version 1.6 project portfolio › download › project_portfolio_1.6.pdfjan de nul sefine shipyard,...

49
Structural Composites Engineered for the 21st Century Project Portfolio Version 1.6

Upload: others

Post on 29-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Structural CompositesEngineered for

    the 21st Century

    Project PortfolioVersion 1.6

  • 1 Stadia

    2 Buildings

    3 Bridges

    4 Maritime

    5 Offshore

    6 Special Applications

    7 Production

    R e c e n t P R o j e c t s

    Contents

  • R e c e n t P R o j e c t s 1Stadia

  • SPS terrace units used to reprofile stand, replacing 40+-year-old pre cast concrete terraces Existing concrete

    rakers re-profiled with new SPST designed and fabricated stool sets

    SPS terraces and components delivered in eighteen 40ft OTC containers Stacked in erection sequence – 28 terrace units per container

    Long reach, high capacity crane used to lift SPS terrace units over upper bowl leaving FOP intact Lower bowl installed from each side onto new steel beams

    Erection cycle 5-8 minutes per SPS terrace 60-80 SPS terraces installed in 8-10 hour day

    University of Delaware Stadium RenovationJuly 2019

    ArchitectEngineersInstallersContract Manager

    HOKEDiSFEI CorporationBarton Mallow

    spstechnology.com

    3,265 seats including wheelchair spacesSPS terraces 19,940sqf /1,816sqmADA platforms 1,460sqf /136sqm

    Stadia

  • Scottish Premiership Club, Hearts, has used SPS terraces to redevelop the Tynecastle main stand as their Gorgie home is expanded. 2,049msq of SPS terraces

    were specified in the design by James Clydesdale Architects for the upper stand section – Rows 11-37. The SPS terraces accommodate 4,200 seats and were delivered to site with pre-drilled hardware fixing holes for rapid seat and handrail installation.

     

    Heart of Midlothian Football ClubSeptember 2017

    OwnerArchitectManagerProject Engineers

    Heart of Midlothian FCJames ClydesdaleHardies Property & ConstructionCundall

    Stadia

    spstechnology.com

  • USTA Flushing Meadow GrandstandJuly 2016

    The 2016 US Open marked the opening of USTA’s new grandstand at Flushing Meadow, New York. In partnership with Walters Group, IE won the contract from HUNT Construction Group to supply and install SPS terraces for the 5,800

    seat grandstand. This was the second SPS stadia project for USTA.

    “The SPS stadia system is one of the most accurate stadia systems we have worked with.

    · The design build process helped coordinate the accuracy of structural steel and eliminated unforeseen conditions.

    · The engineers at SPS helped to coordinate and resolve complex expansion joint issues which were a huge concern for our unstable site.

    · The SPS system helped to complete a complex, 16 sided stadium in an extremely limited amount of time.

    · As designers of sport venues, we especially appreciate the look of the finished system from below and above. The finish on the system is beautiful.”

    Douglas Woodward RA, LEED APAssociate, Senior Designer, Rossetti

    OwnerArchitectEngineerConstruction Manager

    US Tennis AssociationRossettiWSP-NY OfficeHunt Construction

    spstechnology.com

    Stadia

  • spstechnology.com

    San José Earthquakes StadiumFebruary 2015

    OwnerArchitectStructural EngineerContractor

    Earthquakes Soccer LLC 360 ArchitectureMagnusson Klemencic Associates Devcon Construction

     

      “We congratulate you and your team on the successful installation of your SPS Terracing - [and] - thank the SPS team for all the efforts to make the Avaya stadium one of the best in North America. We hope that there will be future opportunities to work together in new stadium or arena.”

    Dave Kaval, President San Jose Earthquakes Avaya Stadium

    SPS and Steel Systems Engineering, Inc. win 2014 Tekla award in BIM category.

    “For coordination of fabricator and general contractor requirements, providing accurate, latest drawings and minimising workload.”

    Stadia

  • The Philippine Arena is the world’s largest mixed-use indoor theatre. SPS terraces account for approximately 40,000 of the 55,000 seats. The use of SPS enabled the terraces to be installed after the roof had been completed. This key

    benefit offered programme flexibility and cost effectiveness which could not be achieved by any other method or material.

