vietnam power resource partners corporation suite …vietnamprp.com.vn/prp/images/client/prp...

89
VIETNAM POWER RESOURCE PARTNERS CORPORATION Hanoi - 2019 Preparation Development Execution O&M COD-Ready

Upload: others

Post on 03-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 203, VNA8 Building, 08 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 1

VIETNAM POWER RESOURCE PARTNERS CORPORATION

Hanoi - 2019

Preparation Development Execution O&MCOD-Ready

Page 2: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 2

GENERAL INFORMATION

Vietnam Power Resource Partners Corporation (Vietnam PRP)

Representative: Mr. Tran Anh Thai Role: General Director

Cellphone: + 84(0) 913.201.168 Email: [email protected]

Address: Room 703, No. 11 Tran Hung Dao St., Hoan Kiem Dist., Hanoi,

Vietnam

Tel : +84 (0) 43.8259620 Fax : +84 (0) 43.8259628

Email : [email protected] Website: www.vietnamprp.com

LEGAL DOCUMENT

Business registration certificate: No. 0103014136

Electricity activity license: No. 22/GP-ĐTĐL

Page 3: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 3

INTERPRETATION

- ERAV: Electricity Regulatory Authority of Vietnam

- EVN: Vietnam Electricity

- EPTC: Electric Power Trading Company

- MOIT: Ministry of Industry and Trade

- NPT: National Power Transmission Corporation

- NLDC: National Load Dispatch Centre (A0)

- NRLDC: Northern Regional Load Dispatch Center (A1)

- SRLDC: Southern Regional Load Dispatch Center (A2)

- CRLDC: Central Regional Load Dispatch Center (A3)

- PTC1: Power Transmission Company No 1

- PTC2: Power Transmission Company No 2

- PTC3: Power Transmission Company No 3

- PTC4: Power Transmission Company No 4

- PCs: Distribution Companies

- MDMSP: Metering Data Management Service Provider

- SMO: System and Market Operator

- SCADA/EMS: Supervisory Control And Data Acquisition/Energy

Management System

- PPA: Power Purchase Agreement

Page 4: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 4

INTRODUCTION

VIETNAM POWER RESOURCE PARTNERS CORPORATION (PRP) is a

Vietnam-based Company established by the Registration No. 0103014136

issued by Planning and Investment Department of People Committee of Hanoi).

PRP was licensed by the Electricity Regulatory Authority of Vietnam under

license number 22/GP-DTDL dated 02nd March 2011.

Our professional activities encompass a significant number of areas in the

Vietnam Power Sector such as:

Power System Analysis:

- Evaluate the necessity of new transmission lines, substations;

- Grid Connection Impact Study

- Real-time Analysis of power system

- Optimal power flow (OPF) and optimal switching

Basic Design and Technical Design of 500kV line and substation;

Power Plant Evaluation and Operation (which is under planning to

construction phases and under operation phase);

Construction Investment Preparation, Design, Bidding, Construction

Supervision of up to 220kV line and substation;

Construction Investment Preparation, Design, Bidding, Construction

Supervision of up to 30MW hydropower plant

Other Consultancy areas:

- Consultant in Power Purchase Agreement (PPA) for power plant

projects;

- Advising on Licensing Power Operation;

- Consultant in Power Market Trading;

- Designer and Technical Assistant in Communication, SCADA,

Metering and Protection systems;

- Relay setting calculation;….

Page 5: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 5

Our advantages are:

Unique Networking with Ex. High Ranking Officers in Vietnam Power

Sector;

Unique Expertise with long experienced Principals and License upto

500kV;

Unique Database with Historian, Current and Future Data warehouse of

Vietnam Power Sector;

Professional tools with PSS/E, PSS/ODMS, QuickStab, DigSilent,

Quantrix,...

PRP brings you strategic thinking, superior system operation expertise,

business insight and leadership to become an integral part of your Resource.

PRP with a team of experienced and talent Power Engineering engineers, and

with the deep understanding and experiences in Vietnam Power Sector, is

adding, through our services, values to your Resources.

Having PRP advantages your Resources would go beyond Stakeholders’

Expectation.

Page 6: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 6

WORK EXPERIENCES

PRP’s Main Project Reference List:

1. Cat Hiep Solar Power project (49.5MWp) .............................................. 9

2. BIM3 Solar Power project (50MWp) ....................................................... 9

3. Song Giang Hydropower plant project (49MW) .................................... 10

4. Soc Son biomass thermal power plant project (75MW) ............................. 11

5. Huong Tan Wind Power Plant project (48MW) .......................................... 11

6. Lien Lap Wind Power Plant project (48MW) .............................................. 12

7. Tan Linh Wind Power Plant project (48MW) .............................................. 13

8. Tay Nguyen Wind Power Plant project (28.8MW) ..................................... 13

9. Phuoc Huu Solar Power Plant project (65MWp) ........................................ 14

10. Song Luy Solar Power Plant project (39MW) ......................................... 15

11. Loc Ninh 1 Solar Power Plant project (200MWp) ................................... 15

12. Loc Ninh 2 Solar Power Plant project (200MWp) ................................... 16

13. Loc Ninh 3 Solar Power Plant project (150MWp) ................................... 17

14. Loc Ninh 4 Solar Power Plant project (200MWp) ................................... 17

15. Loc Ninh 5 Solar Power Plant project (50MWp) ..................................... 18

16. Nexif Ben Tre Wind Power project (Phase 1:30MW and Phase 2: 30MW) 19

17. Da Mi floating Solar Power Plant project (50MWp) ................................ 21

18. BIM2 Solar Power project (250MWp) ............................................... 21

19. Phuoc Trung Solar Power project (50MWp) ..................................... 22

20. Ham Kiem Solar Power project (49MWp) ......................................... 23

21. My Son 1 Solar Power project (50MW) ............................................. 23

22. Xuan Tho 1 Solar Power Plant project (49MWp) .................................... 25

23. Xuan Tho 2 Solar Power Plant project (49MWp) .................................... 26

24. Rung Xanh Solar Power Plant project (150MWp) .................................. 27

25. Phuong Mai 3 Wind Power project (21MW) ........................................... 28

26. CMX RE-SUNSEAP Solar Power Plant project (168MW) ...................... 29

27. Da Bac Solar Power Plant project (48MW) ............................................ 30

28. Da Bac 2 Solar Power Plant project (48MW) ......................................... 31

29. The 220kV Da Bac substation of Da Bac and Da Bac 2 Solar Power Plant project (2x63MVA) ........................................................................................... 32

30. Dam Nai Wind Power project (40MW) .................................................... 33

Page 7: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 7

31. Mong Duong 2 thermal power plant project (1200MW) .......................... 34

32. Mong Duong 2 Thermal Power Plant project - Technical design (1200MW) ........................................................................................................ 36

