Social Monitoring Report Final Report November 2016 VIE: Power Transmission Investment Program, Tranche 1 500kV/220kV Bac Ninh 2 Pho Noi Transmission Line and 500kV Pho Noi Substation Prepared by the Northern Vietnam Power Projects Management Board for the National Power Transmission Corporation and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: phungkiet

Post on 30-Mar-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Social Monitoring Report Final Report November 2016

VIE: Power Transmission Investment Program,

Tranche 1 – 500kV/220kV Bac Ninh 2 – Pho Noi

Transmission Line and 500kV Pho Noi Substation

Prepared by the Northern Vietnam Power Projects Management Board for the National Power

Transmission Corporation and the Asian Development Bank.

This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

NATIONAL POWER TRANSMISSION CORPORATION

POST-EVALUATION REPORT

INDEPENDENT MONITORING CONSULTANT FOR

RESETTLEMENT FOR THE POWER TRANSMISSION

INVESTMENT PROGRAM, TRANCHE 1,

ADB LOAN 2848-VIE

500kV/220kV Bac Ninh 2-Pho Noi Transmission line and

500kV Pho Noi substation

Final report

Submit to

The Northern Power Projects Management Board

No. 4, Nguyen Khac Nhu Str., Truc Bach ward, Ba Dinh district, Hanoi.

Prepared by

Independent Monitoring Consultant for Resettlement

NOVEMBER 2016

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 2

TABLE OF CONTENTS

ACRONYMS .................................................................................................................... 6

ABBREVIATIONS AND UNITS OF MEASUREMENT ..................................................... 7

I. PROJECT BACKGROUND ............................................................................. 9

I.1 Project Design, Components and Location ..................................................... 9

I.1.1. Project Components ................................................................................................. 9

I.1.2. Location .................................................................................................................. 10

I.2 Design and RP preparation with participation................................................ 13

I.3 Project's Resettlement/Compensation Impacts ............................................. 13

I.3.1. Categories of sub-projects' impacts ........................................................................ 13

II. SELECTION OF CONSULTING SERVICES ................................................. 17

III. OBJECTIVES OF POST EVALUATION ........................................................ 17

III.1 Monitoring Progress ...................................................................................... 17

IV. METHODOLOGY .......................................................................................... 30

IV.1 Methodologies Applied for this Report ........................................................... 30

IV.2 Sampling ....................................................................................................... 30

V. FINDINGS ..................................................................................................... 31

V.1 Socio-Economic Information About The Displaced Persons ......................... 31

V.1.1. Source of information ....................................................................................... 31

V.1.2. Characteristics of interviewed households ....................................................... 32

V.1.3. Gender, age and educational level .................................................................. 32

V.1.4. Income of AHs ................................................................................................. 33

V.1.5. Agricultural activities ........................................................................................ 36

V.1.6. Non agricultural activities ................................................................................. 36

V.1.7. Houses and house styles ................................................................................. 36

V.1.8. Access to Infrastructure and Social Services ................................................... 37

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 3

V.2 Compensation, assistance and resettlement ................................................. 38

V.2.1. Detailed Measurement Survey (DMS).............................................................. 38

V.2.2. Established policies and total amounts paid by provinces ................................ 41

V.2.3. Before and after land acquisition and resettlement comparison ....................... 44

V.2.4. Severely Affected Household ........................................................................... 45

V.2.5. Resettlers ........................................................................................................ 46

V.2.6. Vulnerable households: ................................................................................... 48

V.2.7. Income restoration program ............................................................................. 49

V.3 Public Consultation, Disclosure, Participation and Grievance Resolution ..... 51

V.3.1. Public Consultation, Disclosure, and Participation ........................................... 51

V.3.2. Grievance Resolution ...................................................................................... 55

V.4 Effectiveness of resettlement planning .......................................................... 58

V.4.1. Executing Agency and Implementation Agency and RP implementation .......... 58

V.4.2. Time frame and budget arrangements ............................................................. 60

VI. LESSONS LEARNT FOR THE FUTURE ...................................................... 60

VII. CONCLUSIONS AND RECOMMENDATIONS ............................................. 61

VII.1 CONCLUSIONS ............................................................................................ 61

VII.1.1. Gaps in the implementation of the compensation plans of the two sub-projects61

VII.2 RECOMMENDATIONS ................................................................................. 62

APPENDICES ............................................................................................................... 63

Appendix 1. List of Staff met for in-depth interviews and focused group discussions 64

Appendix 2. List of APs questionnaire interviewed .................................................... 66

Appendix 3: Some Photos ......................................................................................... 80

Appendix 4: Questionnaire ........................................................................................ 84

Appendix 5. Payment of compensation by foundations in Bac Ninh province ........... 89

Appendix 6: Legal and policy frameworks related to safeguards ............................... 92

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 4

LIST OF TABLES

Table 1. Location of route and towers erected by province, district and commune ........................... 10

Table 2 Summary of 500/220kV transmission line sub-project impacts ............................................. 13

Table 3 Main project impact in PN 500kV S/C sub-project ................................................................. 15

Table 4 Main project impact in PN 500kV S/C sub-project’s connections .......................................... 16

Table 5 Locations and timing of the last independent monitoring reports .......................................... 17

Table 6. Summary of the pinpointed issues during the monitoring missions ..................................... 20

Table 7. Sampling size ....................................................................................................................... 31

Table 8. Total AHs, APs, AH size surveyed by sub-project ................................................................ 32

Table 9. Surveyed demographic structure .......................................................................................... 33

Table 10. Age and education categories of the surveyed affected households ................................. 33

Table 11. Structure of occupation by educational level of APs .......................................................... 34

Table 12. Income of AHs by sub-project ............................................................................................. 35

Table 13. Income of head of household by gender ............................................................................ 35

Table 14 Off-farming business of AHs in the two sub-projects per surveyed AHs ............................. 36

Table 15 Living condition of AHs in two sub-projects (%) ................................................................... 37

Table 16 Durale goods of AHs in two sub-projects (%) ..................................................................... 37

Table 17. List of the items which DMSs had been officially documented ........................................... 39

Table 18. Compensation and assistance entitlement policy applied for BN2-PN 500/220kV T/L sub-project in the area of Bac Ninh province ............................................................................................. 39

Table 19. Compensation and assistance entitlement policy applied for PN 500kV S/C sub-project in the area of Hung Yen province ........................................................................................................... 40

Table 20. Compensation and assistance entitlement policy applied for PN 500kV S/C sub-project’s connections in Hai Duong province..................................................................................................... 41

Table 21: Breakdown of compensation and assistance for 500kV/220kV BN2-PN T/L sub-project .. 41

Table 22: Breakdown of compensation and assistance for 500kV PN S/C sub-project and 1 connection in Hung Yen province ....................................................................................................... 43

Table 23: Breakdown of compensation and assistance for Pho Noi substation’s connections in Hai Duong province under 500kV PN S/C sub-project ............................................................................. 43

Table 24: Comparison of income percentiles before and after project implementation ..................... 45

Table 25 Comments of SAHs about their training needs and living standard compared to before the project .................................................................................................................................................. 46

Table 26 Percentage of Surveyed Vulnerable Affected Households ................................................. 48

Table 27 Breakdown of assistance and income restoration for two sub-projects .............................. 49

Table 28. Public consultation during RP updating .............................................................................. 52

Table 29: Summary of complaints and redress grievance under the two sub-projects..................... 56

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 5

LIST OF FIGURES

Figure 1. Layout of L2848 Project area ................................................................................................. 9

Figure 2. Overview of Transmission Line Right-of-Way ..................................................................... 11

Figure 3. Pho Noi 500kV Substation layout ........................................................................................ 12

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 6

ACRONYMS

ADB Asian Development Bank

AH Affected Household

AP Affected Person

CARB Compensation and Resettlement Board

CCR Consultant's Completion Report

CLFD Center for Land Fund Development

CPPMB Central Vietnam Power Project Management Board (CPPMB)

CRC Compensation Resettlement Committee

DARBs District Compensation and Resettlement Boards

DMS Detailed Measurement Survey

DONRE Department of Natural Resources and Environment

DPC District Peoples Committee

EA Executing Agency

EMA External Monitoring Agency

EVN Vietnam Electricity

EVNNPT Electricity of Vietnam's National Power Transmission Corporation

FS Feasibility Study

GoV Government of Vietnam

IOL Inventory of Loss

NPMB The Northern Power Project Management Board

PPTA Project preparatory technical assistance

RP Resettlement Plan

SAH Severely Affected Household

SES Socio-economic Survey

SPS Safeguard Policy Statement

T/L Transmission Line

TOR Terms of Reference

USD The United States dollar

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 7

ABBREVIATIONS AND UNITS OF MEASUREMENT

cu m cubic meter

Ha Hectares

Km Kilometers

km² square kilometer

kV Kilo Voltage

M Meter

m³ cubic meter

MW Megawatt

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 8

ACKNOWLEDGEMENT

The assignment on Independent Monitoring Consultant for Resettlement of the Power Transmission

Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi

transmission line and 500kV Pho Noi substation started in April 2014 until December 2016. Since

then, six survey reports have been prepared and submitted to NPMB and ADB by IMC.

A survey has been conducted in November 2016 to prepare for post-evaluation report. With the

support from NPMB leaders and staff i.e. Division of Resettlement and Compensation in terms of

logistics and inputs.

The team would like to sincerely thank DRC leaders and staff for their enthusiastic support and

encouragement and companion with IMC and the team during the pre-survey preparation, field

survey and analyzing and reporting. Staff from DRC have been kept in touch and usually called and

gave instructions/inputs to IMC to fulfill her assignment. We highly appreciate their supports and

cooperation.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 9

I. PROJECT BACKGROUND

I.1 PROJECT DESIGN, COMPONENTS AND LOCATION

1. The Investment Program, which was proposed in November 2011 and approved by ADB in

February 2012, aims to expand power transmission network throughout Vietnam. As a part of the

Investment Program, the Project aims to expand power transmission network in northern and

southern Vietnam.

2. A layout of L2848 Project Area is provided below:

Figure 1. Layout of L2848 Project area

Source: NPMB

I.1.1. Project Components

3. Component 1: Expanded Transmission Network. (The construction of 2 transmission lines and 2 substations will be financed located in the northern and southern part of Viet Nam.

North: (i) 500 kV/220 kV Pho Noi substation and connections; (ii) 500 kV/220 kV Bac Ninh

2 - Pho Noi transmission line sub-project

South: (i) 220 kV Song May – Uyen Hung transmission line; (ii) 220 kV Phu My 2

Industrial Zone substation

4. Component 2: Operational Effectiveness and Efficiency of NPT. The Tranche 1 project

allows management and staff of NPT to strengthen capacity in (i) Strategic corporate planning,

business planning and management; (ii) Accounting, financial management, planning and control;

and (iii) engineering design optimization of transmission network

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 10

5. Component 3: Project Implementation Support: This component supports project

implementation with focus on detailed engineering, construction supervision; procurement;

safeguards compliance; and preparation of subsequent tranches of the investment program. It will

ensure a high degree of readiness for implementation of sub-projects financed under the investment

program with detailed technical designs, advanced procurement for most of the sub-projects, and

capacity to prepare and implement safeguard measures. The completion of detailed engineering

designs, safeguard compliance, and procurement documents will facilitate the preparation for

financing of subsequent tranches.

6. The Project was initially expected to be completed by June 30, 2015. There is an extension

for the closure of disbursement by December 31, 2016.

7. The loan includes the financing of the construction of the (i) 500kV/220kV Bac Ninh 2 – Pho

Noi transmission line and (ii) 500kV Pho Noi substation. The National Power Transmission

Corporation (NPT) is the executing agency and the Northern Power Project Management Board

(NPMB) is the implementing agency for the two sub-projects.

I.1.2. Location

8. The 500kV/220kV Pho Noi – Bac Ninh 2 transmission line and associated 500/220kV Pho

Noi substation are located in the northern part of Viet Nam. The starting point of the transmission

line is the 500kV bus bar of the Pho Noi substation that is located in the Hung Yen province and the

ending point is the 220kV bus bar of the Bac Ninh 2 substation located in the Bac Ninh province.

9. The Bac Ninh 2 - Pho Noi 500/220kV transmission line is one of the two sub-projects

under the Investment Program that National Power Transmission Corporation (NPT) and Northern

Power Project Management Board (NPMB) requested for financing from ADB.

10. BN2-PN 500/220kV T/L has a total length of 30km, starting from the 500kV Pho Noi

substation and ending at the 220kV/110kV Bac Ninh 2 substation. Figure 2 presents an overview of

the ROW of the transmission line and Table 1 and Appendix 5 provide information on the location of

the transmission towers and the compensation amounts by province, district, and commune. The

transmission line traverses two provinces Bac Ninh and Hung Yen. In Bac Ninh province, the length

of the transmission line is about 29.3km which passes through the districts Thuan Thanh, Gia Binh,

Que Vo, and Tien Du of Bac Ninh province. In Hung Yen province, the transmission line is about

1.2km and passes through Sam Khuc village, Viet Hung commune, and Van Lam district.

Table 1. Location of route and towers erected by province, district and commune

Province District Commune Number of towers and codes

Bac Ninh

Tien Du Minh Dao G13C, G16

Canh Hung G17-G18

Tan Chi G13C1

Lac Ve G13B

Tri Phuong G19

Thuan Thanh Nghia Dao G2A

Tram Lo G2A1-G2A2

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 11

Province District Commune Number of towers and codes

An Binh G2B

Mao Dien G2C

Gia Binh Lang Ngam G2D

Que Vo Chi Lang G2E-G2E1, G2F

Hung Yen Van Lam Viet Hung G1A-G1D1, G1D2, G1E-G1F

Source: EVN/PECC3 Technical Report, February 2011

11. The 500/220kV Bac Ninh 2 - Pho Noi T/L has been closed for electrifying since January 04,

20161

12. The total approved cost for the resettlement is VND 20,540,083,411 (USD 938,331,7952);

this cost already includes compensation and allowance payment

Figure 2. Overview of Transmission Line Right-of-Way

Source: NPMB

13. The Pho Noi 500kV substation and connections (PN 500kV S/C) is one of the two sub-

projects under the Investment Program that National Power Transmission Corporation (NPT) and

Northern Power Project Management Board (NPMB) requested for financing from ADB.

14. The Pho Noi 500kV substation and connections (PN 500kV S/C) are built with following

specifications:

- Voltage level: 500/220kV

Area occupied: 239,872.7m2 (included substation and access road)

1 http://www.evn.com.vn/d6/news/Dong-dien-cong-trinh-Duong-day-500220-kV-Bac-Ninh-2-Pho-Noi-6-13-17196.aspx 2 Tentatively in dollar, not an official figure

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 12

Location: Viet Hung, Luong Tai commune, Van Lam district, Hung Yen province.

15. The total compensation and assistance value is VND 66,454,000,000 (equivalent to USD

3,090,884).

Figure 3. Pho Noi 500kV Substation layout

Source: NPMB

16. 500/220 kV Pho Noi substation subproject has 04 line connections, as follows:

500 KV Bac Ninh 2 – Pho Noi has 05 locations in Viet Hung commune. The route length

is 600m (Including the segment to the substation). Starting point is from the Pho Noi SS

and end point is 500 kV/220 kV Pho Noi – Bac Ninh 2 transmission line.

500 KV Quang Ninh – Thuong Tin has 05 location in Viet Hung commune, in which

Connection line No. 1 (to Thuong Tin): route length is 662m (Including the segment to the

substation) and Connection line No. 2 (to Quang Ninh). The route length is 568m

(Including the segment to the substation). Starting point: newly erected tower in the

middle of two towers No. 273 – 274 of the existing 500kV double circuit transmission line

from Quang Ninh to Thuong Tin and Ending point: 500kV gantry tower of Pho Noi 500kV

Substation.

220 KV Pha Lai – Gia Loc has 16 locations, in which 01 location in Viet Hung commune,

Van Lam district, Hung Yen. Remaining locations are in Nghia Dao commune, Thuan

Thanh district, Bac Ninh province (04 locations) and in Cam Hung commune, Cam Giang

district, Hai Duong(11 locations). The route length is 5,107m (Including the segment to the

station). Starting point: newly erected tower in the middle of two towers No. 68 - 69 of the

existing 220kV double circuit transmission line of Pha Lai - Pho Noi - Thuong Tin. Ending

point: 220 kV Gantry tower of Pho Noi 500kV Substation.

220 KV Thuong Tin – Kim Dong has 19 locations out of 81 locations are related to 500kV

Pho Noi substation sub-project, in which: 04 locations in Viet Hung commune, 09

locations in Luong Tai commune, Van Lam district, Hung Yen province and 06 locations in

Ngoc Lien commune, Cam Giang district, Hai Duong. Starting point: Starting point: newly

erected tower in the middle of two towers No. 73 - 74 of the existing 220kV double circuit

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 13

transmission line of Pha Lai - Pho Noi - Thuong Tin. Ending point: 220kV Gantry tower of

Pho Noi 500kV Substation.

I.2 DESIGN AND RP PREPARATION WITH PARTICIPATION

17. During the project preparation, NPMB consultants3 conducted inventory on the possible

project impacts. The survey teams have also conducted discussions and consultations with local

authorities and local people on the possible impacts caused by the project, particularly the alignment

of T/L routes so as the selected line routes are the least impact option.

18. The consultations with affected communities within the proposed site of the substation and

along the transmission line route have been conducted by NPMB and PECC3 team since July 2011.

People from the communes of Tri Phuong, Cam Hung, Minh Dao, Tan Chi and Lac Ve in Tien Du

district and Chi Lang commune in Que Vo district, and Lang Ngam in Gia Binh district, Mao Dien,

Tram Lo, Nghia Dao and An Binh communes in Thuan Thanh district and Viet Hung commune in

Van Lam district of Hung Yen province have been engaged during the consultation meetings.

19. The proposed layouts of the T/L routes of Bac Ninh 2 - Pho Noi 500/220kV T/L (from Viet

Hung commune, Van Lam district of Hung Yen province to Tri Phuong commune of Tien Du district,

Bac Ninh province) was also displayed and discussed again in the respective RP community

meetings.

20. The draft layout of the substation and T/L routes has been communicated by NPMB to the

relevant bodies i.e. provincial, district, and commune Peoples Committees, Departments of Natural

Resources and Environment, provincial/district/commune cadastral services for comments and

public disclosure.

I.3 PROJECT'S RESETTLEMENT/COMPENSATION IMPACTS

I.3.1. Categories of sub-projects' impacts

I.3.1.1. 500/220kV transmission line sub-project

21. 500/220kV BN2 - PN T/L sub-project starts at 500kV Pho Noi Substation at Viet Hung

commune, Van Lam district in Hung Yen province, and then traverses across 11 communes of

Thuan Thanh, Gia Binh, Que Vo and Tien Du districts and ends at 220kV Bac Ninh 2 Substation.

According to the results of DMS, Bac Ninh has 86 locations (for more information please see

Appendix 5), total of 370 HHs and 11 organizations are affected with about 41,204m2 of permanently

affected agricultural land and 270 m2 of residential land; 7,250m2 of temporary affected agriculture

land and 5,650m2 of public land. Across the 04 sub-project’s districts, there is one AH being

relocated because his house and garden locate right under the transmission line4.This project is

classified as Category A based on ADB's Safeguards Policy Statement 2009 (SPS).

Table 2 Summary of 500/220kV transmission line sub-project impacts

Main impacts Unit Affected quantity

1. Affected Households: household 370

Household members person 1,739

3 PECC3 4 Part V.2.4 provides more details

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 14

of which:

+ Households whose residential land is affected household 1*

+ Households whose agricultural land is affected household 370

+ HH losing more than 10% of total land holding household 25

+ Other land** managed by non-AH PC 11 (Commune PCs)

2. Permanently affected area: 48,056m2

Of which:

+ Residential land m2 270m2

+ Agricultural land m2 41,204m2

+ Other land** managed by non-AH m2 6,582m2

3. Temporarily affected agricultural land area: 12,900m2

Of which:

+ Agricultural land of AHs m2 7,250m2

+ Other land** managed by non-AH m2 5,650m2

+ Affected crop area m2 41,204m2

+ Affected structure structure 1

(*) This AH has residential and agricultural land affected

(**) Public road, canal bank, inner-field footpath, managed by public organizations (i.e.CPC) included

Source: Department of Compensation- NPMB-November 2016

I.3.1.2. The 500kV Pho Noi substation sub-project and connection (PN 500kV S/C sub-project)

22. According to results of DMS, 500kV Pho Noi substation and its connection5 go through 02

communes of Luong Tai and Viet Hung, Van Lam district, Hung Yen province. Total of 379 HHs are

affected with about 192,957.2m2 of permanently affected agricultural land and 342.3m2 of residential

land; 2,900m2 of temporary affected public land. There are three AHs being relocated with only one

AH having house on land6. This project is classified as Category A based on ADB's Safeguards

Policy Statement 2009 (SPS).

5 500/220kV Bac Ninh 2 - Pho Noi transmission line 6 One AH accepted cash-for-land compensation, the other two requested land-for-land compensation

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 15

Table 3 Main project impact in PN 500kV S/C sub-project

Main impacts Unit Affected quantity

1. Affected Households: Household 3797

Household members Person 1,895

of which:

+ Households whose residential land being affected Household 3

+ Households whose agricultural land being affected Household 376

HH losing more than 10% of total land holding 247

HH losing 10%-30% of total land holding 164

HH losing 30%-70% of total land holding 83

HH losing 70% of total land holding 08

+ Other non-AH institutions institution 2 (Commune PCs)

2. Permanently affected area 239,872.7m2

Of which:

+ Residential land m2 342.3m2

+ Agricultural land m2 192,957.2m2

+ Other land* m2 46,573.2m2

3. Temporarily affected agricultural area 2,900m2

Of which:

+ Agricultural land m2 0

+ Other land* m2 2,900m2

+ Affected crop area m2 240,558m2

+ Affected structure structure 1

+ Affected grave grave 43

7 Updated by November 2016 as compared to URP. Many an AHs own different pieces of agricultural land, thus, they were named several times in the DMS. Consequently, the number of AHs were orriginal high but now it has been revised and updated. 8 Revised as compared to the statistics at the time of URP

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 16

4. Resettlement site m2 600m2 (**)

Resettled AHs household 29

(*) Public road, canal bank, inner-field footpath, managed by public organizations (i.e.CPC) included (***) The site remains a fish pond at the time of survey i.e. November 2016

Source: Department of Compensation- NPMB-November 2016

23. In the 03 connections10, land acquired and restricted for construction and operation is

agricultural land (paddy land) Total 84 HHs are affected with about 17,689m2 of permanently

affected agricultural land and 797m2 of land managed by CPCs11, There is no residential land

affected; 450 m2 of temporary affected public land of 84 HHs and 02 organizations (CPCs) will be

affected under the subproject, in which 6 out of 84 AHs are seriously affected households (losing

more than 10% of total land holdings), These households have their production land affected by the

project from 10 - 20% total land tenure area, no households losing over 30% of total production land

area.

