia)  Pty  Ltd  (ACN  055254003)  (Veolia)  was  found  to  be  constructing,  repairing,  maintaining  and  operating  the  infrastructure  without  there  being  significant  non-­‐compliances  with  any  of  the  audited  criteria.    Three  insignificant  non-­‐compliances  noted  were  as  follows:  

WIC  Reg  Sch  1cl.6(1)  and  13(1)  –  non-­‐compliant  insignificant:  

Within  the  Infrastructure  Operating  Plan,  although  Veolia  has  yet  to  have  all  network  assets  covered  in  its   systematic   asset   management   system,   the   most   critical   network   assets   are   included   and   work   is  continuing  to  include  additional  network  assets.  Therefore,  although  this  finding  is  a  non-­‐compliance,  it  is  considered  insignificant  provided  work  to  address  the  shortfalls  continues.  

WIC  Reg  Sched  1  cl.7(1)(b)  –  non-­‐compliant  insignificant:  

Within  the  Water  Quality  Plan  (non  potable  water)  there  is  no  explicit  identification  of   'uncertainty'  or  ‘residual  risk’   in   the  risk  assessment  and  the  risk  assessment  does  not  consider  risks   for  each  process  step.   However,   since   the   current   treatment   process  will   soon   be   upgraded   to   a   new   one,   and   since   a  more  comprehensive  risk  assessment  has  been  completed  for  the  new  process,  this  non-­‐compliance  has  been  rated  as  insignificant.  

WIC  Reg  Sched  1  cl.  14(1)(a)  &  (b)  –  non-­‐compliant  insignificant:  

Within  the  Sewage  Management  Plan  there  is  no  explicit  identification  of  'uncertainty'  or  ‘residual  risk’  in  the  risk  assessment  and  the  risk  assessment  does  not  consider  risks  for  each  process  step.  However,  since   the   current   treatment   process   will   soon   be   upgraded   to   a   new   one,   and   since   a   more  comprehensive  risk  assessment  has  been  completed  for  the  new  process,  this  non-­‐compliance  has  been  rated  as  insignificant.  

Given  the  insignificant  nature  of  the  non-­‐compliances  and  the  progress  that  is  being  made  to  address  them,  the  Infrastructure  Operating  Plan,  Water  Quality  Plan  (non  potable  water)  and  Sewage  Management  Plan  were  found  to  be  adequate.    

   

Page 4: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  4  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

2. Introduction  

2.1 Objective  This  report  presents  the  findings  of  an  audit  undertaken  for  the  Independent  Pricing  and  Regulatory  Tribunal  (IPART)  under  the  Water  Industry  Competition  Act  2006.  

The   audit   comprised   of   a   Follow-­‐up   Licence   Plan   Audit,   as   required   in   respect   of   the  Network   Operator's  Licence   (Licence  No.  10_012)   for   the  Bingara  Gorge  Recycled  Water   Scheme,  NSW.     The   Licensee   is   Veolia  Water  Solutions  and  Technologies  (Australia)  Pty  Ltd  (ACN  055  254  003)  (Veolia).  

An  Operational  Audit  was  undertaken  in  conjunction  with  this  audit  and  is  reported  separately.  

2.2 Licensee’s  infrastructure,  systems  and  procedures  The   Licensee’s   infrastructure,   systems   and   procedures   audited   were   those   related   to   the   Bingara   Gorge  Recycled  Water  Scheme,  Wilton  (myrecycledwater.com.au/wilton-­‐rwtp).  

2.3 Audit  method  

Audit  scope  

This   audit   covers   the   operation   and   maintenance   of   the   licenced   infrastructure   and   addresses   the   scope  specified  by   IPART   in   its   letter   to   Jed  Lindley  dated  4  February   2015   relating   to   a   Follow-­‐up  Licence  Plan  Audit.  

Audit  standard  

The  audit  broadly  followed  the  generic  principles  of  auditing  given  in  ISO  19011:2011  -­‐  Guidelines  for  auditing  management   systems.     The   principal   document   used   to   guide   the   audit   was   the   IPART   Audit   Guideline   for  Greenfield  Schemes,  Water  Industry  Competition  Act  2006  (NSW),  July  2013  (the  Audit  Guideline).  

Audits  are  by  necessity  limited  to  sampling  processes.    It  is  not  practicable,  nor  necessary,  to  inspect  100  per  cent  of  items  within  an  audit  scope.    Auditing  forms  part  of  the  broader  risk  management  process,  providing  an   independent   check  on   the  veracity  of   the  processes   and  procedures   in  place   to  manage   risk.     Finding   a  balance  between   audit   effort   and  practicality   requires   the   exercise   of   experienced  professional   judgement.    The  amount  of  effort  allocated  to  this  audit  has  been  kept  to  a  reasonable  minimum  level.  

The   audit   was   undertaken   and   reported   in   accordance   with   the   Audit   Guideline   and   its   associated  Appendices.    The  audit  templates  given  in  the  Guideline  provided  the  reporting  format  for  the  audit  as  well  as  the  detailed  audit  criteria.  

Audit  steps  

An  Audit  Plan  was  submitted  to  both  IPART  and  the  Licensee  prior  to  the  audit  taking  place.    Documentation  was  supplied  by  the  Licensee  to  both  the  auditor  and  IPART.  

Desktop  auditing  took  place  both  prior  and  subsequent  to  the  site  audit.    A  site  audit  took  place  on  Thursday  11th  June  2015;  this  comprised  of  on-­‐site  asset  inspections  during  the  morning  and  a  desktop  audit  during  the  afternoon.    Some  evidence  was  followed  up  after  the  audit  with  the  report  being  prepared  and  submitted  to  the  Licensee  as  draft,  then  a  final,  before  submission  to  IPART.  

The   audit   process   involved   seeking   objective   evidence   that   the   Licensee   met   the   Licence   obligations  identified  for  audit  by  IPART.    The  auditors  collected  evidence  through  interview,  document  review  and  site  inspection.    The  auditors  randomly  sampled  examples  sufficient  to  verify  claims  made  by  the  Licensee.  