33. Nhon Trach 2 Gas turbine power plant project (750MW) ....................... 36

34. Thang Long thermal power plant project (600MW) ................................ 39

35. Thai Binh 1 Thermal Power Plant project (600MW) ............................... 41

36. Song Hau 1 Thermal Power Plant project (2x600MW) ........................... 42

37. Nghi Son 1 Thermal Power Plant project (600MW) ................................ 43

38. Hoa Thuan hydropower plant project ..................................................... 43

39. Coc San hydropower plant project (Phase 1) ......................................... 45

40. Coc San hydropower plant project (Phase 2) ......................................... 46

41. Ngoi Phat hydropower plant project ....................................................... 46

42. Nam Gion hydropower plant project ....................................................... 47

43. Nam Hong 1 hydropower plant project ................................................... 48

44. Song Bac hydropower plant project ........................................................ 49

45. Lower Se San 2 - Hydro power plant project .......................................... 50

46. An Khanh 1 Thermal Power plant project ............................................... 51

47. Ta Lang hydro power plant project ......................................................... 51

48. Guang Lian Steel Cogeneration Plant project ........................................ 53

49. The 110kV Bac Song Cam substation project (Phase 1) ....................... 54

50. The 110kV Bac Song Cam substation project (Phase 2) ....................... 55

51. The 110kV Bridgestone substation project ............................................. 56

52. The 110kV Nui Phao substation project ................................................. 57

53. The 110kV Veam substation project ....................................................... 57

54. The 110kV Ton Hoa Sen substation project ........................................... 58

55. Technical Assistant project: ERAV Support Information Technology/Database: System Design and Training project ............................ 60

56. Transmission charges calculation model development, data collection and calculation project ..................................................................................... 61

57. Information Infrastructure for the Power Market in Vietnam project........ 62

58. SCADA and metering system for Khanh Hoa power company project ... 63

59. Mini SCADA for Bac Ninh Power Company project ................................ 64

60. SCADA system for NLDC project ........................................................... 65

61. SCADA system for SRLDC project ......................................................... 66

62. SCADA system for NPT project .............................................................. 67

Page 8: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 8

63. Monitoring Operations of the Pilot and Full VCGM project ..................... 67

64. Data for Research Power Generation Market in Vietnam project ........... 68

65. EVNNPT Information Technology Roadmap project .............................. 69

Page 9: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 9

1. Cat Hiep Solar Power project (49.5MWp)

Assignment Name:

Technical Agreements Consulting Service

for Cat Hiep Solar Power Plant project

(49.5MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: Binh Dinh TTP Energy and

high technology., JSC

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 04/2019

Completion Date: 06/2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Calculating the capacitor volume.

- Preparing the Procedure on cooperation of plant operation

- Participating in Relay setting calculation

- Grid Impact Study

- Advising on Licensing Power Operation

- Prepare profile for the official commercial operation date.

Description of Actual Services Provided by Your Staff within the assignment: N/A

2. BIM3 Solar Power project (50MWp)

Assignment Name:

Technical Agreements Consulting Service

for Bim3 Solar Power Plant project (50MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: BIM RENEWABLE

ENERGY JOINT STOCK COMPANY

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Page 10: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 10

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Calculating the capacitor volume.

- Preparing the Procedure on cooperation of plant operation

- Participating in Relay setting calculation

- Grid Impact Study

- Advising on Licensing Power Operation

- Prepare profile for the official commercial operation date.

Description of Actual Services Provided by Your Staff within the assignment: N/A

3. Song Giang Hydropower plant project (49MW)

Assignment Name:

Technical Agreements Consulting Service

for Song Giang Hydropower plant project

(49MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Khanh Hoa

province

Duration of Assignment (months): 06 weeks

Name of Client: Nexif Energy Management

Pte Ltd

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 04/2019

Completion Date: 05/2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Grid Impact Study

- Support contract negotiation

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 11: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 11

4. Soc Son biomass thermal power plant project (75MW)

Assignment Name:

Technical Agreements Consulting Service

for Soc Son biomass thermal Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ha Noi province

Duration of Assignment (months): 08 weeks

Name of Client: Ha Noi Thien Y

Environmental Energy Joint Stock

Company

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 03/2019

Completion Date: 05/2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

Description of Actual Services Provided by Your Staff within the assignment: N/A

5. Huong Tan Wind Power Plant project (48MW)

Assignment Name:

Technical Agreements Consulting Service

for Huong Tan Wind Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Quang Tri

province

Duration of Assignment (months): 08 weeks

Name of Client: Phu Dien Construction

Investment And Trading Joint Stock

Company

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Page 12: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 12

Start Date: 03/2019

Completion Date: 05/2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

- Preparation Power Purchase Agreement (PPA) and negotiation with EVN

Description of Actual Services Provided by Your Staff within the assignment: N/A

6. Lien Lap Wind Power Plant project (48MW)

Assignment Name:

Technical Agreements Consulting Service

for Lien Lap Wind Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Quang Tri

province

Duration of Assignment (months): 08 weeks

Name of Client: Phu Dien Construction

Investment And Trading Joint Stock

Company

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 03/2019

Completion Date: 05/2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

Page 13: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 13

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

- Preparation Power Purchase Agreement (PPA) and negotiation with EVN

Description of Actual Services Provided by Your Staff within the assignment: N/A

7. Tan Linh Wind Power Plant project (48MW)

Assignment Name:

Technical Agreements Consulting Service

for Tan Linh Wind Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Quang Tri

province

Duration of Assignment (months): 08 weeks

Name of Client: Phu Dien Construction

Investment And Trading Joint Stock

Company

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 03/2019

Completion Date: 05/2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

- Preparation Power Purchase Agreement (PPA) and negotiation with EVN

Description of Actual Services Provided by Your Staff within the assignment: N/A

8. Tay Nguyen Wind Power Plant project (28.8MW)

Assignment Name:

Relay setting calculation for Tay Nguyen

Wind Power Plant project (28.8MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam Duration of Assignment (months): 08 week

Page 14: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 14

Location within Country: DakLak province

Name of Client: HBRE POWER Total No of Staff-months of the assignment:

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 01, 2019

Completion Date: 03, 2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Grid impact study

- Relay setting calculation

- COD support

Description of Actual Services Provided by Your Staff within the assignment: N/A

9. Phuoc Huu Solar Power Plant project (65MWp)

Assignment Name:

Relay setting calculation for Phuoc Huu

Solar Power Plant project (65MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binhthuan

province

Duration of Assignment (months): 08 week

Name of Client: ATSJSC Total No of Staff-months of the assignment:

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 11, 2018

Completion Date: 01, 2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Grid impact study

