PUBLIC VERSION 2011 GEOTHERMAL INFORMATION REQUEST Evaluation of Responses B&V PROJECT NO. 174209 PREPARED FOR PacifiCorp 16 APRIL 2012 ® ® ©Black & Veatch Holding Company 2011. All rights reserved.

Upload: others

Post on 03-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

 

PUBLIC VERSION 

2011 GEOTHERMAL INFORMATION REQUEST 

Evaluation of Responses 

B&V PROJECT NO. 174209 

PREPARED FOR 

 

 

 

 

PacifiCorp 

16 APRIL 2012 

  ®

®

©Black & Veatch Holding Company 2011. A

ll rights reserved. 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Table of Contents  i  

Table of Contents  1.0  Executive Summary ............................................................................................................................ 1­1 

1.1  Review Procedure ................................................................................................................................ 1‐2 1.2  Recommendations ............................................................................................................................... 1‐2 

2.0  Introduction .......................................................................................................................................... 2­1 2.1  Objectives ................................................................................................................................................ 2‐1 2.2  Approach ................................................................................................................................................. 2‐1 

3.0  Document Development and Scoring Approach ...................................................................... 3­1 3.1  GIR Document Development ........................................................................................................... 3‐1 3.2  Evaluation Approach .......................................................................................................................... 3‐1 

4.0  Summary of Responses ..................................................................................................................... 4­1 4.1  AltaRock Energy, Inc – Buck Mountain ....................................................................................... 4‐3 4.2  Altarock Energy, Inc. – Mount St. Helens North ...................................................................... 4‐3 4.3  Altarock Energy, Inc. – Mount St. Helens Southeast .............................................................. 4‐3 4.4  Caldera Geothermal, Inc. – McGee Mountain ............................................................................ 4‐4 4.5  Caldera Geothermal, Inc. – Teels Marsh ..................................................................................... 4‐4 4.6  Davenport Newberry Holdings LLC ............................................................................................. 4‐4 4.7  Eureka Green Systems LLC .............................................................................................................. 4‐4 4.8  Gradient Resources, Inc ..................................................................................................................... 4‐5 4.9  Ida‐Therm LLC ...................................................................................................................................... 4‐5 4.10  Oski Energy LLC .................................................................................................................................... 4‐5 4.11  Standard Steam Trust – Marys River ........................................................................................... 4‐5 4.12  Standard Steam Trust – Marys River Southwest .................................................................... 4‐6 4.13  Standard Steam Trust – Newdale .................................................................................................. 4‐6 4.14  Standard Steam Trust – Parma....................................................................................................... 4‐6 4.15  Surprise Valley Hot Springs ............................................................................................................. 4‐6 4.16  Western Energy Resources .............................................................................................................. 4‐7 

5.0  Recommendations .............................................................................................................................. 5­1 Appendix A: GIR Response Document ............................................................................................................ 1  

   

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Table of Contents  ii  

 

LIST OF TABLES  Table 1‐1  Summary of GIR Responses ............................................................................................................. 1‐1 Table 1‐2   Projects Identified for Further Investigation ........................................................................... 1‐2 Table 4‐1  Summary of GIR Responses ............................................................................................................. 4‐1 Table 5‐1   Projects Identified for Further Investigation ........................................................................... 5‐1  

LIST OF FIGURES  Figure 4‐1   Proposed GIR Project Locations .................................................................................................... 4‐2   

 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Executive Summary  1‐1  

1.0 Executive Summary PacifiCorp  has  an  interest  in  increasing  the  amount  of  geothermal  energy  sources  in  its 

generation  portfolio  and  is  currently  investigating  a wide  range  of  opportunities.    An  All  Source 

Request for Proposals (RFP) has recently been released to solicit bids from mature projects that are developed  sufficiently  to  enter  into  a  Power  Purchase  Agreement  (PPA).    As  a  way  to  identify 

promising  early  stage development  opportunities  that  are  less mature  than  those  ready  to  enter 

into a PPA, PacifiCorp issued a Geothermal Information Request (GIR) in late 2011.  Respondents to the GIR and RFP are mutually exclusive groups; this report documents the GIR process. 

The  GIR was  open  from  October  5,  2011  through  October  31,  2011.    Information  on  16 

projects was received from 10 respondents.   The proposed projects represent a range of different early stage development phases (defined in Section 3 of this report).   

Table 1‐1 summarizes the GIR responses that were received. 

Black & Veatch and GeothermEx provided an independent review of the responses to the GIR.  This document provides the results of the reviews.  

Table 1‐1  Summary of GIR Responses 

PROJECT  DEVELOPER  LOCATION  SIZE (MW) 

DEV’T PHASE 

RESOURCE TYPE 

Buck Mountain  AltaRock Energy, Inc  Klamath Falls, OR 10‐60  0  Dual Flash EGS

Mt St. Helens N  AltaRock Energy, Inc  Soda Springs, WA 10‐60  0  Dual Flash EGS

Mt St. Helens SE  AltaRock Energy, Inc  Marble Mtn., WA 10‐60  0  Dual Flash EGS

McGee Mtn.  Caldera Geothermal, Inc Humboldt Co., NV Undef.  1  Not Specified, 

Likely Binary 

Teels Marsh  Caldera Geothermal, Inc Mineral Co., NV Undef.  0  Binary

Newberry 

Volcano 

Davenport Newberry   Deschutes Co., OR 15‐42  2  Likely Flash/

Binary EGS 

Grays Lake  Eureka Green Systems  Grays Lake, ID 200  0  Binary or 

Single Flash 

Unspecified  Gradient Resources Inc Various 15‐45  0  Binary and

Dual Flash 

Renaissance  Ida‐Therm LLC  Honeyville, UT 100  1  Binary

Cove Fort  Oski Energy LLC  Cove Fort, UT 15  2  Binary (Kalina)

Marys River  Standard Steam Trust   Elko Co., NV 134  1  Binary

Marys River SW  Standard Steam Trust   Elko Co., NV 124  1  Binary

Newdale  Standard Steam Trust   Newdale, ID Undef.  1  Binary

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Executive Summary  1‐2  

PROJECT  DEVELOPER  LOCATION  SIZE (MW) 

DEV’T PHASE 

RESOURCE TYPE 

Parma  Standard Steam Trust   Parma, ID Undef.  0  Binary

Surprise Valley  Surprise Valley Hot 

Springs  

Modoc Co., CA 2‐5  0  Binary

Wendel  Western Energy 

Resources  

Wendel, CA 40  0  Not Specified

 

1.1 REVIEW PROCEDURE The project reviews occurred at the Black & Veatch and GeothermEx offices from November 

4 until November 28, 2011.   Each response was independently reviewed by three reviewers (two 

from  Black  &  Veatch  and  one  from  GeothermEx)  and  project  features  were  compared  and reconciled.    The  development  phase  of  each  project  was  determined  based  upon  the  amount  of 

testing, permitting and development that has been completed at each site.  An overview of the main 

evaluation criteria and phase identification guidelines can be seen in Section 3. 