Page 5: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  5  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

Audit  team  

The  audit  was   conducted   in   an   integrated  manner  by   two  auditors  who   collectively   addressed   the   various  components  of   the  audit   scope;   this   report   sets  out   the  audit   criteria   that  were  applied.    The   two-­‐member  team   that   conducted   the  audits   consisted  of  Dr  Dan  Deere  and  Mr  Tom  Carpenter,  who  hold   relevant  Lead  Auditor  Accreditation  under  IPART’s  Technical  Services  and  Water  Licensing  Audit  Panel,  as  follows:  

• Dr  Dan  Deere  –  Recycled  Water  Quality,  Sewage  Management  and  overall  management  of  audit;  

• Mr  Tom  Carpenter  –  Infrastructure  Performance  and  related  components.  

Acknowledgements  

The  audit  team  notes,  and  greatly  appreciates,  the  presence  of  IPART  staff  members  Kaye  Power  and  Sachin  Singh  as  valuable  observers  and  commentators  during  the  audit.  

The  audit  team  notes,  and  greatly  appreciates,  the  work  and  effort  put  in  by  those  audited,  including:  

• Chow  Leong,  Recycled  Water  Treatment  Plant  Operator,  Veolia;  

• Inshan  Sheriff,  Hydrex  &  NSW  Service  Manager,  Veolia;  and  

• Chris  Dumbrell,  Project  Manager,  Living  Utilities  –  Property,  Lend  Lease.  

Audit  grades  

Audit  grades  were  awarded   in  accordance  with  the  definitions  given   in  the  Audit  Guideline.    Compliance  of  operation  of  the  infrastructure  with  the  relevant  legal  and  formal  requirements  was  assessed.    More  generally  the  infrastructure  was  assessed  for  its  capability  to  operate  safely.    Grades  were  allocated  as  follows:  

• No  Requirement   (NR)  

• Compliant     (C)  

• Non-­‐compliant  Insignificant     (NCI)  

• Non-­‐compliant  Significant   (NCS)  

2.4 Regulatory  regime  The  scheme  operates  under  the  Water  Industry  Competition  Act  2006  (WICA)  which  in  turn  references  the  following  requirements:  

• Water Industry Competition (General) Regulation (2008).

• Conditions of Network Operator's Licence No. 10_012.

• IPART  Audit  Guideline  for  Greenfield  Schemes,  Water  Industry  Competition  Act  2006  (NSW),  July  2013.

• Relevant aspects of the national Australian Guidelines for Water Recycling: Managing Health and Environmental Risks (Phase 1) 2006.

• Relevant  water  industry  and  environmental  NSW  and  national  codes  of  practice  and  regulations,  as  applicable.  

2.5 Quality  assurance  process  Quality  was  assured  using  a  professional  review  process.    Each  auditor’s  work  was  reviewed  and  approved  by  the  other  auditor.    Both  auditors  are  longstanding  members  of  the  IPART  audit  panel.  

Page 6: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  6  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

2.6 Audit  findings  Audit  findings  are  summarised  in  the  above  Executive  Summary;  they  are  presented  in  more  detail  in  sections  3  and  4  and  in  full  detail  in  the  following  Appendices:  

• Appendix  A  –  Infrastructure  Operating  Plan  –  Outstanding  Issues;  and  

• Appendix  B  –  Water  Quality  Plan  –  Outstanding  Issues.  

2.7 Site  audit  agenda  for  Thursday  11th  June  2015  

Time   Item  and  audit  questions   Location   Lead  

9:00   Opening  meeting   Wilton   Dan  Deere  

9:15   Asset  inspection  

Which  infrastructure  is  currently  in  commercial  operation?  Has  any  new  infrastructure  been  introduced  into  commercial  operation?  If  so  has  it  been  appropriately  approved  [WIC  Reg  Sched  1  cl.  2(1),(2(a,b))]?  

Is  there  alignment  between  the  IOP,  SMP  and  WQP  (npw)  on  the  one  hand  and  the  observed  assets  on  the  other  [WIC  Reg  Sched  1  cl.  6(1),  7(1)(b),  WIC  Reg  Sch  1  cl.  13(1)  and  WIC  Reg  Sched  1  cl.  14(1)(a,b)]?    

Is  there  alignment  between  the  PDT,  turbidity,  UV  and  chlorine  critical  limits  and  requirements  between  the  WQP,  daily  operator's  recording  worksheet  and  SCADA  system  [WIC  Reg  Sched  1  cl.  7(1)(b)]?  

Is  there  evidence  on  site  that  the  customer’s  installations  comply  with  the  Plumbing  and  Drainage  Act  2011(NSW)  [WIC  Reg  Sched  1  cl.  11]?  

Is  there  evidence  that  the  system  is  being  operated  in  a  safe  and  reliable  manner  and  maintained  in  a  proper  condition  [WIC  Reg  Sched  1  cl.  3(c)]?  The  auditor  will  a  detailed,  appropriate  inspection  program  to  assess  whether  the  sewerage  and  recycled  water  systems  are  safe  and  reliable.  A  detailed  audit  of  the  sewerage  system  will  be  undertaken  to  complete  the  assessment  of  the  SMP  and  lOP.  Specifically:    

• Previous  audits  (reports  dated  Aug  2012  and  Apr  2013)  found  non-­‐compliances  with  the  sewerage  system.  Issues  include  apparent  breakdown  in  previous  construction  quality  control,  and  lack  of  formalisation  of  forward  operations  and  maintenance  processes.  High  levels  of  stormwater  ingress  at  the  treatment  plant  suggest  there  may  be  issues  in  the  sewerage  network.  Have  these  issues  been  assessed?    

• The  2013  audit  also  identified  non-­‐compliance  in  signage  and  labelling  of  pipes  in  the  recycled  water  pump  station  –  have  these  been  rectified?    

• In  meetings  in  November  2014  and  January  2015,  Lend  Lease  indicated  that  they  have  implemented  a  program  to  identify  and  fix  the  defects  by  June  2015.  Has  Lend  Lease's  rectification  program  been  completed  and  what  is  its  adequacy  and  progress?  

Wilton   Tom  Carpenter  

and  

Dan  Deere  

11:00   Travel  to  site  office      

Page 7: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  7  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

Time   Item  and  audit  questions   Location   Lead  

11:15   Codes  and  standards  

Does  the  licence  holder  have  regard  to  any  publicly  available  standards  or  codes  relating  to  its  design,  construction,  operation  and  maintenance  [WIC  Reg  Sched  1  cl.  3(c)]?  