    Philippine ArenaJuly 2014

    OwnerArchitectContractor

    New Era University HaeAhn Hanwha Engineering & Construction Co (HENC)

       

    spstechnology.com

    Stadia

  • Aquatics CentreLondon 2012 Olympics

    The two temporary wing-like seating stands containing SPS terraces were removed during the building’s conversion to a public swimming pool, in-line with the Olympic organisers’ goal of creating a sporting legacy for London.

    The SPS terraces have been sold on for re-use in a new venue.

    ArchitectEngineersContactor

    Zaha HadidArupBalfour Beatty

    spstechnology.com

    Completed - June 2012Construction - January 2011

    Conversion - May 2013

    Stadia

  • R e c e n t P R o j e c t s 2Buildings

  • spstechnology.com

    Microchip Factory – Clean Room Environment 2019 - 2020

    • SPS strong track record in this area

    • November 2013 53,000 SPS panels delivered to new facility of a global chip manufacturer

    • SPS panels intrinsic to building design

    • 210,500 panels in production for four new facilities

    • Used to cover access ports on raised floor

    • SPS 28lb panels vs previous solution 95lbs

    • Light enough to be lifted by one person

    • Act as immediate load carrying platform for forklifts

    Data Centres 2018

    • November 2018 flooring panels for third power plant of US data centre

    • 1778m2 for each centre for same client

    • SPS panels inserted into modules then transported to site for building assembly

    • Only viable product

    • Benefits - weight savings and ease of assembly

    Buildings

    Clean Rooms and Data Centres

  • Buildings

    Modular Police Detention Cells2018 - 2019

    OwnerMain ContactorSteel Fabrictors

    ConfidentialWates ConstructionWestbury Park Engineering, Wiltshire

       

    • Sixth project for client – five previous projects in 2011 and 2012

    • 1,753 m²/294 SPS panels delivered to steel fabricators December 2018

    • Plates manufactured with openings for service runs

    • Assembly, window installation, painting carried out by Westbury Park Engineering• Delivered to site April/May 2019

    • Cells lifted directly from lorry into place using a standard crane

    spstechnology.com

    - 2019

  • Space Needle, SeattleSummer 2018

     

    Summer 2018 saw the Space Needle, Seattle undergo a major multi-year renovation, bringing

    floor-to-ceiling glass to both the observation deck and restaurant

    48 SPS panels (86.4msq) were used at the inner radius of the revolving floor

    AdvantagesConstruction at height issues minimised with light weight SPS panels

    Weight of SPS ideal solution for tall buildings where minimal weight is ideal

     

    “The project has been a huge success. Thanks for your involvement.... We are ecstatic. And, your products all fit together perfectly. It’s been great doing business with you.”

    Wade Morris, Fives Group

    The SPS panels are at the inner radius of the revolving floor covered with carpet

    spstechnology.com

    Buildings

  • Carnegie Hall - New YorkFebruary 2011

    ArchitectStructural EngineersConstruction ManagerSteel Erector Fabricator

    iu + bibliowiczRobert Silman AssociatesTishman ConstructionMetropolitan Walters

       

    Shrink wrapped pallet of 14 SPS floor panels (630 sq.ft.)

       

    Restricted access by exterior hoist

    Lightweight, easily handled panels facilitate installation in constrained site

    spstechnology.com

    Buildings

  •  

    Weston-super-Mare Pier, UKOctober 2010

    ArchitectContractor

    Angus MeakJohn Sisk & Sons

    SPS Floors were key to meeting the challenges of rebuilding on an old and damaged structure with limitations on weight, restricted access and a demanding schedule. Intelligent Engineering has gone the extra mile in supporting us from design to installation to ensure the success of the project.”