- Relay setting calculation

Page 15: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 15

Description of Actual Services Provided by Your Staff within the assignment: N/A

10. Song Luy Solar Power Plant project (39MW)

Assignment Name:

Relay setting calculation for Song Luy

Power Plant project (39MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: DakLak province

Duration of Assignment (months): 08 week

Name of Client: B-SOLAR Total No of Staff-months of the assignment:

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 01, 2019

Completion Date: 03, 2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Grid impact study

- Relay setting calculation

Description of Actual Services Provided by Your Staff within the assignment: N/A

11. Loc Ninh 1 Solar Power Plant project (200MWp)

Assignment Name:

Technical Agreements Consulting Service

for Loc Ninh 1 Solar Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binh Phuoc

province

Duration of Assignment (months): 06 weeks

Name of Client: Loc Ninh 1 power JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions

Page 16: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 16

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

Description of Actual Services Provided by Your Staff within the assignment: N/A

12. Loc Ninh 2 Solar Power Plant project (200MWp)

Assignment Name:

Technical Agreements Consulting Service

for Loc Ninh 2 Solar Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binh Phuoc

province

Duration of Assignment (months): 06 weeks

Name of Client: Loc Ninh 2 power JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 17: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 17

13. Loc Ninh 3 Solar Power Plant project (150MWp)

Assignment Name:

Technical Agreements Consulting Service

for Loc Ninh 3 Solar Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binh Phuoc

province

Duration of Assignment (months): 06 weeks

Name of Client: Loc Ninh 3 power JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

Description of Actual Services Provided by Your Staff within the assignment: N/A

14. Loc Ninh 4 Solar Power Plant project (200MWp)

Assignment Name:

Technical Agreements Consulting Service

for Loc Ninh 4 Solar Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binh Phuoc

province

Duration of Assignment (months): 06 weeks

Name of Client: Loc Ninh 4 power JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Page 18: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 18

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

Description of Actual Services Provided by Your Staff within the assignment: N/A

15. Loc Ninh 5 Solar Power Plant project (50MWp)

Assignment Name:

Technical Agreements Consulting Service

for Loc Ninh 5 Solar Power Plant project

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binh Phuoc

province

Duration of Assignment (months): 06 weeks

Name of Client: Loc Ninh 5 power JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

Page 19: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 19

Description of Actual Services Provided by Your Staff within the assignment: N/A

16. Nexif Ben Tre Wind Power project (Phase 1:30MW and Phase 2: 30MW)

Assignment Name:

Feasibility Study and Basic Design and

Technical Agreements Consulting Service

for Nexif Ben Tre Wind Power Plant project

(Phase 1: 30MW and Phase 2: 30MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ben Tre province

Duration of Assignment (months): 06 weeks

Name of Client: NEXIF ENERGY BEN TRE

CO., LTD

Total No of Staff-months of the assignment:

N/A

Address: Unit 1409, 14th Floor, Cornerstone

Building, 16 Phan Chu Chinh, Hoan Kiem,

Hanoi, Vietnam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start: Date:

- Phase 1: 07/2018

- Phase 2: 02/2019

Completion Date:

- Phase 1: 01/2019

- Phase 2: 06/2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Survey for preparation of fs & basic design and general layout 1/500:

o Topography survey

o Geology investigation survey

o Hydrology survey

- Preparation and Acquirement of Agreements from EVN

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

o Power Purchase Agreement (PPA)

- Preparation and Acquirement of Agreements/approvals from relevant authorities for

Feasibility Study.

o Agreement on Power Purchase from local MV system

o Agreement on Firefighting System

Page 20: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 20

o Agreement on Tie Line Right-of-Way

o Agreement on Entrance Route and water supply

o Approval letter (or decision) on approve general layout 1/500

- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;

Wind Power Plant part:

o Feasibility Study Report Preparation

o Basic Design Preparation

o Submission and presentation of FS to MOIT for Appraisal

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 21: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 21

17. Da Mi floating Solar Power Plant project (50MWp)

Assignment Name:

COD service consultant for Da Mi floating

Solar Power Plant project (50MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: ATS JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Calculating the capacitor volume.

- Preparing the Procedure on cooperation of plant operation

- Participating in Relay setting calculation

- Grid Impact Study

- Advising on Licensing Power Operation

- Prepare profile for the official commercial operation date.

Description of Actual Services Provided by Your Staff within the assignment: N/A

18. BIM2 Solar Power project (250MWp)

Assignment Name:

Technical Agreements Consulting Service

for Bim2 Solar Power Plant project

(250MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: ATS JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Page 22: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 22

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Calculating the capacitor volume.

- Preparing the Procedure on cooperation of plant operation

- Participating in Relay setting calculation

- Grid Impact Study

- Advising on Licensing Power Operation

- Prepare profile for the official commercial operation date.

Description of Actual Services Provided by Your Staff within the assignment: N/A

19. Phuoc Trung Solar Power project (50MWp)

Assignment Name:

Technical Agreements Consulting Service

for Phuoc Trung Solar Power Plant project

(49MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: SAVINA POWER JSC Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Design for 22/220kV – 50MVA substation and double line of Phuoc Trung Solar power plant.

- Grid Impact Study for Phuoc Trung Solar power plant.

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 23: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 23

20. Ham Kiem Solar Power project (49MWp)

Assignment Name:

Technical Agreements Consulting Service

for Ham Kien Solar Power Plant project

(49MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: BG Energy Solution

Company Limited

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Technical Due Diligence

- Grid Impact Study

- Support for negotiating EPC contract

Description of Actual Services Provided by Your Staff within the assignment: N/A

21. My Son 1 Solar Power project (50MW)

Assignment Name:

Technical Agreements Consulting Service

for My Son 1 Solar Power Plant project

(50MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: BG Energy Solution

Company Limited

Total No of Staff-months of the assignment:

N/A

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 08/2018

Completion Date: 09/2018

No of professional Staff-Months provided by

associated consultants: N/A

Page 24: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 24

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Technical Due Diligence

- Grid Impact Study

- The review of Design Consultant Contracts

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 25: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 25

22. Xuan Tho 1 Solar Power Plant project (49MWp)

Assignment Name:

Feasibility Study and Technical Agreements

Consulting Service for Xuan Tho 1 Solar

Power Plant project (49MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Phu Yen

province

Duration of Assignment (months): 06 weeks

Name of Client: Nam Viet Hung Investment

Corp.