Previous  audits  (reports  dated  Aug  2012  and  Apr  2013}  found  non-­‐compliances  with  the  sewerage  system.  Issues  include  apparent  breakdown  in  previous  construction  quality  control,  and  lack  of  formalisation  of  forward  operations  and  maintenance  processes.  High  levels  of  stormwater  ingress  at  the  treatment  plant  suggest  there  may  be  issues  in  the  sewerage  network.  Have  these  issues  now  been  addressed?    

The  2013  audit  also  identified  non-­‐  compliance  in  signage  and  labelling  of  pipes  in  the  recycled  water  pump  station.  Has  it  been  completed?    

In  meetings  in  November  2014  and  January  2015,  Lend  Lease  indicated  that  they  have  implemented  a  program  to  identify  and  fix  the  defects  by  June  2015.  Can  the  auditor  review  Lend  Lease's  rectification  program  so  that  he  can  assess  the  adequacy  and  progress  of  their  program?    

Wilton   Tom  Carpenter  

11:30   Metering  and  plumbing  

How  does  the  licensee  ensure  that  customer’s  installations  comply  with  the  Plumbing  and  Drainage  Act  2011(NSW)?  [WIC  Reg  Sched  1  cl.  cl.  11]?  

Wilton   Tom  Carpenter  

11:45   IOP  implementation  and  currency  

What  work  is  undertaken  to  ensure  that  the  infrastructure  operating  plan  is  fully  implemented  and  the  network  operator’s  activities  are  carried  out  in  accordance  with  that  plan  and  in  what  way  is  it  kept  under  regular  review  [WIC  Reg  Sched  1  cl.6(2)(a)  and  WIC  Reg  Sch  1  cl.  13(1)]?  

Wilton   Tom  Carpenter  

Page 8: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  8  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

Time   Item  and  audit  questions   Location   Lead  

12:00   IOP  supporting  items  and  follow-­‐up  licence  plan  audit    

Have  gaps  identified  in  the  previous  IOP  audits  been  closed  [(WIC  Reg  Sch  1cl.6(1)  and  WIC  Reg  Sched  1  cl.  13(1)]?  

The  2012  audit  found  original  maintenance  schedule,  based  on  OEM  requirements,  had  not  been  utilised  for  development  of  O&M  schedules  currently  being  utilised.  Have  the  original  pre-­‐operational  maintenance  schedules  been  applied  to  develop  the  current  maintenance  schedules?  Have  the  monthly,  quarterly  and  yearly  scheduled  works  been  integrated  into  the  daily,  weekly  schedules  currently  used?  

The  2012  audit  found  that  in  some  cases,  no  safe  working  procedure  was  found  in  procedures.  The  rules  and  logic  around  calling  out  attendance  on  plant  when  communications  are  not  functioning  are  unclear.  Therefore,  are  clear,  detailed  safe  work  procedures  now  included  in  the  lOP?  Are  there  documented  safety  procedures  for  key  risks?  Are  there  documented  communication  protocols?    

The  2012  audit  found  a  lack  of  adequate  current  asset  condition  assessment  for  the  sewerage  network.  Is  there  now  a  condition  assessment  procedure  in  the  plan?    

The  2012  audit  found  an  issue  with  groundwater  ingress  into  service  shafts  and  possible  house  paving  leading  to  ingress  via  overflows.  Is  there  a  procedure  for  monitoring  potential  sewerage  ingress!  egress?  How  did  the  lOP  address  sewerage  ingress/egress  based  on  risk  assessment?  

The  2012  audit  found  no  QM  document  numbers  (no  controlled  document  codes  on  O&M  manuals).  Are  there  now  document  control  procedures  in  place  for  important  documents?    

The  2012  audit  found  no  record  of  signoff  of  operator  capability  or  authorisation  to  operate  plant  was  found.  This  should  be  in  place  for  full  membrane  plant  introduction.  Are  organisational  authorisations  for  operator  responsibilities  and  accountabilities  now  included  in  the  plan?    

The  2012  audit  found  that  the  sewerage  system  could  not  be  adequately  assessed  by  Auditor  in  some  aspects.  Has  the  lOP  now  adequately  covered  the  sewerage  network  (noting  that  this  could  not  be  adequately  assessed  in  previous  audits)?  Do  operational  and  maintenance  procedures  now  address  both  normal  and  abnormal  (incident  and  emergency)  conditions?  Has  the  likelihood  and  consequences  of  asset  failure  should  be  predicted?  Does  the  lOP  now  indicate  the  arrangements  in  relation  to  the  maintenance,  monitoring  and  reporting  of  standards  and  services?  

The  2013  audit  found  a  low  but  increasing  risk  to  operational  reliability  associated  with  the  lack  of  formalisation  of  forward  operations  and  maintenance  procedures.  Are  longer  term  operations  and  maintenance  procedures  now  in  the  lOP  which  ensure  appropriate  risk  management  for  ongoing  operation?  Can  IPART  now  observe  that  the  Licensee  has  a  process  in  place  in  the  IOP  to  ensure  compliance  with  relevant  plumbing  code  and  network  standards?  

Both  brevious  audits  (reports  dated  Aug  2012  and  Apr  2013)  found  non-­‐compliances  with  the  sewerage  system.  Issues  include  apparent  breakdown  in  previous  construction  quality  control,  and  lack  of  formalisation  of  forward  operations  and  maintenance  processes.  High  levels  of  stormwater  ingress  at  the  treatment  plant  suggest  there  may  be  issues  in  the  sewerage  network.  Have  these  issues  been  assessed?    

The  2013  audit  also  identified  non-­‐compliance  in  signage  and  labelling  of  pipes  in  the  recycled  water  pump  station  –  have  these  been  rectified?    

In  meetings  in  November  2014  and  January  2015,  Lend  Lease  indicated  that  they  have  implemented  a  program  to  identify  and  fix  the  defects  by  June  2015.  Has  Lend  Lease's  rectification  program  been  completed  and  what  is  its  adequacy  and  progress?  

Wilton   Tom  Carpenter  

1:00   Lunch   -­‐   -­‐  

Page 9: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  9  of  20    Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.    

 

Time   Item  and  audit  questions   Location   Lead  

1:30   SMP  implementation  and  currency  

What  work  is  undertaken  to  ensure  that  the  sewage  management  plan  is  fully  implemented  and  kept  under  regular  review  and  all  its  activities  are  carried  out  in  accordance  with  the  plan    [WIC  Reg  Sched  1  cl.  14(3)(a)]?  

