HOWDY!
Victor M. Vargas P.E.
Assistant Director of Transportation Operations - Austin District
Texas Department of Transportation
![Page 2: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/2.jpg)
Alternative Intersection Analysis
The Do’s & Don’ts on Selling the Public
![Page 4: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/4.jpg)
Alternative Intersection Design?
What is that???
![Page 5: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/5.jpg)
Alternative Intersection Design?
The FHWA in 2009 published
• Alternative Intersections/Interchanges: Informational Report (AIIR)
• AKA: Publication Number: FHWA-HRT-09-060 April 2009
![Page 6: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/6.jpg)
Alternative Intersection Design?
Today’s transportation professionals, with the limited resources available to them, are challenged to meet the mobility needs of an increasing population. At many highway junctions, congestion continues to worsen, and drivers, pedestrians, and bicyclists experience increasing delays and heightened exposure to risk. Today’s traffic volumes and travel demands often lead to safety problems that are too complex for conventional intersection designs to properly handle. Consequently, more engineers are considering various innovative treatments as they seek solutions to these complex problems.
![Page 7: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/7.jpg)
Alternative Intersection Design? Common Denominators: • Reduce signal phases • Reduce Delay • Improve LOS • Improve Travel Times (for most users) • Reduce Intersection Conflict Points • Cost Savings
• Little or no ROW required • Minimal Utility Impacts • PCE type ENV document • Quick construction duration
• THEY ARE NOT WHAT OUR CUSTOMERS ARE USED TO OR EXPECT.
![Page 8: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/8.jpg)
Alternative Intersection Design?
Six examples of Alternative Intersection Designs are : • Displaced Left-Turn (DLT) • Restricted Crossing U-turn (RCUT) • Median U-turn (MUT) • Double Crossover Diamond (DCD)
Interchanges • DLT interchanges. • Quadrant Roadway (QR)
![Page 9: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/9.jpg)
Displaced Left-Turn (DLT)
The “Y” in Oakhill Austin - $640k
![Page 10: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/10.jpg)
Phase I
Phase II
Phase III
D
Existing
CFI
Displaced Left-Turn (DLT)
William Cannon Austin - $832k
![Page 11: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/11.jpg)
Joe Tanner Austin - $440k
Median U-Turn (MUT)
![Page 12: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/12.jpg)
US 290 Corridor Existing
The “Y” in Oakhill
![Page 13: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/13.jpg)
US 290 Corridor Improvements
Letting Feb 2013 $4.92M Delay Reduction ≈ 45% (2015)
![Page 14: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/14.jpg)
Restricted Crossing U-turn (RCUT)
![Page 15: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/15.jpg)
Restricted Crossing U-turn (RCUT) 2-Phase Cycle Illustration
![Page 16: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/16.jpg)
Restricted Crossing U-turn (RCUT) 2-Phase Cycle Illustration
![Page 17: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/17.jpg)
Restricted Crossing U-turn (RCUT)
Let Dec 2011-$3.4 M Delay Reduction ≈ 80% (PM)
![Page 18: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/18.jpg)
Median U-turn (MUT)
![Page 19: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/19.jpg)
Median U-turn (MUT)
Bluffstone/Spicewood Springs ± $1M Existing/Proposed PM Delay 93.6/16.7 Sec
![Page 20: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/20.jpg)
Double Crossover Diamond (DCD) Interchanges
Slaughter Ln- $5.7 M Delay Reduction ≈ 70 %
![Page 21: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/21.jpg)
Double Crossover Diamond (DCD) Interchanges
University Blvd.
![Page 22: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/22.jpg)
Double Crossover Diamond (DCD) Interchanges
University Blvd Existing Travel Time AM Peak 11.1 Min.
![Page 23: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/23.jpg)
Double Crossover Diamond (DCD) Interchanges
University Blvd - $3.6 M Proposed Travel Time AM Peak 2.3 Min.
Delay Reduction ≈ ???? %
![Page 24: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/24.jpg)
DLT interchanges.
Hopkins Street 2020 PM LOS= F.
![Page 25: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/25.jpg)
DLT interchanges.
Hopkins Street - $1.1M 2020 PM LOS= C
80% delay reduction
![Page 26: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/26.jpg)
Lessons Learned
Loop 360 • Unsolicited proposal • Good results confirmed • Good response for similar project at SH 71 and FM 973 • Prop 12 dollars assigned for project development • Prop 12 dollars and Cat 12 assigned for construction • “Small” project, short fuse, hurry to Open House public meeting…roll plots/no animation….. • Big turnout; major controversy…sophisticated audience • Legislative involvement and frustration for lack of communication
Regroup • Plan modification based on input, animation and new plan for outreach • Web page • Moderate levels of support but vocal and organized opposition. • Mass 1 line e-mail responses and Prop 12 deadline lead to cancellation of project and reallocation
of funds
![Page 27: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/27.jpg)
Lessons Learned
• Keep legislators informed! • Assess risk and gauge outreach • Define problem and parameters for solution; establish expertise • Animation; good quality; good resources; anticipate skeptics • Meet with neighborhood associations/small groups; find champions • Understand audience/travel patterns, • Involve commuters • Need positive examples (negatives (Plano) are killers!!!!) • Have thick skin and plenty of stamina • Exit strategy
![Page 28: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/28.jpg)
The Do’s for Success • Engage Local Official and City leaders Early on. • Meet with local business groups • Use graphics that illustrate • Engage the public to encourage involvement in
the solution. • The standard Open House and public meeting
formats do not convey the concepts well • Host or attend smaller meetings more frequently.
HOA, Chamber of Commerce, … • Control of misinformation. Is it possible?
![Page 29: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/29.jpg)
Consultant Partners
• CN14-148P5005 - I. S. Engineers, LLC (ISE) .
• CN 32-132P5001 – Pape-Dawson Engineers
• CN 32-132P5002 HDR Engineering
• CN 32-132P5003 KLOTZ & Associates
![Page 30: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/30.jpg)
Questions & Comments
![Page 31: Victor M. Vargas P.E.HOWDY! Victor M. Vargas P.E. Assistant Director of Transportation Operations - Austin District Texas Department of Transportation](https://reader030.vdocument.in/reader030/viewer/2022040506/5e41b7d735276826fe0fe715/html5/thumbnails/31.jpg)
Thank You!!!!