vestas - crpm. · pdf filevestas.com vestas santander, april 16th 2010 2 | vestas technology...

14
vestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do… R&D and manufacture Assembly and testing Sales and planning Transport Installation Maintenance A 100% focused value chain producing turbines that use wind to generate electricity

Upload: lamdieu

Post on 14-Mar-2018

220 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

vestas.com

VestasSantander, April 16th 2010

2 | Vestas Technology R&D, April 23, 2010

What we do…

R&D and manufacture

Assembly and testing

Sales and planning

Transport Installation Maintenance

A 100% focused value chainproducing turbines that use wind to generate electricity

Page 2: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

3 | Vestas Technology R&D, April 23, 2010

Wind, Oil and

Gas

4 | Vestas Technology R&D, April 23, 2010

25 years ago, this was 3000 kW:

Page 3: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

5 | Vestas Technology R&D, April 23, 2010

Today one turbine produces 3000 kW

6 | Vestas Technology R&D, April 23, 2010

We have installed over 39,000 wind turbines

Page 4: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

7 | Vestas Technology R&D, April 23, 2010

That’s one third of all turbines

in the world

8 | Vestas Technology R&D, April 23, 2010

We install a turbine every 3 hours…

Page 5: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

9 | Vestas Technology R&D, April 23, 2010

Future global wind power penetrations

10 | Vestas Technology R&D, April 23, 2010

R&D is the key to stay No. 1 in Modern Energy

Page 6: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

11 | Vestas Technology R&D, April 23, 2010

Technology R&D is an integrated part of Vestas

12 | Vestas Technology R&D, April 23, 2010

Vestas Technolo gy R&D – 1,400 em plo yees:

Loaded with Innovation Power

Global Research

187 employees

Engineering & Products

665 employees

Operations

195 employees

Technicians & Support

353 employees

Note: No. equals headcounts

18 nationalities

600 additional R&D employees will be recruited in 2010Communicated in Q3 2009 financial report

Page 7: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

13 | Vestas Technology R&D, April 23, 2010

...in a world of multidisciplinary engineering

Meteorologist Software developer

Nano engineer Chemist

14 | Vestas Technology R&D, April 23, 2010

Vestas Technology R&D

Our organisation

The way we work Research DevelopmentContinuous

Product Improvement

Global ResearchEngineering &

ProductsOperations

Page 8: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

15 | Vestas Technology R&D, April 23, 2010

Reliability:Lean

Six Sigma

16 | Vestas Technology R&D, April 23, 2010

By handling real-time data

from 10,200 turbines…

...we know more about wind

than anyone else

Page 9: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

17 | Vestas Technology R&D, April 23, 2010

Vestas Cooperation with Boeing

Vestas press release about cooperation with Boeing: http://www.vestas.com/files//Filer/EN/Press_releases/VWS/2009/090311-VWS_PR_UK-03.pdf

“There is a strong correlation between new technologies needed in the aerospace industry and new technologies needed in the wind energy business, and by pooling our research and development efforts on specific projects both Boeing and Vestas will benefit, as well as the environment that we live in,”Jan Närlinge, President of Boeing Northern Europe

Collaborative technology research on projects in areas, such as:

• aerodynamics,

• structural health monitoring, and

• composite materials fabrication processes, design a nd analysis.

18 | Vestas Technology R&D, April 23, 2010

Computational Fluid Dynamics (CFD)

2D

Computational Fluid Dynamics (CFD)

2D

Page 10: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

19 | Vestas Technology R&D, April 23, 2010

Our focus is on test and verification

Blade bearing test at Test Centre, Isle of Wight, UK

Finite element simulations of mechanical components

Gearbox test bench at Test Centre, Aarhus, Denmark

20 | Vestas Technology R&D, April 23, 2010

Powerful matchmaking

Page 11: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

21 | Vestas Technology R&D, April 23, 2010

Vestas Northern Europe Vestas Mediterranean Vestas Central Europe Vestas Asia Pacific

Vestas China

Vestas OffshoreVestas Americas

Vestas Nacelles A/S

Vestas Blades A/S

Vestas Spare Parts A/S

Vestas Towers A/S

Vestas Control Systems A/S

Vestas People & Culture

Vestas Technology R&D

Global outlook. Local presence

22 | Vestas Technology R&D, April 23, 2010

Vestas Technology R&D Centres

Århus, Lem and Ringkøbing, Denmark

Århus, Lem and Ringkøbing, Denmark

Chennai, IndiaChennai, IndiaHouston, USAHouston, USA

Isle of Wight, UKIsle of Wight, UK

SingaporeSingapore

Page 12: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

23 | Vestas Technology R&D, April 23, 2010

Innovation Network

A global platform of interconnected ideas, technologies, methods and research.

PARTNERSHIP PLEDGE:

• Vestas will work with the best partners globally and those that match our mindset• Innovation Network will ensure that we set up and manage partnerships that provide tangible and measurable value to both partner and Vestas.• Vestas Innovation Network is actively fostering knowledge sharing between partners and Vestas, but respect the sensitivity and confidentiality that comes with innovation.• We recognize that partnerships are built on mutual trust and benefits. Innovation Network will assist both Vestas and partners to achieve their objectives.• No partnership will remain unmanaged – Innovation Network will always put an anchor point resource and effort into working with our partners beyond individual projects.

24 | Vestas Technology R&D, April 23, 2010

Page 13: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

25 | Vestas Technology R&D, April 23, 2010

Project partners

Relations

Preferred partners

Strategic partners

The way we work with partners

26 | Vestas Technology R&D, April 23, 2010

Research Topics

Advanced blades designStructures Materials proved manufacturing processesMechanicsLoads reduction Advanced WTG control Intelligent sensors

Grid compliancePlant control Balance of plant Computational tools Pre-Engineering

Power electronicsElectro magneticsElectro mechanics Power control

Page 14: Vestas - crpm. · PDF filevestas.com Vestas Santander, April 16th 2010 2 | Vestas Technology R&D, April 23, 2010 What we do R&D and manufacture Assembly and testing Sales and

27 | Vestas Technology R&D, April 23, 2010

All our results

are reached

through our employees

vestas.com

Thank you for your attentionQ/A

Copyright NoticeThe documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.