1.2 RECOMMENDATIONS Black  &  Veatch  and  GeothermEx  reviewed  the  projects  and  recommended  projects  that 

were the best matches to PacifiCorp’s development criteria.  The two leading projects from each of the  three  development  phases  were  selected  for  further  consideration.    This  does  not  mean, however, that these are the only projects that should be considered viable for future development.   

Table 1‐2 summarizes the projects recommended for further investigation. 

Table 1‐2   Projects Identified for Further Investigation 

PHASE  DEVELOPER  PROJECT LOCATION MW  TYPE

Oski Energy  Cove Fort Cove Fort, UT 15  Binary (Kalina)

Davenport Newberry  Newberry 

Volcano 

Deschutes County, 

OR 15  Likely Binary 

/Flash EGS 

1 Standard Steam Trust  Newdale Newdale, ID Undef.  Binary

Ida‐Therm  Renaissance Honeyville, UT 100  Binary

AltaRock Energy  Buck Mountain Klamath Falls, OR 10  Dual Flash EGS

Surprise Valley  Surprise Valley 

Hot Springs 

Modoc County, CA 2‐5  Binary 

 

 It should be noted that each of the projects reviewed has development risks that are higher 

than most projects that bid into a typical renewable energy PPA process.  The review team focused 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Executive Summary  1‐3  

on recommending projects with good geothermal resource potential that had realistic expectations 

for development timing, costs, and were located close to PacifiCorp transmission.   Two  projects were  recommended  that  propose  the  use  of  enhanced  geothermal  systems 

(EGS)  technology  which  has  not  been  commercially  demonstrated  in  the  US:  AltaRock  Buck 

Mountain and Davenport Newberry.  The resource at Buck Mountain may turn out to be suitable for a conventional binary system, making  it  lower risk than a project relying solely on the success of 

EGS technology.  Newberry Volcano is one of the most promising EGS systems in the US at this time 

by virtue of its very high resource temperatures (>600°F). Other “Phase 0” projects that are not listed in  

Table 1‐2 may have potential  for  consideration by PacifiCorp  if  additional  projects  are of 

interest.  AltaRock’s Mount St. Helens Southeast project has geothermal resource potential, but the review team was concerned about the pursuit of additional EGS projects due to the technology risk 

and cost.   Gradient’s proposed portfolio of projects may eventually be  suitable  for  consideration, 

but since so little information was provided on the location of the projects and because of the fact that Gradient has not secured leases, it was deemed prudent for PacifiCorp to defer consideration of 

these opportunities until after additional development has progressed. 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Introduction  2‐1  

2.0 Introduction PacifiCorp is one of the West’s largest utilities, serving approximately 1.7 million customers 

in  six  states.    PacifiCorp  has  an  interest  in  increasing  the  amount  of  geothermal  energy  in  its 

generation portfolio.  The company is currently investigating a wide range of geothermal resource opportunities  including entering into option agreements on early stage development projects and 

power  purchase  agreements  (PPAs)  with  geothermal  projects  nearing  completion.    As  a  way  to 

investigate  opportunities  for  early  stage  project  involvement,  PacifiCorp  issued  a  Geothermal Information Request (GIR) on its website to solicit project information from geothermal developers.  

The GIR was open from October 5, 2011 through October 31, 2011. 

The GIR is completely separate from the All Source Request for Proposals (RFP) for electric generation  facilities  that PacifiCorp  issued  in  the  early part of  2012.    The All  Source RFP  solicits 

proposals  for  generation  facilities  that  use  eligible  fuel  sources,  including  geothermal  resources.  

The All Source RFP is for projects that can bid an executable resource by summer 2012, would be provided  with  a  notice  to  proceed  in  approximately  the  second  quarter  of  2013,  and  would  be 

online by summer peak 2016.   Companies that have a geothermal resource project that will  likely 

be submitted in response to the All Source RFP were cautioned not to submit information on those particular projects in response to the GIR.   

2.1 OBJECTIVES The primary goal of this project was to obtain information on potential commercially viable 

geothermal power generation resources that can provide power to the PacifiCorp service territory.  

The  information  will  be  used  by  PacifiCorp  for  resource  planning  purposes.    To  support  this 

objective, a GIR was developed to: 

Identify projects that PacifiCorp may consider as co‐developer or participant 

Assist in structuring future formal Requests for Proposals (RFPs) for geothermal resources 

Identify  what  types  of  commercial  structures  or  resources  are  needed  to  facilitate development of geothermal resources 

Assist both PacifiCorp and the regulatory agencies to identify the level of development and 

viability of geothermal resource opportunities 

Identify  how  to  promote  geothermal  power  development  with  reduced  risk,  while 

maintaining a low cost for renewable energy delivered to PacifiCorp and its customers 

2.2 APPROACH Black  &  Veatch  and  GeothermEx  compiled  a  list  of  the  most  important  items  to  be 

considered when assessing the potential of a new geothermal prospect.   These were consolidated 

into a draft GIR response form that was reviewed with PacifiCorp.  A set of evaluation criteria was 

established  in  parallel with  the  response  form  to  assure  that  all material  needed  to  perform  the 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Introduction  2‐2  

assessment would be provided by the respondents.  After further modifications, this GIR document 

was published on PacifiCorp’s website. Black & Veatch and GeothermEx methodically assessed the strengths and weakness of each 

response based on pre‐defined criteria and guidelines.   The projects were weighted according  to 

relative  importance  of  each  criterion  and  were  then  compiled  into  one  of  four  categories: Experience, Project, Economics, and Readiness.   Projects with good geothermal resource potential 

were  recommended  to  PacifiCorp  for  further  consideration.    This  does  not mean,  however,  that 

these are the only projects that should be considered viable for future development.  