Table 4 Main project impact in PN 500kV S/C sub-project’s connections12

Main impacts Unit Affected quantity

1. Affected Households: households 84

Household members Persons 370

of which:

+ Households whose residential land is affected households 0

+ Households whose agricultural land is affected households 84

HH losing 10%-30% of total land holding 06

HH losing 30%-70% of total land holding 0

HH losing 70% of total land holding 0

+ Other land* PC 213 (Commune PCs)

2. Permanently affected area 17,689 m2

Of which:

9 One AH accepted cash-for-land compensation 10 500/220kV Bac Ninh 2 - Pho Noi transmission line , 500 KV Quang Ninh – Thuong Tin (is presented in Table 2); 220 KV Pha Lai – Gia Loc TL and 220 KV Thuong Tin – Kim Dong TL 11 Public road, canal bank, inner-field footpath etc 12 Total 4 connections: (i) 500/220kV Bac Ninh 2 - Pho Noi transmission line , (ii) 500 KV Quang Ninh – Thuong Tin (is presented in Table 2); (iii) 220 KV Pha Lai – Gia Loc TL and (iv) 220 KV Thuong Tin – Kim Dong TL 13 Revised as compared to DDR, two communes of Ngoc Lien and Cam Giang in Cam Hung district, Hai Duong province

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 17

+ Residential land m2 0 m2

+ Agricultural land m2 16,892 m2

+ Other land* m2 797 m2

3. Temporarily affected agricultural area 450 m2

Of which:

+ Agricultural land m2 0

+ Other land* m2 450m2

(*) Public road, canal bank, inner-field footpath, managed by public organizations (i.e.CPC) included

Source: Department of Compensation- NPMB-November 2016

II. SELECTION OF CONSULTING SERVICES

24. NPT selected and engaged three individual consultants for (a) environment monitoring (in

February 2014) (b) involuntary resettlement, in February 2014), and (c) an independent monitoring

consultant of involuntary resettlement, in April 2014), in accordance with procedures acceptable to

ADB for recruiting individual consultants.

III. OBJECTIVES OF POST EVALUATION

25. For the post-evaluation report, IMC has reviewed the activities since the project began to have

an overview, judgment and evaluation o the level of compliance to the safeguards policies of the

donor i.e. ADB and Vietnam. (See Table 5 for the whole monitoring places and timelines).

26. The objective of this survey is to evaluate the project’s compliance with ADB’s safeguard policies by analyzing:

The social-economic conditions of AHs at the baseline and after resettlement and

compensation

Compensation, assistance and resettlement14;

Public consultation, disclosure, participation and grievance resolution;

Effectiveness of resettlement planning;

Lessons learnt for the future.

III.1 MONITORING PROGRESS

27. IMC was contracted to provide independent monitoring service for the two sub-projects of

Bac Ninh 2 – Pho Noi 500kV/220kV transmission line and 500/220kV Pho Noi substation and

connections. The following Table showcases the progress and paces of the independent monitoring

task:

Table 5 Locations and timing of the last independent monitoring reports

14 Including, among others, confirmation of completion of resettlement, assistance and compensation activities, the numbers of AHs/APs, their affected land area, their entitlement and their acknowledgement of the payments against the plans

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 18

No. Reports Date Locations

1 Inception report April 2014 Desk review plus a few visits to NPMB office

2 First

Independent

Monitoring

Report

May 2014 DARBs of Tien Du district and Que Vo district and Communal

Peoples Committees of Minh Dao in Tien Du and of Chi Lang

in Que Vo district, Bac Ninh province and with Land Fund

Development Center of Van Lam district and Communal

Committees of Luong Tai and Viet Hung in Hung Yen

province.

3 Second

Independent

Monitoring

Report

September

2014

DARBs of Tien Du district and Que Vo district and Communal

Peoples Committees of Minh Dao in Tien Du and of Chi Lang

in Que Vo district, Bac Ninh province and with Land Fund

Development Center of Van Lam district and Communal

Committees of Luong Tai and Viet Hung in Hung Yen province

4 Third

Independent

Monitoring

Report

December

2014

Tien Du District Compensation and Resettlement Boards

(DCARB), Tri Phuong and Chi Lang Commune Peoples

Committees (CPCs) of Tien Du district and Que Vo district

respectively. In Hung Yen province, IMC met with Hung Yen

Center for Land Fund Development and Viet Hung Commune

Peoples Committee of Van Lam district

5 Forth

Independent

Monitoring

Report

June 2015 District Compensation and Resettlement Boards (DARBs) in

Bac Ninh province, Center for Land Fund Development in

Hung Yen province and the selected Commune People

Committees (CPCs), villagers in the three hamlets of Tri

Phuong commune in Tien Du District and one hamlet in Chi

Lang commune in Que Vo District of Bac Ninh province and

one hamlet in Viet Hung commune, Van Lam district, and

Hung Yen province, Cam Hung commune of Cam Giang

district, Hai Duong province

6 Fifth

Independent

Monitoring

Report

January

2016

AHs in Tri Phuong commune of Tien Du district and Nghia Dao

commune of Thuan Thanh district in Bac Ninh province

regarding the foundations and transmission line, Cam Hung

commune of Cam Giang district of Hai Duong province and

Luong Tai commune and Viet Hung commune of in Van Lam

district, Hung Yen province regarding 500kV Pho Noi

Substation and its connections.

7 Final-evaluation

Report

September

and

November

2016

DARBs and AHs in Tien Du district and Que Vo district and

CPCs of Minh Dao commune in Tien Du district and of Chi

Lang commune in Que Vo district, Bac Ninh province and

with Land Fund Development Center of Van Lam district

and CPCs of Luong Tai and Viet Hung in Hung Yen

province, Cam Hung commune of Cam Giang district of Hai

Duong province

Source: Synthesized by IMC, November 2016

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 19

28. Through the monitoring progress, many issues were noted and analyzed, the strengths and

weaknesses of the implementation process were recorded, the following Table summarizes the

monitoring progress and outstanding issues in the specific monitoring missions.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 20

Table 6. Summary of the pinpointed issues during the monitoring missions

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

Information Disclosure, Consultation and Community Participation

BN2-PN

500/220kV T/L

sub-project

- Public disclosure and

consultation have been conducted

by NPMB, DARBs/CLFD, relevant

CPCs in a openly and

transparently basis

- Some AHs were not fully aware

of the project information,

Information dissemination was

mainly one way, from the project

to local people/AHs, AHs did not

have many opportunities to

exchange and discuss with the

investor, local competent

agencies

- The information and

compensation policy of the project

were provided mostly verbally

during meetings, many of the AH

did not remember the details so

the community’s understanding about the project’s AH support policy was limited

- The project information and

resettlement issues have been

disseminated to the local

people twice by the NPMB and

the DARBs/CLFD. The first

time was before DMS and the

second time was the

publicizing the compensation

plan was publicized in offices

of the CPCs and communal

houses of the affected villages

- Information was provided to

the AHs through communal

loudspeakers

- The timing for

posting of

compensation

plans/revised

compensation plans

were strictly

followed

- Mostly one-way

communication,

from the project to

AHs

- Project information

disclosure initially

brought good results.

Information was

provided sufficiently but

more from the top down

than bottom up,

nevertheless, two-way

communication has

been maintained

PN 500kV S/C

sub-project

and

connections

Detailed Measurement Surveys (DMSs)

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 21

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

BN2-PN

500/220kV T/L

sub-project

- DCARB established in August

2013

- DMS carried out in December

2013

- DMSs in Bac Ninh transmission

line sub-project are not yet

completed due to 6 towers in

Hung Yen province have not yet

prepared

- Most of the AHs reportedly

witnessed and involved in the

DMS and signed in the DMS

records

- DMSs in all four project

districts in Bac Ninh province

have been completed

- DMSs in Bac Ninh

transmission line sub-project

are not yet completed due to 6

towers in Hung Yen province

have not yet prepared

- DMSs in Bac Ninh

transmission line sub-project

are completed

- There are 3

households with land

locating in the access

road to 500kV Pho Noi

Substation . One AH

accepted cash-for-land

compensation while the

two others are asking for

land-for-land

compensation

PN 500kV S/C

sub-project

and

connections

- DMSs have been completed

- Most of the AHs reportedly

witnessed and involved in the

DMS and signed in the DMS

records

- DMSs for Pho Noi Sub-

station sub-project have been

completed

- DMS for Pho Noi Sub-

station sub-project have

been completed

- In Cam Hung

commune, Cam Giang

district, Hai Duong

province where there

were 24 households

living under the

transmission line

belonging to 220kV

Thuong Tin-Kim Dong

transmission line sub-

project, connected with

500kV Pho Noi

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 22

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

Substation, within the

Right of Way15

- DMS has been

completed in July 2015

Unit price and compensation pricing

BN2-PN

500/220kV T/L

sub-project

- The District People Committees

were not in the position to issued

Decisions for land acquisition

under this sub-project due to

unavailability of Prime Minister for

waiver of Decree 42/2012/ND-CP

dated May 11, 2012 and Decree

69/2009/ND-CP dated August 13,

2009 of the Government on

recovery of rice field land and

Document 1748/BTNMT-

CTQLDD dated May 13, 2013 on

changing the purpose of land use

from rice planting and protection

forest, special use forest to other

purposes

- NPMB has prepared payment

plans with payment unit prices

applied according to the

updated State regulations. The

payment has been made in an

advancing manner since the

waiver from PM has not yet

made available

- The bottleneck of

500kV/220kV BN2-PN T/L

sub-project on lacking legal

permission for changing land

use purpose was solved with

the Resolution 139/NQ-

HDND dated June 10, 2014

of Bac Ninh Provincial

People's Council

- In two sub-projects

in Bac Ninh and

Hung Yen

provinces,

compensation plans

were made

available and the

payments were

almost completed

accordingly

PN 500kV S/C

sub-project

and

- Such a Prime Minister’s permit has been achieved for all projects

in Hung Yen province (Letter

- Compensation plans are

made available

15 At the time of IMC's post-evaluation survey, 22 out of 24 households accepted the DMS results and received the compensation and assistance. Two households: Mr Nguyen

Van Qua's and Mr. Nguyen Van Luy's have been complaining about the DMS calculations and the compensation rates, they have not yet received the money, more details are

provided in Table Error! Main Document Only.9: Summary of complaints and redress grievance under the two sub-projects

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 23

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

connections 1480/TTg-KTN dated September

2013 on changing the land use

purpose from rice planting to do

other activities under projects in

Hung Yen province), Hung Yen

PPC has issued its Decision

1006/QD-UBND dated June 27,

2014 on land recovery for

conducting Pho Noi 500kv

substation and connection. Van

Lam DPC issued its decisions on

land recovery for each of the AHs

on June 30, 2014

Compensation and Assistance Payment

BN2-PN

500/220kV T/L

sub-project

- AHs receive advancing amounts

combining compensation and

assistance starting from Quarter

2/2014, The compensation plans

of the four affected districts in Bac

Ninh province have been

completed and publicized at

different paces, from July 2013

until July 2014

- The payment was reported

as very convenient for the local

people

- Since the payment were

made during harvesting time,

the families were busy ripping

the rice so only one spouse

could go to get the

compensation and assistance

amounts and signed in the

receipts. The payments were

reportedly correct and exact

with the DMS results. As of the

monitoring time, all households

in the surveyed communes

received their money

- The payments for

all 6 foundations in

Hung Yen province

are made

PN 500kV S/C -The compensation payment for - The payment was reported

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 24

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

sub-project

and

connections

PN 500kV S/C sub-project has

been assigned for Center for Land

Fund Development (CLFD)

- the compensation payment has

almost completed for Pho Noi

Substation and connections.

There are cases of pending

payments of 18 households in

Dong Chung hamlet, Viet Hung

commune where the affected land

areas have been

transferred/exchanged with other

farmers without changing red-

books

as very convenient for the local

people

Assistance delivery

BN2-PN

500/220kV T/L

sub-project

-The assistances payments were

made in cash for livelihood

improvement and the occupation

change and job creation in both

sub-projects

- The amounts were paid together

with the compensation payment at

a time. The applications of unit

prices are found compliant to the

current regulations

- Types of assistances are

mostly (1) livelihood

stabilization, (2) occupation

change and job generation, (3)

people with temporary titles

(temporarily allocated with the

land)16 which are equal to

30% of the compensation rate

of the permanent titles (i.e.

30% of VND 70,000/m2)

(without receiving (1) and (2),

this is only found in BN2-PN

500/220kV T/L sub-project in

Bac Ninh province

16 Land was temporarily allocated to AHs since before the year 1993 with Green Book only,

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 25

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

PN 500kV S/C

sub-project

and

connections

- In Hung Yen, most of the

titles are permanent,) and

other types of assistance such

as bonus for early moving

(VND 10,000/m2 in Hung Yen

only) and removing graves

SAHs

BN2-PN

500/220kV T/L

sub-project

- 25 AHs lost more than 10% their

agricultural land, and no AH being

relocated or resettled, no AH

having their houses/structures

affected

- SAHs informed that their

livelihoods were no longer

relying on agriculture activities,

though they were identified as

severely AHs or SAHs under

the sub-project, there is hectic

industrialization process in the

area

PN 500kV S/C

sub-project

and

connections

- There are 164 HHs losing from

10-30% land area, 83HHs losing

from 30-70% and no HH losing

more than 70% of total land

holding

While assistance amount for

livelihood stabilization is paid

directly to the AHs, assistance for

vocational education and training

for the SAHs are transferred to

the account of Hung Yen

Department of Labor, Invalids and

Social Affairs (DOLISA) to provide

training for those AHs who have

desires to get vocational training

for doing a new job

- As a result of the survey, it is

observed by IMC that their

livelihoods are now less relied

on agriculture activities, though

they were identified as SAHs

under the sub-project, there is

a hectic industrialization

process in the area

- The connections go

through 03 provinces of

Hung Yen, Hai Duong

and Bac Ninh. The

survey results present

that for 03 connections,

84 households and 02

organizations (actually

CPCs) are affected by

the project, 06 out of the

AHs are SAHs i.e. losing

more than 10% of total

land holding

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 26

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

- AHs feel very inconvenient with

this set up, they would like to

receive the assistance in cash so

that they can have more specific

and practical for vocational

training plans

Vulnerable households

BN2-PN

500/220kV T/L

sub-project

- 78 affected households that are

women headed HHs out of 370

AHs, no poor household and no

ethnic minority ones

PN 500kV S/C

sub-project

and

connections

- 67 affected households that are

women headed HH out of 379

households

- There are 6 poor households in

the surveyed villages of Sam

Khuc and Dong Chung of Viet

Hung commune i.e. household

with income of less than VND

500,000/head/month).

- There are supposedly a high

percentage in women-headed

AHs. It was found by IMC during

the survey that women headed

those who were named in the

DMSs were not really the heads

of the households in many cases,

those female names listed in the

DMS lists actually are the LURC

(red-book) holders which were

issued long time ago i.e. since

- 02 households in Cam

Hung commune, Cam

Giang district, and Hai

Duong province are

acquired between 10-

20% of the total

agricultural land area,

but they have additional

incomes from working

as hired labor in wood

carving company, which

has high income level, a

very fruitful business.

They do not categorized

as vulnerable AHs as

prescribed by the project

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 27

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

2001. This has been explained in

detail in the 1st independent

monitoring report

Complaints and grievance redress mechanism

BN2-PN

500/220kV T/L

sub-project

- Grievance redress mechanisms

have been established

- There are CPC staff and local

people, during the survey,

expressing their concerns about

the Electromagnetic Field (EMF)

problem as they anticipated that

after the circuits are closed, their

living environment might be

threatened by the EMF and this

might barrier them from

development opportunities

- Mr. Nguyen Dac Hai’s household in Que Hoi village, Chi

Lang commune, Que Vo district

for additional land acquisition in

the remaining land area

surrounding one tower foundation

since the remaining area would

be no longer convenient for his

family to cultivate rice

- The commune is proposing

the Que Vo district CARB to

check the land condition and

plot a compensation plan for

Mr. Nguyen Dac Hai's family

- Several proposals from Mr.

Nguyen Dac Hai’s household in Que Hoi

village, Mr. Le Van Hieu and

Ms. Dao Thi Cuong in Thuy

village, Chi Lang commune,

and Que Vo district on

additional land acquisition in

the remaining land area

surrounding one tower

foundation since the

remaining area would be no

longer convenient for their

family to cultivate rice. Since

they had lodged his proposal

(November 2013) before the

final decision DCARB

(November 2014), their

requests were considered

and accepted in the

proposed plan and approved

in the Decision of land

recovery by Decision

3246/QD-UBND of Que Vo

DPC. They had received the

compensation and

assistance amounts for the

additional acquisition

- There are verbal

complaints about

bumpy road after

the contractors

returned the

borrowed land

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 28

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

PN 500kV S/C

sub-project

and

connections

- There are CPC staff and local

people, during the survey,

expressed their concerns about

the Electromagnetic Field (EMF)

problem as they anticipated that

after the circuits are closed, they

living environment might be

threaten by the EMF and this

might barrier they from

development opportunities

- Complaint by Mr. Nguyen Van

Dinh in Dong Chung village, Viet

Hung commune, Van Lam district.

He refused to receive payment for

his family, however, it is not

because his family has problem

with the DMS, pricing or payment

whatsoever, but because He has

some verbal complaints about the

project policy of public land in

general

- Complaint made by Mr.

Nguyen Van Dinh is being

handled by Viet Hung CPC

- Complaint made by Mr.

Nguyen Van Dinh is

resolved by Viet Hung CPC

- Concerns about

EMF without

explanation from

competent units

- Some applications (10,

with insufficient

statistics) of AHs in Cam

Hung commune, Cam

Giang district of Hai

Duong province to ask

for resettlement instead

of limitation of

heightened activities

since they are afraid of

living under dangerous

high voltage

transmission lines.

These applications have

been received by Cam

Hung commune

Coordination among stakeholders

BN2-PN

500/220kV T/L

sub-project

- The system has been

established and the coordination

among the agencies i.e. NPMB,

DARBs, CPCs and villages were

generally good

- Information was provided

through the DARBs to the

CPCs. CPCs disseminated the

information to the chiefs of

village and the local people.

DMS was taken with the

participation of NPMB staff,

DARBs, CPCs and the

villagers

- Compensation and

The system has been

established and the

coordination among the

agencies i.e. NPMB, DARBs,

CPCs and villages was

generally good

The system has

been established

and the

coordination among

the agencies i.e.

NPMB, DARBs,

CPCs and villages

was generally good

The system has been

established and the

coordination among the

agencies i.e. NPMB,

DARBs, CPCs and

villages was generally

good

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 29

Issues 1st mission 2 mission 3rd mission 4th mission 5th mission

assistance was paid directly to

the APs under the supervision

of representatives of DARBs,

PPCs and chiefs of the villages

PN 500kV S/C

sub-project

and

connections

- Compensation and

assistance were paid directly

to the APs under the

supervision of representatives

of CLFD, PPCs and chiefs of

the villages

The system has been

established and the

coordination among the

agencies i.e. NPMB, DARBs,

CPCs and villages was

generally good

The system has

been established

and the

coordination among

the agencies i.e.

NPMB, DARBs,

CPCs and villages

was generally good

The system has been

established and the

coordination among the

agencies i.e. NPMB,

DARBs, CPCs and

villages was generally

good

Source: Consolidated from IMC’s external monitoring reports

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 30

IV. METHODOLOGY

IV.1 METHODOLOGIES APPLIED FOR THIS REPORT

29. Desk review: IMC reviews all legal documents, internal reports on safeguard compliance and

documents relating to compensation, assistance and resettlement i.e. Project Feasibility Study, Loan

Agreement and Facility Administration Manual of Tranche 1 Investment Program (FAM), RPs,

updated RPs and DDR of the two sub projects, Memorandum of Understanding from ADB’s missions (2014, 2015, 2016), ADB’s SPS 2009, ADB’s guideline on resettlement assessment, Land

Law 2003 and Land Law 2013, Decree 69 (guiding Land Law 2013), Decisions of Bac Ninh PPC,

Hung Yen PPC and Hai Duong PPC on prices of land, trees and crops, houses and structures and

other assets for compensation when the State recovers the land; NPMB and LIC’s quarterly reports which are taken as primary information for baseline review, analysis and assessing the related

issues.

30. Questionnaire interview: During the monitoring process, this tool is used as the main channel

of information collecting to assess the resettlement implementation. The questionnaire interview has

been designed for 100% of SAHs, 10% of partly AHs, accordingly 361 AHs have been surveyed.

Table 7 provides more details about the number of questionnaires, the questionnaires have been

input and processed to provide inputs for the final report

31. In-depth interview: IMC conducted in-depth interviews with officials from two selected

DARBs of Tien Du district and Que Vo district and Communal Peoples Committees of Minh Dao in

Tien Du and of Chi Lang in Que Vo district, Bac Ninh province and with Land Fund Development

Center of Van Lam district and Communal Committees of Luong Tai and Viet Hung in Hung Yen

province, Cam Giang district of Hai Duong province to assess the: (i) advantages and disadvantages

during the project implementation; (ii) positive and negative impacts of the project; (iii) resettlement

issues; (iv) the levels of recovery and the stability of AHs after the land recovery and compensation

and assistance process completed. Also, the design of the questionnaire interview provides plenty

rooms for in-depth interview. The interviewers were also encouraged to ask and write down any

further information from the respondents. All the information has been carefully read, noted down

and aggregated by IMC. Appendices 1 and 2 provide lists of questionnaire responders and in-depth

interviewees.

32. Focused group discussion (FGDs): 3 FGDs were held with in the surveyed communes with

the hamlets/villages officials and 3 FGDs representatives of villages. FGDs were designed to clarify

issues that are unable to be made clear by questionnaires (for instance, typical cases, opinions or

recommendations of APs etc.). FGDs are to find advantages and disadvantages and solutions.

Moreover, FGDs focus on AH entitlements, participation, livelihoods restoration, resettlement,

gender, etc.

33. Observation: During the field trip, IMC visited and interviewed AHs to observe their living

conditions and facilities. IMC also observe the construction sites to image how it may interfere in the

daily life of the local people and the potential inconvenience etc.

IV.2 SAMPLING

34. The sampling size is designed with 100% of severely AHs (resettlers, losing more than 10%

of land) and 10% of insignificantly AHs.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 31

Table 7. Sampling size (person)

No Sub-project AHs Severely AHs Samples

1 500kV/220kV Bac Ninh 2 – Pho Noi TL 370 25 62

2 500KV PN substation, and 379 247 285

connections 84 6 14

Total 361

Source: Calculated by IMC based on the actual figures-November 2016

35. It was noticed during the past missions and this mission that AHs reside in close proximity to

each other (i.e. in the same hamlets) in all sub-projects, a supporting team and key informants (i.e.

chief of the surveyed hamlets) are engaged to facilitate the interviews. The AHs were interviewed in

a revolving mode.

