HOW OFTEN SHOULD YOU RUN A VERIFICATION SEQUENCE? It depends upon how often the instrument is used. If used infrequently, run a verification sequence before each use. In a production environment, verification should be run daily at minimum. In a high volume production environment, we recommend you run a verification test for every shift. This will ensure that if there is a problem, the number of products that need to be re-tested is limited. DCW Settings 10.00mA 60.0s Results Load Test_01-003 1.24kv CONT. CHECK RESET TEST Hypot® Series DIELECTRIC WITHSTAND TESTER RETURN HIGH VOLTAGE My Menu / Select POWER DATA BARCODE TEST TEST TEST RESET TVB-2 TVB-2 FAIL 2 Max 1A 500 mMax 1A PASS ACW / DCW FAIL 120 kMax 2300V 2 MMax 2500V PASS GB FAIL 200 Max 50W 50 mMax 50W PASS RETURN VERIFICATION LOAD BOX Continious Power Limitations - See Specifications IR FAIL 1 MMax 1000V 4 MMax 2500V PASS TVB-2 TVB-2 FAIL 2 Max 1A 500 mMax 1A PASS ACW / DCW 120 kMax 2300V 2 MMax 2500V PASS CONT. CHECK RESET TEST Hypot® Series DIELECTRIC WITHSTAND TESTER RETURN HIGH VOLTAGE My Menu / Select POWER DATA BARCODE DCW Settings 10.00mA 60.0s Results Load Test_01-003 1.24kv GB FAIL 200 Max 50W 50 mMax 50W PASS RETURN VERIFICATION LOAD BOX Continious Power Limitations - See Specifications IR FAIL 1 MMax 1000V 4 MMax 2500V PASS A B C D VERIFY HIPOT PASS/FAIL VERIFY GROUND CONTINUITY PASS/FAIL STEP 2. Connect leads for Hipot PASS Condition STEP 1. Set parameters for Hipot PASS and FAIL Conditions Note: Setting may vary depending on the application. STEP 1. Connect leads for Ground Continuity PASS Condition STEP 4. Connect leads for Hipot FAIL Condition STEP 3. Connect leads for Ground Continuity FAIL Condition STEP 3. Press the TEST button STEP 2. Check for a PASS STEP 5. Press the TEST button STEP 4. Press the TEST button STEP 6. Check for Failure The instrument will indicate a failure, sound an audible alarm and the RESET button will illuminate. STEP 5. Check for Failure The instrument will indicate a failure, sound an audible alarm and the RESET button will illuminate. The instrument will indicate a PASS and the TEST button will illuminate. The TEST button will illuminate indicating the circuit has continuity. A. Connect the high voltage lead from the HV terminal on the instrument to the ACW/DCW PASS terminal on the TVB-2. B. Connect the return lead from the RETURN terminal on the instrument to the RETURN terminal on the TVB-2. A. Connect the CONT. CHECK terminal on the instrument to the GC PASS terminal on the TVB-2. B. Connect the RETURN terminal on the instrument to the RETURN terminal on the TVB-2. C. Connect the high voltage lead from the HV terminal on the instrument to the ACW/ DCW FAIL terminal on the TVB-2. D. Connect the return lead from the RETURN terminal on the instrument to the RETURN terminal on the TVB-2. C. Connect the CONT. CHECK terminal on the instrument to the GC FAIL terminal on the TVB-2. D. Connect the RETURN terminal on the instrument to the RETURN terminal on the TVB-2. © Associated Research 2017 V2.0 | 7.2017 Hipot PASS/FAIL recommended settings with TVB-2 Voltage 1240 VAC, 2121 VDC Current 10mAAC, 5000 uADC Test Time 2 sec ramp up and 2 sec dwell TVB-2 TVB-2 FAIL 2 Max 1A 500 mMax 1A PASS ACW / DCW 120 kMax 2300V 2 MMax 2500V PASS GB FAIL 200 Max 50W DCW Settings 10.00mA 60.0s Results Load Test_01-003 1.24kv CONT. CHECK RESET TEST Hypot® Series DIELECTRIC WITHSTAND TESTER RETURN HIGH VOLTAGE My Menu / Select POWER DATA BARCODE CAUTION HIGH VOLTAGE 50 mMax 50W PASS RETURN VERIFICATION LOAD BOX Continious Power Limitations - See Specifications IR FAIL 1 MMax 1000V 4 MMax 2500V PASS D C TVB-2 TVB-2 FAIL 2 Max 1A 500 mMax 1A PASS ACW / DCW FAIL 120 kMax 2300V 2 MMax 2500V PASS GB FAIL 200 Max 50W 50 mMax 50W PASS RETURN VERIFICATION LOAD BOX Continious Power Limitations - See Specifications IR FAIL 1 MMax 1000V 4 MMax 2500V PASS CONT. CHECK RESET TEST Hypot® Series DIELECTRIC WITHSTAND TESTER RETURN HIGH VOLTAGE My Menu / Select POWER DATA BARCODE A B DCW Settings 10.00mA 60.0s Results Load Test_01-003 1.24kv TEST TEST TEST RESET WORKING PROPERLY Verify your instrument is TVB-2

Upload: others

Post on 21-May-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Verify your instrument is WORKING PROPERLY · 2017. 6. 6. · ACW / DCW FAIL 120 kΩ 2 MΩ PASS FAIL 200 Ω50 m PASSRETURN 1 M 4 M TVB-2 TVB-2 FAIL PASS ACW / DCW CONT. CHECK RESET

HOW OFTEN SHOULD YOU RUN A VERIFICATION SEQUENCE?It depends upon how often the instrument is used.