 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Document Development and Scoring Approach  3‐1  

3.0 Document Development and Scoring Approach 

3.1 GIR DOCUMENT DEVELOPMENT Black & Veatch used experience gathered  in developing previous utility RFIs and RFPs as 

the basis for the GIR response document.  Modifications to criteria used in other solicitations were applied to reflect the focus on geothermal resources and the early stage development status for the 

projects that would likely be responding.  For example, while detailed information on financing and 

interconnection  requirements are  typical  in utility PPA solicitations, data  requests  in  these areas were deemphasized. 

After  completion  of  an  initial  draft,  the  GIR  response  document  was  provided  to 

GeothermEx for their review and comment.  GeothermEx provided input on the technical aspect of the  information  request  as  a way  to  distinguish  between  projects  and  their  development  status.  

The completed draft was then sent to PacifiCorp for review and final comment.  After incorporation 

of comments and discussion with PacifiCorp, the document was published on PacifiCorp’s website, with  notification  e‐mails  sent  to  a  list  of  potential  respondents.    This  list  was  developed  by 

GeothermEx  based  on  their  database  of  known  developers.    Follow‐up  calls  were  made  by 

PacifiCorp and Black & Veatch with this list of respondents. The GIR document can be seen in Appendix A. 

3.2 EVALUATION APPROACH Prior  to evaluating any proposal,  the  evaluation procedures,  criteria,  and guidelines were 

established  by  the  evaluation  team.    These were  based  on  PacifiCorp  GIR  requirements  and  the review team’s experience in similar evaluation processes.  The team collaborated with PacifiCorp to 

refine  the  criteria.    The  goal was  to  identify  all  important  aspects  of  the  proposed  projects  that 

would be necessary  to  consider  and determine  the weighting of  each  criterion.    The  criteria  and guidelines were approved by PacifiCorp. 

The main review criteria utilized during this process are outlined below. 

  Experience  –  This  category  measures  how  likely  it  is  that  the  responding  company  can 

actually execute  the project based on previous experience.   Factors  include  the company’s 

experience  developing  and  executing  similar  projects  and  the  relevant  experience  of  the project management team.  

  

Project  –  This  category  measures  the  viability  of  the  project  and  associated  generating technology.    Factors  include  the project  feasibility  and  resource  sufficiency  to  support  the 

proposed production.   

 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Document Development and Scoring Approach  3‐2  

Economics – This category measures  factors affecting the  financial viability of  the project.  

Factors such as price reasonableness and level of support required were evaluated for this category.   

 

Readiness  – This  category measures how  far  along  the development pathway  the project has  proceeded.    Projects  that  have  completed  advanced development work would  receive 

the highest evaluations.   

 Each project was classified by its development phase, with scores for projects within similar 

phases being grouped together.   The Geothermal Energy Association (GEA) defines four phases of 

geothermal energy project development1.   Besides using the  four development phases defined by GEA,  in  this  report  Black  &  Veatch  identifies  projects  that  do  not  meet  the  minimum  Phase  1 

threshold as “Phase 0” projects.   PacifiCorp has an interest in investigating geothermal projects in 

all stages of development.   Below is a summary of the guidelines set forth by GEA for classifying project development 

phases.    Criteria  are  grouped  by  GEA  into Resource Development, Transmission Development, and 

External Development activities. 

Phase I: Resource procurement and identification   

Resource Development: for a project to be considered a Phase I project at least two of the following Resource Development criteria must be met. 

Literature Survey Complete 

Geologic Mapping Completed, Geophysical and Geochemical Sample Sites Identified  Geochemical and geophysical surveys in progress 

‐AND‐ 

Transmission Development:  for  a  project  to  be  considered  a  Phase  I  project  all  of  the following Transmission Development criteria must be met. 

Internal transmission analysis complete. 

‐AND‐ External Development: for a project to be considered a Phase I project all of the following 

criteria must be met. 

Land or lease acquired  Permitting process for exploration drilling (TGH and/or slimholes) underway 

Phase II: Resource Exploration and Confirmation 

Resource Development: for a project to be considered a Phase II project at least one of the 

following Resource Development criteria must be met.  Temperature Gradient Holes (TGH) Drilled 

                                                            1 “New Geothermal Terms and Definitions: A Guide to Reporting Resource Development Progress and Results to the Geothermal Energy Association” GEA, November 2010, available at www.geo‐energy.org  

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Document Development and Scoring Approach  3‐3  

Slim Hole Drilled 

One Full Size Discovery Well Drilled ‐AND‐ 

Transmission Development: for a project to be considered a Phase II project at least one 

of the following Transmission Development criteria must be met.  Interconnection application submitted and queue position established 

Transmission feasibility studies underway 

‐AND‐ External  Development:  for  a  project  to  be  considered  a  Phase  II  project  one  of  the 

following External to Resource Development criteria must be met. 

Permit for Slim Hole Drilling Applied for or Approved  Permit for Production Well Drilling Applied for or Approved 

Phase III: Permitting and initial development 

Resource Development: for a project  to be considered a Phase  III project at  least  two of 

the following Resource Development criteria must be met. 

At least one full size production well drilled and operational  At least one full size injection well drilled and operational 

Reservoir characterization completed and sustainable reservoir capacity determined 

‐AND‐ Transmission Development: for a project to be considered a Phase III project at least two 

of the following Transmission Development criteria must be met. 

Interconnection feasibility study complete  System impact study (SIS) underway or complete 

Interconnection facility study underway 

Transmission Service Request Submitted (if appropriate) ‐AND‐ 

External Development: for a project to be considered a Phase III project at least two of the 

following External to Resource Development criteria must be met.  Plant permit application complete or in process 

Power purchase agreement secured or in negotiation 

Financing secured, or being secured, for portion of project construction 

Phase IV: Resource Production and Power Plant Construction 

Resource Development: for a project  to be considered a Phase  IV project at  least  two of 

the following Resource Development criteria must be met. 