Wilton   Dan  Deere  

1:45   SMP  supporting  items  and  follow-­‐up  licence  plan  audit    

Have  gaps  identified  in  the  previous  SMP  audits  been  closed  [(WIC  Reg  Sch  1cl.14(1)(a,b)]?  

2012  finding:  The  risk  assessments  need  to  be  extended  to  include  residual  risk  with  control  in  place,  and  a  more  process  step  by  process  step  risk  assessment,  in  the  AGWR/HACCP  style.  Are  residual  risks  and  controls  for  each  process  step  now  included  in  the  risk  assessment  for  the  SMP?    

2013  finding:  Low  but  increasing  environmental  risks  due  to  excess  stormwater  entry  to  sewer,  spillage  from  sewer  and  misuse  of  recycled  water  associated  with  the  lack  of  formalisation  of  relevant  forward  O&M  processes.  Are  environmental  risks  in  the  risk  register  and  environmental  management  procedures  included  in  the  SMP?    

Wilton   Dan  Deere  

2:15   WQP  implementation  and  currency  

What  work  is  undertaken  to  ensure  that  the  water  quality  plan  is  fully  implemented  and  the  network  operator’s  activities  are  carried  out  in  accordance  with  that  plan  and  in  what  way  is  it  kept  under  regular  review  [WIC  Reg  Sched  1  cl.7(4)(a)]?  

Wilton   Dan  Deere  

2:45   WQP  supporting  items  and  follow-­‐up  licence  plan  audit    

Have  gaps  identified  in  the  previous  WQP  audits  been  closed  [(WIC  Reg  Sch  1cl.7(1)(b)]?  

2012  finding:  Element  2  The  risk  assessments  completed  under  the  HAZOP  and  the  high  level  risk  assessment  for  the  scheme  collectively  provide  adequate  risk  assessment  documentation  to  meet  this  requirement  but  need  to  be  extended  to  include  residual  risk  with  controls  in  place,  and  a  more  process  step  by  process  step  risk  assessment,  in  the  AGWR/HACCP  style,  to  become  fully  adequate.  Are  residual  risks  now  and  controls  for  each  process  step  included  in  the  risk  assessment?    

2012  finding:  Element  2  There  is  no  explicit  identification  of  'uncertainty'  in  the  risk  assessment  although  actions  are  assigned  for  each  risk  that  would  help  investigate  uncertainties.  This  issue  does  not  affect  scheme  compliance  from  a  scheme  safety  perspective  but  is  an  opportunity  for  improvement.  Have  uncertainties  now  been  identified,  investigated  and  documented  in  the  risk  assessment?    

The  2012  audit  found  general  training  has  been  undertaken  for  incident  management  (AGWR  Element  6)  but  to  date  a  whole  of  scheme  training  incident  has  not  been  undertaken  with  Lend  Lease.  There  was  a  low  risk  of  confusion  arising  during  incidents.  Has  this  risk  been  addressed?  Has  the  licensee  undertaken  a  whole  of  scheme  incident  training  session?  

Wilton   Dan  Deere  

3:00   Afternoon  break   -­‐   -­‐  

3:15   Incidents  

Have  any  incidents  occurred  during  the  conduct  of  the  network  operator’s  activities  that  threaten,  or  could  threaten,  water  quality,  public  health  or  safety  and,  if  so,  have  the  Minister  administering  the  Public  Health  Act  2010  (NSW)  and  the  Public  Health  Regulation  2012  (NSW),  the  Minister  administering  Part  2  of  the  Water  Industry  Competition  Act  2006  (NSW)  and  any  connected  network  operator,  retail  supplier  or  public  water  utility  been  notified  [WIC  Reg  Sched  1  cl.  1(2)(a,b,c,d,e)]?  

In  addition  to  personal  testimony,  evidence  will  be  requested  in  the  form  of  water  quality  monitoring  and  SCADA  results  to  show  whether  or  not  any  incidents  occurred  during  the  audit  period  that  threatened  water  quality,  public  health  or  safety.  

Wilton   Dan  Deere  

Page 10: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  10  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

Time   Item  and  audit  questions   Location   Lead  

3:30   Changes  to  use  

For  what  purpose  has  the  non-­‐potable  water  been  supplied  and  what  evidence  is  there  that  the  water  has  been  fit  for  that  purpose  [WIC  Reg  Sched  1  cl.  10(a)]?  

Wilton   Dan  Deere  

3:15   Changes  to  authorised  persons  

Has  an  Authorised  Person  ceased,  proposed  to  cease  or  received  notification  to  cease  providing  any  of  the  services  relating  to  the  activities  authorised  by  this  Licence  and,  if  so,  has  the  Licence  Holder  provided  IPART  with  written  notice  as  soon  as  practicable  and  in  any  event  no  later  than  28  days  before  the  date  of  cessation  of  the  services  and,  if  so,  did  such  written  notice  include  details  of  how  the  services  previously  undertaken  by  the  Authorised  Person  will  continue  to  be  undertaken  [Network  Operator  Licence  cl.  B10]?  

Wilton   Dan  Deere  

3:30   Code  of  conduct  

Is  Veolia’s  network  is  connected  to  another  licenced  network  operator  or  a  public  water  utility  and,  if  so,  has  the  Licence  Holder  established  a  code  of  conduct,  in  writing,  in  relation  to  the  respective  responsibilities  of  the  Licence  Holder  and  each  licensed  network  operator,  licensed  retail  supplier  and/or  public  water  utility  that  is  responsible  for  the  other  water  industry  infrastructure  in  accordance  with  Network  Operator  Licence  cl.  B9.3  [Network  Operator  Licence  cl.  B9.1  to  9.3]?  

Wilton   Dan  Deere  

3:45   Sampling  and  analysis  

Has  the  appropriate  water  quality  verification  monitoring  been  undertaken,  have  full  sampling  records  (date,  time,  location,  sampler  name)  been  kept  and  were  the  analyses  NATA  accredited  [Network  Operator  Licence  cl.  B7.1  to  7.3]?  

Wilton   Dan  Deere  

4:00   Contingency  period  –  additional  items  that  may  arise.   -­‐   -­‐  

4:30   Audit  close   Wilton   Dan  Deere  

 

Page 11: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  11  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

3. Infrastructure  Operating  Plan  –  Outstanding  Issues  

3.1 Summary  of  findings  WIC  Reg  Sch  1cl.6(1)  and  13(1)  –  non-­‐compliant  insignificant:  

Although   Veolia   has   yet   to   have   all   assets   covered   in   its   systematic   asset   management   system,   the   most  critical   assets   are   included   and   work   is   continuing   to   include   additional   assets.   Therefore,   although   this  finding  is  a  non-­‐compliance,  it  is  considered  insignificant  provided  work  to  address  the  shortfalls  continues.  