    Andy McGoldrick Project Director, John Sisk & Sons Ltd

    spstechnology.com

    Buildings

  • R e c e n t P R o j e c t s R e c e n t P R o j e c t s 3Bridges

  • • Over 157’ long bridge, part of Seattle waterfront re-development (Coleman Dock)

    • Harbour key for Seattle to islands from where many commute on a daily basis to Downtown and hub for visitors to Victoria BC and San Juan Islands

    • SPS deck panels delivered to bridge fabricators on one truck

    • Light wearing surface factory applied

    • Complete bridge shipped via barge to Coleman Dock

    • Lifted into position by 250,000 lb crane and bolted down in just 35 minutes

    Seattle Waterfront BridgeNovember 2018

    OwnerEngineersContractorsBridge FabricatorsSPS Fabricators

    Washington State DOTWashington State DOTHoffman ConstructionJesse-Co Metal Fabrication & MachineryUS Bridge

    spstechnology.com

    Bridges

  • Grand Duchess Charlotte Bridge (Pont Rouge)October 2017

     The widening and strengthening of this bridge was undertaken by German SPS bridge licensee,

    SEH Engineering.

    Pont Rouge was upgraded from six vehicle lanes to a mixed use bridge fulfilling modern day requirements. 1.82m was added to its width using a total of 2,240 m² of SPS panels.

    The bridge now accommodates four SPS strengthened vehicle lanes and two newly installed tram lines; plus a two-way cycle lane and predestrian walkways on either side which are acoommodated on the newly installed SPS panels.

     

     

    spstechnology.com

    Bridges

  • Roseville BridgeMay 2017

    A new 52’ 6” bridge, with a 100 year service life, was successfully installed in just 29 days. With an integrated SPS bridge deck, this two vehicle lane modular prefabricated bridge, arrived on site on two trucks. Each section was

    located onto the abutments in just 10 minutes. The bridge was funded by the FHWA AID programme, the aim of which, was to identify a competitive alternative superstructure to address their aging bridge inventory.

    The bridge, designed and delivered by SPS licensee US Bridge, won the NSBA Special Award - Technological Advancement.

    OwnerEngineersContractor

    Ohio DoT Muskingum County US Bridge

    spstechnology.com

    Bridges

  • Mettlach BridgeJanuary 2015

       

     

    • Renovation of Mettlach Bridge in Germany carried out by Eiffel Deutschland Stahltechnologie (EDS) using prefabricated SPS panels to replace existing concrete deck

    • Use of SPS reduced deck weight by 300 tonnes allowing load restrictions to be lifted. Works completed within four months

    • Project received prestigious Ulrich Finsterwalder Engineering Award in January 2015

       

    spstechnology.com

    Bridges

  • OwnerStructural Engineers

    Construction ManagerFabricator/Steel Erector

    Northumberland County CouncilNorthumberland County Council, SPS TechnologyCarillionDMJ Engineering

    Wark Tyne Bridge September 2011

     

     

     

     

    spstechnology.com

    Bridges

  • R e c e n t P R o j e c t s 4Maritime

  • spstechnology.com

    Superyacht Deck November 2020

    ClassSPS Licensee

    ABSSRC, Estonia

    Project Summary

    • Main deck raised by 100mm to reach 5000mm ABL (minimum freeboard requirements), required by classification society, ABS

    • SPS double bubble core used to achieve the needed height increase

    • Aluminium top plate

    • No disturbance to below deck spaces, services and structural fire protection insulation in the compartments adjacent and below

    “This was the first time that SPS was installed with this particular combination of elements in a maritime environment; aluminium plates, double bubble core and no hot work. It was a perfect solution for the project as the installation of the SPS had no impact in other areas of the yacht cabins, corridors, ship systems, service runs and insulation which other solutions would have caused. The project was executed in a fraction of the time of other modification solutions.”

    Ivo Muru, SRC

  • spstechnology.com

    Pride of Bruges and Pride of York January and February 2019

    OwnerClassSPS Licensee

    P&O North SeaLloyd’s RegisterSRC Group

    Pride of Bruges• 55m² deck reinstated whilst still in service between

    Hull and Rottterdam

    • Sixth programme of SPS works to be executed on this vessel

    Pride of York• Work carried out at Damen Shipyard

    • 58m² reinstated across Decks E&F, plus 17m² on bulkhead of water ballast tank

    • Fourth SPS project to be undertaken on this vessel

    • Took just 8 days to complete

    Maritime

  • Commodore ClipperOctober 2019

    YardSPS LicenseeClassification Society

    A&P Shipyard, FalmouthMOMDNV-GL

    Project Summary

    • 74m² steel reinstated on Deck 3

    • Project did not interfere with any other work being conducted

    • Project coincided with 20-year anniversary of 1st SPS repair project being undertake at same yard

    spstechnology.com

  • Sun Princess June 2018

    OwnerYardSPS Licensee

    Princess Cruise Line LtdSembawang Shipyard, SingaporeSRC

       