Plant equipment on order  Plant construction underway 

Production and injection drilling underway 

‐AND‐ 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Document Development and Scoring Approach  3‐4  

Transmission  Development:  for  a  project  to  be  considered  a  Phase  IV  project  the 

Interconnection Agreement must be  signed.  If  the  transmission of  power  from  the project  to  the end user requires point‐to‐point service through one or more utility networks then all of the below 

criteria must be met for the project to be considered a Phase IV project. 

Interconnection Agreement Signed  Transmission System Service Request studies completed 

‐AND‐ 

External  Development:  for  a  project  to  be  considered  a  Phase  IV  project  all  of  the following Resource Development criteria must be met. 

Plant permit(s) approved 

EPC contract signed  PPA secured 

 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Summary of Responses  4‐1  

4.0 Summary of Responses Responses were received to the GIR from 10 respondents, who submitted information on 16 

different projects.  Table 4‐1 summarizes the projects for which information was received.   

Table 4‐1  Summary of GIR Responses 

PROJECT  DEVELOPER  LOCATION  SIZE (MW) 

DEV’T PHASE 

RESOURCE TYPE 

Buck Mountain  AltaRock Energy, Inc  Klamath Falls, OR 10‐60  0  Dual Flash EGS

Mt St. Helens N  AltaRock Energy, Inc  Soda Springs, WA 10‐60  0  Dual Flash EGS

Mt St. Helens SE  AltaRock Energy, Inc  Marble Mtn., WA 10‐60  0  Dual Flash EGS

McGee Mtn.  Caldera Geothermal, Inc Humboldt Co., NV Undef.  1  Not Specified, 

Likely Binary 

Teels Marsh  Caldera Geothermal, Inc Mineral Co., NV Undef.  0  Binary

Newberry 

Volcano 

Davenport Newberry   Deschutes Co., OR 15‐42  2  Likely Flash/ 

Binary EGS 

Grays Lake  Eureka Green Systems  Grays Lake, ID 200  0  Binary or 

Single Flash 

Unspecified  Gradient Resources Inc Various 15‐45  0  Binary and 

Dual Flash 

Renaissance  Ida‐Therm LLC  Honeyville, UT 100  1  Binary

Cove Fort  Oski Energy LLC  Cove Fort, UT 15  2  Binary (Kalina)

Marys River  Standard Steam Trust   Elko Co., NV 134  1  Binary

Marys River SW  Standard Steam Trust   Elko Co., NV 124  1  Binary

Newdale  Standard Steam Trust   Newdale, ID Undef.  1  Binary

Parma  Standard Steam Trust   Parma, ID Undef.  0  Binary

Surprise Valley  Surprise Valley Hot 

Springs  

Modoc Co., CA 2‐5  0  Binary

Wendel  Western Energy 

Resources  

Wendel, CA 40  0  Not Specified

 

A map of the location, size and development status for each project can be seen in  Figure  4‐1  on  the  following  page.    Also  provided  on  this  map  is  information  on  known 

geothermal regions from Idaho National Laboratory, boundaries of the PacifiCorp service territory, 

and the location of major PacifiCorp transmission lines.  Following  Figure 4‐1  is a summary of each response, with basic  information on each project and  its 

development status.   

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Summary of Responses  4‐2  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 4‐1   Proposed GIR Project Locations   

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Summary of Responses  4‐3  

4.1 ALTAROCK ENERGY, INC – BUCK MOUNTAIN AltaRock  Energy,  Inc.  (“AltaRock”)  proposes  a  10  MW  demonstration  dual  flash 

hydrothermal  project  near  the  John  C  Boyle  reservoir,  southwest  of  Klamath  Falls,  Oregon,  on 

Weyerhaeuser  geothermal  leases.    In  addition  to  the  planned  hydrothermal  development,  EGS 

technology  may  be  implemented  to  supplement  the  in  situ  permeability  of  the  resource,  as 

required.   The proposed  interconnection point  is on  the PacifiCorp system  four miles away, near John C Boyle dam which is scheduled for retirement. 

The Klamath Falls area has some existing geothermal energy systems (mainly geothermal 

heating) and is a known geothermal resource area.  If EGS technology is successfully demonstrated, it would benefit the geothermal industry as a whole. 

The project is at an early stage of exploration.   Permits have been identified and potential 

geothermal  resources  have  been  initially  characterized,  but  this  is  based  on  such  work  as  a literature search, field geology, geothermometry, remote sensing, and stress‐direction estimates. 

 

4.2 ALTAROCK ENERGY, INC. – MOUNT ST. HELENS NORTH AltaRock proposes a 10 MW demonstration dual flash hydrothermal project north of Mount 

St. Helens outside the National Monument on Weyerhaeuser surface and geothermal leases.  Follow 

on development could enlarge the project by up to 50 MW increments until the resource associated with  the  thermal anomaly  is  fully developed.   Expansion of  the project would continue using any 

discovered hydrothermal  resources until  the  limit  of  economic development  is  reached.    Further 

expansion would be done using EGS  technology.    The proposed  interconnection point  is  through another utility (Lewis County PUD), 10 miles away. 

The project is at an early stage of exploration.  Permits have been identified and geothermal 

resources  have  been  initially  characterized,  based  on  preliminary  assessment  work  such  as  a temperature‐gradient hole, geothermometry, structural mapping and earthquake swarms. 

 

4.3 ALTAROCK ENERGY, INC. – MOUNT ST. HELENS SOUTHEAST AltaRock proposes a 10 MW dual flash hydrothermal project southeast of Mount St. Helens, 

outside the National Monument area on Weyerhaeuser geothermal leases.  This site may be able to 

support  a  binary  project  based  on  initial  resource  assessment.    A  PacifiCorp  substation  is  three 

miles  away,  at  Smith  #1  Dam.    If  the  demonstration  size  project  is  successful,  expansion would develop the hydrothermal resource to the fullest possible extent.  Expansion beyond any identified 

hydrothermal resource would be through the use of EGS technology proprietary to AltaRock. 

The project is at an early stage of exploration.  Permits have been identified and geothermal resources  have  been  initially  characterized,  based  on  a  literature  search,  field  geology, 

geothermometry, temperature‐gradient holes, and stress‐direction estimates. 