To  achieve  full  compliance,  it  is  recommend  that:  

• The  Licence  Holder  work  to  address  the  shortfalls  in  the  asset  management  system  continues,  including  populating  the  asset  management  system  with  all  network  assets.  

3.2 Review  of  actions  The   Licensee   did   not   provide   any   additional   data   or   information   and   did   not   make   any   suggestions   for  corrections  or  clarifications  following  the  review  of  the  draft  report  prior  to  the  final  report  being  issued.  

3.3 Opportunities  for  improvement  No  opportunities  for  improvement  (further  to  the  above  recommendations)  have  been  identified  in  respect  of  the  Infrastructure  Operating  Plan  as  a  result  of  this  audit.  

 

 

 

 

Page 12: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  12  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

4. Water  Quality  Plan  (non-­‐potable  water)  (WQP  (npw))  –  Outstanding  Issues  

4.1 Summary  of  findings  WIC  Reg  Sched  1  cl.7(1)(b)  –  non-­‐compliant  insignificant:  

There   is   no   explicit   identification   of   'uncertainty'   or   ‘residual   risk’   in   the   risk   assessment   and   the   risk  assessment  does  not  consider  risks  for  each  process  step.  However,  since  the  current  treatment  process  will  soon  be  upgraded  to  a  new  one,  and  since  a  more  comprehensive  risk  assessment  has  been  completed  for  the  new  process,  this  non-­‐compliance  has  been  rated  as  insignificant.  

To  achieve  full  compliance,  it  is  recommend  that:  

• in  future  risk  assessments  the  Licence  Holder  should  document  and  investigate  uncertainties  and  assess  maximum  and  residual  risks  at  specific  process  steps.  

4.2 Review  of  actions  The   Licensee   did   not   provide   any   additional   data   or   information   and   did   not   make   any   suggestions   for  corrections  or  clarifications  following  the  review  of  the  draft  report  prior  to  the  final  report  being  issued.  

4.3 Opportunities  for  improvement  It  would  be  helpful  to  include  table  numbers  for  ease  of  cross-­‐referencing.  

Page 13: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  13  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

5. Sewage  Management  Plan  (SMP)  –  Outstanding  Issues  

5.1 Summary  of  findings  WIC  Reg  Sched  1  cl.  14(1)(a)  &  (b)  –  non-­‐compliant  insignificant:  

There   is   no   explicit   identification   of   'uncertainty'   or   ‘residual   risk’   in   the   risk   assessment   and   the   risk  assessment  does  not  consider  risks  for  each  process  step.  However,  since  the  current  treatment  process  will  soon  be  upgraded  to  a  new  one,  and  since  a  more  comprehensive  risk  assessment  has  been  completed  for  the  new  process,  this  non-­‐compliance  has  been  rated  as  insignificant.  

To  achieve  full  compliance,  it  is  recommend  that:  

• in   future   risk   assessments   Licence   Holder   should   document   and   investigate   uncertainties   and   assess  maximum  and  residual  risks  at  specific  process  steps.  

5.2 Review  of  actions  The   Licensee   did   not   provide   any   additional   data   or   information   and   did   not   make   any   suggestions   for  corrections  or  clarifications  following  the  review  of  the  draft  report  prior  to  the  final  report  being  issued.  

5.3 Opportunities  for  improvement  It  would  be  helpful  to  include  table  numbers  for  ease  of  cross-­‐referencing.  

 

Page 14: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  14  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

Appendix  A   Infrastructure  Operating  Plan  (IOP)  –  Outstanding  Issues  

WIC  Reg  Sch  1cl.6(1)  and  13(1)    

Requirement   Compliance  Grade  

Before   commencing   to   operate   water/sewerage  infrastructure   commercially,   the   licensed   network  operator  for  the  infrastructure  must  prepare,  and  forward  to   IPART,   an   infrastructure   operating   plan   that   indicates  the  arrangements  that  the  licensee  has  made,  or  proposes  to  make,  in  relation  to:    

(b)   the   continued   safe   and   reliable   performance   of   the  infrastructure,  and    

(e)   the   maintenance,   monitoring   and   reporting   of  standards  of  service.        

Non-­‐compliant  Insignificant  

 

Risk  

There   was   a   low   but   growing   risk   of   inadequate  asset   management   due   to   the   asset   management  system  not  being  populated  with  all  network  assets.  

Target  for  Full  Compliance  

The  asset  management  system  should  be  populated  with  all  network  assets.  

Evidence  sighted  

§ Infrastructure   Operating   Plan   (IOP)   entitled:   Bingara   Gorge   Development   Network   Operator’s  Combined  Sewerage  &  Water  Infrastructure  Operating  Plan,  Rev  4,  February  2015.  

§ Interview  with  Inshan  Sheriff,  Chris  Dumbrell  and  Chow  Leong.  

§ Field  inspection  at  Bingara  Gorge,  Wilton,  on  the  morning  of  11th  June  2015.  

§ Review   of   electronic   and   hard   copy   documents   and   records   at   Veolia,   Macquarie   Park,   11th   June  2015.  

Summary  of  reasons  for  grade    

Although  Veolia  has  yet  to  have  all  assets  covered  in  its  systematic  asset  management  system,  the  most  critical  assets  are  included  and  work  is  continuing  to  include  additional  assets.  Therefore,  although  this  finding   is   a   non-­‐compliance,   it   is   considered   insignificant   provided   work   to   address   the   shortfalls  continues.  

Discussion  and  notes  

IOP  currency  

The   Infrastructure  Operating   Plan   (IOP)  was   last   updated   on   the   25th   February   2015   and   provided   to  IPART  on  the  27th  March  20151.  This  document  appears  to  be  sufficiently  current  and  up  to  date.  