    Project Summary

    • 62sqm on deck 14 (ventilation room), reinstated using SPS• Pipework etc made access challenging• Project completed on time according to schedule

    spstechnology.com

    Maritime

  • spstechnology.com

    PompeiOctober 2018

    OwnerYardSPS Licensee

    Jan de NulSefine Shipyard, TurkeyMOM

    Project Summary

    • 131m² SPS used to enhance the performance of the bilge protection system designed by Jan de Nul on hopper barge

    • Result will withstand very high operational and accidental loading conditions

    • Provide improved lifetime performance, better resistance to abrasion and impact

    • Reduced future maintenance, repair and down-time

  • spstechnology.com

    European Seaways July 2018

       

    OwnerClassYardSPS Licensee

    P&O Lloyd’s RegisterRemontowa, EstoniaSRC

    Project Summary

    • 300m² steel renewal on decks 3, 5 and 11

    • Over 30 projects completed for P&O

  • spstechnology.com

    Queen Mary 2 October 2017 & September 2018

    OwnerClassAreaLocation

    Carnival CruisesLloyd’s Register88m²In Service

    spstechnology.com

    Maritime

    “The team was able to complete the repair under challenging circumstances whilst the vessel was in-service. In order not to impact on our guests’ cruise experience, restrictions were placed on when works could be undertaken which the team worked around, delivering the project on time with minimal disruption.”

    Andrew Menzies Deck & Safety SME, Carnival UK

    Project Summary

    With SPS licensee, SRC Group, an SPS project for Carnival Cruises on board the Queen Mary 2 was completed in September 2018. It follows on from a similar project October 2017. Both projects were undertaken during a scheduled cruise between New York and Southampton. Two areas, 48m² and 88m² were reinstated tween deck 8 and deck A. The repairs were inspected and approved by Lloyd’s Register on both sides of the Atlantic!

  • The 127,500dwt Solitaire, one of the world’s largest pipe-layers, has completed some of the most challenging

    projects in which heavy pipe has been laid in very deep waters.

    Fatigue and corrosion meant that 550m2 of tank top in hold number 6 needed to be reinstated. After a detailed assessment was carried out, Allseas opted for SPS technology instead of steel renewal. The project was undertaken with LR Class approval at United Stevedores in Amsterdam.

    Solitaire May 2016

    OwnerYardDesign

    AllseasUnited Stevedores, Amsterdam10 – 20 - existing

     

     

    “I am very pleased with the performance and will consider using SPS again should a similar project have to be undertaken.”

    Quirien GrulAllseas’ Manager Technical Department

    spstechnology.com

    Maritime

  • Atlantic Optimist April 2016

    OwnerYardDesign

    Ueushuk Fisheries LtdGlovertown Shipyards1/4” - 3/4” - existing

     The existing steelwork on board the vessel was badly corroded, access tight and a crop-and-replace repair was an

    unattractive option.

    40m² of deck required steel reinstatement. Solid perimeter bars that form the boundary of the cavity and top plates were welded into place and the resulting cavity injected with the elastomer core to form the new composite deck

    The SPS deck reinstatement was substantially quicker than an equivalent conventional steel repair.

    “I like the fact that the new deck is much stronger because the old deck is still there with a new deck on top bonded by the elastomer core. I recommend this process to anyone who has to replace steel on board ships where the SPS system can be used.”