 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Summary of Responses  4‐4  

4.4 CALDERA GEOTHERMAL, INC. – MCGEE MOUNTAIN The McGee Mountain project area  is  located  in Humboldt County, Nevada, about 20 miles 

southwest  from the community of Denio on the Oregon border.   The project  technology type and 

size was  not  specified  by  the  respondent.    The  total  area  of  land  and  accompanying  geothermal 

leases at McGee Mountain is about 8,535 acres. 

The  project  is  at  an  early  stage  of  development,  but  enough  work  has  been  done  to categorize  it  as  GEA  Development  Phase  1.    Some  permits  have  been  identified  and  geothermal 

resources have been characterized through geochemistry and temperature gradient wells.  Permits 

have been obtained for temperature gradient drilling. 

4.5 CALDERA GEOTHERMAL, INC. – TEELS MARSH The Teels Marsh project  area  is  located  in Mineral  County, Nevada,  and was  acquired by 

Caldera Geothermal,  Inc.  (“Caldera”)  in 2009.   A binary plant of unspecified capacity  is proposed.  The  area  likely  has  potential  for  geothermal  energy  production  as  evidenced  by  the  shallow 

geoprobe  investigations  referenced  by  Caldera.    This  project  is  at  a  somewhat  earlier  stage  of 

development  than Caldera’s other project, McGee Mountain.   Moving  the power  to  the PacifiCorp service  territory  would  likely  be  more  challenging  than  McGee  Mountain  due  to  its  location  in 

southwest Nevada. 

The  project  is  at  a  very  early  stage  of  development.    Geothermal  resources  have  been characterized, but no test wells have been drilled.  Caldera has geochemistry and two‐meter probe 

data at the site. 

4.6 DAVENPORT NEWBERRY HOLDINGS LLC Davenport Newberry Holdings LLC (“Davenport”) has leases on approximately 40,000 acres 

of  BLM  land  near  Newberry  Volcano  in  Oregon  and  is  in  the  process  of  developing  an  EGS 

demonstration project.  This is an opportunity for participation in a high‐risk/high‐reward research 

and development project to prove the commercial viability of EGS technology. The  site  is  14 miles  from  a  Bonneville  Power  Administration  substation  at  La  Pine,  near 

Newberry Volcano National Monument.  The project can be categorized as GEA Development Phase 

2, making it one of the most advanced projects reviewed in this study.  The respondent has secured leases  for  all  required  land.    Geothermal  resources  have  been  characterized  by  the  drilling  of 

several  deep  production/test  wells.    Considerable  environmental  work  has  been  done,  with 

additional work in progress.   

4.7 EUREKA GREEN SYSTEMS LLC Eureka Green Systems LLC, (“Eureka”) has leases on properties near Grays Lake, Idaho.   A 

binary or steam flash  facility up to 200 MW of capacity has been proposed.   The prospect can be categorized  as  very  early  stage.    The  resource  is  a  blind  geothermal  system  (no  obvious  surface 

expression), with temperatures measured in a single oil and gas exploration well. 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Summary of Responses  4‐5  

Limited initial project development has taken place other than securing the necessary site 

leases.  The site has almost five square miles under lease, with the sole resource data point from a previous oil and gas well close to the lease boundary. 

4.8 GRADIENT RESOURCES, INC No detailed information available; site and project specifics to be determined.   

4.9 IDA‐THERM LLC  Ida‐Therm LLC (“Ida‐Therm”) has proposed a 100 MW binary project (Renaissance)  to be 

located near Honeyville, Utah.   Limited project development activities have been accomplished to 

date, though a discovery well has been drilled.   Based  on  the  work  that  has  already  been  performed,  it  can  be  categorized  as  a  GEA 

Development Phase  1.    The  lease  position  appears  solid.    Permitting  activities must  be  restarted 

after failure of previously attempted development efforts at this site. 

4.10 OSKI ENERGY LLC Oski Energy LLC (“Oski”) has proposed a binary (Kalina cycle) project near Cove Fort, UT.  

Cove  Fort  is  a  GEA Development  Phase  2  project,  to  be  located  on  3,600  acres  of  property with 

resources estimated to support a 15 MW geothermal power plant. Most  of  the  Oski  lease  position  lies  to  the  west  of  a  thermal  anomaly  documented  by 

historical temperature gradient drilling.  The proposed Kalina Cycle plant has one prior geothermal 

application (Husevik, Iceland) and has not yet been successfully demonstrated in the US.  The site is within five miles of a PacifiCorp substation.   

The project  is  the most  developed  of  all  the  submitted projects.    Potential  team partners 

(major equipment suppliers, EPC contractor, etc.) have been contacted.  State land use permits have been obtained and a NEPA review has been completed.   A water appropriation application  is still 

pending from the Utah State Engineer. 

4.11 STANDARD STEAM TRUST – MARYS RIVER Standard Steam Trust (“SST”)  is proposing a 134 MW binary project  to be  located  in Elko 

County,  Nevada.    SST  has  leases  on  property  which  has  been  shown  through  surface  features, 

geochemistry, geophysics, and temperature gradient holes to have some resource potential based on GeothermEx estimates.   

No  confirmation  of  a  transmission  path  from  the  nearby  NV  Energy  line  to  PacifiCorp 

service  territory  has  been  identified.    There  is  no  existing  infrastructure  in  place,  but  the  site benefits  from  no  competition  from  offsetting  development.    Both Marys  River  projects  are  early 

phase  projects,  although  enough  work  has  been  performed  to  meet  GEA  Development  Phase  1 

criteria.    

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Summary of Responses  4‐6  

4.12 STANDARD STEAM TRUST – MARYS RIVER SOUTHWEST SST  is  proposing  a  124  MW  binary  project  to  be  located  in  Elko  County,  Nevada,  on  a 

separate  acreage  block  southwest  of  the  Marys  River  site  discussed  above.    SST  has  leases  on 

property  which  has  been  shown  through  surface  features,  geochemistry,  geophysics,  and 

temperature gradient holes to have some resource potential based on GeothermEx estimates.  The 

Marys River projects can be categorized as GEA Development Phase 1. 