V. FINDINGS

V.1 SOCIO-ECONOMIC INFORMATION ABOUT THE DISPLACED PERSONS

V.1.1. Source of information

36. IMC, with the support of a survey team, has conducted a socio-economic survey to collect

information based on a sampling design of 100% seriously impacted AHs (those who had to resettle

and lost more than 10% of the landholding areas) and 10% of partly affected households, with no

regard to gender or ethnic group. The objective of this survey is to provide information about sub-

projects' AHs to evaluate the impacts of the resettlement/land acquisition and compensation on

different aspects and to make sure that all the proposed entitlements in the Resettlement Plans have

been provided and used as the focal point for designing the restoration program and in resettlement

monitoring process. Information and data after collection was processed and analyzed to identify the

categories of AHs, vulnerable groups to propose the entitlements/assistance appropriate for these

groups.

37. Socio-economic profiles of AH have been reviewed for the people who are living in the

project area and are impacted by the project in terms of land and assets. The information supports

for the evaluation of the i) socio-economic characteristics in the localities as well as the AHs ii) living

standards of AHs; iii) Sources of income of the households; iv) Rate of incomes and the linkage to

poverty; v) Holding of assets.

38. The survey was conducted in November 2016 with the support from NPMB leaders and staff

i.e. Division of Resettlement and Compensation in terms of logistics and inputs. 07 affected

communes of 05 districts had been visited by the team for this reporting period: Tien Du, Que Vo,

Thuan Thanh (Bac Ninh), Van Lam (Hung Yen), Cam Giang (Hai Duong). Total surveyed

households were 361 households, covering 100% SAHs and 10% of partly affected households.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 32

V.1.2. Characteristics of interviewed households

39. Based on the TOR of IMC and at the request of NPMB for post-evaluation report

preparation, a sample design has been drawn, taking into account of the targets of survey, methods

used and type of information and data to be collected. Total 361 AHs had been put together for a

sampling structure, including 25 severely AHs (100% under Bac Ninh 2-PN T/L sub-project) and 37

partly AHs, 296 severely AHs (100% under Pho Noi Substation sub-project) and 43 partly AHs,

(totally 278 severely AHs and 63 partly AHs) of the two sub-projects.

40. Total surveyed people are 1,320,845 of which are men (accounting for 64%) and 475 are

women (accounting for 36%). The average size of an AH is 4.1 person/household. Of the total

surveyed AHs, 222 AHs have 1-4 members in their families, accounting for 68.6%; 102 AHs have 5 -

8 members in their families, accounting for 3.4%, there is no AH with more than 8 members in the

family.

Table 8. Total AHs, APs, AH size surveyed by sub-project

Su

b-p

roje

cts

Surveyed AHs

Av

era

ge s

ize

p

er

A

H (

pe

rso

n/A

H) AHs

No

of

AH

s

Se

ve

rely

AH

s

Pa

rtly

AH

s

Ma

le (

pe

rso

n)

Fe

ma

le (

pe

rso

n)

To

tal

AP

s

<4

pe

rso

ns

fro

m 5

- 7

p

ers

on

s

>8

pe

rso

ns

BN2-PN T/L 62 25 37 128 41 169 2.7 82 40 2

Pho Noi S/S 285 247 18 621 488 1109 4.5 130 91 0

Connections 14 6 8 32 10 42 3 10 8 0

Total 361 278 63 781 539 1320 4.1 222 137 2

Source: Socio-economic survey of IMC, November 2016

V.1.3. Gender, age and educational level

41. The results of the socio-economic survey showed that of 361 surveyed AHs, there are only

20 women-headed households (accounting for 6.2%).

42. Out of 361 households surveyed, total number of affected people has percentage of men

54% against 46% female. An average size of the affected families is identified as 4.1

persons/household.17

43. Regarding the age structure of APs (all AH’s members),the age groups of the surveyed AHs

are rather young. Percentages of persons under 18 years old, 18-30 and 31-45 are 17.8%, 22.6%,

and 10.6% respectively. Of them, persons over 60 years old account for smallest percent of 12.4%.

Details are as follows:

17

That the age structure becoming likes this was because of the method of collecting information. It is not the intention of IMC that a survey that similar to a census should be carried out, rather, only those who have land titles, and their family members who are living together under the same roof, eating together and sharing one budget. are the objects of the survey. Sometimes along the survey, some households with members living under the same roof but belong to different families according to their residential register books and don't share incomes and expenses, so those who don't have land acquired by the project were left out from the survey.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 33

Table 9. Surveyed demographic structure

Unit: person

Sub-projects

Total Aged <18 Aged 18-30 Aged 31-45 Aged 46-60 Aged > 60

AHs APs

Heads of HHs APs

Heads of HHs APs

Heads of HHs APs

Heads of HHs APs

Heads of HHs APs

BN2-PN T/L 62 169 0 51 10 51 36 32 76 51 11 31

Pho Noi S/S 285 1109 0 163 17 211 168 289 97 212 3 128

Connections 14 42 0 22 3 37 6 3 61 34 3 5

Total 361 1320 0 236 30 299 210 324 234 297 17 164

Source: Socio-economic survey of IMC, November 2016

44. 208/361 heads of the households have the educational level of secondary school

(accounting for 57.6%), while 55% heads of the households have upper secondary level (accounting

for 15%), 79/361 heads of the households stop at primary schools (accounting for 21.0%). There is

as humble number as 19/361 heads of the households have vocational high

school/college/university degree (accounting for 5.2%).

45. Correlation of age group and educational level of head of AHs is as the following:

Table 10. Age and education categories of the surveyed affected households

Sub-projects

Gender ratio (%) Distribution of heads of household by educational level

(person)

Male Female Primary Lower

secondary

Upper seconda

ry

High school/College/Univer

sity

Bac Ninh 2-Pho Noi T/L

72 28 25 28 6 3

Pho Noi S/S 56 44 51 138 56 40

Connections 64 36 5 3 7 1

Total 64 36 81 169 69 44

Source: Socio-economic survey of IMC, November 2016

46. That the age structure becoming likes this was because of the method of collecting

information. It is not the intention of IMC that a survey that similar to a census should be carried out,

rather, only those who have land title, and their family who are living under the same roof and eating

together and sharing one family budget, which were recovered under these sub-projects are the

object of the survey. Sometimes along the survey, some households with members living under the

same roof but belong to different families and don't share incomes and expenses, so those who

don't have land acquired by the project were left out.

47. There is a strong separation of nuclear family from their parents. Young couples, in most of

the cases, registered as an independent family in a residential register book. There are cases which

one old couple has five or six children who are all got married and are keeping separate Residential

Register Book

V.1.4. Income of AHs

48. Based on the data collected from the socio-economic survey, the households can be

identified as belonging to one of four income groups as follows:

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 34

49. Poor: This group includes those people who earn incomes that fall below the new

MOLISA poverty line18 (i.e. VND 700,000/person/month). Some of these people have availed of

credit and have managed to purchase livestock, but in general operate with very small cash

incomes over and above subsistence activities, and many are subject to seasonal cash incomes

due to the nature of the agriculture sector. The seasonality of production and/or income would

mean that these people would require a greater degree of support (than families in the

transitional category) to become food sufficient for 12 months per year.

50. Transitional: This group includes those who have moved above the official poverty line

(and earn between VND 701,000 and VND 1,000,000/person/month for rural area) but still

remain vulnerable to shocks and are less able to withstand either natural disasters or economic

trauma than the non-poor. These people have relatively low disposable income and particularly

those between 10% and 15% above the poverty line still have trouble meeting minimum basic

needs. This group is considered to be transitional as they are moving, albeit slowly, out of the

classification of poor into non-poor, they constitute the ‘upwardly mobile poor’.

51. Non-Poor: This group includes households with people who earn between VND

1,001,000 and VND 3,000,000/person/month. This income category captures those that are

non-poor and who have relatively high levels of disposable income. Beside the income from

crops, this group still invests in animal raising (buffalo, pigs, chicken…) to supplement their

income.

52. Better-off: Households in this category include those with members earning more than

VND 3,000,000 /month and are considered to be more than non-poor i.e. they are

comparatively wealthy and have very high levels of disposable income and have savings.

Usually for households in this category farming is not the main source of income, and they have

members who are engaged in salaried work, and small business or trade.

Correlation between educational level and occupation and income

Table 11. Structure of occupation by educational level of APs

Sub-projects

Su

rveyed

AH

s

Occupation/Source of income of AHs (%) By educational level of AH (%)

Ag

ricu

ltu

re

Bu

sin

es

s/S

er

vic

es

Hir

ed

/sala

ry

based

Oth

ers

Pri

mary

Lo

wer

seco

nd

ary

Up

per

seco

nd

ary

Hig

h s

ch

oo

l

Co

lleg

e/U

niv

ers

ity

ac Ninh 2-Pho Noi T/L

62 51.9 4.6 42.3 1.2 16.5 51.9 21.7 6.6 3.2

Pho Noi S/S 285 49.2 5.5 42.8 2.5 14.8 54.8 18.1 10.8 1.4

Connections 14 44.4 5.6 47.2 2.8 15.2 63.3 17.7 3.8 0.0

Total 361 48.5 5.2 44.1 2.2 15.5 56.7 19.2 7.1 1.5

Source: Socio-economic survey of IMC, November 2016

18 Decision No. 59/2015/QD-TTg dated November 19, 2015.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 35

53. Of all the surveyed AH, 15.5% pass the primary level, 56.7% stop at lower secondary school

and is the highest percent and 19.2% have upper secondary grades and only 7.1% of them went to

higher education grades (vocational high school) while college or university graduated people are

only about 1.5%.

54. Agriculture is the main livelihood of the local people and is the main source of income for the

local people in general and affected households in particular. Data from Table 12 shown that 48.5%

income of AHs are from agricultural production i.e. planting rice, husbandry, fish raising etc.

Business/service takes small account in the income structure of AHs with 5.2%. Other sources of

income i.e. salary based/payroll, handicaps and seasonal laboring accounts for 44.1% of the income

structure overall in which the income from business/services in BN2-PN T/L and PN SS and

Connections are similarly low with 4.5%, 5.5% and 5.6% respectively and income from salary BN2-

PN T/L and PN SS and Connections are similarly rank second with 42.3%, 42.8% AND 47.2%

respectively.

Table 12. Income of AHs by sub-project

Sub-projects

AH's monthly income

Total

1-3 millions19

3-5 millions Over 5

millions Over 10 millions

No of HH %

No of HH %

No of HH %

No of HH %

No of HH %

Bac Ninh 2-Pho Noi T/L 6 9.7 22 35.5 25 40.3 9 14.5 62 37

Pho Noi S/S 0 0 189 67.2 92 31.5 4 1.3 285 39

Connections 1 7.1 5 35.7 4 28.6 4 28.6 14 54

Total 7 1.9 216 59.8 121 33.5 17 4.7 361 100

Source: Socio-economic survey of IMC, November 2016

55. In all two sub-projects, the monthly income between VND 3-5 million/month has the highest

probalities with 35.5%, 67.2% and 35.7% of BN2-PN T/L, PN S/S and connections respectively and

no AH has the monthly income of less than VND 1 million/month20).

Table 13. Income of head of household by gender

Sub-projects

Rate of income (million VND) Total (person)

No income Under 1 1-3 3-5 Over 5 Male Female

Male Female Male Female Male Female Male Female Male Female

Bac Ninh 2-Pho Noi T/L

1 0 27 20 26 15 4 1 3 1 61 37

Pho Noi S/S 10 9 34 28 35 24 13 11 12 9 104 81

Connections 4 4 30 32 23 16 2 1 6 2 65 55

Total 15 13 91 80 84 55 19 13 21 12 230 131

Source: Socio-economic survey of IMC, November 2016

56. There is correlation between rate of income and gender. With over VND 5 million/month,

male account for 3.3% while female accounts for half the percentage of 1.2%, while there is a

19 There is no APs with montly income less than 700,000VND/month. These figures are from less than 3 member AHs, Table 8 and Section V.2.6. Vulnerable AHs have more detailed information.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 36

balance in gender structure in group under 1 of income of 46% and 48% of male and female

respectively, it is further noticed during the survey that those who belong to this group often rely on

agriculture production i.e. rice production without auxiliary business/affair/salary/pension etc.

V.1.5. Agricultural activities

57. Mostly the agricultural production activities in the project area fall under one or few of the

following categories: (i) rice and agricultural crops, (ii) livestock, (iii) small services related to

agriculture services i.e. hired seasonal farmers, selling pesticides, fertilizers, seeds, or running rice

husk separator etc. Through the survey result, it is noted that agriculture is the main source of most

of the AHs in particular and local people in general. Agricultural production activities usually

associated with crops such as rice, maize, cassava.

58. Livestock is an important part of agricultural based livelihoods. However, it is noted during

the survey that there is no big-scale livestock production or big animal herd. Most of the livestock

activities are small scaled and for self-subsistence in most of the case. An average of

0.7cows/buffaloes/household is made out of the socio-economic survey. Cattle are kept in styles and

grazed every other day and for pulling and meat provision purpose. Cattle and poultry manure is

piled and composted to use for improving the soil fertility.

59. There is no forest land area in the project area.

V.1.6. Non agricultural activities

60. There are 26 AHs informed that they have non-agricultural services/businesses aside from

agricultural activities. These take part of the income structure include providing basis necessities,

daily living supplies (grocery shops), handicrafts, hair cut, motorbike-bicycle repairing with very

humble income (from VND 1-3 million /month/business) similarly between Bac Ninh and Hung Yen

(Table 14).

Table 14 Off-farming businesses of AHs in the two sub-projects per surveyed AHs

Grocery shop

Handicraft (wood

carving)

Motorcycle/white goods repairing

Tailoring

Number of AH 6 2 10 8

Income/month on average (million VND) 1.5 5 3 1

Source: Socio-economic survey of IMC, November 2016

V.1.7. Houses and house styles

61. The survey result shows that 67.5% AHs are living in a grade 3 - house, with one story, flat

and cemented roof and tiled floor. The most popular house area is 60-80m2 large on a premise of

200m2, with kitchen and bathroom. 34.8% AHs are living in grade 4-houses with steel/cast sheet roof

and brick floor. Almost all the houses were built since 1980’s with 76.5% of the responses.

62. 51% houses were built between 1960-1999, 42% houses were built during 2000 to before

2013 and 7% were from 2014-2016.

20 As being stated elswhere in the report, there is no AP with monthly income of less than 700,000 VND (poverty line in 2015).

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 37

Table 15 Living condition of AHs in two sub-projects (%)

63. The survey result shows that The living condition of AHs in both sub-projects is general good

with 100% AHs use electricity from national grid. 82.8% AHs cook by LPG however, there is only 3%

AHs use electricity for cooking, 22% AHs can access to internet.

Table 16 Durable goods of AHs in two sub-projects (%)

Durable goods

Car Motorcycle

(1 piece) Mobiles VCD Refrigerator

Electricity cooker

Washing

machine

Air

conditioner 0.8 82 94 41 81.3 59 3.6

Source: Socio-economic survey of IMC, November 2016

64. High percentage of durable goods used by AHs in both sub-projects as being shown in Table

16: 82% of AHs own at least 1 motorcycle and 18% of them own from two monocycles upwards.

81.3% of them using Refrigerator, there is only 0.8% of AHs using a car and it is as low as 3.6% of

them using air conditioner which is very low in view of the hot weather during 9 months (late spring-

summer-early fall) in a year in the Northern of Vietnam.

65. There is almost no AH who should resettle since the recovered area is agricultural

production land area. Most of AHs have been living their whole live in the same house, same area

and also did their parents. In Bac Ninh 2-Pho Noi 500kV/220kV transmission line sub-project, there

is one AH has house recovered and in 500kV PN S/C sub-project 3 AHs have residential land and 1

house on the land recovered. Other than that, no AH’s house is impacted by the two sub-projects.

V.1.8. Access to Infrastructure and Social Services

66. The infrastructure are satisfactory in terms of basic social services i.e. health clinic, transport

road, grid electricity, school.

67. Electricity: all AHs connect with national electricity grid.

68. Water supply: There is no tap water yet, all surveyed AHs said they kept rainwater tank and

drilled well for cooking, drinking and washing.

69. Markets: The sub-project areas have small market places scattering all over which provide

and satisfy basic needs for the local residents. Markets are available daily from early morning to

early afternoon, after that, it is much difficult to buy foods, fruits and meat. Markets are easily

accessed by inter-road systems

70. Schools: All communes surveyed reportedly had nurseries, kindergartens, primary and lower

secondary schools while upper secondary schools are only available at district level. For vocational

schools, students have to live far from their home but it is very convenient for them to travel in view

of the city-peripheral location of the project areas.

Hygiene Utility

Toilet Water Electricity Fuel

Internet One vault/ two vaults

Septic tank

Drilled well Tap Grid Off-grid Coal/firewood LPG Electricity

30.7 70.3 100 0 100 0 13.1 82.8 3 22

Source: Socio-economic survey of IMC, November 2016

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 38

71. Health center: there is one health center of each commune and health services are provided

through public health workers. All national health programs i.e. vaccination, deworming etc. are

made available to all people in the commune including all APs.

V.2 COMPENSATION, ASSISTANCE AND RESETTLEMENT

V.2.1. Detailed Measurement Survey (DMS)

72. 500kV/220kV BN2-PN T/L sub-project: DMS of the sub-project was prepared in December

2013. All DMSs in the four project districts of Bac Ninh province have been completed.

73. DARBs in Bac Ninh province together with the Resettlement Division of NPMB, communal

inventory teams conducted the measurements, preparing DMS results with the participation of the

concerned land owners. After DMS, the results were delivered to the AHs. They checked and then

signed in the DMS lists. The DMSs were directly conducted by: (i) staff from NPMB/compensation

division; (ii) staff of DARBs in Bac Ninh province; (iii) communal staff; (iv) village staff; (v)

representatives of the AHs who participated in the measurement process. After agreeing on the

affected land and crops, all parties signed in the DMSs. This was the basis for preparing

compensation plans for the AHs

74. 500kV PN S/C sub-project: DMS of the sub-project was prepared in June 2014. All DMSs in

the two communes of Luong Tai and Viet Hung in Van Lam district, Hung Yen province have been

completed.

75. Center for Land Fund Development (CLFD) in Hung Yen province together with the

Resettlement Division of NPMB, communal inventory teams conducted the measurements,

preparing DMS results with the participation of the concerned land owners. After DMS, the results

were delivered to the AHs. They checked and then signed in the DMS lists. The DMSs were directly

conducted by (i) staff from NPMB/compensation division; (ii) staff of CLFP in Hung Yen province; (iii)

communal staff; (iv) village staff; (v) representatives of the AHs who participated in the measurement

process. After agreeing on the affected land and crops, all parties signed in the DMSs. This was the

basis for preparing compensation plans for the AHs.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 39

Table 17. List of the items which DMSs had been officially documented

No Items DMS conducted

since

Implementation Issues

1 500kV/220kV BN2-PN T/L in Bac

Ninh province

November 2013 Payments had been made since

February 2014, completed as of

November 2016

2 500kV/220kV BN2-PN T/L in Hung

Yen province

June 2014 There are 6 foundations in Hung Yen

province which have been paid from

March 2015 and is completed as of

November 2016, completed as of

November 2016

3 500kV Pho Noi Substation and

connection21

June 2014 Payments had been made since

October 2014 and by November 2016

almost all the AHs received the

compensation and assistance cash

except 2 AHs who are waiting for land-

for-land compensation, more details

can be found in paragraph 88

4 Connections22 July 2015 Payment had been made since

September 2015, to date, 2 AHs have

not yet receive compensation and

assistance, they are complaining about

DMS results and errors in calculating,

more details can be found in Table 29

Source: IMC synthesized from NPMB’s progress reports

76. BN2-PN 500/220kV T/L sub-project was assigned for District Compensation, Assistance and

Resettlement Boards (DCARBs). Fours DCARBs of Gia Binh, Tien Du, Que Vo and Thuan Thanh

districts, in coordination with NPMB, prepared, submitted for approval of the compensation and

assistance plan and payment.

Table 18. Compensation and assistance entitlement policy applied for BN2-PN 500/220kV T/L sub-project in the area of Bac Ninh province

No Types of

assets Unit

Unit

prices

(VND/m2)

Legal documents

1 Compensation

for rice field

and land for

annual crops

m2 70,000 Article 3, Decision No.570/2013/QD-UBND dated December

25, 2013 of Bac Ninh PPC on procedures on price of types

of land in 2014 in Bac Ninh province

2 Compensation

for crops on

land

m2 9,000 Project Entitlement Matrix (For annual crops and trees, cash

compensation equivalent to the highest production of crop

over the last three years multiplied by current market value

21 500 KV Quang Ninh – Thuong Tin TL 22 500 KV Bac Ninh 2 – Pho Noi TL; 220 KV Pha Lai – Gia Loc TL and 220 KV Thuong Tin – Kim Dong TL

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 40

No Types of

assets Unit

Unit

prices

(VND/m2)

Legal documents

of crops at the time of compensation.)

3 Assistance for

livelihood

stabilization

m2 10,000 Paragraph 1, Article 8, Decision No.171/2009/QD-UBND

dated December 18, 2009 of Bac Ninh PPC on procedures

on compensation, assistance and resettlement in the event

of land recovery by the State in Bac Ninh province

4 Assistance for

occupation

changing and

job generation

m2 350,000 Article 1 Decision No.157/2011/QD-UBND dated December

27, 2011 of Bac Ninh PPC on amending Item 1, Article 10 of

Decision No.171/2009/QD-UBND dated December 18, 2009

of Bac Ninh PPC on procedures on compensation,

assistance and resettlement in the event of land recovery by

the State in Bac Ninh province, revising Article 10 of

Decision No.171/2009/QD-UBND dated December 18, 2009

of Bac Ninh PPC on procedures on compensation,

assistance and resettlement in the event of land recovery by

the State in Bac Ninh province

Source: NPMB and data collected by IMC

77. The compensation payment for 500kV PN S/C sub-project has been assigned for Center

for Land Fund Development (CLFD) of Hung Yen Department of Natural Resources and

Environment for preparing, submit for approval of compensation and assistance plan and

coordinating with NPMB for payment.

Table 19. Compensation and assistance entitlement policy applied for PN 500kV S/C sub-project in the area of Hung Yen province

No Types of assets

Unit Unit prices

(VND/m2)

Legal documents

1 Compensation for rice field and land for annual crops

m2 66,000 Article 3, Decision No.15/2013/QD-UBND dated December

20, 2013 of Hung Yen PPC on procedures on price of types of land in 2014 in Hung Yen province

2 Compensation for crops on land

m2 10,000 Notification No 103/TB-STC dated October 2, 2012 of Hung

Yen Ministry of Finance on compensation price unit for tree

and domestic animal in Hung Yen and Project Entitlement

Matrix (For annual crops and trees, cash

compensation equivalent to the highest production of crop

over the last three years multiplied by current market value

of crops at the time of compensation.)