Asset  management  

The  2012  audit  found  that  the  original  maintenance  schedule,  based  on  OEM  requirements,  had  not  been  utilised   for  development  of   the  operations   and  maintenance   schedules   currently  being  utilised.  During  the  current  audit  the  auditors  asked  whether  or  not  the  original  pre-­‐operational  maintenance  schedules  had   been   applied   to   develop   the   current   maintenance   schedules   and   whether   or   not   the   monthly,  quarterly   and   yearly   scheduled  works   had   been   integrated   into   the   daily,   weekly   schedules   currently  used.  In  addition,  the  2013  audit  found  a  low  but  increasing  risk  to  operational  reliability  associated  with  the   lack  of   formalisation  of   forward  operations   and  maintenance  procedures.   During   the   current   audit  the  auditors  asked  for  evidence  that  longer  term  operations  and  maintenance  procedures  are  now  in  the  lOP  to  ensure  appropriate  risk  management  for  ongoing  operation.  Finally,  the  2012  audit  found  a  lack  of  adequate   current   asset   condition   assessment   for   the   sewerage   network.   During   the   current   audit   the  Licence  Holder  was  asked  for  evidence  of  a  condition  assessment  procedure  in  the  IOP.    

                                                                                                                                       1  Email  from  Dan  Deere  to  Kaye  Power  and  Sachin  Singh  dated  27th  March  2015.  

Page 15: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  15  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

 

Veolia   have   developed   a   detailed   plan   for   asset   maintenance   based   on   documents   prepared   by   VKL  Consulting2.  This  document  covers  the  frequency  of  inspection  of  sewer  reticulation,  maintenance  holes  and  sewage  pump  stations.  Veolia  demonstrated  examples  of  the  civil  drawings  and  network  drawings  of  the  network  assets  from  the  construction  contractors  and  have  access  to  the  Lend  Lease  dial-­‐before-­‐you-­‐dig  asset  information.  

Veolia  are  using  an  asset  management  worksheet-­‐based   temporary  asset  management   system  (as   they  are  for  the  Darling  Quarter  plant)  rather  than  using  a  sophisticated  asset  management  system.  However,  at   present   Veolia   has   only   captured   the   details   of   operations   and   maintenance   for   the   sewage   pump  stations   and   the   generators   in   its   excel-­‐based   management   system.   In   addition,   although  most   of   the  network  assets  are  now  on  an  Arc-­‐GIS  database  with  Lend  Lease,  Veolia  don’t  yet  have  these  assets  on  the  Veolia  GIS.  For  other  assets  the  worksheet  system  is  not  yet  complete.  Therefore,   it  cannot  be  said  that  Veolia  has   implemented  a  comprehensive  asset  management  system  for   the  network  at   the   time  of   the  audit,  although   it   is  noted  that   the  network  assets  are  very  new,  and  that   the  most  sensitive  assets  are  included.  

Some  assets,   such   as   covers,   generators,   sewer  pump   stations   and  pits,   are   included  on   the   inspection  schedules  of  the  plant  operator.  Generators  on  the  treatment  plant  and  pump  stations  are  scheduled  for  weekly  services  and  start  up  runs.   In  general,   the  major  pump  stations  have   full  redundancy  as  well  as  level   indication   alarms.   Flow   rate   analysers   and   level   sensors   come   with   calibration   certificates  (examples  were  sighted).    

Veolia   took   over   operations   and   maintenance   of   the   network   infrastructure   during   December   2014.    Other  contractors  used  include  VKL,  who  are  involved  in  design  specifications,  and  Cardno  who  carry  out  both  hydraulic  design  as  well  as  carrying  out  independent  checks  on  adequacy  of  construction.    

Documented  operating  procedures  

The  2012  audit  found  that  in  some  cases,  no  safe  working  procedure  was  found  in  procedures.  During  the  current  audit  procedures  were  reviewed.    

Veolia   now   has   a   broad   set   of   operating   procedures   in   place.   These   included   Standard   Operating  Procedures   (SOP)  and  Safe  Work  Methods  Statements   (SWMS).  An  SOP3  and  SWMS4  were   reviewed   in  detail  and  these  procedures  appeared  to  be  adequate.  This  was  considered  adequate.  

Meter  readings  

At  present  Veolia  conducts  quarterly  meter  readings.  This  was  considered  adequate.  

Contractor  management  

Veolia   takes   part   in   formal   reporting   and   meetings   with   Lend   Lease   on   its   asset   management   and  operations   and  maintenance.   This   includes   Quarterly  Meetings,   Periodic   Service  Management   Reviews  and  Monthly  Reports  from  Veolia  to  Lend  Lease.  This  was  considered  adequate.  

Sewerage  system  

The  2012  audit  found  that  the  sewerage  system  could  not  be  adequately  assessed  by  the  Auditor  in  some  aspects.  During  the  current  audit,  the  auditors  sought  evidence  that  the  lOP  now  adequately  covered  the  sewerage   network.   The   auditors   examined   whether   or   not   operational   and   maintenance   procedures  addressed  both  normal  and  abnormal  (incident  and  emergency)  conditions  and  whether  or  not  likelihood  and  consequences  of  asset  failure  had  been  predicted.  In  addition,  the  lOP  was  assessed  for  an  indication  of  the  arrangements  in  relation  to  the  maintenance,  monitoring  and  reporting  of  standards  and  services.  Finally,  the  auditors  sought  evidence  that  the  Licensee  had  a  process  in  place  to  ensure  compliance  with  relevant  plumbing  code  and  network  standards.  

Under  the  current  arrangements,  the  Water  Services  Coordinator,  Cardno  signs  off  all  of  the  recycled  and  sewer   assets   and  QualCheck  do   the   same   for   the  potable   assets.   In   the  past  QualCheck   conducted   that  sign-­‐off  without  the  involvement  of  Cardno.  This  was  considered  adequate.  

                                                                                                                                       2  An  example  was  seen  of  the  “Gravity  Sewer  System  O&M  Requirements”  document  prepared  by  VKL  Consulting.  3  An  example  was  seen  of  a  Standard  Operating  Procedure  for  ECO  Disk  Drum  Screen  “CIP-­‐PR-­‐BG-­‐OPS-­‐007-­‐Rev  1”.  4  An  example  was  seen  of  a  Safe  Work  Method  Statement  for  UV  Replace  Lamp/Sleeve  “SWMS-­‐OHS-­‐081”.  

Page 16: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  16  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

Call  out  to  plant  

The   2012   audit   found   that   the   rules   and   logic   around   calling   out   attendance   on   plant   when  communications  are  not  functioning  were  unclear.    