Total No of Staff-months of the assignment:

N/A

Address: No. 84 Street 11, Quarter 5, Linh

Xuan Ward, Thu Duc District, Ho Chi Minh

City

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 06/2018

Completion Date: 08/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

- Preparation and Acquirement of Agreements/approvals from relevant authorities for

Feasibility Study.

o Agreement on Power Purchase from local MV system

o Agreement on Firefighting System

o Agreement on Tie Line Right-of-Way

o Agreement on Entrance Route and water supply

- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;

Solar Power Plant part:

o Feasibility Study Report Preparation

o Basic Design Preparation

o Submission and presentation of FS to MOIT for Appraisal

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 26: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 26

23. Xuan Tho 2 Solar Power Plant project (49MWp)

Assignment Name:

Feasibility Study and Technical Agreements

Consulting Service for Xuan Tho 2 Solar

Power Plant project (49MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Phu Yen

province

Duration of Assignment (months): 06 weeks

Name of Client: Nam Viet Hung Investment

Corp.

Total No of Staff-months of the assignment:

N/A

Address: No. 84 Street 11, Quarter 5, Linh

Xuan Ward, Thu Duc District, Ho Chi Minh

City

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 06/2018

Completion Date: 08/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

- Preparation and Acquirement of Agreements/approvals from relevant authorities for

Feasibility Study.

o Agreement on Power Purchase from local MV system

o Agreement on Firefighting System

o Agreement on Tie Line Right-of-Way

o Agreement on Entrance Route and water supply

- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;

Solar Power Plant part:

o Feasibility Study Report Preparation

o Basic Design Preparation

o Submission and presentation of FS to MOIT for Appraisal

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 27: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 27

24. Rung Xanh Solar Power Plant project (150MWp)

Assignment Name:

Grid Impact Study for Rung Xanh Solar

Power Plant project (150MWp)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Dak Lak province

Duration of Assignment (months): 06 weeks

Name of Client: Dak Lak Produce Forestry

and Food Processing Company Limited

Total No of Staff-months of the assignment:

N/A

Address: Ea Sup District, Dak Lak Province Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 06/2018

Completion Date: 06/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Contingency analysis

o Short circuit studies

- Considering the factors affecting the power plant connection to local grid based on

operation standards of Vietnam

- Considering the stability of Rung Xanh and connection grid.

- Considering the capability of supplying power of Rung Xanh in the calculation

scenarios.

- Offering the appropriate recommendations for Dak Lak Forestry Co.Ltd on this project,

including on grid availability and potential curtailment from EVN

- Preparing the final grid impact study report for submitting to Dak Lak Forestry Co.Ltd.

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 28: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 28

25. Phuong Mai 3 Wind Power project (21MW)

Assignment Name:

Feasibility Study and Basic Design and

Technical Agreements Consulting Service

for Phuong Mai 3 Wind Power Plant project

(21MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Binh Dinh

province

Duration of Assignment (months): 06 weeks

Name of Client: Central Wind-Power

Investment & Development Co.

(CENWINDCO)

Total No of Staff-months of the assignment:

N/A

Address: 31 Nguyen Cong Tru, Le Hong

Phong Ward, Quy Nhon City, Binh Dinh

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 03/2017

Completion Date: 06/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN

o Preliminary Agreement on Power Purchasing

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

o Power Purchase Agreement

- Preparation and Acquirement of Agreements/approvals from relevant authorities for

Feasibility Study.

o Agreement on Power Purchase from local MV system

o Agreement on Firefighting System

o Agreement on Tie Line Right-of-Way

o Agreement on Entrance Route and water supply

- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;

Wind Power Plant part:

o Feasibility Study Report Preparation

o Basic Design Preparation

o Submission and presentation of FS to MOIT for Appraisal

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 29: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 29

26. CMX RE-SUNSEAP Solar Power Plant project (168MW)

Assignment Name:

Feasibility Study and Technical Agreements

Consulting Service for CMX RE Solar

Power Plant project (168MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: SUNSEAP Group (CMX

RE CMX-SUNSEAP Vietnam Solar Power

Joint Stock Company)

Total No of Staff-months of the assignment:

N/A

Address: Tan My Hamlet, My Son

Commune, Ninh Son District, Ninh Thuan

Province, Vietnam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 12/2017

Completion Date: 04/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation and Acquirement of Agreements from EVN for Power Purchase Agreement:

o Grid Impact Study and and Agreement on Grid Connection

o Agreement on Tariff Metering System

o Agreement on Relay Protection and Automation System

o Agreement on SCADA and Telecommunication System

- Preparation and Acquirement of Agreements/approvals from relevant authorities for

Feasibility Study.

o Agreement on Technical Design of Grid Connection Points

o Agreement on Power Purchase from local MV system

o Agreement on Firefighting System

o Agreement on Tie Line Right-of-Way

o Agreement on Entrance Route and water supply

- Feasibility Study (FS) and Basic Design for Substation and Transmission lines part;

Solar Power Plant part:

o Feasibility Study Report Preparation

o Basic Design Preparation

o Submission and presentation of FS to MOIT for Appraisal

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 30: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 30

27. Da Bac Solar Power Plant project (48MW)

Assignment Name:

Technical Agreements Consulting Service

for Da Bac Solar Power Plant project

(48MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ba Ria – Vung

Tau province

Duration of Assignment (months): 06 weeks

Name of Client: Dong A Joint Stock

Company

Total No of Staff-months of the assignment:

N/A

Address: Binh Hoa district, Thuan An ward,

Bình Duong province, Viet Nam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 1/2018

Completion Date: 03/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation of dossier and support Client in getting the approval of Preliminary

Agreement on Power Purchasing

- Grid Impact Study and Preparation of dossier and support Client in getting the approval

of Agreement on Grid Connection

- Preparation of dossier and support Client in getting the approval of Agreement on Grid

Connection

- Preparation of dossier and support Client in getting the approval of Agreement on Tariff

Metering System

- Preparation of dossier and support Client in getting the approval of Agreement on Relay

Protection and Automation System

- Preparation of dossier and support Client in getting the approval of Agreement on

SCADA and Telecommunication System

- Prepare the PPA and support Client in the negotiation dossier of PPA

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 31: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 31

28. Da Bac 2 Solar Power Plant project (48MW)

Assignment Name:

Technical Agreements Consulting Service

for Da Bac 2 Solar Power Plant project

(48MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ba Ria – Vung

Tau province

Duration of Assignment (months): 06 weeks

Name of Client: Tai Tien Co.,Ltd Total No of Staff-months of the assignment:

N/A

Address: Dong Nhat ward, Bien Hoa city,

Dong Nai province, Viet Nam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 1/2018

Completion Date: 03/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Preparation of dossier and support Client in getting the approval of Preliminary

Agreement on Power Purchasing

- Grid Impact Study and Preparation of dossier and support Client in getting the approval

of Agreement on Grid Connection

- Preparation of dossier and support Client in getting the approval of Agreement on Grid

Connection

- Preparation of dossier and support Client in getting the approval of Agreement on Tariff