If used infrequently, run a verification sequence before each use. In a production environment, verification should be run daily at minimum. In a high volume production environment, we recommend you run a verification test for every shift. This will ensure that if there is a problem, the number of products that need to be re-tested is limited.

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

TEST TEST

TEST RESET

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

FAIL

120 kΩMax 2300V

2 MΩMax 2500V

PASS

GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

120 kΩMax 2300V

2 MΩMax 2500V

PASS

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

A

B

C

D

VERI

FY H

IPO

T PA

SS/F

AIL

VERI

FY G

ROU

ND

CO

NTI

NU

ITY

PASS

/FA

IL

STEP 2. Connect leads for Hipot PASS Condition

STEP 1. Set parameters for Hipot PASS and FAIL ConditionsNote: Setting may vary depending on the application.

STEP 1. Connect leads for Ground Continuity PASS Condition

STEP 4. Connect leads for Hipot FAIL Condition

STEP 3. Connect leads for Ground Continuity FAIL Condition

STEP 3. Press the TEST button

STEP 2. Check for a PASS

STEP 5. Press the TEST button

STEP 4. Press the TEST button

STEP 6. Check for Failure The instrument will indicate a failure, sound an audible alarm and the RESET button will illuminate.

STEP 5. Check for Failure The instrument will indicate a failure, sound an audible alarm and the RESET button will illuminate.

The instrument will indicate a PASS and the TEST button will illuminate.

The TEST button will illuminate indicating the circuit has continuity.

A. Connect the high voltage lead from the HV terminal on the instrument to the ACW/DCW PASS terminal on the TVB-2.

B. Connect the return lead from the RETURN terminal on the instrument to the RETURN terminal on the TVB-2.

A. Connect the CONT. CHECK terminal on the instrument to the GC PASS terminal on the TVB-2.

B. Connect the RETURN terminal on the instrument to the RETURN terminal on the TVB-2.

C. Connect the high voltage lead from the HV terminal on the instrument to the ACW/DCW FAIL terminal on the TVB-2.

D. Connect the return lead from the RETURN terminal on the instrument to the RETURN terminal on the TVB-2.

C. Connect the CONT. CHECK terminal on the instrument to the GC FAIL terminal on the TVB-2.

D. Connect the RETURN terminal on the instrument to the RETURN terminal on the TVB-2.

© Associated Research 2017V2.0 | 7.2017

Hipot PASS/FAIL recommended settings with TVB-2Voltage 1240 VAC, 2121 VDCCurrent 10mAAC, 5000 uADC

Test Time 2 sec ramp up and 2 sec dwell

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

120 kΩMax 2300V

2 MΩMax 2500V

PASS

GB

FAIL

200 ΩMax 50W

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

D

C

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

FAIL

120 kΩMax 2300V

2 MΩMax 2500V

PASS

GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

A

BDCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

TEST TEST

TEST RESET

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

FAIL

120 kΩMax 2300V

2 MΩMax 2500V

PASS

GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

120 kΩMax 2300V

2 MΩMax 2500V

PASS

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

A

B

C

D

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

TEST TEST

TEST RESET

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

FAIL

120 kΩMax 2300V

2 MΩMax 2500V

PASS

GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

120 kΩMax 2300V

2 MΩMax 2500V

PASS

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

A

B

C

D

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

TEST TEST

TEST RESET

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

FAIL

120 kΩMax 2300V

2 MΩMax 2500V

PASS

GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

TVB-2

TVB-2

FAIL

2 ΩMax 1A

500 mΩMax 1A

PASS

ACW / DCW

120 kΩMax 2300V

2 MΩMax 2500V

PASS

CONT.CHECK

RESET

TEST

Hypot® SeriesDIELECTRIC WITHSTAND TESTER

RETURN

HIGH VOLTAGE

My Menu / SelectPOWER DATA

BARCODE

CAUTIONHIGH VOLTAGE

5KVAC MAX.6KVDC MAX.

DCW Settings

10.00mA

60.0s

Results

Load

Test_01-003

1.24kv GB

FAIL

200 ΩMax 50W

50 mΩMax 50W

PASS RETURN

VERIFICATION LOAD BOX

Continious Power Limitations - See Specifications

IR

FAIL

1 MΩMax 1000V

4 MΩMax 2500V

PASS

A

B

C

D

WORKING PROPERLYVerify your instrument is

TVB-2