4.13 STANDARD STEAM TRUST – NEWDALE SST has proposed a binary project of undefined size to be located near Newdale, Idaho.  SST 

has identified just over 13,000 acres of leased land that could be utilized for the Newdale project.  A tie‐in  substation  has  not  been  identified,  but  a  PacifiCorp  high‐voltage  line  runs  close  to  the 

property.  A high proportion of the lease position (78 percent) is on private land. 

As with the Marys River projects, the Newdale prospect is in the early development phase, although enough work has been performed to meet GEA Development Phase 1 criteria. 

4.14 STANDARD STEAM TRUST – PARMA SST has proposed a binary project of undefined size to be located near Parma, Idaho.   SST 

has identified just over 27,000 acres of leased land that will be used for the Parma project, a binary plant.   Legacy oil and gas wells from the 1970s indicate geothermal resources in the vicinity.   SST 

has performed a geophysical assessment to identify prospective drilling locations.   

Measured  resource  temperatures  in  the  high  300°F  in  a  centrally  located  oil  and  gas exploration  well  (the  Highland  well)  give  some  confidence  that  the  resource  has  economic 

potential.   An  Idaho Power Company  transmission  line runs through  lease area, but  the path to a 

PacifiCorp substation is not yet identified.  The leases comprise a relatively high proportion of BLM land (86 percent). 

Parma is an early phase project, with a level of development falling below the threshold for 

meeting GEA Phase 1 criteria.  Project development has consisted primarily of lease acquisition.  

4.15 SURPRISE VALLEY HOT SPRINGS Surprise  Valley  Hot  Springs  (“Surprise  Valley”)  has  proposed  a  2  to  5  MW  binary  cycle 

project to be located on private land in Modoc County, California.  The site is close to Surprise Valley Electric's transmission line.   The land is privately owned, but there is some potential for wetlands 

issues during development.  

An existing shallow artesian well  is onsite  that could be used  for production; besides  this well,  little  other  development  work  has  been  done.    No  interconnection  or  major  equipment 

procurement work has been undertaken.   A  literature survey and some resource evaluation have 

been performed.   The site is small, roughly 500 acres, but the respondent has complete control of the site.  This project is classified as Development Phase 0.   

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Summary of Responses  4‐7  

4.16 WESTERN ENERGY RESOURCES The property proposed for future development by Western Energy Resources (“Western”) 

is  located  in Wendel,  CA  (20  miles  east  of  Susanville).    The  site  is  immediately  adjacent  to  the 

Wineagle geothermal plant (currently operated by Oski with a capacity of under 1 MW), and it  is 

also adjacent to a biomass plant that derives about 2 MW worth of heat from geothermal wells.   

Western reports that a full‐diameter well was drilled on their property in October 2010.  In addition, water supply wells are available.  The property owners claim to be permitted for up to 14 

geothermal wells onsite.  Owners are looking to sell the property or to find a partner to develop the 

resource.  They state that a 40MW capacity geothermal plant is feasible.   The project is reportedly close to existing transmission lines, but the transmission path to 

PacifiCorp territory  is unclear.   No work has been done to date beyond  initial wells, and minimal 

documentation was  submitted on  the  existing well.    The  respondent has  complete  control  of  the 1,500 acre site. 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Recommendations  5‐1  

5.0 Recommendations Black & Veatch and GeothermEx evaluated the projects and selected leading projects from 

each of the three development phases for  further consideration.   Multiple factors were utilized to 

determine the projects that were recommended for further investigation.  The intent was to select the  top  two  projects  from  each  development  phase  that  would  be  the  best  fit  for  PacifiCorp’s 

generation system.   This does not mean, however,  that these are the only projects that should be 

considered viable for future development. Table 5‐1 summarizes the projects recommended for further investigation. 

Table 5‐1   Projects Identified for Further Investigation 

PHASE  DEVELOPER  PROJECT  LOCATION  MW  TYPE 

Oski Energy  Cove Fort Cove Fort, UT 15  Binary (Kalina)

Davenport Newberry   Newberry 

Volcano 

Deschutes County, 

OR 15  Likely Binary 

/Flash EGS 

1 Standard Steam Trust  Newdale Newdale, ID Undef.  Binary

Ida‐Therm  Renaissance Honeyville, UT 100  Binary

AltaRock Energy  Buck Mountain Klamath Falls, OR 10  Dual Flash EGS

Surprise Valley  Surprise Valley 

Hot Springs 

Modoc County, CA 2‐5  Binary 

 

 

It should be noted that each of the projects reviewed has development risks that are higher 

than most projects that bid into a typical renewable energy PPA process.  The review team focused on recommending projects with good geothermal resource potential that had realistic expectations 

for development timing and costs which were located close to PacifiCorp transmission.   

Two  projects were  recommended  that  propose  the  use  of  enhanced  geothermal  systems (EGS)  technology  which  has  not  been  commercially  demonstrated  in  the  US:  AltaRock  Buck 

Mountain and Davenport Newberry.  The resource at Buck Mountain may turn out to be suitable for 

a conventional binary system, making  it  lower risk than a project relying solely on the success of EGS technology.  Newberry Volcano is one of the most promising EGS systems in the US at this time 

by virtue of its very high resource temperatures (>600°F).   

Other  “Phase  0”  projects may have  potential  for  consideration  by PacifiCorp  if  additional projects  are  of  interest.    AltaRock’s Mount  St. Helens  Southeast  project  has  geothermal  resource 

potential, but the review team was concerned about the pursuit of additional EGS projects due to 

the technology risk and cost.  Gradient’s proposed portfolio of projects may eventually be suitable for  additional  consideration,  but  since  so  little  information  was  provided  on  the  location  of  the 

projects and the fact that Gradient has not secured leases, it was deemed prudent for PacifiCorp to 

defer consideration of these opportunities until after additional development has progressed. 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH | Recommendations  5‐2  

The  review  team  recommends  not  pursuing  multiple  projects  with  one  developer  until 

more  information can be provided  for  local  resource potential or when a more established  track record for development is established.  For instance, the Newdale project appears to have the best 

potential  of  the  SST  projects  for  future  development  with  PacifiCorp,  taking  into  account 

considerations such as the location of the project, the percentage of private land, and contiguity of lease position.   Having SST develop this project  first would establish  its viability as a company to 

pursue other opportunities. 