3 Assistance for livelihood stabilization

m2 10,000 Paragraph d, Article 29, Decision No.09/2011/QD-UBND

dated June 1, 2011 of Hung Yen PPC on procedures on compensation, assistance and resettlement in the event of land recovery by the State in Hung Yen province

4 Assistance for occupation changing and job generation

m2 198,000 Decision No.09/2011/QD-UBND dated June 1, 2011 of

Hung Yen PPC on procedures on compensation, assistance and resettlement in the event of land recovery by the State in Hung Yen province

Source: NPMB and data collected by IMC

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 41

78. NPMB will be responsible for distributing funds for the compensation for land and

resettlement to the Hung Yen PPC. The PPC will be responsible for the transfer of budget to

subproject DPC/CARB to make payments directly to APs with respect to affected land, crops and

trees.

Table 20. Compensation and assistance entitlement policy applied for PN 500kV S/C sub-project’s connections in Hai Duong province

No Types of assets

Unit Unit prices (VND/m

2)

Legal documents

1 Compensation for rice field and land for annual crops

m2 66,000 Decision No.33/2014/QD-UBND dated December 20, 2014

of Hai Duong PPC on procedures on price of types of land in Hai Duong province

2 Compensation for crops on land

m2 10,000 Decision No 37/2014 dated December 22, 2014 of Hai

Duong PPC, promulgating regulations on compensation,

assistance and resettlement in the event of land recovery

by the State in Hai Duong province

3 Assistance for livelihood stabilization

m2 10

kg/per/month * 3 months

Decision No 37/2014 dated December 22, 2014 of Hai Duong PPC, promulgating regulations on compensation, assistance and resettlement in the event of land recovery by the State in Hai Duong province

4 Assistance for occupation changing and job generation

m2 140,000 Decision No 37/2014 dated December 22, 2014 of Hai

Duong PPC, promulgating regulations on compensation, assistance and resettlement in the event of land recovery by the State in Hai Duong province

Source: NPMB and data collected by IMC

V.2.2. Established policies and total amounts paid by provinces

79. 500kV/220kV BN2-PN T/L sub-project: Basis for preparing compensation and assistance

amounts are the following documents i.e. Land Law 2013; Decree No. 45/2014/ND-CP dated May

15, 2014 of the Vietnam Government providing on the collection of land use levies; Decree No.

43/2014/ND-CP dated May 15, 2014 of the Vietnam Government guiding in detail a number of

Articles of Vietnam Land Law; Decree No. 47/2014/ND-CP dated May 15, 2014 of the Vietnam

Government providing on compensation, support, resettlement when land is recovered by the State;

Decree No. 44/2014/ND-CP dated May 15, 2014 of the Vietnam Government providing on land

price, Decision No.157/2011/QD-UBND dated December 27, 2011 of Bac Ninh PPC, Decision

No.171/2009/QD-UBND dated December 18, 2009 of Bac Ninh PPC, Decision No.570/2013/QD-

UBND dated December 25, 2013 of Bac Ninh PPC on procedures on price of types of land in 2014

in Bac Ninh province, Decision 47/2008QD-UBND dated April 08, 2008 of Bac Ninh Provincial

Peoples Committee on issuance of remaining minimum land area after acquisition when the State

recovers land area in Bac Ninh province and based on the RP’s matrix of entitlement.

The total cost estimate for payment of compensation and assistance in Bac Ninh province is VND

26,495,000,000 (equivalent to USD 1,232,326). In which, (i) total compensation for affected land is

VND 3,308,819,266; (ii) total compensation for crops and trees is VND 406,914,348; (iii) total

amount of assistance is VND 19,897,831,000.

Table 21: Breakdown of compensation and assistance for 500kV/220kV BN2-PN T/L sub-project

Unit: VND

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 42

Districts in Bac Ninh

Compensation Assistance

For land* Tree and

crops Livelihood restoration

Vocational training and

jobs

Households with

temporary land title**

Assistance for

removing graves

70% returned

to the commune

Gia Binh 265,125,000 34,087,500 35,580,000 1,271,900,000 N/A*** N/A N/A

Tien Du 268,058,000 34,464,600 38,294,000 1,340,290,000 N/A N/A N/A

Que Vo 592,847,000 71,225,100 2,303,502,000 16,618,200 N/A 38,775,800

Thuan Thanh 1,114,568,000 134,300,748 131,000,000 4,585,000,000 40,196,100 11,960,000 93,790,900

District in Hung Yen

Compensation Assistance

For land* Tree and

crops Livelihood restoration

Vocational training and

jobs Bonus for early handing-over

Van Lam (Hung Yen province) 247,130,400 34,337,000 679,872,600 34,337,000

(*) including public land

(**) Temporary land title: for agricultural land, the land owner is registered and recorded in the

CPC’s land administration system (usually unofficially called as Green Book) but has no land

certificate (Red Book), 30% of compensation rate for land

(***) N/A means Not Applied, there is no payment and entitlement for the item it falls under.

Source: NPMB

80. 500/220kV BN2-PN T/L sub-project in Bac Ninh province: Basis for preparing

compensation and assistance amounts are the following documents i.e. Land Law 2003; Decrees

No. 197/2004/ND-CP; 123/2007/ND-CP; Decree No.188/2004/ND-CP; Decree No. 69/2009/ND-CP;

Circular 14/2009/TT-BTNMT guiding the implementation of Decree No. 69; Circulars No. 116 and

114/2004/TT-BTC of MOF on price determination method and price frame for different kinds of land

as well as the policies on compensation and resettlement assistance of Hung Yen province i.e.

Decision No.09/2011/QD-UBND dated June 1 , 2011 of Hung Yen PPC on procedures on

compensation, assistance and resettlement in the event of land recovery by the State in Hung Yen

province; Decision No.15/2013/QD-UBND dated December 20, 2013 of Hung Yen PPC on

procedures on price of types of land in 2014 in Hung Yen province; Notification No 103/TB-STC

dated October 2, 2012 of Hung Yen Ministry of Finance on compensation price unit for tree and

domestic animal in Hung Yen province.

81. The total costs for compensation and assistance in Pho Noi substation and connection of

Hung Yen province is VND 66,454,000,000 (equivalent to about USD

3 million). In which, (i) total compensation for affected land is VND 15,831,597,540; (ii) total

compensation for crops and trees is VND 1,948,029,800; (iii) total amount of assistance is VND

41,448,097,040.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 43

Table 22: Breakdown of compensation and assistance for 500kV PN S/C sub-project and 1

connection in Hung Yen province

District

Compensation Assistance

For land* Tree and crops* Livelihood restoration

Vocational training and jobs

Bonus for early

handing-over

Grave relocation

Van Lam 15,831,597,

540 2,030,188,000 40,481,193,200 579,898,500 1,932,995,000

121,451,700

(*) including public land

Source: NPMB

82. 500kV PN S/C’s 3 connections in Hai Duong province: Basis for preparing compensation

and assistance amounts are the following documents i.e. Land Law 2003; Decrees No.

197/2004/ND-CP; 123/2007/ND-CP; Decree No.188/2004/ND-CP; Decree No. 69/2009/ND-CP;

Circular 14/2009/TT-BTNMT guiding the implementation of Decree No. 69; Circulars No. 116 and

114/2004/TT-BTC of MOF on price determination method and price frame for different kinds of land

as well as the policies on compensation and resettlement assistance of Hai Duong PPC: Decision

No.03/2015/QD-UBND dated Feb.11, 2015 of Hai Duong PPC on regulation for adjustment

coefficient for land unit price in some land location in Hai Duong in 2015; Decision No 37/2014

dated December 22nd, 2014 of Hai Duong PPC, promulgating regulations on compensation,

assistance and resettlement in the event of land recovery by the State in Hai Duong province;

Decision No.33/2014/QD-UBND dated Dec. 20, 2014 of Hai Duong PPC on procedures on price of

types of land in Hai Duong province.

83. The total costs for compensation and assistance in Pho Noi substation’s connections in Hai Duong province under 500kV PN S/C sub-project for land recovery and restriction of land and asset

use under 500kV/220kV transmission line is VND 4,248,741,000 (equivalent to about US$ 194,000).

In which, (i) total compensation and assistance for affected land is VND 830,524,000; (ii) total

compensation and assistance for crops and trees is VND 29,916,000; (iii) total compensation and

assistance for structure is VND 3,388,301,000.

Table 23: Breakdown of compensation and assistance for Pho Noi substation’s connections in Hai Duong province under 500kV PN S/C sub-project

District

Compensation and assistance (VND)

Land (25% of compensation

rate)

Tree and crops (full unit

price)

Structure (coefficient:

2.76)

Cam Giang 830,524,000 29,916,000

3,388,301,000

Source: NPMB

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 44

Picture: Acknowledgement of Receipts of AHs in Sam Khuc

and Me Dau villages in Viet Hung commune, Van Lam

district-Hung Yen province

Picture: Receipt of Mr. Nguyen Duc

Huu in Chi Lang Que Vo-Bac Ninh

province

V.2.3. Before and after land acquisition and resettlement comparison

84. The survey results show that there are changes in terms of size of family, income source and

job of AHs. The baseline study shows that the average size of family was around 4.7

persons/household while the figure is 4.1 person/household, also, the rate of income of AHs was

about 80.0% from agriculture while the percentage falls down to 41.9% and 49.2% in BN2-PN TL

subproject and Pho Noi S/S sub-project respectively at the time of the survey. It is assumed that

because of infrastructure development programs as these two sub-projects and the booming of

industrial parks in the region, it is clear that most of the cases, worker’s monthly salary outweighs

incomes from smallholder agricultural production .

85. Through discussion with leaders and people of affected communes during the baseline

survey in April 2014, it was found that before project implementation, local people still worked as

freelancer for private sector. Moreover, income from agriculture is low when the investment for

agriculture increases (increase in the prices of fertilizer, insecticide, plough, working day). At the

time, each kg of rice costs VND 10,000-11,000 (while it is VND 15,000-16,000 at the time of 2016).

In addition, agriculture activities are seasonal and intermittent. AHs do not only gain income from

agriculture but also other sources such as freelance jobs, handicraft, worker and small business,

however agriculture activities account for the extremely high percentile in the income structure of

AHs.

86. There is a trend to move from other income categories to salary based occupations with

36.8% from the baseline survey to 44.1% in November 2016. With the boosting moves toward

industrialization, Hung Yen and Bac Ninh are attracting investors to invest in assembly facilities in

the close proximity with the project area which attract former famers to get new skills and new jobs in

the production facilities/industrial parks, especially young people.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 45

Table 24: Comparison of income percentiles before and after project implementation

T/L sub-project S/S sub-project

Before (%) After (%) Before (%) After (%)

Business/trade 4 10.2 3 9.7

Agriculture 79.6 41.9 80 49.2

Services 4.6 4.6 9 5.5

Salary/wage 10.7 42.1 7.6 42.8

Housework 1.1 1.2 0.4 2.5

Source: Socio-economic surveys by LIC and IMC covering April 2014-November 2016 period

87. There is a sharp downfall of percentiles of agriculture category across both sub-projects with

79.6 (2014) against 51.9 (2016) in Bac Ninh 2 – Pho Noi 500/220kV Transmission line sub-project

and 80.0 (2014) against 49.2 (2016) in Pho Noi 500kV Substation sub-project and connections. On

the contrary, a remarkable increase in salary/wage category after the project across the board with

10.7 in 2014 to 42.3 in 2016 and from 7.6 in 2014 to 42.8 in 2016 in Bac Ninh 2 – Pho Noi

Transmission line sub-project and Pho Noi 500kV Substation sub-project and connections

respectively. The strong trend of industrialization has made a clear impact on the movement of

occupations of APs. Bac Ninh23, Hung Yen24 and Hai Duong25 are among the fast industrialization

provinces in the North with many industrial zones and huge demand of young and skilled workers.

88. The resettlement/compensation/assistance planning in restoring the living conditions should

take account of the changing situation in the area, at this period and in the near future, it is beneficial

for AHs if they can get skill refining/awareness raising opportunities from such restoration programs

as vocational trainings, small credits etc. so that they can feel more at ease to enter into a new

working environment and get better income.

V.2.4. Severely Affected Household

500kV/220kV BN2-PN T/L sub-project

89. According to the RP, severely affected households mean all AHs that lose 10% or more of

total productive land, other assets and/or income sources or lose 10% or more of their total income

sources due to the Project. Accordingly, the results of Detailed Measurement Survey for foundation

show that 370 HHs in total have been affected by the sub-project in 4 districts of Tien Du, Que Vo,

Gia Binh and Thuan Thanh in Bac Ninh province, of which, 25 AHs were losing more than 10% their

agricultural land, and no AH being relocated or resettled, no AH having their houses/structures

affected. Notwithstanding, all of them informed that their incomes are no longer based on only

agricultural activities but also based on other off-farming businesses i.e. self-employed, providing

services, freelancers, pay-roll staff etc. All the AHs under BN2-PN T/L sub-project in Bac Ninh

province received assistance together with the compensation amount.

23 http://www.izabacninh.gov.vn/ 24 http://banqlkcn.hungyen.gov.vn/Pages/default.aspx 25 http://haiduong.gov.vn/doanhnghiep/kcn/Pages/default.aspx

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 46

500kV PN S/C sub-project and connections

90. In Hung Yen province, it was identified in the DMS that there were 164 HHs losing from 10-

30% land area, 83 HHs losing from 30-70% and no HH losing more than 70% of total land holding.

In the connections, there are 6 HHs lost from 10-30% of total land holdings. While assistance

amount for livelihood stabilization is paid directly to the AHs, assistance for vocational education and

training for the severely affected households are transferred to the account of Hung Yen Department

of Labor, Invalids and Social Affairs to provide training for those AHs who have desires to get

vocational training for doing a new job.

91. 98% of SAHs have the income per month from VND 3 to 5 million. There are 120 SAPs who

are retired State officers coming back their hometown with 100% of them having pension from VND

5-10 million/month and 100% of them graduating from colleges/universities.

92. Table below shows there is only 1 SAH in 500kV/220kV BN2-PN T/L sub-project and 5

SAHs in 500kV PN S/C sub-project and no SAH in the connections expressing the need for

vocational training out of 278 SAHs and 99.3% of them commenting that their families are living with

the same/better conditions as compared to before the project.

Table 25 Comments of SAHs about their training needs and living standard compared to

before the project

Sub-projects SAHs

Need vocational

training

Living standard compared to before

Same and better Worse

500kV/220kV BN2-PN T/L sub-project 25 1 25 0

500kV PN S/C sub-project and connections 253 5 251 2

Total 278 6 276 2

Percent of total SAHs (%) 2.2 99.3 0.7

Source: Socio-economic surveys by LIC and IMC covering April 2014-November 2016 period

V.2.5. Resettlers

93. In Bac Ninh 2 - Pho Noi 500kV/220kV transmission line sub-project, 1 AH has been identified

to be resettled, Mr. Nguyen Duc Quang’s in Van Chung village, Tan Chi commune, Tien Du district,

whose resident land was to be recovered by the sub-project since it lied under the transmission

which subject to limitation of all living activities. Tien Du DARB together with NPMB conducted

consultation with his family and he agreed to move. DMS had been completed and compensation

and assistance funds have been paid. However, he is requested to dismantle the house on land but

at the time of supervision (November 2016), he has moved to other house, but not yet removed the

house on the land.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 47

Official document confirming that the resettlement, compensation and assistance process has been completed for Mr. Nguyen Duc Quang’s family, issued on April 27, 2016

House and land on the access road of 500KV Pho Noi Sub-station, the road is on the left side, which was realigned

due to the AH's house in the middle of the picture, was not dismantled before the construction phase, Luong Tai

commune, Van Lam District, Hung Yen province

94. There are 3 households with land locating in the access road to 500kV Pho Noi Substation.

IMC has worked with Luong Tai CPC and CLFD about this issue. It was reported that these houses

were allocated with non-residential land. They are Mr. Do Van Thuc's, Do Van Tha's (they are

brothers), Mr. Nguyen Van Hung. Mr. Do Van Tha has build a one-story brick house on the land

since August 2014, while Mr. Do Van Thuc and Mr. Nguyen Van Hung have their pieces of land

unconstructed (above is a panorama picture of the land and house). Of them, Mr. Nguyen Van

Hung agreed cash-for-land compensation while Mr. Do Van Tha and Mr. Do Van Thuc are

submitting application for land-for-land compensation. Their families asked for replacement land

area. As of the final evaluation time (November 206), Mr. Nguyen Van Thuc’s and Mr. Nguyen Van

Tha’s have been allocated another land in nearby area for rehousing. Before that, in February 2016,

Hung Yen CLFD has sent a request to Hung Yen PPC for approval of land-for-land compensation for

these two households. The request has been approved. CLFD has been preparing the

compensation and assistance plan based on the Hung Yen DONRE’s unit prices for compensation of land recovery in 2016 and NPMB’s cost estimate. As of November 2016, the two households still

stay put and have not yet handed over the site to the project due to the replacement land area has

not yet prepared by CLFD and CPC for housing (i.e. no dredging and no earth filling yet).

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 48

V.2.6. Vulnerable households:

95. According to the DMS results, there are 78 affected households that are women headed

HHs26 out of 370 AHs, no poor household and no ethnic minority ones in 04 districts of BN2-PN

500/220kV T/L sub-project. The survey results as of November 2016 of both surveys showed no

poor households in the surveyed villages. i.e. household with income of less than

700,000/head/month in 201627.

Table 26 Percentage of Surveyed Vulnerable Affected Households

Sub-projects Poor AHs Disabled Veteran Lonely elderly

Women headed

28

500kV/220kV BN2-PN T/L sub-project 0 0 1 2 0

500kV PN S/C sub-project and connections 0 1 11 0 2

Total surveyed VAHs 0 1 12 2 2

%of total surveyed VAHs 0.0 0.3 3.3 0.6 0.6

Source: Socio-economic surveys by LIC and IMC covering April 2014-November 2016 period

96. According to the DMS results, in PN 500kV S/C sub-project, there are 67 affected

households that are women headed HH out of 379 households. it was identified that there are 6 poor

households in the surveyed villages of Sam Khuc and Dong Chung of Viet Hung commune i.e.

household with income of less than VND 700,000 /head/month).

Interviewing Ms. Nguyen Thi Mo, a women-headed AH in Cam Hung village, Cam Giang

district, Hai Duong province:

“My 20-year-old son is working for a relative. He is young and unskilled. He earns about 1.2

million/month by assisting other skilled masonry to build houses. He stops going to school after

lower-secondary school (i.e. grade 9). I am living alone, I grow rice and raise ten chicken. I have

many elderly diseases. My son works far from home, just coming back once every two weeks. I

has been entitled for compensation, assistance from the project, but my most concern is my son

can get more money and be settled. The lady in the neighborhood told me there is some

vocational training from the project, it is free for APs like us, but we don’t know how to have that. Also, my son should have better income so that he can get married and bring up his wife and

children, then I can rest assured about him.”

97. In the project areas, many State subsidized programs and projects i.e.30A, 135 etc. reaching

out to those who are the most vulnerable in the community. AHs have not only receive support from

the project but also are being back-up by the programs and projects for different groups in the

community.

26 It is then commonly confirmed by the Chairmen of the CPCs in the two surveyed areas that the reason for such a high percentage of the households with woman headed that the names were listed in the DMS list are the red-book holders which were issued long time ago i.e. since 2001. So many changes in terms of demographical data since then which IMC has not enough time and resource to go further into it. 27 Confirmed for the survey samples only. 28 Real women-head AHs i.e. the head of the household is a woman and she is living alone or with children/relatives

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 49

V.2.7. Income restoration program

98. The assistances payments were made in cash for livelihood improvement and the

occupation changing and job creation in both sub-projects.

99. In general, BN2-PN 500/220kV T/L sub-project has a small impact due to implementation of

transmission line. In Bac Ninh province, accordingly updated DMS, for foundation construction, there

are 25 household losing from 10% to 30% of total land holdings. Notwithstanding, assistance for

livelihood stabilization, occupation change and job creation have been provided in accordance with

the laws and project policy. The amounts were paid together with the compensation payment at a

time. The applications of unit prices are found in compliance with the current regulations, please see

Tables 27 for more details on the amounts paid under compensation, assistance and income

restoration categories of this sub-project.

100. In PN 500kV S/C sub-project, it was identified that PN 500kV S/C sub-project have three

resettlement AH, there are 83 HHs losing more between 30% and 70% and no HH losing more than

70% of total land holding. Notwithstanding, assistance for livelihood stabilization and occupation

changing and job creation have been provided in accordance with the current laws of Vietnam,

please see Table 27 for more details on the amounts paid under compensation, assistance and

income restoration categories of this sub-project.

Table 27 Breakdown of assistance and income restoration for two sub-projects

Unit: VND

Items No. APs

Description Amounts

BN2-PN 500/220kV T/L sub-project

Income Restoration 19,897,831,000

Living Stability Allowance 370 VND 10,000/m2 408,396,000

Job Changing Allowance 370 VND 350,000 per

m2 19,489,435,000

PN 500kV S/C sub-project29

Income Restoration 41,061,091,700

Allowances 40,481,193,200

Living Stability Allowance 83 891,000,000

From 30% - 70% of total landholding 83

30kg of rice/per/month x 6

months x VND 12,500/kg of rice

864,000,000

Job Changing Allowance 379 VND 198,000 per

m2 38,273,297,040

29 There is no income restoration for the connections’ AHs in Hai Duong province

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 50

Allowance for community works 2 VND 6,000/m2 1,439,236,200

Bonus 379 VND 10,000 per m2 1,932,995,000

Income Restoration Program 579,898,500

Job training allowance 379 VND 3,000 per m2 579,898,500

Source: NPMB and IMC’s survey

101. The assistances payments were made in cash for livelihood improvement and the

occupation changing and job creation in both sub-projects. In general, BN2-PN 500/220kV T/L sub-

project has small impact due to implementation of transmission line. In Bac Ninh province, according

to the updated DMS, for land recovery of foundation construction, there are 25 household losing

from 10% to 30% of total land holdings. Notwithstanding, assistance for livelihood stabilization and

occupation change and job creation have been provided in accordance with the laws and project

policy. The amounts were paid together with the compensation payment at a time. The applications

of unit prices are found in accordance with the current regulations.

Decision 2189/QD-UBND dated of June 30, 2014 Van Lam district, Hung Yen about the funds

allocated for vocational training/income generation program for severely AHs under Pho Noi 500kV

substation sub-project 30

30 There is a national program on Employment and Training through Decision 1956/QD-TTg dated November 27, 2009 of Prime Minister and Decision 1201/QD-TTg dated August 31, 2012 of the Prime Minister stipulates the

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 51

102. IMC was informed by Viet Hung commune leaders and local people during the survey that

while assistance amount for livelihood stabilization is paid directly to the AHs, assistance for

vocational education and training for the SAHs are transferred to the account of Hung Yen

Department of Labor, Invalids and Social Affairs to provide training for those AHs who have desires

to get vocational training for doing a new job.