Metering System

- Preparation of dossier and support Client in getting the approval of Agreement on Relay

Protection and Automation System

- Preparation of dossier and support Client in getting the approval of Agreement on

SCADA and Telecommunication System

- Prepare the PPA and support Client in the negotiation dossier of PPA

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 32: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 32

29. The 220kV Da Bac substation of Da Bac and Da Bac 2 Solar Power Plant project (2x63MVA)

Assignment Name:

Technical Agreements Consulting Service

for the 220kV Da Bac substation and 220kV

transmission lines of Da Bac and Da Bac 2

Solar Power Plant projects

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ba Ria – Vung

Tau province

Duration of Assignment (months): 06 weeks

Name of Client: Tai Tien Co.,Ltd Total No of Staff-months of the assignment:

N/A

Address: Dong Nhat ward, Bien Hoa city,

Dong Nai province, Viet Nam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2/2018

Completion Date: 05/2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Basic Design of the 220kV Substation and 220kV Transmission lines part:

- Feasibility Study Report Preparation

- Basic Design Report Preparation

- Submission and presentation of FS to MOIT for Appraisal

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 33: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 33

30. Dam Nai Wind Power project (40MW)

Assignment Name:

Grid Impact Study for Dam Nai Wind

Power project (40MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ninh Thuan

province

Duration of Assignment (months): 06 weeks

Name of Client: Dam Nai Wind Power Joint

Stock Company

Total No of Staff-months of the assignment:

N/A

Address: Lang Me village, Bac Son hamlet,

Thuan Bac ward, Ninh Thuan province, Viet

Nam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2017

Completion Date: 2017

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Contingency analysis

o Short circuit studies

o Stability study

- Considering the factors affecting the power plant connection to local grid based on

operation standards of Vietnam

- Considering the stability of Dam Nai and connection grid.

- Considering the capability of supplying power of Dam Nai in the calculation scenarios.

- Offering the appropriate recommendations for Dam Nai Wind Power Joint Stock

Company on this project, including on grid availability and potential curtailment from

EVN load dispatch center (for seasons: dry or wet season)

- Preparing the final grid impact study report for submitting to Dam Nai Wind Power Joint

Stock Company.

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 34: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 34

31. Mong Duong 2 thermal power plant project (1200MW)

Assignment Name:

- 1st contract: Grid Impact Study for

Mong Duong 2 – 2x600MW

- 2nd contract: 1st Supplementary Grid

impact Study with installed capacity

increase to 2x700 MW

- 3rd contract: 2nd Supplementary Grid

impact study with new initial data to

reflect global crisis

Approx. Value of the contract (in current

US$):

- 1st contract: N/A

- 2nd contract: N/A

- 3rd contract: N/A

Country: Vietnam

Location within Country: Quang Ninh

province

Duration of Assignment (months):

- 1st contract: 2 months

- 2nd contract: 2 months

- 3rd contract: 3 months

Name of Client: AES-VCM Mong Duong

Power Company Limited

Total No of Staff-months of the assignment:

- 1st contract: 18 Staff-months

- 2nd contract: 18 Staff-months

- 3rd contract: 22 Staff-months

Address: 6 Nha Tho, Hoan Kiem, Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$):

- 1st contract: N/A

- 2nd contract: N/A

- 3rd contract: N/A

Start Date:

- 1st contract: 07th Jun, 2007

- 2nd contract: 15th May, 2008

- 3rd contract: 27th Dec, 2008

Completion Date:

- 1st contract: 07th Aug, 2007

- 2nd contract: 15th Jul, 2008

- 3rd contract: 30th Mar, 2009

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

N/A

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Mai Thanh Tung: Deputy Project

Manager

- Le Van Hoang: Technical Support

Narrative Description of Project: Works to be conducted:

- Data collection and update

- Connection scheme proposal

Page 35: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 35

- Energy & power balance studies

- Load flow analysis

- Short circuit studies

- Dynamic stability studies

- Static stability studies

- Measuring system proposal

- SCADA/EMS connection proposal

- Communication solution proposal

- Cooperate with AES to reach agreement on connection, metering and SCADA/EMS

connection with EVN and affiliates

Description of Actual Services Provided by Your Staff within the assignment:

- Data collection and update

o Updating commissioning schedules of 500kV, 220kV transmission grids of

Vietnam for the period 2007-2025: Mai Thanh Tung, Nguyen Anh The, Tran

Duc Minh Chau (in 3rd contract only)

o Updating power plant commissioning schedules for the period 2007-2025: Le

Van Hoang, Do Truong Giang, Le Quoc Anh

o Updating load demand and forecasting load demand for the period 2007-2025:

Nguyen Tuyen Tam, Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)

- Connection scheme proposal

o Alternative connection schemes: Tran Anh Thai, Le Van Hoang

- Energy & power balance studies:

o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)

o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)

- Load flow analysis

o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van

Hoang, Do Truong Giang, Tran Duc Minh Chau (in 3rd contract only)

o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le

Van Hoang, Do Truong Giang, Tran Duc Minh Chau (in 3rd contract only)

- Short circuit studies:

o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh

- Dynamic stability studies: Nguyen Tuyen Tam, Tran Duc Minh Chau (in 3rd contract

only)

- Static stability studies: Tran Duc Ky, Nguyen Duc Tam (in 3rd contract only)

- Measuring system proposal: Le Van Hoang, Do Truong Giang

- SCADA/EMS connection proposal:

o Protocol description, connection requirement and connection protocol: Tran

Anh Thai, Le Quoc Anh

- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The

- Cooperate with AES to reach agreement on connection, metering and SCADA/EMS

Page 36: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 36

connection with EVN and affiliates: Tran Anh Thai, Le Van Hoang

32. Mong Duong 2 Thermal Power Plant project - Technical design (1200MW)

Assignment Name:

Technical design and assist Doosan Vina in

Mong Duong 2 Thermal Power Project

(2x600MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Quang Ninh

province

Duration of Assignment (months): 13 months

Name of Client: Doosan Vina Total No of Staff-months of the assignment:

Address: Dung Quat Industrial Complex Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Nov, 2011

Completion Date: Dec, 2012

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Technical design of Metering System

- Technical design of Relay Protection System

- Technical design of SCADA System

- Technical design of Telecommunication System

- Sub-Synchronous Resonance (SSR) calculation for the Mong Duong 2

- Assist Doosan Vina in negotiation with EVN

Description of Actual Services Provided by Your Staff within the assignment:

33. Nhon Trach 2 Gas turbine power plant project (750MW)

Assignment Name:

Grid Impact Study and Analyze to reduce

short-circuit current in Nhon Trach 2 – 3x250

MW

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam Duration of Assignment (months): 2 months

