Grooved Construction Reduces Field Manhours
Total Field Manhours
Civil / Structural
Equipment
Electrical
Piping
Large Component of Total Manhours
![Page 3: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/3.jpg)
Grooved Construction Reduces Risk & Contingency
“Variable” Costs• Risk-Intensive
• High Contingency Factors
• Exposure
"Fixed" vs. "Variable" Costs - Welded
Labour“Variable” Costs: 60%
Material“Fixed” Costs: 40%
WELDED
“Fixed” Costs• Reduced Risk
• Low Contingency Factors
• Reduced Exposure
GROOVED"Fixed" vs. "Variable" Costs - Grooved
GROOVED
Material“Fixed” Costs: 60%
Labour“Variable” Costs: 40%
![Page 4: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/4.jpg)
Grooved Method History British War Department sought faster way to join pipe in WWI
– Rapid deployment of water and fuel to front lines
– Faster than welding or threading
VICTAULIC company name– “VICTory Joint” for use on hydrAULICs
![Page 5: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/5.jpg)
Anatomy of a Grooved Joint
![Page 6: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/6.jpg)
Roll Grooving Technology
![Page 7: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/7.jpg)
Grooved Coupling Assembly
![Page 8: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/8.jpg)
Grooved 2 to 60-inch
Mechanical Joining Methods
Pressed ½ to 2-inch
Plain or ringed end 16 to 192-inch +
![Page 9: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/9.jpg)
Customers & Specifiers
![Page 10: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/10.jpg)
Hoover Dam
![Page 11: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/11.jpg)
Ontario Power Generation Healey Falls G.S.
145” Penstock Expansion Joints
![Page 12: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/12.jpg)
Canoe Creek Run-of-RiverBritish Columbia
36” Grooved Penstock
![Page 13: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/13.jpg)
GTAA Cogen PlantOntario, Canada
• Cooling Water
• Circulating Water
• Service Water
• City Water
• Plant Air
• Instrument Air
![Page 14: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/14.jpg)
![Page 15: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/15.jpg)
FACT: The average age of welders is 54.*
* According to the American Welding Society
![Page 16: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/16.jpg)
Skilled Labour AllocationSpecialized Welders
Pipefitters
Systems/Applications: (P91)
Steam NG Hydrogen
Systems/Applications: Cooling Water Compressed Air Water Treatment Fire Water Domestic Water Process Water (Penstocks)
Crew Mix: Specialized Welder Pipefitter (journeyman)
Crew Mix: Journeyman Fitter Apprentice
![Page 17: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/17.jpg)
Schedule Impact with Grooved Construction
![Page 18: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/18.jpg)
Case StudyPortlands Energy Centre
Toronto, Ontario, Canada
![Page 19: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/19.jpg)
Portlands Energy CentreToronto, Ontario, Canada
• Challenged with schedule restraints
• Allocated available welders for P91 systems, pipefitters for grooved systems
• Press system allowed for two-person crew team, rather than three-person team
• Plant was delivered ahead of schedule
![Page 20: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/20.jpg)
John MacFarlandPower Market [email protected]
Resources:www.victaulic.com www.compressedschedule.com
![Page 21: Victaulic Grooved Piping Implications For Workforce Management](https://reader034.vdocument.in/reader034/viewer/2022050920/54c5f44e4a7959b5488b45e4/html5/thumbnails/21.jpg)
Grooved piping implications for workforce management