103. AHs feel very inconvenient with this set up, since Viet Hung and Luong Tai communes are

about 50km far from the capital city of the province, if someone wants to get training they should pay

more for logistics to get training than the funding for training itself. It was also asked by the Viet

Hung CPC staff and people in the questionnaires and in-depth interviews that if possible, they would

like to receive the assistance in cash so that they can have more specific and practical for vocational

training plans.

V.3 PUBLIC CONSULTATION, DISCLOSURE, PARTICIPATION AND GRIEVANCE

RESOLUTION

V.3.1. Public Consultation, Disclosure, and Participation

104. During LIC’s RP updating process, two rounds of consultation were conducted. The

purposes of the first round of consultation, and information dissemination are to initially inform the

local authorities about the sub-project, its objectives and principles on land acquisition,

compensation and resettlement in accordance with current GoV’s policies and ADB’s policies on involuntary resettlement, plan, and schedule for the SES, DMS and information needs for preparing

an Interim RP. The meeting was held at office of 04 sub-project districts to introduce to local

authorities and local NGOs about:

General information on the project;

List of the project affected districts, communes and scale of land acquisition under the

project;

Objectives and Principles of RP according to the requirements of GoV and ADB’s policies on involuntary resettlement;

Schedules of SES and public consultations;

Other issues.

implementation of the Program during period 2012-2015, thanks to that, vocational training and job generation initiatives have been made available to the wide beneficiaries categories in terms of significant skill improvement, job generation, income improvement in the communal level. The main agencies in charge of the vocational training initiatives are Provincial Department of Labor, Invalid and Social Affairs.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 52

Table 28. Public consultation during RP updating

Area Topics Target group Month/Year

Stakeholders

Bac Ninh,

Hung Yen

(i) Project information; (ii) the scope

and objectives of the sub-project

based on preliminary design; (iii) the

polices, principles, entitlement and

procedures for land acquisition,

compensation and resettlement; (iv)

implementation schedule and, (v)

preliminary estimates of land

acquisition requirements and

grievance redress.

Representatives of local authorities

of different levels, local community

and groups of affected households,

local government organizations

such as Women’ association,

Farmer association, etc. at central,

provincial, district, communes and

village level

July 2011

Fist round of consultation during RP update

Bac Ninh (i) Project’s policies on compensation, assistance and resettlement. (ii)

Consulting on project impacts on

AHs. (iii) Consulting on the

possibilities to carry out livelihood

restoration programs. (iv) Consulting

on socio-economic survey and

inventory of affected assets.

(v) Collecting opinions on other

issues.

Representatives of district people’s committees; Representatives of

District Compensation Council;

Representatives of Finance-

Planning Division; Representatives

of Natural Resources and

Environment Division;

Representatives of Agriculture

Division; Representatives of

Industrial Commerce Division;

Representatives of Women’s Union; Representatives of

Farmer’s Association; Representatives of project affected

communes;

May 2014

(i) compensation unit price should be

met with market price; (ii) local

government and organizations

supported the project implementation

and would coordinate with project

stakeholders to disseminate the

project’s information and objectives; (iii) a clear mechanism/requirements

with contractors should be available

during the construction execution, site

clearance, site reinstatement,

assistance for AHs during the

construction

Local leaders and staff in 04

districts of Bac Ninh and

representatives of CPCs

May 2014

Hung Yen (i)Project information disclosure:

objectives, scope, location etc.; (ii)

Project’s policies on compensation, assistance and resettlement. (iii)

Consulting on project impacts on

AHs. (iv) Consulting on the

Representatives of district people’s committees; Representatives of

District Compensation Council;

Representatives of Finance-

Planning Division; Representatives

of Natural Resources and

September

2014

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 53

Area Topics Target group Month/Year

possibilities to carry out livelihood

restoration programs. (v) Consulting

on socio-economic survey and

inventory of affected assets. (vi)

Collecting opinions on other issues.

Environment Division;

Representatives of Agriculture

Division; Representatives of

Industrial Commerce Division;

Representatives of Women’s Union; Representatives of

Farmer’s Association; Representatives of project affected

communes;

(i) compensation unit price should be

met with market price; (ii)local

authorities and organizations

supported the project implementation

and would coordinate with project

stakeholders to disseminate the

project’s information and objectives; (iii) a clear mechanism/requirements

with contractors should be available

during the construction execution, site

clearance, site reinstatement,

assistance for AHs during the

construction

Local leaders and staff in 02

communes of Luong Tai and Viet

Hung, Van Lam districts of Hung

Yen and representatives of CPCs

September

2014

Affected groups

Second round of consultation during RP update

Bac Ninh (i) Scope of land acquisition, (ii)

Entitlements of APs, (iii) Difficulties of

APs and (iv) Income restoration

methods

Local leaders and AHs in (i) Chi

Lang commune, Que Vo district,

(ii) Lang Ngam commune, Gia Binh

district, (iii) Minh Dao commune,

Tien Du district, (iv) Nghia Dao

commune, Thuan Thanh district.

May 2014

Hung Yen (i) Scope of land acquisition, (ii)

Entitlements of APs, (iii) Difficulties of

APs and (iv) Income restoration

methods

Local leaders and AHs in (i) Viet

Hung commune, Luong Tai

commune in Que Vo district

September

2014

Source: IMC consolidated

105. During the first round consultation, key issues had been discussed with local leaders and

staff in 04 districts of Bac Ninh and representatives of CPCs. Almost all opinions focused on the

following points: (i) compensation unit price should be met with market price; (ii) local government

and organizations supported the project implementation and would coordinate with project

stakeholders to disseminate the project’s information and objectives; (iii) a clear mechanism/requirements with contractors should be available during the construction execution, site

clearance, site reinstatement, assistance for APs during the construction.

106. At the end of May 2014, Consultant conducted the second round consultation (group

discussions with the project affected communities) to continuously disclose information to the APs

and collect comments of APs on different issues related to the compensation and resettlement. The

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 54

second round consultation also focused on the topics such as the scope of land acquisition,

entitlements of APs, difficulties of APs and income restoration methods.

107. During the second round consultation, the content of community consultation meetings in

sub-project communes was focused on following points: (i) Almost local people supported the project

as it brought many benefits to the community; (ii) APs requested to be compensated in accordance

with current regulations taking into account different kinds of assistance or allowance; (iii) APs

requested the contractors to execute the construction works during the their leisure time to minimize

the project impacts; (iv) APs would like to have payment for their temporarily affected land area

caused by the contractors.

108. During the implementation period, to the reporting time, the project information and

resettlement issues have been disseminated to the local people twice by the NPMB and the

DARBs/CLFD. The first time was before DMS and the second time when the compensation plan was

publicized in offices of the CPCs and communal houses of the affected villages.

109. During the public posting of the compensation plan, some households in the surveyed

villages had some complaints about the mistakes/errors regarding the inventory and the pricing, staff

of NPMB/Division of Compensation together with the DARBs/CLFD and the CPCs have checked

and revised and then prepared the final payment plan then reposting.

110. The timing for posting the compensation plan in both sub-projects was 20 days (20 days for

the first posting, after revising, another 20 days for reposting the revised plan). These practices in

500kV/220kV BN2-PN T/L sub-project and 500kV PN S/C sub-project were checked with the local

authorities and APs by IMC. They confirmed that the timeline for posting of compensation

plans/revised compensation plans was strictly followed.

111. Besides, the communal authorities also provide the AHs with information through communal

loudspeakers for them to know about the DMS plan, posting of compensation plan and payment

plan. It is noted by the consultant that most of the AHs know clearly about the project information i.e.

project impacts, project scope, DMS, payment of compensation and assistance, construction

projection of the project etc.

112. Aside from the official public disclosure and consultation, it is seen by the IMC that project

information was communicated with the local authorities and citizens in many ways, i.e. DMS when

the measurements were taken with the household’s participation, the publication of compensation plan, and through loudspeakers when the AHs were informed to go to receive compensation and

assistance amount. However, the survey results shown that still there are some certain restrictions,

such as (i) Information dissemination was mainly one way, there are no exchanging of opinions from

the project to people, the AHs did not have many opportunities to exchange and dialogue with the

investor and the local governments (ii) the information and compensation policy of the project were

provided mostly verbally during meetings, many of the AHs did not remember the details so the

community’s understanding about the project’s AH support policy is limited. It was cross-checked

with APs and the staff in charge from NPMB that in 500kV PN S/C sub-project, when AHs come to

receive the compensation money, if they were still confused about the project's policies (i.e.

discrepancies between cost-norms of the two sub-projects applied, he was there to explain very

carefully to them to avoid misunderstanding and unneeded complaints that may arise which were

confirmed by the APs interviewed.

113. According to interview results of the Independent Monitoring Consultant (IMC), 93.2% of

interviewees said they were informed of project information. Some of them were afar at the time of

the information disclosure and consultation activities, but they easily caught up with the information

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 55

about the project's land acquisition and compensation, etc. from other family members and

neighbors since such information was very concerned about and directly impacted their residence

and livelihoods.

V.3.2. Grievance Resolution

114. Under the sub-projects, grievance redress mechanisms have been established which allow

APs to appeal their problems arising from the compensation/allowance/assistance and to settle any

general project-related disputes.

115. In order to ensure that all APs’ grievances and complaints on any aspect of land acquisition, compensation and resettlement are addressed in a timely and satisfactory manner, and that all

possible avenues are available to APs to air their grievances, a well defined grievance redress

mechanism needs to be established. All APs can send any questions to implementation agencies

about their rights in relation with entitlement of compensation, compensation policy, rates, land

acquisition, resettlement, allowance and income restoration. Otherwise, all APs are not ordered to

pay any fee during the grievance and complaints at any level of trial and court.

116. During consultation processes by NPMB and LIC, representatives of the concerned

DARCs/CLFDs helped informed the grievance mechanisms for the affected households through

different meetings (please refer to Table 16 for the consultation process).

117. Before site clearance, information on the entitlement, project policies, environment impact

possibility of the project, project implementation arrangement, responsibilities of the stakeholders

and grievance redress mechanism etc. were informed to the local people through several

consultation meetings. DMS results were posted at village houses and CPC offices, for 20 days

according to the project policy, depending on each commune, Naturally, AHs were very concerned

about DMS and their entitlement. Information was carefully cross-checked by AHs and

NPMB/DARBs/CLFDs. After check and question-and-correction, the revised DMSs were posted in

public place another 20 days. Table 29 details the questions and complaints about DMS and

entitlement policies. In general, through several supervision missions, by talking to AHs, it was noted

that this step was conducted in compliance with the project policy.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 56

Table 29: Summary of complaints and redress grievance under the two sub-projects

Sub-projects Cases Status Responsible agencies Completion date

BN2-PN 500/220kV T/L sub-project

- Mr. Nguyen Dac Hai’s household in Que Hoi village, Chi Lang commune, Que Vo district for additional land acquisition in the remaining land area surrounding one tower foundation since the remaining area would be no longer convenient for his family to cultivate rice

Since they had lodged his proposal (November 2013) before the final decision DCARB (November 2014), their requests were considered and accepted in the proposed plan and approved through the Decision of land recovery by Decision 3246/QD-UBND of Que Vo DPC. They had received the compensation and assistance amounts for the additional acquisition

Que Vo DCARB, Que Vo DPC, Chi Lang CPC

November 2014

Mr. Le Van Hieu and Ms. Dao Thi Cuong in Thuy village, Chi Lang commune, and Que Vo district for additional land acquisition in the remaining land area surrounding one tower foundation since the remaining area would be no longer convenient for their family to cultivate rice

Since they had lodged his proposal (November 2013) before the final decision DCARB (November 2014), their requests were considered and accepted in the proposed plan and approved through the Decision of land recovery by Decision 3246/QD-UBND of Que Vo DPC. They had received the compensation and assistance amounts for the additional acquisition

November 2014

Mr. Nguyen Duc Quang in Van Chung village, Tan Chi commune, Tien Du district. His family has an extra house attached with a garden of total 173.9m2 to be recovered by the project. He had handed over the land to the project since April 2015. He asked for re-issuance of a new Redbook which excluding the recovered land area.

Since the reissuance of new red-books will be pending for all AHs until there is a decision from district level, his request was relayed to DPC for further explanation. DPC has explained to him about the general situation and he is ok with that

Tien Du DPC and Tien Du DARB

October 2016

PN 500kV S/C sub-project

Complaint by Mr. Nguyen Van Dinh in Dong Chung village, Viet Hung commune, Van Lam district. He refused to receive payment for his family, however, it is not because his family has problem with the DMS, pricing or payment whatsoever, but because He has some verbal complaints about the project policy of public land in general

Complaint made by Mr. Nguyen Van Dinh is resolved by Viet Hung CPC since November 2015. Viet Hung CPC organized a meeting with him to listen to his concern and provided him with project information and policy. He has accepted the payment for his family. He confirmed to IMC in November 2016 that he is happy with the result and has no complaint anymore

Viet Hung CPC, Van Lam district, Hung Yen province

November 2015

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 57

Sub-projects Cases Status Responsible agencies Completion date

Connections

Mr. Nguyen Van Luy, Dong Quan village, Cam Hung commune, Cam Giang district, Hai Duong province. He disagreed with the DMS results, the entitlement for land, crops and trees (which is 25% of the unit price used in DMS), he asked for resettlement because he felt unsafe and worried about his family's health-being living under the high-voltage transmission line. He logged his complaint to the commune level 3 times, after that he submits to the district level in May 2016 and Provincial level in July 2016.

Hai Duong PPC has responded to him about assigning inspectors of Cam Giang district to verify his complaints and follow the case. It was informed by Cam Giang DPC that his case would be discussed during District Peoples Council Meeting in Mid September 2016 and gives him the response after that. Until now, there is not yet a feedback from the district level

Dong Quan village, Cam Hung PPC, Cam Giang DPC, Cam Giang DARB, Hai Duong PPC

Pending, as of November 2016

Mr. Nguyen Van Qua Former Land administration officer of Cam Hung commune, Dong Xuyen village, Cam Hung commune, Cam Giang district, his house should be shortened due the clearance safety requirement under the high-voltage transmission line. He logged complaint about the DMS result and the application of the compensation rate for the items to be removed from his house to Cam Giang DARB

It was informed by Cam Giang DPC that his case would be discussed during District Peoples Council Meeting in Mid September 2016 and gives him the response after that. Until now, there is not yet a feedback from the district level

Dong Quan village, Cam Hung PPC, Cam Giang DPC, Cam Giang DARB

Pending, as of November 2016

Source: Synthesized from all missions and final evaluation as of November, 2016 by IMC

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 58

118. Aside from the individual complaints listed above, it was verbally complained by some old

men, not all of them are AHs in Dong Chung village, Viet Hung commune, Van Lam district, Hung

Yen. They were displeased with the way of naming of the works in a very annoying and confusing

manner, for example: Cam Giang bridge, which is a bridge connecting the main road and access

road to Pho Noi Substation, located in Me Dau village, Viet Hung commune while Cam Giang is the

name of other commune in Hai Duong province about 10km far away from the place. Also the name

of the substation raises questions from villagers, because Pho Noi (500kV Substation) is named

after an urban district which is 50km far away from Dong Chung village.

119. There are CPC staff and local people, during the survey, expressed their concerns about the

Electromagnetic Field (EMF) problem as they anticipated that after the circuits are closed, they living

environment might be threaten by the EMF and this might barrier them from development

opportunities.

V.4 EFFECTIVENESS OF RESETTLEMENT PLANNING

V.4.1. Executing Agency and Implementation Agency and RP implementation

120. Under the Power Transmission Investment Program, four resettlement plans (RPs) have

been prepared through extensive consultation with stakeholders. Two of the sub-projects included in

Project 1 are category A for resettlement, namely the (i) 500k/220kV Pho Noi substation and (ii) 220

kV Song May-Uyen Hung transmission line, as the impact is significant. IMC has been mobilized

since August 2014 to monitor the compliance with the resettlement plans. With regard to ethnic

minorities, the provincial governments confirmed that ethnic minorities are not residing in the project

areas.

121. The National Power Transmission Corporation (NPT) and the Power Project Management

Boards (PPMBs) are wholly responsible for the implementation of ADB financed Investment

Program, as agreed jointly between the beneficiary and ADB, and in accordance with Government

and ADB’s policies and procedures. According to Paragraph 5 of the Facility Administration Manual

(FAM), NPT is the investment program’s executing agency and NPMB is the implementing agency of

the two sub-projects.

122. The National Power Transmission Corporation (NPT) is the executing agency of the program

and is responsible to:

(i) Provide overall management and coordination of the sub-project;

(ii) Liaise with PPMBs to carry out all sub-project components;

(iii) Coordinate with ADB to engage resettlement consultant services for the sub-project;

(iv) Support NPMB and SPPMB for updating RPs and/or the REMDPs of the sub-project

components;

(v) Consolidate sub-project progress reports on land acquisition and resettlement

submitted by NPMB and SPPMB for relevant ministries and ADB; and

(vi) Recruit and supervise independent monitoring services resettlement monitoring

Implementation Agency and RP implementation

123. The Power Project Management Boards (PPMBs) are responsible to:

(i) Actively participate in the updating and implementation activities in collaboration with

the concerned organization at the Province, District and Commune levels;

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 59

(ii) Liaise with the Province People’s Committee (PPC) to facilitate the establishment of the CARB at the provincial/city and district levels.

(iii) Provide an orientation, to the concerned People’s Committees of the province/city, districts, and communes, the CARB and related groups on the project, its Resettlement

Policy,

(iv) Process flow, and on the specific tasks of these groups relative to the updating and

implementation of the RP;

(v) Take the lead in the public disclosure of the Project RP in coordination with the

concerned People’s Committees, and participate in project information dissemination

and holding of consultation meetings with AHs and other stakeholders;

(vi) Monitor grievances related to the project and calls the attention of concerned

government offices where complaints have remained outstanding beyond prescribed

action periods;

(vii) Design and implement an internal monitoring system that shall capture the overall

progress of the RP updating and implementation; and prepare quarterly progress

reports for submission to NPT and ADB;

(viii) Engage and closely coordinate with an independent monitoring agency that shall

perform a third-party monitoring and evaluation of the RPs and/or REMDPs updating

and implementation

At local level, there are responsibilities divisions among the competent agencies, specifically:

124. Provincial People’s Committee. The main responsibilities of the PPC in each province include: (i) establishment and mobilization of Provincial Compensation and Resettlement Board

(PCARB) (ii) organization and mobilization of all organizations and individuals concerning

compensation, support and resettlement policies and ground clearance according to the land

recovery decisions of competent State bodies; (iii) updating the unit costs to reflect the replacement

cost of sub-project-affected private and public assets; (iv) planning resettlement arrangements, job

change training plans according to their assigned competence; (v) authorizing the DPC to approve

compensation, assistance support to APs; (vi) providing guidance to concerned agencies on the

neutral settlement of citizens’ complaints, denunciations related to compensation, support and resettlement; (vii) authorizing the DPC to apply coercion to cases of deliberately failing to abide by

the State’s land recovery decisions.

125. District People’s Committee. The DPC will be responsible for the following: (i) extension of

support for updating and preparation as well as implementation of the RP or REMDPs; (ii) review

and submit all RP or REMDPs to PPC as endorsed by DCARB; (iii) review the accuracy of and

validate the cost estimates for compensation and assistance; (vi) acquisition of Land Use Rights

Certificates (LURCs) for households and individuals who have lands and/or houses entirely-

recovered; (vii) adjustment of LURCs for households and individuals whose lands and houses have

been partially affected; (viii) responsible for the redressed of complaints and grievance from APs; (ix)

concurrence with the schedule of RP or REMDP implementation and monitor the progress thereon;

and (x) mobilization of the respective DCARB that will appraise the compensation and assistance to

APs; as well as (xi) the provisions of lands to APs.

126. District Compensation and Resettlement Board (DCARB) : The responsibilities of the

DCARB will be the following: (i) organize and carry out resettlement activities in the district on behalf

of the DPC; (ii) assist in the DMS, public consultations and disclosure activities; (iii) review and

submit to DPC proposed compensation, assistance and resettlement alternatives; (iv) assist in the

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 60

identification and allocation of land for the APs; (v) along with the CPC, assist NPMB in the timely

delivery of compensation payment and other entitlements to DPs; and (vi) assist in the resolution of

complaints and grievances:

(i) The dissemination of the Public Information Brochure and other publicity material;

ensuring that APs are aware of the LAR process.

(ii) Planning and carrying out the DMS and the disbursement of compensation

payments.

(iii) The identification of severely affected and vulnerable APs and the planning and

implementation of rehabilitation measures for these APs.

(iv) Help identify any resettlement sites and new farming land for DPs who cannot remain

in their present location.

(v) Assist in the resolution of AP grievances.

(vi) Facilitate the work of the agency appointed to undertake the external monitoring.

127. Commune People’s Committee. The CPCs will assist the NPMB and the DCARB in the

following tasks: (i) remind the APs about the compensation plan and the process of delivery, income

restoration plans, relocation strategies and land clearance requirements based on the approved RP

or REMDPs; (ii) maintain the list of eligible APs that will be provided after the DMS has been

conducted; (iii) assign commune officials to extend assistance in the update and/or preparation as

well as the implementation of the RP or REMDPs; (iv) identify replacement lands for the APs; (v)

sign the Agreement Compensation Forms along with the APs; and (vi) assist in the resolution of

grievances and in other related-resettlement activities and concerns.

V.4.2. Time frame and budget arrangements

128. As the work plan and budgets are sufficient in view of the objectives of the project and are

according to the current regulation of Vietnam, based on the approved RP, NPMB registered the

budget plan for the compensation plan on a yearly basis. The compensation/assistance costs are

making out of the counterpart funds of National Power Transmission Corporation (EVNNPT). The

annual budget proposal prepared and submitted by EVNNPT should include all the estimated costs

for compensation and site clearance/preparation.

129. EVNNPT uses the annual budget to prepare the compensation plans. When DARBs approve

the plan with the district level decision, NPMB will report to EVNNPT to disburse the funds.

VI. LESSONS LEARNT FOR THE FUTURE

130. In general, the compensation/assistance of these sub-projects has been good. However, for

smoother project progress of future program, some lessons learn can be drawn as follows:

Project information disclosure should be adequate to make sure that local people understand

about the project and know how to lodge complaint/going through grievance redress

process.

Project Information Book (PIB) for the AHs including all the project information and the

contact information of the persons in charge i.e. NPMB’s and DARBs’ officers are needed according to the donor’s SPS, for the information disclosure and consultation rounds in the sub-project on 500 kV Pho Noi substation, PIB should be made available.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 61

Compensation and resettlement: NPMB works closely with the contractor and keep an

agreements with the contractors to take pledge/penalties to speed up the construction

process and asks the contractor to be more careful/responsible for the damages and

incidents that they may cause (which are sometimes unavoidable) during the construction

i.e. Requesting the contractors to deposit a sum of money to make sure that after

construction, the borrowed surface is returned like before the project.