Page 37: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 37

Location within Country: Dong Nai

province

Name of Client: PetroVietnam Power

NhonTrach 2 Joint Stock Company

(PVPNT2)

Total No of Staff-months of the assignment:

18 Staff-months

Address: Hamlet 3, Phuoc Khanh

Commune, Nhon Trach District, Dong Nai

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date:

- Stage 1 - Grid Impact Study: 12th

Jul, 2007

- Stage 2 - Analyze to reduce short-

circuit current: 01st Nov, 2008

Completion Date:

- Stage 1 - Grid Impact Study: 31st

Aug, 2007

- Stage 2 - Analyze to reduce short-

circuit current: 15th Nov, 2008

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

N/A

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Mai Thanh Tung: Deputy Project

Manager

- Le Van Hoang: Technical Support

Narrative Description of Project: Works to be conducted:

- Data collection and update

- Connection scheme proposal

- Energy & power balance studies

- Load flow analysis

- Short circuit studies

- Dynamic stability studies

- Static stability studies

- Measuring system proposal

- SCADA/EMS connection proposal

- Communication solution proposal

- Cooperate with AES to reach agreement on connection, metering and SCADA/EMS

connection with EVN and affiliates

- Analyze to reduce short-circuit current

Description of Actual Services Provided by Your Staff within the assignment:

- Data collection and update

o Updating commissioning schedules of 500kV, 220kV transmission grids of

Page 38: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 38

Vietnam for the period 2007-2025: Mai Thanh Tung, Nguyen Anh The

o Updating power plant commissioning schedules for the period 2007-2025: Le

Van Hoang, Do Truong Giang, Le Quoc Anh

o Updating load demand and forecasting load demand for the period 2007-2025:

Nguyen Tuyen Tam, Tran Duc Ky

- Connection scheme proposal

o Alternative connection schemes: Tran Anh Thai, Le Van Hoang

- Energy & power balance studies:

o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky

o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky

- Load flow analysis

o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van

Hoang, Do Truong Giang

o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le

Van Hoang, Do Truong Giang

- Short circuit studies:

o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh

- Dynamic stability studies: Nguyen Tuyen Tam

- Static stability studies: Tran Duc Ky

- Measuring system proposal: Le Van Hoang, Do Truong Giang

- SCADA/EMS connection proposal:

o Protocol description, connection requirement and connection protocol: Tran

Anh Thai, Le Quoc Anh

- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The

- Cooperate with PVPNT2 to reach agreement on connection, metering and SCADA/EMS

connection with EVN and affiliates: Tran Anh Thai, Le Van Hoang

- Analyze to reduce short-circuit current: Tran Anh Thai, Le Van Hoang

Page 39: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 39

34. Thang Long thermal power plant project (600MW)

Assignment Name:

- 1st contract: Grid Impact Study and

Technical design of SCADA and

metering system for Thang Long –

2x300 MW

- 2nd contract: Advising and

conducting negotiations for Power

Purchase Agreement (PPA)

Approx. Value of the contract (in current

US$):

- 1st contract: N/A

- 2nd contract: N/A

Country: Vietnam

Location within Country: Quang Ninh

province

Duration of Assignment (months):

- 1st contract: 4 months

- 2nd contract: 2007-2009

Name of Client: Thang Long Power Joint-

stock Company (TLP)

Total No of Staff-months of the assignment:

- 1st contract: 18 staff-months

- 2nd contract: 12 staff-months

Address: 64 Nguyen Luong Bang St., Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$):

- 1st contract: N/A

- 2nd contract: N/A

Start Date:

- 1st contract:

o Stage 1 - Grid Impact

Study: 31st Aug, 2007

o Stage 2 - Technical design

of SCADA and metering

system: 01st May, 2008

- 2nd contract: 08th Aug, 2008

Completion Date:

- 1st contract:

o Stage 1 - Grid Impact

Study: 31st Nov, 2007

o Stage 2 - Technical design

of SCADA and metering

system: 01st Jun, 2008

- 2nd contract: 2009

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

N/A

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Mai Thanh Tung: Deputy Project

Manager

- Le Van Hoang: Technical Support

Page 40: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 40

Narrative Description of Project: Works to be conducted:

- Grid impact study:

o Data collection and update

o Connection scheme proposal

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

o Dynamic stability studies

o Static stability studies

o Measuring system proposal

o SCADA/EMS connection proposal

o Communication solution proposal

o Cooperate with TLP to reach agreement on connection, metering and

SCADA/EMS connection with EVN and affiliates

- Technical design of SCADA and metering system:

o Metering point

o Signal list

o Signal Chanel

o Communication connection

- Advising and conducting negotiations for Power Purchase Agreement (PPA)

o Drafting and preparing documents for PPA

o Regulations on Tariff studies of MOIT to apply for TLP

o Drafting Power Purchase Agreement (PPA)

o Preparing Appendix and Form relate to PPA

o Organizing Meetings and negotiating with EVN – EPTC to get Power Purchase

Agreement (PPA)

Description of Actual Services Provided by Your Staff within the assignment:

Grid impact Study:

- Data collection and update

o Updating commissioning schedules of 500kV, 220kV transmission grids of

Vietnam for the period 2007-2025: Mai Thanh Tung, Nguyen Anh The

o Updating power plant commissioning schedules for the period 2007-2025: Le

Van Hoang, Do Truong Giang, Le Quoc Anh

o Updating load demand and forecasting load demand for the period 2007-2025:

Nguyen Tuyen Tam, Tran Duc Ky

- Connection scheme proposal

o Alternative connection schemes: Tran Anh Thai, Le Van Hoang

- Energy & power balance studies:

o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky

o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky

Page 41: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 41

- Load flow analysis

o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van

Hoang, Do Truong Giang

o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le

Van Hoang, Do Truong Giang

- Short circuit studies:

o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh

- Dynamic stability studies: Nguyen Tuyen Tam

- Static stability studies: Tran Duc Ky

- Measuring system proposal: Le Van Hoang, Do Truong Giang

- SCADA/EMS connection proposal:

o Protocol description, connection requirement and connection protocol: Tran

Anh Thai, Le Quoc Anh

- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The

- Cooperate with TLP to reach agreement on connection, metering and SCADA/EMS

connection with EVN and affiliates: Tran Anh Thai, Le Van Hoang

Technical design of SCADA and metering system:

o Metering point: Le Van Hoang, Do Truong Giang

o Signal list: Tran Anh Thai, Le Quoc Anh

o Signal Chanel: Tran Anh Thai, Le Quoc Anh

o Communication connection: Mai Thanh Tung, Nguyen Anh The

Advising and conducting negotiations for Power Purchase Agreement (PPA)

o Drafting and preparing documents for PPA: Tran Anh Thai, Le Van Hoang

o Regulations on Tariff studies of MOIT to apply for TLP: Tran Anh Thai, Mai

Thanh Tung, Le Van Hoang, Nguyen Anh The, Le Quoc Anh, Do Truong Giang,

Tran Duc Ky, Nguyen Tuyen Tam

o Drafting Power Purchase Agreement (PPA): Tran Anh Thai, Le Van Hoang,

Nguyen Anh The, Do Truong Giang

o Preparing Appendix and Form relate to PPA: Tran Anh Thai, Mai Thanh Tung,

Nguyen Tuyen Tam, Tran Duc Ky, Le Quoc Anh, Nguyen Tuyen Tam

o Organizing Meetings and negotiating with EVN – EPTC to get Power Purchase

Agreement (PPA): Tran Anh Thai, Le Van Hoang.