    Captain Rex Simmonds Ueushuk Fisheries Ltd

    spstechnology.com

    Maritime

  • R e c e n t P R o j e c t s 5Offshore

  • spstechnology.com

    Project Summary

    • Licensee MOM used SPS® to provide a permanent repair to restore integrity of a damaged (cracked) area of the hull structure

    • Structural integrity restored by the SPS elastomer core transferring loading/stress levels from the existing plate to new SPS top plate therefore ‘bridging the cracks’

    • SPS reduced the cost, disruption and time required for the repair

    • FPSO was able to remain on-station and in production

    FPSO Side Shell Crack RepairAugust 2020

    Project TypeAreaDesignYardClassSPS Licensee

    Fracture repair and prevention of crack propagation5m²12-25-EOn-station, North SeaDNV-GLMarine Offshore Management

  • spstechnology.com

    YardSPS Licensee

    CSSC Shanghai Waigaoqiao Shipyard (SWS)ASOM

    FPSO Newbuild2019

    Project Summary

    • 74.5m² SPS panels used for additional bulkhead blast protection located between the Emergency Generator Room, CCR and Permit Office

    • Panels into which the SPS elastomer core was subsequently constructed as part of sub-blocks of the accommodation house

    • The completed sub-blocks joined to create a complete accommodation house while the FPSO’s hull was in dry-dock

    • Once launched the elastomer core injected into the panels - did not disturb any other work streams (electrical, piping, insulation and carpentry)

  • Noble Paul Romano I & II August 2015 and June 2019

    OwnerRepair LocationClass

    Noble CorporationTexas, USAABS

     

    spstechnology.com

    The high impact resistance that SPS provides made it the perfect solution for the reinstatement of the pipe deck on

    this semi-submersible, which had suffered damage from dropped objects. Two areas of the deck were repaired with SPS. Its use guaranteed the integrity of below deck service runs which were unaffected by the extensive work above.

    A second project to reinstate 134m² of pipe deck scheduled for June 2019.

     

     

     

    Offshore

  • FPSO RepairJuly 2018

    ClassLocationSPS Licencee

    ABSOn-station offshore AustraliaASOM

     Project Summary

    • 72sqm of its side shell reinstated

    • 6 weeks of June and July 2018

    • Reinstatement of the side shell and longitudinal bulkhead plating for the starboard slop tank

    • Vessel remained fully operational throughout the repair

    • Second SPS project reinstatement of accommodation deck plating in May 2014

    • No cofferdam and divers

    • Reduced safety risk, repair schedule and cost significantly

    • SPS low heat input solution avoids direct welding to the affected side shell

    spstechnology.com

    Offshore

  • FPSO Baobab Ivoirien MV10 February 2018

    OwnerClassLocationSPS Licencee

    ModecABSOn-station 25km off Ivory CoastASOM

     

    spstechnology.com

    Project Summary

    • Low heat SPS installation method – safe, rapid repair

    • Use of SPS eliminated need to empty fuel oil settling and water tanks

    • Vessel fully operational throughout

    • 494m² steel reinstated across decks B, C, D, wheel house top and upper deck

    • Insulation, piped and electrical service runs unaffected

    • Work started November 2017 con-cluding February 2018

    Offshore

  • FPSO Ngujima Yin November 2018

    ClassYardSPS Licencee

    Lloyd’s RegisterKeppel Shipyard, Tuas, SingaporeASOM

     

    Project Summary• 746m² steel reinstated across various decks

    • Selected as SPS preserves insulation and cable runs

    • Low heat solution used to ensure safety

    • Completed in just two months despite monsoon rain

    spstechnology.com

     

     

    Offshore

  •  

    FPSO Espoir IvoirienFebruary 2017

    ClassClientLocationSPS LicenceeArea

    DNV GLBW Offshore/Marine Service International (MSI) On-station 25km off Ivory CoastASOM203m²

    spstechnology.com

    Project Summary• Two phase undertaken between

    November 2016 – February 2017

    • Side shell reinstatement in the Forepeak Tank Most of the side shell plates to be repaired were located below the FPSO’s waterline

    • Using allowed a safe and unhindered repair to be undertaken: no cropping of existing side shell, cofferdam or diving team

    • FPSO remained on-station fully operational

    Offshore

  • R e c e n t P R o j e c t s 6Special Applications

  • SPS delivered as a ‘Modular System’