A restoration program in combination with some on-going social welfare incentives need to

be plan right from the design of the project. Participatory approach is highly recommended

during the designing in this regard.

More community consultation meetings need to be organized to make sure that the project

components and project policies are made known to the local people, especially in DMS,

calculation of compensation/assistance and grievance redress mechanism.

Monitoring during the construction phase should be enhanced to ensure that any negative

impacts on the local people during construction will be measured and compensated in

accordance with the project policies

VII. CONCLUSIONS AND RECOMMENDATIONS

VII.1 CONCLUSIONS

VII.1.1. Gaps in the implementation of the compensation plans of the two sub-projects

131. Resettlement and compensation: DMS, compensation and assistance are strictly complied

with Vietnam's procedures and take account of ADB's safeguards policies.

132. However, there are some gaps in the implementation i.e. Communication before, during and

after the resettlement seem to leave much to be desired. Many AHs displeased about the

communication/information disclosure from the project. The information and compensation policy of the

project were provided mostly verbally during meetings, many of the AH did not remember the details so

the community’s understanding about the project’s AH support policy is limited.

133. DMSs in all sub-projects have been completed at different paces, starting from end of 2013

to July 2015. Most of the AHs reportedly witnessed and involved in the DMS and signed in the DMS

records.

134. Most of the affected land is agriculture production land payment plans with payment unit prices

applied according to the updated State regulations. A replacement cost survey has been conducted by

LIC. It was reportedly the unit prices applied is similar. However, AHs found that different unit prices have

been applied i.e. in the same sub-project31 which makes them unhappy.

135. The payment was reported as very convenient for the local people. Both

compensation/assistance and bonuses were calculated and paid at the same time. Due to the payment

were made during harvesting time, the families were busy ripping the rice so only one spouse could go to

get the compensation and assistance amounts and signed in the receipts. The payments were reportedly

correct and exact with the DMS results. As of the monitoring time, all households in the surveyed

communes received their money except 2 HHs in Luong Tai commune of Van Lam district, Hung Yen

province and 2 HHs in Cam Hung commune of Cam Giang district, Hai Duong province.

31 IMC's external monitoring reports 1 and 2

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 62

136. Assistance: While assistance amount for livelihood stabilization is paid directly to the AHs,

assistance for vocational education and training for the SAHs are transferred to the account of Provincial

Department of Labor, Invalids and Social Affairs (DOLISAs)32 to provide training for those AHs who have

desires to get vocational training for doing a new job. AHs feel very inconvenient with this set up, they

would like to receive the assistance in cash so that they can have more specific and practical for

vocational training plans.

137. Vulnerable AHs: The number of women-headed HHs listed in the URPs were based on the

LURC's holder which mean a female name on the red-book in most of the cases, the women are

living with husband and children/parents/relatives. In such the cases, these AHs do not belong to

women-headed HH category . Survey results show very small number of real women-headed HHs.

There are no poor AHs reported in IMC's survey in the two sub-projects according to 2015 poverty-

line of Vietnam.

138. Severely Affected Households (SAHs) and resettlers: Most of SAHs reported that their

living standards in general seem better than before the project and that they are in to many off-

farming businesses for income aside from farming and husbandry.

139. Resettlers: 1 AH in Bac Ninh2-Pho Noi T/L sub-project and 3 AHs in 500kV Pho Noi S/S

sub-projects having residential land affected. 1 HH in Bac Ninh2-Pho Noi T/L sub-project and 1 AH

in 500kV Pho Noi S/S sub-project accepted cash-for-land compensation. 2AHs in 500kV Pho Noi

S/S sub-project accepted land-for-land compensation. They are waiting for site preparation of one

resettlement site.

140. Grievances: The coordination between competent agencies to address the complaint seems

to be effective. The cases are satisfactorily resolved.

VII.2 RECOMMENDATIONS

141. There seems to have a need to re-evaluation of vulnerable AHs under these two sub-

projects taking into account of their actual status and needs to have assistance by the project, that is

in accordance with the project policy.

142. Project is to consider the request of Viet Hung commune on transfer money for assistance

for vocational training for SAHs back to each AHs so that can joint in the training courses of their

choice with more affordable costs.

143. Vocational training programs for the AHs should be tackling, as being observed by IMC, they

keen on jobs which need immediate skills (masonry, tailoring etc.). The project communes are

recommended to help put together the list of vocational training needs to submit to the Provincial

Departments of Labor, Invalids and Social Affairs to consider.

32 Only Bac Ninh and Hung Yen

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 63

APPENDICES

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 64

APPENDIX 1. LIST OF STAFF MET FOR IN-DEPTH INTERVIEWS AND FOCUSED GROUP

DISCUSSIONS

No.

Full name

Position, Organization

NPMB

1 Mr. Do Duc Manh Chief of Resettlement and Compensation Division (RCD)

2 Mr. Tran Xuan Le Staff of RCD, Pho Noi 500kV S/S

3 Mr. Do Viet Dung Staff of RCD, Bac Ninh 2-Pho Noi 220kV T/L

4 Mr. Nguyen Xuan An Planning division

5 Mr. Vu Manh Quan Planning division

6 Mr. Nguyen Duc Thanh NPMB

DARBs/CLFD

7 Mr. Nguyen Van Hoi Chief of DONRE Division, Tien Du district

8 Mr. Vu Tien Minh Chief of Center for Land Fund Development, DONRE, Hung Yen

9 Ms. Tran Trung Phu Expert, Center for Land Fund Development, DONRE, Hung Yen

10 Mr. Do The Toan Deputy Chief of DONRE Division, Van Lam district, Hung Yen

11 Mr Nguyen Xuan Lich Chief of DONRE Division, Cam Giang District, Hai Duong

12 Mr Hoang Duc Giang Staff of DONRE Division, Cam Giang District, Hai Duong

Communal Peoples Committees (CPCs)

13 Mr. Dao Tien Bac Chairman of Tri Phuong CPC, Tien Du district

14 Mr. Nguyen Danh Huu Land Administration officer of Tri Phuong commune

15 Mr. Nguyen Van Hung Chief of Tri Phuong Commune Police

16 Mr. Hoang Van Hop Deputy Chief of Nghia Dao commune, Thuan Thanh district

17 Mr. Hoang Van Hieu Chairman of Viet Hung CPC

18 Mr. Nguyen Van Sy Land administration officer of Viet Hung CPC

19 Mr. Manh Cuong Deputy Chairman of Ngoc Lien commune, Cam Giang district

20 Mr. Nguyen Van Hien Land administration officer of Ngoc Lien commune

21 Mr. Kim Dinh Kien Chairman of Cam Hung CPC, Cam Giang district

22 Mr. Tran Manh Trong Land administration officer, Cam Hung commune, Cam Giang district

23 Mr. Pham Van Chuong Deputy chairman of Luong Tai CPC, Van Lam district

24 Mr. Nguyen Van Doan Land administration officer of Luong Tai commune

25 Mr. Tran Van Dinh Chief officer, Lang Ngam commune, Gia Binh district, Bac Ninh

26 Mr. Do Trong Truong Chairman of Lang Ngam CPC, Gia Binh district, Bac Ninh

27 Ms. Nguyen Thi Hang Cadastral officer, Lang Ngam commune, Gia Binh district, Bac Ninh

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 65

No.