  

 

PacifiCorp | 2011 GEOTHERMAL INFORMATION REQUEST (PUBLIC VERSION) 

BLACK & VEATCH   Appendix‐1  

Appendix A: GIR Response Document 

 

Page | 1 Geothermal IR

Geo t her m al In fo r m at io n Req u est ( IR)

In t r o d u ct io n PacifiCorp is one of the West’s leading utilities, serving approximately 1.7 million customers in 6 states. PacifiCorp Energy has an interest in increasing the amount of geothermal energy sources in its generation portfolio to serve its customers. PacifiCorp is currently investigating a wide range of geothermal resource opportunities, including entering into option agreements on early-stage development projects and entering into power purchase agreements (PPAs) w ith geothermal projects nearing completion. PacifiCorp has issued a Geothermal Information Request (IR) on its website soliciting information from geothermal developers. The Geothermal IR will be open from October 5, 2011 through October 31, 2011. If your company is interested in replying to the Geothermal IR, please send an email to [email protected] with your company name and contact info. PacifiCorp will email reminders regarding deadlines for submitting the IR and will send out any clarifications to the IR to all the potential respondents who have submitted their company name and contact info. The Geothermal IR is posted on PacifiCorp’s website at www.pacificorp.com/ geothermalinfo. As a geothermal developer, we encourage you to participate in this IR. Geothermal developers can download the Geothermal IR document from the PacifiCorp website and send their responses to PacifiCorp via email or by mailing a paper copy. After receiving all responses to the IR, PacifiCorp will determine which projects are of greatest interest to PacifiCorp at this time and will investigate what steps can be taken increase the PacifiCorp’s geothermal resources in the future. PacifiCorp has hired Black & Veatch and GeothermEx to assist PacifiCorp in evaluating the responses to the Geothermal IR. The objectives of the Geothermal IR are:

• Identify projects that PacifiCorp may consider as project co-developer or participant • Assist in structuring future formal Requests for Proposals (RFPs) for geothermal

resources. • Identify what types of commercial structures or resources are needed to facilitate

development of geothermal resources. • Assist both PacifiCorp and the regulatory agencies to identify the level of development

and viability of geothermal resource opportunities. • Identify how to promote geothermal power development w ith reduced risk, while

achieving reduced cost for renewable energy delivered to PacifiCorp and its customers. PacifiCorp realizes your specific project may have unique needs.

PacifiCorp encourages all respondents to provide as much information as possible about their geothermal projects. Because PacifiCorp would like to identify geothermal projects across the spectrum of the development process, the questions in the IR cover projects at a range of levels of development maturity. Respondents with projects in early stages of development should feel free to skip any questions that pertain to later stages of development and project execution.

Page | 2 Geothermal IR

However, PacifiCorp encourages all geothermal developers who would like to work with PacifiCorp in the future to provide as much specific information about their projects as possible. PacifiCorp reserves the right to enter into direct discussions which could lead to direct negotiation with any IR respondent. PacifiCorp recognizes that some of the information requested may be highly confidential to respondents. Specific project production and financial information marked confidential by respondents will be kept confidential by PacifiCorp. PacifiCorp will enter into confidentiality agreements as needed. Im p o r t an t N o t e The Geothermal IR is completely separate from an A ll Source Request for Proposals (RFP) for electric generation facilities that PacifiCorp will issue within the next few months. The All Source RFP will solicit proposals for generation facilities that use eligible fuel sources. Eligible fuel sources are defined as resources that can be scheduled or dispatched. Geothermal resources would meet these criteria. It should be noted that the A ll Source RFP is for resources that can bid an executable resource by summer 2012, would be provided with a notice to proceed in approximately the second quarter of 2013, and would be online by summer peak 2016. I f your company has a geothermal resource project that w i l l l i kely be submi tted in response to the A l l Source RFP, they should not submi t information on that particular project to the Geothermal IR. If you have any questions about the Geothermal IR and how it relates to the planned A ll Source RFP, please send an email to [email protected]. Inst r u ct io ns If you are interested in replying to the Geothermal IR, please send an email to with your company name, project name(s) and contact info to [email protected]. PacifiCorp will email reminders regarding deadlines for submitting the IR and will send out any clarifications to the IR to all the potential respondents who have submitted their company name and contact info. A ll respondents are requested to complete to the extent possible the items listed below. A ttach additional documents as necessary. The completed IR can be emailed to PacifiCorp at [email protected] or it can be mailed to PacifiCorp at the following address:

Geothermal Info c/ o Ken Clark PacifiCorp Energy 1407 W. North Temple, Suite 210 Salt Lake City, UT 84116

Page | 3 Geothermal IR

1. Applicant Information

Lead Company/Organization Name Project Company/Organization Address PO Box / Street City / State / Zip

Main Contact Person First / Last / Title

Telephone

Fax Email Preferred Contact Method Telephone, email,mail, fax

Ownership Structure Sole proprietor / LLC / etc.

2. Project Information

Proposed Date of Initial Commercial Operation: DD/MM/YYYY

Projected Initial Net Capacity: kW

Net Annual Generation: MWh/yr

Projected Resource Decline : Percent Per Year (%)

Project Life: Years

Page | 4 Geothermal IR

3. Site information

Property Owner Name:

Physical Location of Project: Mailing address if applicable; alternatively, location with reference to state and nearest town; or Township, Range, and Section

Site Coordinates: (Latitude/Longitude)

Water Rights: (Ownership and Amount)

Provide map of project area, showing geothermal lease or ownership boundaries, as well as existing or proposed roads, wells, pipelines, and plant location(s) Include also any rights of way or easements that could affect project development. Degree of Site Control Geothermal development rights yet to be obtained Have an option for geothermal lease Have an option for ownership Have surface-occupancy rights throughout project area Have partial control of geothermal resource through lease or ownership Have complete control of geothermal resource through lease or ownership

3. Provide greater description of site control, including length of ownership, length of lease, any restrictions on surface occupancy, and any potentially conflicting development rights (e.g., mineral rights, agricultural access). Include known information about status and extent of any offsetting geothermal developments.