    SPS Modular Construction - Volumetric London Metropolitan Police Custody Centres(Brixton, Kingston, Wood Green, Walworth)

    January 2016

     

    Clean architectural finishes

     

    spstechnology.com

    Special Applications

    SPS Modular Construction - Flat PanelLondon Metropolitan Police Custody Centres (Croydon)

    August 2011

    Metropolitan PoliceRaymond Smith PartnersWates Construction

    OwnerArchitectMain Contractor

    Lightweight SPS Cells lifted directly into position

     

    SPS delivered as a ‘Flat Panel System’

    SPS Cell roof forms load

    bearing floor above

    Lightweight SPS Cells lifted directly into position

  • Vehicle BarriersJanuary 2016

    The rising anti-ram SPS vehicle barrier, tested successfully in the UK to industry standards in May 2015, has now gone into production. The vehicle barriers which successfully brought a 40 tonne truck to a complete standstill are for

    national and international clients.

     

    Special Applications

    spstechnology.com

       

  • Column ProtectionJuly 2015

     

     

    DESIGN CRITERIA• Absorb energy from radial impacts or glancing blows

    without contact or damage to column

    • Impact protection system is replaceable

    DESIGN• Consists of SPS 20-25-20 circular plate, 15 mm thick

    Y-shaped steel stiffeners, steel-concrete composite reaction wall secured to a base structure and embedded in the tarmac adjacent to columns supporting the airport piers

    • Designed to resist a direct impact from a tow hitch on a 70 tonne tug master moving at 30 km/hr (kinetic energy = 2.4 MJ)

    PROVEN IMPACT RESISTANCE• The design was verified by advanced finite element

    analyses for all possible impact scenarios (critical load case is radial impact along centreline)

    • Full-scale test demonstrates impact resistance

    PRODUCTION• 22 units under production in Singapore by client.

    IE to undertake injection

    • To be installed by client

    70 Tonne Tug Master

    spstechnology.com

    Special Applications

  •  

    Transformer CasingNovember 2013

     • SPS Transformer Casings increase stiffness,

    reduce weight and dampen vibration and sound

    • Six projects completed to date, using the Overlay method in-situ, to verify design and benefits

    • High volume production will use prefabricated SPS panels

     

     

      spstechnology.com

    Special Applications

  • R e c e n t P R o j e c t s 7Production

  • The new SPS production facility at Hae Gang Co Ltd was opened in early 2019. First on its order book were terraces for Delaware Stadium and 6,000 semi-conductor chip plant floor panels per week during a 12 month production run.

    spstechnology.com

    Production

    KoreaSPS Production Plant May 2019

  • Production Process SPS Production PlantMarch 2014

    spstechnology.com

    Production

       

    Steel plate surface preparation Fast low heat robotic welding

    Injecting PU CNC drilling of bolt holes

    Panels stacked Panels loaded for shipment

  • Shipment SPS ProductionSeptember 2013

    spstechnology.com

    Production

       

    Loads 77 to 79 to Philippine Arena, Manila, Philippines. Total 64,471 kgs of longest SPS Terraces fabricated to date (up to 12,183mm)

    Loads 3 & 4 to Q204 Escape tunnel Mokpo, Korea. Total 22,670 kgs of flat, large radius outer tunnel & small radius inner tunnel panels up to 4,925mm long

     

    Load 73 to Philippine Arena, Manila22,112 kgs wide back of bowl terraces

     

     

    Big R Demo Bridge to Greeley, Colorado, USA. 3 concept bridge deck panels with innovative connection details - Total 4,370 kgs

  • SPS Technology Ltd

    Aston Court

    Kingsmead Business Park

    High Wycombe

    HP11 1JU

    T: +44 1753 890 575

    SPS Technology North America Ltd

    251 Laurier Avenue West, Suite 900

    Ottawa

    Ontario

    K1P 5J6

    T: +1 613 569 3111

    330 Evergreen Road

    Suite 1

    Louisville

    Kentucky

    40243

    T: +1 502 352 8280

    SPS Technology Asia Pte Ltd

    3 Temasek Avenue

    Centennial Tower #34-45B

    Singapore

    039190

    T: +65 6513 2782