Full name

Position, Organization

28 Mr. Phung Nghia Deputy chairman of Tan Chi commune, Tien Du district, Bac Ninh

29 Mr. Nguyen Tuan Son Extension staff, Tan Chi commune, Tien Du district, Bac Ninh

Villages

30 Mr. Phan Van Phuong People Inspector, My Hao village, Ngoc Lien commune, Cam Giang

31 Mr. Nguyen Van Qua Former Cadastral Officer, Cam Hung commune Cam Giang district

32 Mr. Phan Van Can Chief of Nuong village, Tri Phuong commune, Bac Ninh

33 Mr. Phan Van Chief of Giao village, Tri Phuong commune, Bac Ninh

34 Mr. Dinh Hien Chef of Cao village, Tri Phuong commune, Bac Ninh

35 Mr Nguyen Ba Quang Chief of Nghi Khuc village, Nghia Dao commune, Bac Ninh

36 Mr. Vu Duc Mat Chief of Sam Khuc village, Viet Hung commune, Hung Yen

37 Mr. Pham Van Ngoan Party Secretary, Tuan Luong village, Luong Tai commune, Hung Yen

38 Mr. Vu Van Thuong Deputy Chief of Dinh Khuoc village, Luong Tai commune, Hung Yen

39 Mr. Nguyen Van Len Chief of Xuan Dao village, Luong Tai commune, Hung Yen

40 Mr. Do Manh Hiep Deputy Chief of Tuan Luong village, Viet Hung commune, Hung Yen

41 Mr. Nguyen Van Dien People's Inspector, Dong Chung village, Viet Hung commune

42 Mr Nguyen Van Tho Deputy Chief of Dong Chung village, Viet Hung commune, Hung Yen

43 Mr Tran Van Chien Chief of Me Dau village, Viet Hung commune, Hung Yen

44 Mr. Hoang Sy Lan Secretary of Van Chung village, Tan Chi commune, Tien Du district

45 Mr. Nguyen Van Ha Secretary, Chi Dong village, Tan Chi commune, Tien Du district

46 Mr. Quang Ngoan Chief Chi Dong village, Tan Chi commune, Tien Du district, Bac Ninh

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 66

APPENDIX 2. LIST OF APS QUESTIONNAIRE INTERVIEWED

No AH Village Commune District

BN2-PN T/L/ Bac Ninh Province

1 Nguyen Van Tien Nghi Khuc An Binh Thuan Thanh

2 Nguyen The Doanh Nghi Khuc An Binh Thuan Thanh

3 Nguyen Tong Tuy Nghi Khuc An Binh Thuan Thanh

4 Nguyen Thi Nang Nghi Khuc An Binh Thuan Thanh

5 Nguyen Thi Quy Nghi Khuc An Binh Thuan Thanh

6 Nguyen Dang Dat Nghi Khuc An Binh Thuan Thanh

7 Nguyen Thi Phien Nghi Khuc An Binh Thuan Thanh

8 Nguyen Van Chuong Dong Long Dia Nghia Dao Thuan Thanh

9 Nguyen Van Thoi Dong Long Dia Nghia Dao Thuan Thanh

10 Nguyen Van Thieu Nam Tan Duoi Nghia Dao Thuan Thanh

11 Nguyen Van Theu Nam Tan Duoi Nghia Dao Thuan Thanh

12 Nguyen Thi Du Nam Tan tren Nghia Dao Thuan Thanh

13 Nguyen Thi Tinh Nam Tan tren Nghia Dao Thuan Thanh

14 Nguyen Xuan Hinh Nam Tan tren Nghia Dao Thuan Thanh

15 Nguyen Thi Huan Nam Tan tren Nghia Dao Thuan Thanh

16 Nguyen Van Canh Nam Tan tren Nghia Dao Thuan Thanh

17 Ngo Quang Manh Phia Nam Tram Lo Thuan Thanh

18 Ngo Dang Nen Phia Nam Tram Lo Thuan Thanh

19 Nguyen Thi Be Phia Nam Tram Lo Thuan Thanh

20 Nguyen Dinh Tu Phia Nam Tram Lo Thuan Thanh

21 Nguyen Van Binh Phia Nam Tram Lo Thuan Thanh

22 Ngo Sy Quan Phia Nam Tram Lo Thuan Thanh

23 Ngo Quang Dung Phia Nam Tram Lo Thuan Thanh

24 Ngo Tien Dan Phia Nam Tram Lo Thuan Thanh

25 Ngo Dang Chi Phia Nam Tram Lo Thuan Thanh

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 67

No AH Village Commune District

26 Ngo Thoan Phia Nam Tram Lo Thuan Thanh

27 Ngo Quyest Phia Nam Tram Lo Thuan Thanh

28 Ngo Thang Phia Nam Tram Lo Thuan Thanh

29 Nguyen Dac Tuyen Phia Nam Tram Lo Thuan Thanh

30 Luu Phan Ha Phia Nam Tram Lo Thuan Thanh

31 Ngo Thi Thich Phia Nam Tram Lo Thuan Thanh

32 Ngo Tien Bach Phia Nam Tram Lo Thuan Thanh

33 Nguyen Dang Tuyen Phia Nam Tram Lo Thuan Thanh

34 Ngo Van Tim Phia Nam Tram Lo Thuan Thanh

35 Nguyen Ba Soat Phia Nam Tram Lo Thuan Thanh

36 Nguyen Ba Bi Phia Nam Tram Lo Thuan Thanh

37 Nguyen Thi Thanh Chi Dong Tan Chi Tien Du

38 Ho Quang Thang Chi Dong Tan Chi Tien Du

39 Nguyen The An Chi Dong Tan Chi Tien Du

40 Ha Thi Hai Chi Dong Tan Chi Tien Du

41 Nguyen Thi Sang Chi Dong Tan Chi Tien Du

42 Hoang Thi Lan Chi Dong Tan Chi Tien Du

43 Nguyen Duy Tung Chi Dong Tan Chi Tien Du

44 Nguyen Thi Anh Chi Dong Tan Chi Tien Du

45 Nguyen Thi Thuy Chi Dong Tan Chi Tien Du

46 Duong Thi Van Chi Dong Tan Chi Tien Du

47 Phan Thi Hac Dong Chua Minh Dao Tien Du

48 Doan Ba Thinh Dong Chua Minh Dao Tien Du

49 Nguyen Duc Mong Dong Chua Minh Dao Tien Du

50 Nguyen Duc Hoa Dong Chua Minh Dao Tien Du

51 Nguyen Duc Thu Dong Chua Minh Dao Tien Du

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 68

No AH Village Commune District

52 Nguyen Duc Hue Dong Chua Minh Dao Tien Du

53 Nguyen Thi Hoai Dong Chua Minh Dao Tien Du

54 Doan Ba Chung Dong Chua Minh Dao Tien Du

55 Nguyen Duc Hiep Dong Chua Minh Dao Tien Du

56 Nguyen Duc Kiet Dong Chua Minh Dao Tien Du

57 Phan Van Vuong Dong Chua Minh Dao Tien Du

58 Nguyen Huy Hai Dong Chua Minh Dao Tien Du

59 Nguyen Van Hanh Dong Chua Minh Dao Tien Du

60 Nguyen Xuan Duoc Dong Chua Minh Dao Tien Du

61 Doan Phu Kim Dong Chua Minh Dao Tien Du

62 Doan Trong Khanh Dong Chua Minh Dao Tien Du

500kV Pho Noi S/S/Hung Yen Province

1 Nguyen Van Dung Dinh Khuoc Luong Tai Van Lam

2 Nguyen Van Hung Dinh Khuoc Luong Tai Van Lam

3 Hoang Van Dan Dong Trai Luong Tai Van Lam

4 Nguyen Van Len Dong Trai Luong Tai Van Lam

5 Dao Thi Can Tuan Luong Luong Tai Van Lam

6 Do Van Vinh Tuan Luong Luong Tai Van Lam

7 Do Van Can Tuan Luong Luong Tai Van Lam

8 Do Thi Mien Tuan Luong Luong Tai Van Lam

9 Nguyen Thi Tuyen Tuan Luong Luong Tai Van Lam

10 Do Van Phong Tuan Luong Luong Tai Van Lam

11 Nguyen Xuan The Tuan Luong Luong Tai Van Lam

12 Pham Van Ngai Tuan Luong Luong Tai Van Lam

13 Nguyen Van Chinh Tuan Luong Luong Tai Van Lam

14 Nguyen Van Thao Tuan Luong Luong Tai Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 69

No AH Village Commune District

15 Pham Van Tinh Tuan Luong Luong Tai Van Lam

16 Pham Van Hung Tuan Luong Luong Tai Van Lam

17 Nguyen Van Thuy Tuan Luong Luong Tai Van Lam

18 Do Van Luyen Tuan Luong Luong Tai Van Lam

19 Nguyen Thi Luot Tuan Luong Luong Tai Van Lam

20 Do Van Hung Tuan Luong Luong Tai Van Lam

21 Nguyen Thi Thien Tuan Luong Luong Tai Van Lam

22 Dao Duy Toan Tuan Luong Luong Tai Van Lam

23 Do Van Tan Tuan Luong Luong Tai Van Lam

24 Pham Van Ngoan Tuan Luong Luong Tai Van Lam

25 Hoang Thi Dinh Tuan Luong Luong Tai Van Lam

26 Pham Xuan La Tuan Luong Luong Tai Van Lam

27 Do Van Anh Tuan Luong Luong Tai Van Lam

28 Do Van Quan Tuan Luong Luong Tai Van Lam

29 Do Van Quang Tuan Luong Luong Tai Van Lam

30 Do Tien Dat Tuan Luong Luong Tai Van Lam

31 Pham Van Dan Tuan Luong Luong Tai Van Lam

32 Dao Van Ngan Tuan Luong Luong Tai Van Lam

33 Khuc Thi Hang Xuan Dao Luong Tai Van Lam

34 Khuc Chi Chan Xuan Dao Luong Tai Van Lam

35 Tran Van Vinh Xuan Dao Luong Tai Van Lam

36 Dao Van Linh Dong Chung Viet Hung Van Lam

37 Pham Thi Loan Dong Chung Viet Hung Van Lam

38 Nguyen Thi Loan Dong Chung Viet Hung Van Lam

39 Vu Van Xuong Dong Chung Viet Hung Van Lam

40 Vu Minh Ngoan Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 70

No AH Village Commune District

41 Dang Thi Dao Dong Chung Viet Hung Van Lam

42 Pham Van Dong Dong Chung Viet Hung Van Lam

43 Nguyen Thi Ha Dong Chung Viet Hung Van Lam

44 Pham Thi Tam Dong Chung Viet Hung Van Lam

45 Tran Van Thoi Dong Chung Viet Hung Van Lam

46 Nguyen Van Nha Dong Chung Viet Hung Van Lam

47 Phung Thi Anh Dong Chung Viet Hung Van Lam

48 Tran Van Hau Dong Chung Viet Hung Van Lam

49 Nguyen Van Hoanh Dong Chung Viet Hung Van Lam

50 Vu Van Tuyen Dong Chung Viet Hung Van Lam

51 Nguyen Van Ghi Dong Chung Viet Hung Van Lam

52 Vu Thi Hoi Dong Chung Viet Hung Van Lam

53 Nguyen Thi Voi Dong Chung Viet Hung Van Lam

54 Phùng Xuân Năng Dong Chung Viet Hung Van Lam

55 Vu Van Dinh Dong Chung Viet Hung Van Lam

56 Nguyen Van Nhuong Dong Chung Viet Hung Van Lam

57 Phuc Thi May Dong Chung Viet Hung Van Lam

58 Nguyen Duc Quang Dong Chung Viet Hung Van Lam

59 Nguyen Van Duong Dong Chung Viet Hung Van Lam

60 Nguyen Tuan Son Dong Chung Viet Hung Van Lam

61 Vu The Anh Dong Chung Viet Hung Van Lam

62 Nguyen Van At Dong Chung Viet Hung Van Lam

63 Tran Van Au Dong Chung Viet Hung Van Lam

64 Nguyen Van Ba Dong Chung Viet Hung Van Lam

65 Trinh Van Bao Dong Chung Viet Hung Van Lam

66 Nguyen Van Bao Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 71

No AH Village Commune District

67 Nguyen Van Bau Dong Chung Viet Hung Van Lam

68 Nguyen Van Phuong Dong Chung Viet Hung Van Lam

69 Nguyen Thi Bau Dong Chung Viet Hung Van Lam

70 Nguyen Thi Be Dong Chung Viet Hung Van Lam

71 Nguyen Van Dam Dong Chung Viet Hung Van Lam

72 Vu Van Binh Dong Chung Viet Hung Van Lam

73 Nguyen Van Phan Dong Chung Viet Hung Van Lam

74 Nguyen Van Bo Dong Chung Viet Hung Van Lam

75 Do Van Bo Dong Chung Viet Hung Van Lam

76 Nguyen Thi Boi Dong Chung Viet Hung Van Lam

77 Trinh Van Buc Dong Chung Viet Hung Van Lam

78 Nguyen Van Buoi Dong Chung Viet Hung Van Lam

79 Nguyen Thi Ca Dong Chung Viet Hung Van Lam

80 Nguyen Van Can Dong Chung Viet Hung Van Lam

81 Dao Xuan Canh Dong Chung Viet Hung Van Lam

82 Tranh Van Canh Dong Chung Viet Hung Van Lam

83 Nguyen Thi Canh Dong Chung Viet Hung Van Lam

84 Tran Van Chat Dong Chung Viet Hung Van Lam

85 Nguyen Van Chien Dong Chung Viet Hung Van Lam

86 Tran Thi Chieu Dong Chung Viet Hung Van Lam

87 Nguyen Van Chiu Dong Chung Viet Hung Van Lam

88 Vu Thi Chieu Dong Chung Viet Hung Van Lam

89 Nguyen Van Chung Dong Chung Viet Hung Van Lam

90 Vu Van Chiet Dong Chung Viet Hung Van Lam

91 Nguyen Van Cua Dong Chung Viet Hung Van Lam

92 Nguyen Van Cuc Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 72

No AH Village Commune District

93 Dao Thi Dac Dong Chung Viet Hung Van Lam

94 Nguyen Van Dac Dong Chung Viet Hung Van Lam

95 Nguyen Van Dang Dong Chung Viet Hung Van Lam

96 Tran Thi Dao Dong Chung Viet Hung Van Lam

97 Le Viet Dat Dong Chung Viet Hung Van Lam

98 Nguyen Van Dau Dong Chung Viet Hung Van Lam

99 Nguyen Van Dia Dong Chung Viet Hung Van Lam

100 Nguyen Van Dien Dong Chung Viet Hung Van Lam

101 Tran Van Diep Dong Chung Viet Hung Van Lam

102 Nguyen Thi Dieu Dong Chung Viet Hung Van Lam

103 Nguyen Van Dinh Dong Chung Viet Hung Van Lam

104 Nguyen Xuan Dinh Dong Chung Viet Hung Van Lam

105 Vu Van Do Dong Chung Viet Hung Van Lam

106 Tran Van Doa Dong Chung Viet Hung Van Lam

107 Vu Thi Doan Dong Chung Viet Hung Van Lam

108 Vu Van Duc Dong Chung Viet Hung Van Lam

109 Nguyen Van Duc Dong Chung Viet Hung Van Lam

110 Nguyen Thi Dun Dong Chung Viet Hung Van Lam

111 Tran Van Dung Dong Chung Viet Hung Van Lam

112 Trinh Van Duynh Dong Chung Viet Hung Van Lam

113 Nguyen Van Ga Dong Chung Viet Hung Van Lam

114 Nguyen Thi Gay Dong Chung Viet Hung Van Lam

115 Nguyen Van Duy Dong Chung Viet Hung Van Lam

116 Do Huy Giap Dong Chung Viet Hung Van Lam

117 Do Van Gioi Dong Chung Viet Hung Van Lam

118 Pham Van Hoi Dong Chung Viet Hung Van Lam

119 Tran Van Hai Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 73

No AH Village Commune District

120 Nguyen Van Han Dong Chung Viet Hung Van Lam

121 Nguyen Van Hanh Dong Chung Viet Hung Van Lam

122 Tran Van Hang Dong Chung Viet Hung Van Lam

123 Nguyen Van He Dong Chung Viet Hung Van Lam

124 Pham Van Hen Dong Chung Viet Hung Van Lam

125 Nguyen Van Hien Dong Chung Viet Hung Van Lam

126 Do Van Hinh Dong Chung Viet Hung Van Lam

127 Dao Van Hoa Dong Chung Viet Hung Van Lam

128 Vu Van Hoa Dong Chung Viet Hung Van Lam

129 Nguyen Van Hoa Dong Chung Viet Hung Van Lam

130 Pham Van Hoa Dong Chung Viet Hung Van Lam

131 Do Van Han Dong Chung Viet Hung Van Lam

132 Nguyen Van Hoan Dong Chung Viet Hung Van Lam

133 Vu Van Hoan Dong Chung Viet Hung Van Lam

134 Pham Van Hoat Dong Chung Viet Hung Van Lam

135 Tran Van Hoi Dong Chung Viet Hung Van Lam

136 Pham Van Hua Dong Chung Viet Hung Van Lam

137 Vu Xuan Hung Dong Chung Viet Hung Van Lam

138 Vu Van Hung Dong Chung Viet Hung Van Lam

139 Do Van Huong Dong Chung Viet Hung Van Lam

140 Dao Van Huy Dong Chung Viet Hung Van Lam

141 Do Van Huyen Dong Chung Viet Hung Van Lam

142 Trinh Van Huynh Dong Chung Viet Hung Van Lam

143 Vu Van Huynh Dong Chung Viet Hung Van Lam

144 Do Van Huynh Dong Chung Viet Hung Van Lam

145 Vu Trong Hinh Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 74

No AH Village Commune District

146 Nguyen Van Kenh Dong Chung Viet Hung Van Lam

147 Nguyen Thi Ket Dong Chung Viet Hung Van Lam

148 Nguyen Van Kha Dong Chung Viet Hung Van Lam

149 Nguyen Thi Khai Dong Chung Viet Hung Van Lam

150 Nguyễn Thị Khai Dong Chung Viet Hung Van Lam

151 Nguyen Van Khen Dong Chung Viet Hung Van Lam

152 Tran Thi Kheo Dong Chung Viet Hung Van Lam

153 Nguyen Van Khoa Dong Chung Viet Hung Van Lam

154 Nguyen Dang Khoa Dong Chung Viet Hung Van Lam

155 Dao Van Khoan Dong Chung Viet Hung Van Lam

156 Do Van Khoi Dong Chung Viet Hung Van Lam

157 Nguyen Van Khoi Dong Chung Viet Hung Van Lam

158 Do Van Khuyen Dong Chung Viet Hung Van Lam

159 Nguyen Van Kich Dong Chung Viet Hung Van Lam

160 Do Van Kien Dong Chung Viet Hung Van Lam

161 Tran Van Kien Dong Chung Viet Hung Van Lam

162 Nguyen Van Kien Dong Chung Viet Hung Van Lam

163 Nguyen Van Nghe Dong Chung Viet Hung Van Lam

164 Nguyen Van Kieu Dong Chung Viet Hung Van Lam

165 Nguyen Van Ky Dong Chung Viet Hung Van Lam

166 Nguyen Quang Lan Dong Chung Viet Hung Van Lam

167 Nguyen Van Lanh Dong Chung Viet Hung Van Lam

168 Do Thi Lau Dong Chung Viet Hung Van Lam

169 Lai Duc Le Dong Chung Viet Hung Van Lam

170 Nguyen Thi linh Dong Chung Viet Hung Van Lam

171 Do Van Long Dong Chung Viet Hung Van Lam

172 Do Thi Lop Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 75

No AH Village Commune District

173 Tran Van Luc Dong Chung Viet Hung Van Lam

174 Dao Van Luc Dong Chung Viet Hung Van Lam

175 Truong Thi Luyen Dong Chung Viet Hung Van Lam

176 Nguyen Van Mai Dong Chung Viet Hung Van Lam

177 Tran Van Manh Dong Chung Viet Hung Van Lam

178 Dao Thi Mau Dong Chung Viet Hung Van Lam

179 Nguyen Thi May Dong Chung Viet Hung Van Lam

180 Nguyen Van Mien Dong Chung Viet Hung Van Lam

181 Vu Van Minh Dong Chung Viet Hung Van Lam

182 Nguyen Van Minh Dong Chung Viet Hung Van Lam

183 Do Van Mung Dong Chung Viet Hung Van Lam

184 Nguyen Thi My Dong Chung Viet Hung Van Lam

185 Vu Van Nam Dong Chung Viet Hung Van Lam

186 Do Van Nam Dong Chung Viet Hung Van Lam

187 Nguyen Van Nam Dong Chung Viet Hung Van Lam

188 Pham Thi Lap Dong Chung Viet Hung Van Lam

189 Nguyen Van Ngao Dong Chung Viet Hung Van Lam

190 Vu Thi Ngoan Dong Chung Viet Hung Van Lam

191 Tran Van Ngu Dong Chung Viet Hung Van Lam

192 Vu Van Nhac Dong Chung Viet Hung Van Lam

193 Nguyen Thi Nhan Dong Chung Viet Hung Van Lam

194 Nguyen Thanh Nhan Dong Chung Viet Hung Van Lam

195 Tran Van Nhan Dong Chung Viet Hung Van Lam

196 Dao Cong Nho Dong Chung Viet Hung Van Lam

197 Do Van Nhuong Dong Chung Viet Hung Van Lam

198 Do Duy Nhuong Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 76

No AH Village Commune District

199 Do Van Lo Dong Chung Viet Hung Van Lam

200 Nguyen Van Nui Dong Chung Viet Hung Van Lam

201 Tran Duc Oanh Dong Chung Viet Hung Van Lam

202 Tran Van Phinh Dong Chung Viet Hung Van Lam

203 Do Van Phu Dong Chung Viet Hung Van Lam

204 Nguyen Van Phuc Dong Chung Viet Hung Van Lam

205 Nguyen Van Quan Dong Chung Viet Hung Van Lam

206 Dao Van Quang Dong Chung Viet Hung Van Lam

207 Vu Van Quang Dong Chung Viet Hung Van Lam

208 Nguyen Van Quang Dong Chung Viet Hung Van Lam

209 Dao Van Quynh Dong Chung Viet Hung Van Lam

210 Do Van Rang Dong Chung Viet Hung Van Lam

211 Dao Thi Ru Dong Chung Viet Hung Van Lam

212 Tran Van Sang Dong Chung Viet Hung Van Lam

213 Trinh Van Sanh Dong Chung Viet Hung Van Lam

214 Tran Van Sao Dong Chung Viet Hung Van Lam

215 Vu Van Sat Dong Chung Viet Hung Van Lam

216 Nguyen Van Siu Dong Chung Viet Hung Van Lam

217 Dao Van Song Dong Chung Viet Hung Van Lam

218 Tran Van Sot Dong Chung Viet Hung Van Lam

219 Nguyen Thi Suc Dong Chung Viet Hung Van Lam

220 Do Thi Sy Dong Chung Viet Hung Van Lam

221 Tran Van Sau Dong Chung Viet Hung Van Lam

222 Do Van Tac Dong Chung Viet Hung Van Lam

223 Nguyen Van Tac Dong Chung Viet Hung Van Lam

224 Nguyen Van Tan Dong Chung Viet Hung Van Lam

225 Nguyen Thi Tan Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 77

No AH Village Commune District

226 Nguyen Van Tang Dong Chung Viet Hung Van Lam

227 Nguyen Thi Teo Dong Chung Viet Hung Van Lam

228 Nguyen Van Tha Dong Chung Viet Hung Van Lam

229 Nguyen Thi Thang Dong Chung Viet Hung Van Lam

230 Dao Van Thang Dong Chung Viet Hung Van Lam

231 Tran Van Thang Dong Chung Viet Hung Van Lam

232 Do Van Thang Dong Chung Viet Hung Van Lam

233 Nguyen Van Thang Dong Chung Viet Hung Van Lam

234 Nguyen Van Hoi Dong Chung Viet Hung Van Lam

235 Trinh Van Thanh Dong Chung Viet Hung Van Lam

236 Tran Van Thanh Dong Chung Viet Hung Van Lam

237 Nguyen Van Thanh Dong Chung Viet Hung Van Lam

238 Nguyen Van Vuong Dong Chung Viet Hung Van Lam

239 Nguyen Trung Thanh Dong Chung Viet Hung Van Lam

240 Do Van Thao Dong Chung Viet Hung Van Lam

241 Vu Hung Thao Dong Chung Viet Hung Van Lam

242 Vu Van Them Dong Chung Viet Hung Van Lam

243 Tran Thi Thi Dong Chung Viet Hung Van Lam

244 Do Thi Thiec Dong Chung Viet Hung Van Lam

245 Vu Xuan Thinh Dong Chung Viet Hung Van Lam

246 Do Thi Thoai Dong Chung Viet Hung Van Lam

247 Nguyen Van Thong Dong Chung Viet Hung Van Lam

248 Tran Van Thung Dong Chung Viet Hung Van Lam

249 Vu Thi Thuy Dong Chung Viet Hung Van Lam

250 Vu Thi Tuyen Dong Chung Viet Hung Van Lam

251 Vu Van Tien Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 78

No AH Village Commune District

252 Do Van Tien Dong Chung Viet Hung Van Lam

253 Vu Van Tinh Dong Chung Viet Hung Van Lam

254 Nguyen Thi Quyet Dong Chung Viet Hung Van Lam

255 Vu Thi Toan Dong Chung Viet Hung Van Lam

256 Nguyen Van Toan Dong Chung Viet Hung Van Lam

257 Vu Văn Toan Dong Chung Viet Hung Van Lam

258 Dao Van Toan Dong Chung Viet Hung Van Lam

259 Do Van Toan Dong Chung Viet Hung Van Lam

260 Nguyen Van Manh Dong Chung Viet Hung Van Lam

261 Tran Van Tang Dong Chung Viet Hung Van Lam

262 Nguyen Van Tong Dong Chung Viet Hung Van Lam

263 Nguyen Van Trai Dong Chung Viet Hung Van Lam

264 Nguyen Van Trieu Dong Chung Viet Hung Van Lam

265 Ngo Thi Truong Dong Chung Viet Hung Van Lam

266 Vu Van Truyen Dong Chung Viet Hung Van Lam

267 Nguyen Van Tu Dong Chung Viet Hung Van Lam

268 Nguyen Van Ha Dong Chung Viet Hung Van Lam

269 Nguyen Thi Tu Dong Chung Viet Hung Van Lam

270 Tran Van Tua Dong Chung Viet Hung Van Lam

271 Dang Thi Tuan Dong Chung Viet Hung Van Lam

272 Nguyen Ngoc Tuan Dong Chung Viet Hung Van Lam

273 Tran Van Tuong Dong Chung Viet Hung Van Lam

274 Vu Van Tuynh Dong Chung Viet Hung Van Lam

275 Nguyen Van Ty Dong Chung Viet Hung Van Lam

276 Nguyen Van Van Dong Chung Viet Hung Van Lam

277 Vu Van Vien Dong Chung Viet Hung Van Lam

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 79

No AH Village Commune District

278 Pham Thi Viet Dong Chung Viet Hung Van Lam

279 Tran Quang Vinh Dong Chung Viet Hung Van Lam

280 Vu Van Vinh Dong Chung Viet Hung Van Lam

281 Do Van Vo Dong Chung Viet Hung Van Lam

282 Dang Thi Vong Dong Chung Viet Hung Van Lam

283 Vu Thi Vung Dong Chung Viet Hung Van Lam

284 Vu Van Vuong Dong Chung Viet Hung Van Lam

285 Tran Van Xua Dong Chung Viet Hung Van Lam

Connections/Hai Duong province

1 Vu Van Chu Dong Quan Cam Hung Cam Giang

2 Nguyen Van Lung Dong Quan Cam Hung Cam Giang

3 Nguyen Van Tho Dong Quan Cam Hung Cam Giang

4 Nguyen Van Nhue Dong Quan Cam Hung Cam Giang

5 Nguyen Thi An Dong Quan Cam Hung Cam Giang

6 Vu Van Tu Dong Quan Cam Hung Cam Giang

7 Vu Thi Dung Dong Quan Cam Hung Cam Giang

8 Nguyen Thi Mo Dong Quan Cam Hung Cam Giang

9 Nguyen Van Luy Dong Quan Cam Hung Cam Giang

10 Nguyen Van Qua Dong Quan Cam Hung Cam Giang

11 Nguyen Thi Dao Dong Quan Cam Hung Cam Giang

12 Nguyen Van Doan Dong Quan Cam Hung Cam Giang

13 Nguyen Thi Trung Dong Quan Cam Hung Cam Giang

14 Nguyen Van Tram Dong Quan Cam Hung Cam Giang

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 80

APPENDIX 3: SOME PHOTOS

Photo 1: Interviewing AH in Van Chung village, Tan Chi commune, Tien Du, BNinh

Photo 2: Group discussion with leaders and AHs in Dong Chung village, Viet Hung commune, Van Lam, Hung Yen

Photo 3: A typical Grade-4 house of AH in Nghi Khuc village, An Binh commune, Thuan Thanh district, Bac Ninh province

Photo 4: Water from drilled water is pumped to the filtering tank. Tap water is not available, taken in AH house in Nghi Khuc village, An Binh commune, Thuan Thanh district, Bac Ninh province

Photo 5: Kitchen of AH in Chi Dong village, Tan Chi commune, Tien Du district, Bac Ninh province

Photo 6: Bathroom of AH in Chi Dong village, Tan Chi commune, Tien Du district, Bac Ninh province

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 81

Photo 7: Interviewing Mr. Pham Van Chuong, Deputy chairman of Luong Tai CPC, Van Lam district

Photo 8: These two ladies are of two families whose incomes and expenditures separated. The old lady’s name is Nguyen Thi Quy, Nghi Khuc village, An Binh commune, Thuan Thanh district, Bac Ninh who is classified as single women-headed AH with main income from agriculture production while the younger lady, her daughter-in-law, is not AP, she is a farmer with side business as a tailor. In fact Ms Quy lives with her son’s 4-member family under the same roof.

Photo 9: Ms. Nguyen Thi Luong, APis sharing her displeasure due to 500kV BN2-PN transmission line is traversing across her house premise, taken in Van Chung village, Tan Chi commune, Tien Du, Bac Ninh

Photo 10: Group discussion with Tuan Luong village’s leaders, Luong Tai commune, Van Lam, Hung Yen

Photos 11, 12: Ms Nguyen Thi Mo, a poor women-headed AH with monthly income less than VND 700,000 /month, she wishes that her 20-year-old son get vocational training incentives from the project, photo taken in Dong Quan village, Cam Hung commune, Cam Giang district, Hai Duong

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 82

Photo 13, 14: Liquidation of 500kV/220kV Bac Ninh 2-Pho Noi Transmission Line Expenditures, NPMB

Photo 15: 3rd notice for payment to one AH in Cam Hung commune, Cam Giang district, Hai Duong province

Photo 16: Briefing the AH’s socio-economic condition with Mr. Nguyen Van Ha, Party Secretary, Chi Dong village, Tan Chi commune, Tien Du district

Photo 17: Interviewing AHs in Nghi Khuc village, An Binh commune, Thuan Thanh, Bac Ninh

Photo 18: Inner village road and houses of AHs in Van Chung village, Tan Chi commune, Bac Ninh

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 83

Photo 19: Side business for major income source: tailoring, taken in AH house in Nghi Khuc village, An Binh commune, Thuan Thanh, Bac Ninh

Photo 20: Interviewing Mr. Nguyen The An, an AP in Chi Dong village, Tan Chi commune, Tien Du district, Bac Ninh province during his short-break.

Photo 21: Mr Nguyen Duc Phuc’s letter to chief of Sam Khuc village, Viet Hung commune, Van Lam, Hung Yen about compensation for his land area recovered for tower in Hung Yen province

Photo 22: Interviewing Mr. Nguyen Van Luy,Van Chung village, Cam Hung, Cam Giang, Hai Duong, one team member is assigned to interview at least 15 AHs/day

Photo 23: Meeting with Deputy Chairman of Tan Chi commune, Tien Du district, Bac Ninh

Photo 24: We have been living here our whole life and never wanted to resettle, its good that we don’t have to, photo taken in Van Chung village, Tan Chi commune, Tien Du district, Bac Ninh

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 84

APPENDIX 4: QUESTIONNAIRE

QUESTIONNAIRE

INDEPENDENT MONITORING ON RESETTLEMENT

Province: BN...../HY...../HD.....

District:...............................Commune.......................................Village........................

What type of project impact is on your family’s land and asset:

1. Pillar 2. Sub-station 3. Line 4. Other (specified)

Land area......... m2

Type of land: 1. Agricultural 2. Resident 3. Shop/Kiosk 4. Other

A. GENERAL INFORMATION ON HOUSEHOLD’S SOCIO-ECONOMIC

CONDITIONS

1. Head of Household:...

2. Name of Interviewee:........., Male /Female

3. Relations with the Head of Household

1. Head of household

2. Father/Mother

3. Husband/wife

4. Siblings

5. Children

6. Others

4. Age of interviewee :

1. Under 18

2. From 18 – 30

3. From 31 - 45

4. From 46 - 60

5. Over 60

6. Unknown

5. Ethnic Group: 1. Vietnamese 2. Others (please specify)

6. Education:

1. Below primary education

2. Primary school

4. High school

5. Intermediate/College/University

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 85

3. Secondary school 6. Postgraduate

7. Occupation:

1. Farming

2. Business/Services

3. Official

4. Worker

5. Craftsmen

6. Self-employed

7. Housework

8. Retired

9. Disabled

10. Others

8. Household rating by income level: 1. Well-off 2. Average 3. Near-poor 4. Poor

9. Vulnerable household: 1. Yes 2. No-> Skip to 14

If yes, please specify (can be more than one selection)

1. Poor household (certified)

2. Disable household

3. Invalid or ‘revolution’ household

6. Lonely

7. Elderly

8. Single women (with dependents)

9. Other...

10. Information of family members: (those who live under the same roof and share

household income):

Total persons:..........

No Relationship

with head of

the household

(a)

Age/Year

of birth

Gender

(b)

Education

(c)

Main

occupation

(d)

Average

income

per

month (e)

Specified

1

2

3

4

5

6

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 86

...

Code: (a): 1. Head, 2 Spouse, 3 Children, 4 Parent, 5 Grandparent, 6 Cousin/Niece, 7 Sibling, 8

Relative.

(b) Gender: 1. Male, 2. Female

(c) Education: 1. Illiteracy, 2. Primary, 3. Secondary, 4. Highschool, 5. College/University,

6. Post Graduate

(d) Occupation: 1. Farmer, 2. Worker, 3. Officer, 4. Retired, 5. Business (specified), 6.

Armed force, 7. Freelancer, 8. Student, 9. Handicraft (specified), 10. Under school aged,

11. Unemployed, 12. Disabled, 13. Elderly, 14. Others (specified)

(e) 1. Under VND 1 million, 2. From VND 1 - 2 million, 3. Above VND 2 – 3.5 million, 4. Above

VND 3.5 - 5 million, 5. Above VND 5 - 7 million, 6. More than VND 7 million (specified)

No Income source (estimate) Amount

(Dong/household/month)

1 Salary

2 Agriculture (Livestock, fishery, growing forest, cultivation)

3 Business/service

4 Subsidy, allowance, gift

5 Other (specified)

6 Total income

11. Expenditures average of household per month (dong/month)

No Expenditures (estimate) Amount (Dong/household/month)

1 Food

2 Education

3 Health

4 Utility (Electricity, Water, Gasoline)

5 Inputs for production/business/services

6 Traveling, shopping, wedding, funeral, etc.

7 Others (specified)

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 87

8 Total

B. LIVING STANDARD

12. Durable goods

Name of asset Quantity Name of asset Quantity

1. Bicycle 8. Computer

2. Motorbike 9. Internet

3. Car 10. Rice cooker

4. Television 11. LPG cooker

6. Telephone/mobile 12. Fridge

7. Video/CD player 13. Washing machine

C. INFRASTRUCTURE

13. Utility

Tap water: 1. Yes 2. No Toilet 1. Latrine 2. Septic tank 3. No toilet

Electricity 1. Grid 2. Sharing 3. No electricity Fuel 1. Gas 2. Electricity 3. Wood/coal 4. Other

14. Housing

Number of house owned/used by your family: ......house(s)

Category of house: 1. Permanent 2. Category IV 3. Temporary 4. Other

Year of construction/Number of year.........

Total floor area:........................m2

Type of LURC: 1 Permanent 2 LURC with time limited 3 Non-title 4 Other:....

D. LAND

15. Total of land area owned/used by your family........m2

16. Type of land and area

Type of land Area

m2

Source of

land (a)

Type of land Area

m2

Source of

land (a)

1. Agricultural 4. Forest/mountain

2. Residential 5. Shop/Kiosk

3. Pond/lake/waterbody 6. Other land

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 88

Code: 1. Inheritance, 2. Allocated by the State, 3. Renting, 4. Bought, 5. Reclaimed, 6. Other

(specified)

E. AWARENESS ON THE PROJECT, COMPENSATION, ASSISTANCE AND

RESETTLEMENT

17. Who and where do you get project information from?

Who do you get

project information

Yes Where do you get project information Yes

1 Family member 1. Village meeting

2 Neighbor/friend 2. Word of mouth

3 Government officer 3. Billboard/poster

4 Village leader 4. Project Information book (PIB)

5 Other (specified) 5. Loudspeaker

18. Did you know that your land/house would be recovered? 1. Yes 2. No 3. No idea

19. How did the land recovery affect your family’s livelihood:

.......................................................................................................................................................

20. How do your family’s livelihood change after land recovery:

1. Better 2. Same 3. Worse 4. No idea

21. What measure for rehabilitation that you expect from the project

1. Vocational training: ......................................For how long:..........months

2. Remain in the current job, get more training for that job 3. No need/Have no idea

22. Comments on the compensation process: (write on the other side if more space needed)

23. Comments on the assistance process: (write on the other side if more space needed)

24. Comments on other issues: (write on the other side if more space needed)

F. VI. EVALUATION OF THE INVESTIGATOR:

..........................................................................................................................