During  the  audit  evidence  was  sought  of  clear,  detailed  safe  work  procedures  being  included  in  the  lOP,  documented  safety  procedures  for  key  risks  and  documented  communication  protocols.  It  was  noted  that  there   is   just   one   1300   number   for   all   issues   which   goes   to   Veolia   as   the   responsible   entity   for   first  response.  This  was  considered  adequate.  

Sewerage  ingress/egress  

The  2012  audit   found  an   issue  with  groundwater   ingress   into  service  shafts  and  possible  house  paving  leading   to   ingress   via   overflows.   During   the   current   audit   evidence   was   sought   of   a   procedure   for  monitoring   potential   sewerage   ingress/egress   and   of   how   the   lOP   addressed   sewerage   ingress/egress  based  on  risk  assessment?  

During  the  audit  it  was  noted  that  on  the  existing  system,  the  sewage  pump  stations  now  have  high  level  alarms  so  that  there  is  an  alarm  if  there  is  a  high  level  in  those  pump  stations.  The  new  assets  will  include  pressure  sewers  with  alarms  in  the  POTs  (albeit  out  of  scope  of   the  audit  period).  This  was  considered  adequate.  

Document  quality  management  

The  2012  audit  found  no  quality  management  document  numbers  (e.g.  no  controlled  document  codes  on  operations   and   maintenance   manuals.).   During   the   current   audit   evidence   was   sought   of   document  control  procedures  in  place  for  important  documents.    

The  audit  found  that  LATIS  is  now  used  to  trigger  work  orders  for  revision  of  documents.  Documents  are  nominally  reviewed  and  updated  every  three  years.  All  documents  are  stored  on  the  backed  up  “J  drive”.  This  was  considered  adequate.  

Operator  capability  

The   2012   audit   found   no   record   of   signoff   of   operator   capability   or   authorisation   to   operate   the  treatment   plant.   The   auditors   considered   that   such   training   should   be   in   place   for   membrane   plants.  During   the   current   audit   evidence   was   sought   of   organisational   authorisations   for   operator  responsibilities  and  accountabilities  within  the  IOP.    

The  audit  found  evidence  of  Chow  Leong  having  completed  training  for  Part  1  of  Wastewater  TO  during  August   2011.   David   Harris   had   signed   off   an   Operator   Level   Credit   whereby   Veolia   certifies   that   its  operators  can  operate  the  specific  plants.  This  was  considered  adequate.  

Recommendations  

It   is   recommended   that   the   Licence   Holder   work   to   address   the   shortfalls   in   the   asset   management  system  continues,  including  populating  the  asset  management  system  with  all  network  assets.  

Opportunities  for  improvement  

No  opportunities  for  improvement  have  been  identified  in  respect  of  this  requirement.  

 

 

   

Page 17: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  17  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

Appendix  B   Water  Quality  Plan  (non-­‐potable  water)  (WQP  (npw))  –  Outstanding  Issues  

WIC  Reg  Sched  1  cl.7(1)(b)  

Requirement   Compliance  Grade  

Before   commencing   to   operate   water   infrastructure  commercially,   the   licensed   network   operator   for   the  infrastructure   must   prepare,   and   forward   to   IPART,   a  water  quality  plan,   in  relation  to   the  water  supplied   from  the  infrastructure,  that  specifies:  

a) if  the  water  so  supplied  is  non-­‐potable  water,  how  the   12   elements   of   the   framework   for   the  management  of  recycled  water  quality  and  use,  as  detailed   in   the   Australian   Guidelines   for   Water  Recycling,   have   been   addressed   and   will   be  implemented   and,   having   regard   to   those  guidelines,  the  purposes  for  which  the  water  may  be  used  and  the  purposes  for  which  the  water  may  not  be  used.  

Non-­‐compliant  Insignificant  

   

 

Risk  

There   is   a   low   risk   that   some   relatively   uncertain  risks   were   not   adequately   investigated   or   that  inadequate   controls  were  not   identified   at   specific  process  steps.  

Target  for  Full  Compliance  

Documentation   and   investigation   in   future   risk  assessments   of   uncertainties   and   assessment   of  maximum   and   residual   risks   at   specific   process  steps.  

Evidence  sighted  

§ Interview  with  Inshan  Sheriff,  Chris  Dumbrell  and  Chow  Leong.  

§ Review   of   electronic   and   hard   copy   documents   and   records   at   Veolia,   Macquarie   Park,   11th   June  2015.  

§ Review  of  electronic  and  hard  copy  documents  and  records  at  Lend  Lease,  Wilton,  11th  June  2015.  

§ Combined   Sewage   Management   Plan   (SMP)   and   Water   Quality   Plan   (non-­‐potable   water)   (WQP  (npw)   entitled:   Bingara   Gorge   Development   Network   Operator’s   Sewage   Management   &   Water  Quality  Plan,  Rev  6,  March  2015.    

Summary  of  reasons  for  grade    

There   is   no   explicit   identification   of   'uncertainty'   or   ‘residual   risk’   in   the   risk   assessment   and   the   risk  assessment  does  not  consider  risks  for  each  process  step.  However,  since  the  current  treatment  process  will   soon   be   upgraded   to   a   new   one,   and   since   a   more   comprehensive   risk   assessment   has   been  completed  for  the  new  process,  this  non-­‐compliance  has  been  rated  as  insignificant.    

Discussion  and  notes  

Element  2.  Risk  assessment.  

It  was  noted  during  the  2012  audit   that  the  risk  assessments  did  not   include  residual  risk5,  not  did  the  process  assess  risk  process  step  by  process  step  risk6.   In  addition  the  risk  assessment  did  not  consider  uncertainty.  The  auditors  reviewed  the  most  recent  risk  assessment  to  see  whether  or  not  residual  risks  and  uncertainties  had  been  assessed  and  whether  or  not  risks  had  been  assessed  for  each  process  step.    

The  audit   found  that  on  the  27th  March  2015  Veolia  conducted  a  revised  risk  assessment  relating  to   its  new  recycled  water  treatment  plant  but  not  relating  to  the  current  arrangement.  Therefore,  at  the  time  of  the  audit,   the  most  recent  relevant  risk  assessment  did  not   include  an  assessment  of  residual  risks  and  uncertainties  and  had  not  considered  each  process  step  in  the  risk  assessment.    

                                                                                                                                       5  Risk  assessed  assuming  the  controls  are  in  place.  6  As  illustrated  in  the  examples  given  in  the  Australian  Guideline  for  Water  Recycling  2006.  