Page | 5 Geothermal IR

4. Status of Proof of Resource (mark all that apply)

Surface manifestations Potentially commercial reservoir temperatures inferred from geochemistry Potentially commercial reservoir conditions inferred from geophysics Temperature-gradient wells above the reservoir Completed exploration well that penetrates the reservoir Production well(s) tested at potentially commercial rates Demonstrated well productivity equivalent to 25% of planned plant capacity Production/injection strategy confirmed by drilling and testing All drilling completed with at least 5% spare production and injection capacity

Provide, as an attachment, any collected geothermal data for the site that helps characterize the geothermal resource quality, quantity and proposed production and injection levels. Describe any test drilling that has been performed and the key findings. Include a table of existing or proposed wells, including well names, completion dates, shut-in wellhead pressures, static liquid levels, maximum temperatures and measured flow rates. Any back-up documentation that will facilitate resource evaluation will be helpful, including temperature-pressure surveys, geochemical analyses, mud logs, and drilling records. If available, provide any relevant third-party reports assessing the nature and capacity of the geothermal resource.

5. Type of Contract Desired (mark any of interest):

Power Purchase Agreement (PPA) PPA with Transfer Turnkey Sales Joint Venture with PacifiCorp Other (describe)

5. List reasons for preferences or “other” structure desired. (examples: share risk, reduce cost of capital, reduce cost to PacifiCorp, etc.)

Page | 6 Geothermal IR

6. Desired PacifiCorp Support List any support desired from PacifiCorp to develop or operate the project.

7. Pricing a. Estimate the electricity price (tariff) that would be desired from PacifiCorp to

make your project viable. Mention if this is levelized or will require escalation through the life of the project.

6. Early-stage projects may need a different kind of deal structure and risk mitigation. Late-stage projects may only need interconnection and a PPA.

7a. Enter price here, along with any major factors that could impact this price.

Page | 7 Geothermal IR

b. Describe contract terms that would increase your level of interest in negotiating with PacifiCorp rather than other potential off-takers of geothermal energy. As an example, items could include:

• Ability of a developer to adjust contract capacity up or down on an annual basis within some specified range.

• Guarantee of PacifiCorp to provide comparable pricing to subsequent expansion projects at the same site, subject to confirmation of adequate resource.

• Structure of power purchase agreement needed to secure financing.

c. Describe any state or federal incentives assumed to be part of the project

support structure and their availability.

7b.

7c.

Page | 8 Geothermal IR

d. Describe what the project plans to do with any Renewable Energy Credits (RECs) produced by the project.

7d.

Page | 9 Geothermal IR

8. Project Team Provide geothermal experience of the project team and contractors in the chart below. Attach additional team organizational charts and information as necessary.

Project Lead Engineering Drilling Construction Operator Financial Partner(s)

Other (list role)

Individual /Company / Organization Name

Years of Experience With Similar Projects

Name of Reference Project(s)

Size of Project(s)

Location (City/State) of Project(s)

Year the Project(s) went On-line

Role

Page | 10 Geothermal IR

9. Financial Information

List plans for financing all stages of the project, including development, resource identification, construction, and operation. List any private or public support mechanisms desired or required for financing.

b.

9.

Page | 11 Geothermal IR

10. Interconnection Requirements Provide the following information:

Interconnection Point / Substation

Distance to Delivery Point If known

Owner of the Interconnection Point PacifiCorp, BPA, WAPA, other

Nominal Voltage Output kV

Type of Interconnection Application LGIA, SGIA, other

Interconnection Capacity, kW

Date Interconnection Was Filed DD/MM/YYYY – if filed

Interconnection Application Status

Not Submitted Application Submitted System Impact Study Completed Facilities Study Completed Interconnection Agreement Completed

Page | 12 Geothermal IR

11. Technology

a. Identify the power plant technology that may be used through the check boxes below, with additional elaboration in the text box. Describe any main decision points remaining in the technology selection process.

Steam Cycle (Select One) Single Flash Dual Flash Binary Hybrid Cooling Type (Select One) Dry/Air Cooling Evaporative/Wet Cooling Hybrid/Wet-Dry Cooling Well Type (Select All That Apply) Self Flowing/Artesian Wells Pumped Wells

11a.

Page | 13 Geothermal IR

b. List the major pieces of equipment required and the procurement status of each. Include potential suppliers of major equipment (such as turbine manufacturers).

c. Provide the status of EPC contractor selection, any groups being considered, and the path

forward to finalization of the team.

11c.

11b.

Page | 14 Geothermal IR

12. Permits Provide a list of the major permits that will be required and the status of each. Use additional sheets as necessary.

Acquired Not Acquired Not Needed Drilling Permits 1. 2. 3. 4. 5. Construction Permits 1. 2. 3. 4. 5. Water Use Permits 1. 2. 3. 4. 5. State Land Use Permits 1. 2. 3. 4. 5. Federal Land Use Permits 1. 2. 3. 4. 5. Environmental Permits 1. 2. 3. 4. 5. Other: 1. 2. 3. 4. 5.

Page | 15 Geothermal IR

13. Other Utilities

Provide a list of other utilities that are being considered as potential project partners or power purchasers.

14. Milestone Schedule

a. List the expected milestone completion dates for the following stages of the project. If a listed stage is already complete, list the date it was finished.

Milestone Completion Date

Start of Drilling of Exploration Wells Start of Drilling of Full-Diameter Wells Demonstration of Well Capacity at 25% of Planned Plant Capacity Finalization of Development Team Selection of EPC Contractor Interconnection Study Completed All Permits Obtained Construction Financing Obtained Major Equipment Ordered Start of Construction of Surface Facilities Completion of Drilling Commercial Operation Date

13.

Page | 16 Geothermal IR

b. List the main development issues and key project risks that could delay meeting any of the milestones listed above. Outline any plans established to mitigate these risks.

c. Define any intermediate decision points that will play a factor on the project’s

viability and commercial operation schedule.

14b.

14c.

Page | 17 Geothermal IR

15. Other Factors

a. Describe any unique environmental, social, or economic benefits of your project.

b. List any other information you think would be helpful for PacifiCorp to understand to

assist in development of this project.

15a.

15b.