Interviewee

(Signature and full name)

Date:....../......./2016

Interviewer

(Signature and full name)

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 89

APPENDIX 5. PAYMENT OF COMPENSATION BY FOUNDATIONS IN BAC NINH PROVINCE

This Table is reproduction of Appendix 3 of the First Mornitoring Report of IMC. This is to

make it more clear for Table 1 Location and Code of the towers under 500kV/220kV Bac Ninh

2-Pho Noi Transmission Line sub-project.

No Tower Commune Number of

households

Number of organization(s)

(organizations by district; and pieces

owned by organization by commune)

Amount paid (VND)

40 towers Tien Du district 181 5 1,336,279,266

1 G18-2 Tri Phuong commune 4 19,929,000

2 G18-3 Tri Phuong commune 6 20,867,000

3 G18-4 Tri Phuong commune 3 22,183,000

4 G18-5 Tri Phuong commune 1 19,292,000

5 G18-6 Tri Phuong commune 7 22,183,000

6 G18-7 Tri Phuong commune 5 20,580,000

7 G18-8 Tri Phuong commune 4 22,449,000

8 G19A Tri Phuong commune 1 26,901,000

9 G19B Tri Phuong commune 1 17,486,000

10 G13B Tan Chi commune 5 32,354,000

11 G13B-1 Tan Chi commune 3 1 9,849,000

12 G13C1 Tan Chi commune 5 47,509,000

13 G13C1-1 Tan Chi commune 3 15,589,000

14 G2F-6 Tan Chi commune 4 26,600,000

15 G2F-7 Tan Chi commune 3 24,717,000

16 G13C Minh Dao commune 6 1 103,404,000

17 G13C-1 Minh Dao commune 5 34,916,000

18 G13C1-2 Minh Dao commune 6 29,834,000

19 G13C-2 Minh Dao commune 6 26,369,000

20 G13C-3 Minh Dao commune 6 34,426,000

21 G13C-4 Minh Dao commune 4 1 25,508,000

22 G13C-5 Minh Dao commune 10 22,974,000

23 G16 Minh Dao commune 17 1 56,518,266

24 G16-1 Minh Dao commune 6 54,271,000

25 G16-2 Minh Dao commune 6 43,582,000

26 G2E-3 Lac Ve commune 2 34,447,000

27 G2F Lac Ve commune 5 86,303,000

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 90

No Tower Commune Number of

households

Number of organization(s)

(organizations by district; and pieces

owned by organization by commune)

Amount paid (VND)

28 G2F-1 Lac Ve commune 4 34,419,000

29 G2F-2 Lac Ve commune 1 34,419,000

30 G2F-3 Lac Ve commune 2 1 34,419,000

31 G2F-4 Lac Ve commune 3 37,296,000

32 G2F-5 Lac Ve commune 4 26,369,000

33 G16-3 Canh Hung commune 7 24,220,000

34 G16-4 Canh Hung commune 11 34,426,000

35 G16-5 Canh Hung commune 2 1 37,275,000

36 G17 Canh Hung commune 3 33,292,000

37 G17-1 Canh Hung commune 3 39,305,000

38 G17-2 Canh Hung commune 3 18,305,000

39 G17-3 Canh Hung commune 4 42,175,000

40 G18 Canh Hung commune 3 39,319,000

27 towers Thuan Thanh District 83 4 1,114,568,000

41 G2A1 Tram Lo commune 5 32,046,000

42 G2A1-1 Tram Lo commune 2 27,020,000

43 G2A-5 Tram Lo commune 1 1 41,846,000

44 G2A-6 Tram Lo commune 5 37,324,000

45 G2A-7 Tram Lo commune 6 48,125,000

46 G2A-8 Tram Lo commune 3 31,878,000

47 G2A-9 Tram Lo commune 6 40,719,000

48 G1A-1 Nghia Dao commune 2 16,100,000

49 G1B Nghia Dao commune 2 1 40,600,000

50 G1C Nghia Dao commune 2 42,350,000

51 G1D Nghia Dao commune 7 1 113,568,000

52 G1D1 Nghia Dao commune 1 27,013,000

53 G1D1-1 Nghia Dao commune 3 1 39,725,000

54 G1D1-2 Nghia Dao commune 2 54,299,000

55 G1E1-2 Nghia Dao commune 1 10,290,000

56 G2A Nghia Dao commune 6 1 52,892,000

57 G2A-1 Nghia Dao commune 3 1 67,186,000

58 G2A-2 Nghia Dao commune 4 43,946,000

59 G2A-3 Nghia Dao commune 1 86,765,000

60 G2A-4 Nghia Dao commune 3 34,433,000

61 G2B Mao Dien commune 5 32,172,000

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 91

No Tower Commune Number of

households

Number of organization(s)

(organizations by district; and pieces

owned by organization by commune)

Amount paid (VND)

62 G2B-1 Mao Dien commune 2 1 26,376,000

63 G2B-2 Mao Dien commune 3 30,982,000

64 G2A1-2 Anh Binh commune 1 34,426,000

65 G2A1-3 Anh Binh commune 5 34,426,000

66 G2A2 Anh Binh commune 4 40,054,000

67 G2A2-1 Anh Binh commune 3 28,007,000

13 towers Que Vo district 68 1 592,847,000

68 G2C-2 Chi Lang commune 20 1 130,737,000

69 G2D Chi Lang commune 6 1 43,545,000

70 G2D-1 Chi Lang commune 3 24,913,000

71 G2D-2 Chi Lang commune 8 47,782,000

72 G2D-3 Chi Lang commune 2 1 24,367,000

73 G2E Chi Lang commune 8 1 60,354,000

74 G2E1 Chi Lang commune 1 1 40,229,000

75 G2E-1 Chi Lang commune 3 1 46,809,000

76 G2E1-1 Chi Lang commune 5 39,522,000

77 G2E1-2 Chi Lang commune 1 34,447,000

78 G2E-2 Chi Lang commune 2 19,747,000

79 G2E-3 Chi Lang commune 3 1 45,962,000

80 G2E-4 Chi Lang commune 4 34,433,000

6 towers Gia Binh district 38 1 259,805,000

81 G2B-3 Lang Ngam commune 6 50,435,000

82 G2B-4 Lang Ngam commune 4 43,043,000

83 G2B-5 Lang Ngam commune 9 1 38,465,000

84 G2B-6 Lang Ngam commune 4 19,754,000

85 G2C Lang Ngam commune 10 59,031,000

86 G2C-1 Lang Ngam commune 6 49,077,000

Total 370 39 3,308,819,266

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 92

APPENDIX 6: LEGAL AND POLICY FRAMEWORKS RELATED TO SAFEGUARDS

The legal and policy framework for compensation, resettlement under the Project is defined by the

relevant laws and regulations of the Government of Viet Nam and the ADB’s policies. In case of discrepancies between the Borrower’s laws, regulations, and procedures and ADB's policies and requirements, ADB's policies and requirements will prevail.

Relevant Vietnamese Legislation

The Constitution of the Socialist Republic of Viet Nam (1992) confirms the right of citizens to own

and protect the ownership of a house. In addition, the Government has enacted a number of Laws,

Decrees and regulations that constitute the legal framework for land acquisition, compensation and

resettlement. The principal documents include:

The 2003 Land Law No.13/2003/QH11 passed by the National Assembly dated Nov.26,

2003.

Decree No.197/2004/ND-CP dated Dec.3, 2004 on compensation, assistance,

rehabilitation and resettlement in the event of land recovery by the State.

Decree No. 188/2004/ND-CP dated 16 November 2004 specifying methods for land pricing

and land price frameworks in the event of land recovery by the State.

Decree No.123/2007/ND-CP dated Jul.27, 2007 on adjustment and supplementation of

articles of the Decree No.188/2004/ND-CP dated Nov.16, 2004.

Decree No. 84/2007/ND-CP dated 25 May 2007 amending provisions of land use right

certificates, land acquisition, implementation of land use right, procedures and sequencing

of compensation, assistance and resettlement when State recover land, and solving land

grievances.

GOV Decree No.17/2006/ND-CP dated Jan.27, 2006 on adjustment and supplementation

of decrees on implementation guidelines of Land Law.

Decree No. 69/2009/ND-CP dated 13 August 2009 amending a number of provisions on

land use planning, land rental rates, land reclamation, and resettlement and compensation.

Decree No.14/2014/ND-CP dated Feb.26, 2014 stipulating in detail the execution of

Electricity Law regarding electrical safety.

Circular No. 14/2009/TT-BTNMT, dated 1 October 2009 guiding the implementation of

Decree 69/2009/ND-CP.

Circular No. 114/2004/TT-BTC dated 7 December 2004 guiding the implementation of

Decree No. 188/2004/ND-CP.

Circular No. 69/2006/TT-BTC dated 2 August 2006 issued by Ministry of Finance , guide

on amending and supplementing Circular No.116/2004/TT-BTC;

Presently, there are some changes on some policies such as Land Law and regulations on

compensation, assistance and resettlement of the GoV:

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 93

Land law 2013 issued on 29th November 2013 and took effect on 01 July 2014 (Law No.

45/2013/QH13

Decree No. 43/2014/ND-CP dated 15 May 2014 of the Government, providing detailed

regulations on implementation of a number of articles of Land Law.

Decree No. 44/2014/ND- CP dated 15 May 2014 of the Government on regulations on land

prices.

Decree No. 47/2014/ND-CP dated 15 May 2014 of the Government on compensation,

assistance and resettlement when the State acquires land.

Circular No. 36/2014/TT-BTNMT, dated 30 June 2014 detail regulation on method of land

valuating, construction, adjustment of price unut, land valuating and consultation for

defining land price

Circular No. 37/2014/TT-BTNMT, dated 13 August 2014 detail regulation on

compensation, assistance and resettlement in the event of land recovery by the State

Regulations from Hung Yen PPC:

Decision No.09/2011/QD-UBND dated June 1 , 2011 of Hung Yen PPC on procedures on

compensation, assistance and resettlement in the event of land recovery by the State in

Hung Yen province

Decision No.15/2013/QD-UBND dated December 20, 2013 of Hung Yen PPC on

procedures on price of types of land in 2014 in Hung Yen province;

Notification No 103/TB-STC dated Octorber 2, 2012 of Hung Yen provincial Department of

Finance of on compensation price unit for tree and domestic animal in Hung Yen.

ADB’s Policy on Involuntary Resettlement

The ADB’s Policy on Involuntary Resettlement aims to avoid or minimize the impacts on people affected by a project, and to provide support and assistance for those who lose their land and

property, as well as for others whose livelihood is affected by the acquisition of land or temporary

construction activities. Resettlement planning has the objectives of providing APs with a standard of

living equal to, if not better than, that which they had before the project.

The three (3) important elements of the policy are (i) compensation for lost assets, livelihood and

income; (ii) assistance for relocation; and (iii) assistance for rehabilitation, to achieve at least the pre-

project level of well-being.

The Operations Manual Section F2/BP notes that the policy treats involuntary resettlement as a

“development opportunity” and allows planners to manage impoverishment risks and turn dispossessed or displaced people into project beneficiaries, particularly the poor and vulnerable,

who may be disproportionately affected by resettlement losses. To this end, the main objectives and

principles of ADB’s policy are as follows:

Involuntary resettlement should be avoided where feasible;

Where population displacement is unavoidable, it should be minimized by exploring all

viable project options;

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 94

People unavoidably displaced should be compensated and assisted, so that their

economic and social future would be generally as favorable as it would have been in the

absence of the project;

APs should be informed fully and consulted in resettlement and compensation options;

Existing social and cultural institutions of resettles and their hosts should be supported and

used to the greatest extent possible, and resettles should be integrated economically and

socially into host communities;

The absence of legal title to land by APs will not be a bar to compensation; particular

attention should be paid to households headed by women and other vulnerable groups,

such as indigenous peoples and ethnic minorities, and appropriate assistance provided to

help them improve their living standard;

As far as possible, involuntary resettlement should be conceived and executed as part of

the project; and

The full costs of resettlement and compensation should be included in the presentation of

project costs and benefits.

Applied Policies

The basic resettlement principles of the project are:

Involuntary resettlement and loss of land, structures and other assets and incomes will be

avoided or minimized by exploring all viable options.

All APs will be entitled to compensation for all lost and affected assets, incomes and

businesses at replacement cost and provided with rehabilitation measures sufficient to

assist them to improve or at least maintain their pre-project living standards, incomes and

productive capacity.

The APs without legal title to land (non-titled APs) will not be compensated land by land

but they are allowed to use their remained land, which is not affected by the project. In

addition, they are entitled to compensation for their assets on land at replacement cost,

provided they cultivated/occupied the land before the eligibility cut-off date.

Compensation for affected assets will be provided at replacement cost.

In cases where relocation or displacement is required, efforts will be made so that the

existing social and cultural institutions of the people being resettled and host community

will be maintained to the extent possible.

Preparation of resettlement plans (as part of sub-project preparation) and their

implementation will be carried out with participation and consultation of affected persons.

Implementation schedule and budget for resettlement planning (including socio-economic

survey/census) and implementation will be incorporated into each sub-project and the

overall project.

EVN will ensure that civil works contractors are not issued a notice of possession of site for

any section of construction works unless NPMB has (i) satisfactorily completed, in

accordance with the approved relevant resettlement plan for that sub-project,

compensation payment and relocation to new sites, and (ii) ensured that the rehabilitation

assistance is in place and the area required for civil works is free of all encumbrances.

Compensation for vulnerable households including ethnic minorities, female headed-

households, and families with disabled or elderly will be carried out with respect for their

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 95

cultural values and specific needs. Appropriate assistance must be provided to help them

improve their socio-economic status.

Harmonization in resettlement policies between GoV and ADB

In general, the Land Law 2003 and Decree No. 197/2004/ND-CP, Decree No. 17/2006/ND-CP,

Decree No. 84/2007/ND-CP and Decree No. 69/2009/ND-CP on amendment of some provisions

guiding implementation of the Land Law 2003 and Decree No. 197/2004/ND-CP, satisfy the most

principles and objectives of the ADB’s Policy on Involuntary Resettlement.

However, due to existence of some gaps between policy of Vietnam and ADB, the Government had

approved a Resettlement policy Framework for the MFF. The table below provides summary of

differences between Resettlement Policies of the Government of Vietnam and the Asian

Development Bank and the Policy proposed for the MFF.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 96

Discrepancies between Decree 47/ND- CP, Decree 43/ND- CP and ADB Safeguard Policy Statement

Issues Policies of GoV (Land Law 2013, Decree 43/2014/ND – CP and Decree 47/2014/ND - CP)

ADB SPS, 2009 Project Policy

Severely impacted APs losing productive land

Art 19, Decree 47/2014/ND-CP, Stipulates that households directly engaged in agriculture production losing 30% and more of agricultural land, are entitled to support for stabilizing livelihood.

.

The involuntary resettlement impacts of an ADB-supported project are considered significant if 200 or more persons will experience major impacts, which are defined as (i) being physically displaced from housing, or (ii) losing 10% or more of their productive assets (income generating).

Losing 10% or more of the household’s assets shall be considered as threshold.

APs without LURC Article 75, Land Law 2013, promulgating regulations on eligibility for land compensation when the State acquires land for the purposes of national defense, security, socio-economic development in the national and public interests.

Article 3, of Decree No. 47/2014/ND – CP stipulates that in case those who own land acquired for building the State structures and meet conditions on land ownership rights as stipulated in provisions of Article 76, Land Law 2014 will be eligible for compensation for remaining investment costs on land. Unless otherwise, the People’s Committees of the provinces and cities directly under the Central authority shall be responsible for considering and solving for specific case.

Art 1, 2, 3, 4 , Article 82, Land Law 2013 stipulate cases ineligible for compensation on land when the State acquires land.

Art 1, 2 and 3, Article 92, Land Law 2013 stipulate cases ineligible for compensation for on-land assets when the State acquires land.

Those APs without legal title to land will be included in consultations. Ensure that APs without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non-land assets including dwellings, structures and other improvements to land such as crops, irrigation, at full replacement cost.

Safeguards cover involuntary restrictions on land use or on access to legally designated parks and protected areas. Covers temporary and partial losses.

Project affected people, without legal or recognizable legal claims to land acquired, will be equally entitled to participation in consultations and project benefit schemes where possible, and be compensated for their lost non-land assets such as dwellings and structures occupied before cut-off date. They will be entitled to resettlement assistance and other compensation and social support to assist them to improve or at least restore their pre-project living standards and income levels.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 97

Issues Policies of GoV (Land Law 2013, Decree 43/2014/ND – CP and Decree 47/2014/ND - CP)

ADB SPS, 2009 Project Policy

Compensation for lost land

Article 3, Art 6, Decree No. 47/2014/ND – CP: The compensation rates for land shall be determined by the PPC in accordance with the Government regulations for the type of land which has been used for at the time of land acquisition.

Art 74, Land Law 2013: The compensation must be made in the form of allocating new land with the same land use purpose with the recovered land. If there is no land available for compensation, the land users shall receive compensation in money calculated according to the specific land price of the type of recovered land which is decided by the provincial-level People’s Committee at the time of the recovery decision.

Land based livelihoods restoration based upon land based strategies where possible, or cash compensation at replacement value provided loss of land does not undermine livelihoods for those with legal rights to land.. Provide adequate and appropriate replacement land. If land not available non-land based options built around opportunities for employment, self-employment should be provided in addition to cash compensation for land and non-land assets lost.

Where appropriate land-based compensation is not viable replacement cost surveys have been carried out and will be carried out by the project staff to ensure that project rates for all categories of loss will be equivalent to replacement cost at current market value, to be updated at the time of compensation and combined with other assistance and livelihood restoration measures to ensure full restoration and improvements. Provided AP has legal or recognizable claim, compensation is for full amount of land acquired.

Differences between compensation rates and market rates

Article 113, Land Law 2013, Land price frames The Government shall promulgate land price frames once every 5 years for each type of land and for each region. During the implementation of land price frames, if the popular price in the market increases 20% or more over the maximum price or reduces 20% or more below the minimum price prescribed in land price frames, the Government shall adjust land price frames accordingly.

Provide physically and economically APs with needed assistance including i) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, integration of APs economically and socially into host communities, ii) transitional support and development assistance such as land development, credit facilities, training or employment opportunities, and, iii) civil infrastructure as required.

Physically displaced (relocated) APs are to receive relocation assistance, secured tenure to relocated land, with comparable access to production and employment opportunities, and civic infrastructure and community services as required, transitional support and development assistance such as land development, credit facilities, training or employment opportunities.

Compensation for structures

Art 89, Land Law 2013 – Compensation for House, Structures on Acquired Land.

Clause (1) – For houses and land-attached residential construction facilities of households, individuals or overseas Vietnamese which are wholly or partially dismantled upon land recovery by the State while the remaining part does not meet technical standards as prescribed by law, their owners are entitled to

Rate of compensation for acquired housing, land and other assets will be calculated at full replacement costs, based upon: i) fair market value, ii) transaction costs, iii) interest accrued, iv) transitional and restoration costs, v) other applicable payments.

Full compensation at replacement cost will be paid for all affected structures without any deductions for salvageable materials or depreciation, full replacement costs, based upon: i) fair market value, ii) transaction costs, iii) interest accrued, iv) transitional and restoration costs, v) other applicable payments

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 98

Issues Policies of GoV (Land Law 2013, Decree 43/2014/ND – CP and Decree 47/2014/ND - CP)

ADB SPS, 2009 Project Policy

compensation equivalent to the value of new houses and construction facilities with equivalent technical standards.

If the remaining part of the houses and construction facilities still meets the technical standards as prescribed by law, the compensation must be made based on the actual damage.

Art 92, Land Law 2014 Cases ineligible for compensation for land-attached assets upon land recovery by the State Cases of land recovery due to termination of land use in accordance with law, voluntary return of land or risks threatening human life

Clause (1) Organizations to which land is allocated by the State without land use levy, or organizations to which land is allocated with land use levy and the land use levy is originated from the state budget, are dissolved, go bankrupt, move to another place, or have lower or no land use demand; land users which lease land with annual rental payment are dissolved, go bankrupt, move to another place, or have lower or no land use demand

Clause (2) Land-attached assets which are illegally created or created after the notice of land recovery by a competent state agency takes effect.

Clause (3) Technical infrastructure, social infrastructure and other construction facilities which are no longer in use.

Compensation for registered businesses

Article 19.4b of Decree No. 47/2014/ND-CP stipulates that economic organizations, households and individuals engaged in production and business and foreign-invested enterprises, that have to stop production and business, are entitled to support in

Affected business owners are entitled to i) costs of re-establishing commercial activities elsewhere, ii) the net income lost during the transition period, iii) costs of transferring and reinstalling plant, machinery and equipment.

Affected business owners are entitled to i) costs of re-establishing commercial activities elsewhere, ii) the net income lost during the transition period, iii) costs of transferring and

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 99

Issues Policies of GoV (Land Law 2013, Decree 43/2014/ND – CP and Decree 47/2014/ND - CP)

ADB SPS, 2009 Project Policy

cash for stabilizing production which does not exceed 30% of the after-tax income of one year being the average of the three preceding years, averaged over last 3 years as certified by Tax Dept.

reinstalling plant, machinery and equipment.

Compensation for non-registered businesses

Decree No. 47/2014/ND-CP Provincial-level People’s Committees shall decide on the level and time of support and periodically pay support money suiTable to local practical conditions.

No distinction between registered or non-registered businesses in regards to compensation entitlement for lost income and other assistance.

The DPC must certify that the AP has a business in current operation and approve the level of lost income.

Monitoring No monitoring indicators indicated Monitoring indicators specified for internal and external monitoring and reporting

The Executing Agency (EA) must appoint an independent external monitor and undertake internal monitoring according to the critical indicators.

Post-Evaluation Report Independent Monitoring Consultant for Resettlement for the Power Transmission Investment Program, Tranche 1, ADB Loan 2848 VIE - 500kV/220kV Bac Ninh 2 – Pho Noi transmission line and 500kV Pho Noi substation

P a g e | 100

Grievance redress procedure in accordance with the current law

The grievance redress procedure is based on the Law on Denunciation No 02/2011/QH13 including 4

following steps:

Step 1: AH sends/forwards directly his/her complaint (written or verbal) to the commune level. These

complaint will be discussed in one informal meeting between AH and Communal PC. The Communal PC

is obligated to redress such complaint within 15 days to 45 days since the complaint is logged.

Step 2: If the two parties cannot reach to an agreement or no solution is drawn, or the communal PC fails

to respond, AH can forward his/her complaint to the district level. Within a month, AH may prepare a

formal written complaint and supporting documents/evidences and send to the district CARB. The district

CARB will give out the final decision from 30 to 70 days since the AH submit the complaint

Step 3: If AH does not satisfied with the decision from district CARB or in the absence of any response,

AH can appeal to the Provincial Peoples Committee. PPC will review and issue a decision on the appeal

within 30-45 days from the day received.

Step 4: After 30 days, If AH does not satisfied with the decision of PPC or in the absence of any response

within the stipulated time, AH may submit his/her case to the district court.