vicmap property update robert morrison vicmap property custodial officer

20
Vicmap Property Update Robert Morrison Vicmap Property Custodial Officer

Upload: alexis-elliott

Post on 17-Dec-2015

237 views

Category:

Documents


0 download

TRANSCRIPT

Vicmap Property Update

Robert Morrison

Vicmap Property Custodial Officer

• Land Administration Themes

• Data Improvement Projects

• Future Diredtions

Presentation Overview

Land Administration Themes (LAT)

Par

cel

Approved

Proposed

Pro

pert

y

Approved

Proposed

Add

ress

Adm

in B

dys

No Status

3.3 Mil 3.1 Mil

LAT Maintenance Process

Customers

Customer Data

Delivery

Property Custodian

Maintenance Docs

Parcel Custodian

Maintenance Docs

Custodian Data Delivery

SII Responsibility

External Maintainer

VSDL

Mai

ntai

ned

Vic

map

LA

T

LAT Annual Maintenance Stats

ActivityNo. of Updates

SubdivisionProposed 165000

Approved 55000

Non SubdivisionCrown Notings 5000

VicRoads SPs 200

Property & Address M1 Records 176000

Admin Boundary Upgrades 100

Data Improvement Projects• Aspatial Record Compliance

– Property Completion Initiative– Parcel Completion Program

• Road Polygons

1. Improve Aspatial Record Compliance to Authoritative Sources

98% Parcel & Property

Match Rates

Land Registry Records Comparison

• VOTS Freehold

• VOTS Crown

Parcel

LGA Property Records Comparison

• Property & Rates

Property

Vicmap Property

Parcel and Property Quality Audits

Target Match Rate

Real Parcel match rate 75.82%

980K parcels to be added

The 3 R’s to resolve

• Roads

• Railways

• Reserves

2. Road Polygon Creation

• Traditionally road casements voids • Drivers for Road Polygon Creation

– Road Management Act 2004– Facilities Management of “Road Furniture”

• Polygonisation commenced in late 2009 – Programmatic Scripts & Manual Editing– Due for release in the coming months

Future Directions

RE Plans

Complete

• Improved Spatial Accuracy

• Custodian Empowerment

Direct Editing

Quicker Turn

Around

Reduce Duplication

of Effort

Direction 1: Spatial Accuracy Improvement

• 3.75% points .1 metre• 47.65% points .5 metre • 20.21% points 2.5 metres• 5.20% points 10 metres• 22.71% points 25 metres

Current Accuracies

Incremental Spatial Upgrading• Utilising Digital Subdivisions to Improve

Accuracy• Extracting Coordinates for Fieldnotes• Re-established 4 growth corridor areas• Adjust a Region using Survey control &

Photography• Adopted higher accuracy data from other

authorities

Developments Highlighting Spatial Issues

• Higher resolution aerial photography

• Hand held GPS devices

• Changing Work Practices

Spatial Upgrade Business Case• Identifies the impacts of spatial

changes

• Details the benefits of improving the spatial accuracy

• Assesses change options available

• Outlining funding options

Business Case Preferred Option

• 10 year process to spatially upgrade state– All Urban & Peri-Urban Areas 0.05 m

• Existing observations and field control infill

– Rural Areas – 0.1 m to 10 m• Mathematical Adjustment to high resolution Aerial

Photography• Control either derived from aerial photography

and/or field control

Direction 2: Custodian Process Control / Real Time Access

• Current practices are restricting– Source Data Custodians cannot make any changes to the

data– Turn around time frames can be up to 5 weeks from

creation of work order

• Introduction of Notification and Editing Service – Improved process transparency – Given custodians power of veto – Didn’t improve turn-around or provide edit ability

NES-VSDL

Custodian

Maintenance Docs

Notifier

NES ‘CRs’

VSDLV

icm

ap

‘WO

s’

Vicmap Replicatio

n

Customers

Customer Data

Delivery

Maintained Vicmap

Verifi

cati

on o

f

‘CRs’

Maintainer

Current Architecture

Desired Maintenance Environment

• Centrally Stored Master Copy• Web based tool to facilitate maintenance

material incorporation into the master copy– Incorporate data from Custodian Editor packages– Provide GIS package for simple edits

• Business custodians able to edit their data in VSDL directly;– Retaining an editing service

• Hourly turn around of maintenance edits within production copy

Web

Serv

ices

VSDL

Graphics Custodian

Spa

tial A

udits

Customers

Controlled

Customer Data

AccessNotifier

Custodian Maintenance Material

CRs

Verifica

tion of ‘C

Rs’

Proce

ssing of W

O’s

QUESTIONS?