victaulic solutions for “ym mercury” chemical & oil carrier - imo no. 9452775 owner:...

14
Victaulic Solutions for “YM Mercury” Chemical & oil carrier - IMO No. 9452775 Owner: Chemfleet – Class: BV Built: 2010 Marmara Tersanesi, Turkey

Upload: benjamin-armstrong

Post on 24-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Victaulic Solutions for “YM Mercury” Chemical & oil carrier - IMO No. 9452775

Owner: Chemfleet – Class: BV

Built: 2010 Marmara Tersanesi, Turkey

Repair of a leak on a pressfit connection

• System: Oil Piping (1 ½”) on a Nitrogen Generator

• Requirements: – Oil/Chemical tanker -> no hot works allowed– Quick Repair: Tanker only 24 hours in the port – Nitrogen System out of order -> as short as possible because

needed for loading and unloading– Lack of space due to existing piping and electrical wires

• Products used: Victaulic Couplings Style 77 galva - grade O

Repair of a leak on a pressfit connection

Victaulic Piping Solutions:

1. Safety: no hot works– Existing pipe on board the vessel was cut and

rollgrooved by hand. No (fire) hazard.– New piping was cut to length and grooved along the

quay– Mechanical pipe couplings style 77 were used to

connect the piping at location.

Existing pipe on board the vessel was cut and rollgrooved by

hand. No (fire) hazard.

New piping was cut to length and

grooved along the quay

Mechanical pipe couplings style 77 were used to connect the piping at location. No risk for the existing equipment (electrical wires etc.)

Victaulic Piping Solutions:

2. Quick Repair- The Victaulic team arrived August 23rd at 8.45 am

at the dock, boarded the vessel and met the crew at 9.15 am, inspected the work area and started the repair around 10am.

- It took 1 hour and 15 minutes to complete the job.- A pressure test was made together with the crew.

All systems where checked. The installation was working well and piping giving full satisfaction.

Victaulic Piping Solutions:

3. Little space needed- Clearance of

180mm was sufficient to let the manual roll groover rotate around the existing pipe.

Final Result

Before

After