Page 18: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  18  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

Element  6.  Incident  response.  

The   2012   audit   found   that   general   training   had   been   undertaken   for   incident  management   and   that   a  whole  of  scheme  training  incident  had  not  been  undertaken  with  Lend  Lease.  Therefore,  there  was  a  low  risk  of  confusion  arising  during  incidents.  During  the  current  audit,  the  auditors  asked  how  this  risk  had  been  addressed  including  asking  whether  or  not  the  licensee  had  undertaken  a  whole  of  scheme  incident  training  session  with  Lend  Lease.  Since  the  previous  audit,  operational  responsibility  for  the  scheme  has  moved  to  Veolia  with  the  role  of  Lend  Lease  now  being  very  minimal.  For  instance,  it  is  now  Veolia  that  man   the   1300   number   and  manage   the   operations   and  maintenance   for   all   assets.   Therefore,   such   an  action   is   no   longer   considered   a   priority   and   this   insignificant   non-­‐compliance   is   now   considered  compliant.  

Element  10.  Documentation  and  reporting.  

It  was  noted  that  the  document  did  not  contain  table  heading  numbers  for  ease  of  cross-­‐referencing  and  there  is  room  to  improve  the  document  by  including  these.  

Recommendations  

It   is   recommended   that   in   future   risk   assessments   the   Licence   Holder   document   and   investigate  uncertainties  and  assess  maximum  and  residual  risks  at  specific  process  steps.  

Opportunities  for  improvement  

It  would  be  helpful  to  include  table  numbers  for  ease  of  cross-­‐referencing.  

Page 19: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  19  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

Appendix  C   Sewage  Management  Plan  (SMP)  –  Outstanding  Issues  

WIC  Reg  Sched  1  cl.  14(1)(a)  &  (b)    

Requirement   Compliance  Grade  

Before   commencing   to   operate   sewerage   infrastructure  commercially,   the   licensed   network   operator   for   the  infrastructure   must   prepare,   and   forward   to   IPART,   a  sewage  management   plan,   in   relation   to   the   conveyance,  treatment   and   disposal   of   sewage   by   means   of   the  infrastructure,  that  indicates:    

a) the   manner   in   which   health   and   ecological  assessments  will  be  undertaken  and  any  concerns  arising  from  any  such  assessment  addressed,  and    

b) the   arrangements   for   the   disposal   of  waste   from  the  infrastructure.    

 

Non-­‐compliant  Insignificant  

 

 

Risk  

There   is   a   low   risk   that   some   relatively   uncertain  risks   were   not   adequately   investigated   or   that  inadequate   controls  were  not   identified   at   specific  process  steps.  

Target  for  Full  Compliance  

Documentation   and   investigation   in   future   risk  assessments   of   uncertainties   and   assessment   of  maximum   and   residual   risks   at   specific   process  steps.  

Evidence  sighted  

§ Interview  with  Inshan  Sheriff,  Chris  Dumbrell  and  Chow  Leong.  

§ Review   of   electronic   and   hard   copy   documents   and   records   at   Veolia,   Macquarie   Park,   11th   June  2015.  

§ Review  of  electronic  and  hard  copy  documents  and  records  at  Lend  Lease,  Wilton,  11th  June  2015.  

§ Combined   Sewage   Management   Plan   (SMP)   and   Water   Quality   Plan   (non-­‐potable   water)   (WQP  (npw)   entitled:   Bingara   Gorge   Development   Network   Operator’s   Sewage   Management   &   Water  Quality  Plan,  Rev  6,  March  2015.    

Summary  of  reasons  for  grade    

There   is   no   explicit   identification   of   'uncertainty'   or   ‘residual   risk’   in   the   risk   assessment   and   the   risk  assessment  does  not  consider  risks  for  each  process  step.  However,  since  the  current  treatment  process  will   soon   be   upgraded   to   a   new   one,   and   since   a   more   comprehensive   risk   assessment   has   been  completed  for  the  new  process,  this  non-­‐compliance  has  been  rated  as  insignificant.    

Discussion  and  notes  

Element  2.  Risk  assessment  

It  was  noted  during  the  2012  audit   that  the  risk  assessments  did  not   include  residual  risk7,  not  did  the  process  assess  risk  process  step  by  process  step  risk8.   In  addition  the  risk  assessment  did  not  consider  uncertainty.  The  auditors  reviewed  the  most  recent  risk  assessment  to  see  whether  or  not  residual  risks  and  uncertainties  had  been  assessed  and  whether  or  not  risks  had  been  assessed  for  each  process  step.    

The  audit   found  that  on  the  27th  March  2015  Veolia  conducted  a  revised  risk  assessment  relating  to   its  new  recycled  water  treatment  plant  but  not  relating  to  the  current  arrangement.  Therefore,  at  the  time  of  the  audit,   the  most  recent  relevant  risk  assessment  did  not   include  an  assessment  of  residual  risks  and  uncertainties  and  had  not  considered  each  process  step  in  the  risk  assessment.    

                                                                                                                                       7  Risk  assessed  assuming  the  controls  are  in  place.  8  As  illustrated  in  the  examples  given  in  the  Australian  Guideline  for  Water  Recycling  2006.  

Page 20: Veolia Bingara Licence Plan Audit 2015 V5 · Water Futures. ABN 97109956961. 66 Merrivale Rd, Pymble 2073. 0409 283 737. dan@waterfutures.net.au t-cAM Consulting. ABN 76559967228

Report  on  Follow-­‐up  Licence  Plan  Audit  of  Network  Operator’s  Licence  No.  10_012  (Bingara  Gorge)  under  WICA.     Page  20  of  20  

Document  Version  5.  Water  Futures  and  iq-­‐AM.  Last  updated:  15-­‐July-­‐2015.    Doc  Controller:  DD.      

Element  10.  Documentation  and  reporting.  

It  was  noted  that  the  document  did  not  contain  table  heading  numbers  for  ease  of  cross-­‐referencing  and  there  is  room  to  improve  the  document  by  including  these.  

Recommendations  

It   is   recommended   that   in   future   risk   assessments   the   Licence   Holder   document   and   investigate  uncertainties  and  assess  maximum  and  residual  risks  at  specific  process  steps.  

Opportunities  for  improvement  

It  would  be  helpful  to  include  table  numbers  for  ease  of  cross-­‐referencing.