35. Thai Binh 1 Thermal Power Plant project (600MW)

Assignment Name:

Relay setting calculation for Thai Binh 1

Thermal Power Plant (2x300MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Thai Binh

province

Duration of Assignment (months): 05 months

Name of Client:

Contractor 1: Toshiba Vietnam

Total No of Staff-months of the assignment:

Page 42: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 42

Contractor 2: FUJI

Contractor 3: Marubeni

Address: 44 Ly Thuong Kiet, Hoan Kiem,

Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: May, 2016

Completion Date: July, 2017

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis in year 2016 and year 2017

- Relay setting calculation for two 220kV lines

- Relay setting calculation for Generator Step-up Transformer

- Relay setting calculation for Station Transformer supplying auxiliary power

- Relay setting calculation for Generators

- Working with A0/A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

36. Song Hau 1 Thermal Power Plant project (2x600MW)

Assignment Name:

Relay setting calculation for Song Hau 1

Thermal Power Plant (2x600MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hau Giang

province

Duration of Assignment (months): 02 months

Name of Client: Petro Vietnam Song Hau

1 Power Project Management Broard -

Lilama

Total No of Staff-months of the assignment:

Address: Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Jan, 2019

Completion Date: March, 2019

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

Page 43: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 43

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Technical design of Relay Protection System.

- Technical design of SCADA system and Telecommunication system.

Description of Actual Services Provided by Your Staff within the assignment: N/A

37. Nghi Son 1 Thermal Power Plant project (600MW)

Assignment Name:

Relay setting calculation for Nghi Son 1

Thermal Power Plant (2x300MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Thanh Hoa

province

Duration of Assignment (months): 05 months

Name of Client: Alstom Vietnam Total No of Staff-months of the assignment:

Address: 44 Ly Thuong Kiet, Hoan Kiem,

Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Apr, 2012

Completion Date: Sep, 2012

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis in year 2013 and year 2014

- Relay setting calculation for two lines 220kV Line Nghi Son 1 – Nghi Son Subs

- Relay setting calculation for 220kV Nghi Son 1 Substation

- Relay setting calculation for Generator Step-up Transformer

- Relay setting calculation for Station Transformer supplying auxiliary power

- Relay setting calculation for Generators

- Working with A0/A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

38. Hoa Thuan hydropower plant project

Assignment Name:

Technical Consultant services and Relay

setting calculation for Hoa Thuan

Approx. Value of the contract (in current

US$): N/A

Page 44: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 44

hydropower plant (17.4MW)

Country: Vietnam

Location within Country: Cao Bang

Duration of Assignment (months): 05 months

Name of Client: Hoa Thuan joint stock

company

Total No of Staff-months of the assignment:

N/A

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2017

Completion Date: 2018

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- Relay setting calculation for:

o Generators

o The Generator Step-up Transformers

o The 110kV busbar Hoa Thuan

o The 110kV lines from the power plant

- Supporting and getting the numbering equipment decision

- Preparing the Procedure on cooperation of plant operation

- Supporting training and certification of plant operators

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 45: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 45

39. Coc San hydropower plant project (Phase 1)

Assignment Name:

- 1st contract: Grid Impact Study

- 2nd contract: Electrical Engineering

Consultant Service

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Lao Cai

Duration of Assignment (months):

- 1st contract: 2 months

- 2nd contract: 5 months

Name of Client: Colben Energy (Vietnam)

Joint Stock Company

Total No of Staff-months of the assignment:

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date:

- 1st contract: 05th Nov, 2012

- 2nd contract: 10th April, 2013

Completion Date:

- 1st contract: 05th Jan, 2013

- 2nd contract: 10th Sep, 2013

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- 1st contract: Grid Impact Study

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- 2nd contract: Electrical Engineering Consultant Service

o Review of EPC Electrical Engineering Designs, including: Engineering design

document of Investor; Engineering design document of EPC Contractor;

Technical specification for Generator and equipment supply Sub-contract.

o Finalization and execution of the Power Purchase Agremeent (PPA) with Northern Power Company (EVN-NPC)

Page 46: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 46

40. Coc San hydropower plant project (Phase 2)

Assignment Name:

Relay setting calculation for Coc San

hydropower plant

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Lao Cai

Duration of Assignment (months): 05 months

Name of Client: LCRE Total No of Staff-months of the assignment:

N/A

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2015-2016

Completion Date: 2016

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- Relay setting calculation for:

o Generators

o The Generator Step-up Transformers

o The 110kV busbar Coc San

o The 110kV lines from the power plant

- Supporting and getting the numbering equipment decision

- Preparing the Procedure on cooperation of plant operation

- Supporting training and certification of plant operators

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

41. Ngoi Phat hydropower plant project

Assignment Name:

Relay setting calculation for Song Bac

hydropower plant

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam Duration of Assignment (months): 06 months

Page 47: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 47

Location within Country: Lao Cai

Name of Client: NEDI 2 Total No of Staff-months of the assignment:

N/A

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2014

Completion Date: 2014

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- Relay setting calculation for:

o Generators

o The Generator Step-up Transformers

o The 110kV busbar Ngoi Phat

o The 110kV line Ngoi Phat – Lao Cai

- Preparing the Procedure on cooperation of plant operation

- Working with A0/A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

42. Nam Gion hydropower plant project

Assignment Name:

Relay setting calculation for Song Bac

hydropower plant

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Son La

Duration of Assignment (months): 05 months

Name of Client: Nam Gion Jsc. Total No of Staff-months of the assignment:

N/A

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$):

Start Date: 2014

Completion Date: 2014

No of professional Staff-Months provided by

associated consultants: N/A

Page 48: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 48

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- Relay setting calculation for:

o Generators

o The Generator Step-up Transformers

o The 110kV busbar Nam Gion

o The 110kV line Nam Gion – Thuan Chau

- Preparing the Procedure on cooperation of plant operation

- Supporting training and certification of plant operators

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

43. Nam Hong 1 hydropower plant project

Assignment Name:

Relay setting calculation for Nam Hong 1

hydropower plant

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Son La

Duration of Assignment (months): 05 months

Name of Client: Nam Hong Hydropower

Construction & Investment joint stock

company

Total No of Staff-months of the assignment:

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: March, 2013

Completion Date: May, 2013

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

Page 49: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 49

- Power system analysis

- Relay setting calculation for Generators

- Relay setting calculation for the power transformer (T1 - 10MVA)

- Relay setting calculation for the 35kV lines

- Working with So La power company to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

44. Song Bac hydropower plant project

Assignment Name:

Relay setting calculation for Song Bac

hydropower plant

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ha Giang

Duration of Assignment (months): 05 months

Name of Client: Song Bac Hydropower joint

stock company

Total No of Staff-months of the assignment:

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: May, 2013

Completion Date: September, 2013

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- Relay setting calculation for:

o Generators

o The Generator Step-up Transformers

o The 110kV line Bac Quang – Song Bac

- Preparing the Procedure on cooperation of plant operation

- Working with A0/A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 50: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 50

45. Lower Se San 2 - Hydro power plant project

Assignment Name:

Verify and review Power Purchase

Agreement (PPA), Lease Agreement (LA),

and Implementation Agreement (IA) of

Lower Se San 2 in Cambodia.

Approx. Value of the contract (in current

US$): N/A

Country: Cambodia/Vietnam

Location within Country: Phnom

Penh/Hanoi

Duration of Assignment (months): 3.5 months

Name of Client: EVN International Joint-

stock Company (EVNI)

Total No of Staff-months of the assignment:

50 staff-months

Address: 11 Khuat Duy Tien St., Thanh

Xuan Dist., Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$):

N/A

Start Date: 15th Jun, 2010

Completion Date: 27th Oct, 2010

No of professional Staff-Months provided by

associated consultants: 5 staff-months

Name of Associated Consultants, If Any:

- Le Duc Son: financial professionals

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical Supporter

Narrative Description of Project: Works to be conducted:

- Verify and review Power Purchase Agreement (PPA)

- Verify and review Lease Agreement (LA)

- Verify and review Implementation Agreement (IA)

- Support EVNI in the process of finalizing PPA, LA, IA contract to be negotiated with the

Cambodian government

Description of Actual Services Provided by Your Staff within the assignment:

- Verify and review Power Purchase Agreement (PPA): Tran Anh Thai, Mai Thanh Tung,

Le Duc Son, Le Van Hoang, Do Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen

Tuyen Tam, Nguyen Duc Tam, Tran Duc Minh Chau

- Verify and review Lease Agreement (LA): Tran Anh Thai, Mai Thanh Tung, Le Duc Son,

Le Van Hoang, Do Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam,

Nguyen Duc Tam, Tran Duc Minh Chau

- Verify and review Implementation Agreement (IA): Tran Anh Thai, Mai Thanh Tung, Le

Duc Son, Le Van Hoang, Do Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen

Tuyen Tam, Nguyen Duc Tam, Tran Duc Minh Chau

- Support EVNI in the process of finalizing PPA, LA, IA contract to be negotiated with the

Cambodian government: Tran Anh Thai, Le Van Hoang

Page 51: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 51

46. An Khanh 1 Thermal Power plant project

Assignment Name:

Support SAM in the Financial and Technical

Due Diligence of An Khanh 1 Power Plant

(115MW)

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Thai Nguyen

Duration of Assignment (months): 5 months

Name of Client: Saigon Asset Management

(SAM)

Total No of Staff-months of the assignment:

Address: TMS Building, 12th Floor

172 Hai Ba Trung Street, District 1

Ho Chi Minh City, Vietnam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Nov, 2011

Completion Date: Apr, 2012

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Collecting the inputs and assumptions provided by the project owner

- Constructing financial model to provide sufficient information to either decline or to

proceed project

- Sensitivity Analysis with variation of total investment, annual power output, electricity

tariff, fuel price, rate exchange

- Closely examining and validating the inputs and assumptions

- Closely examining and validating the contracts provided by the project owner

- Constructing financial model once again with more detail analysis

Description of Actual Services Provided by Your Staff within the assignment: N/A

47. Ta Lang hydro power plant project

Assignment Name:

Provide consulting services for Ta Lang

Hydro Power Plant

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Bac Kan

Duration of Assignment (months): 2 months

Name of Client: Bac Kan Material

Construction Producing Join-stock Company

Total No of Staff-months of the assignment:

18 Staff-months

Address: 74 Doi Ky St., Song Cau Ward, Approx. Value of Services provided by your

Page 52: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 52

Bac Kan Town, Bac Kan firm under the contract (in Current US$): N/A

Start Date: 25st Arpil, 2009

Completion Date: 28th Jul, 2009

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

N/A

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical Supporter

Narrative Description of Project: Works to be conducted:

- Grid impact study:

o Data collection and update

o Connection scheme proposal

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

o Dynamic stability studies

o Static stability studies

o Measuring system proposal

o SCADA/EMS connection proposal

o Communication solution proposal

o Cooperate with Bac Kan Material Construction Producing JSC. to reach

agreement on connection, metering with EVN and affiliates

- Technical design of metering system:

o Metering point

o Communication connection

- Advising and conducting negotiations for Power Purchase Agreement (PPA)

o Drafting and preparing documents for PPA

o Regulations on Tariff studies of MOIT to apply for Bac Kan Material

Construction Producing JSC.

o Drafting Power Purchase Agreement (PPA)

o Preparing Appendix and Form relate to PPA

o Organizing Meetings and negotiating with EVN – NPC to get Power Purchase

Agreement (PPA)

Description of Actual Services Provided by Your Staff within the assignment:

Grid impact Study:

- Data collection and update

o Updating commissioning schedules of 110kV, 35kV transmission grids in the

North of Vietnam for the period 2009-2015: Mai Thanh Tung, Nguyen Anh The

o Updating power plant commissioning schedules for the period 2009-2015: Le

Van Hoang, Do Truong Giang, Le Quoc Anh

o Updating load demand and forecasting load demand for the period 2009-2015:

Nguyen Tuyen Tam, Tran Duc Ky

Page 53: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 53

- Connection scheme proposal

o Alternative connection schemes: Tran Anh Thai, Le Van Hoang

- Energy & power balance studies:

o Energy balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky

o Power balance: Tran Anh Thai, Le Van Hoang, Le Quoc Anh, Nguyen Tuyen

Tam, Tran Duc Ky

- Load flow analysis

o Base case analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le Van

Hoang, Do Truong Giang

o Contingency analysis: Tran Anh Thai, Mai Thanh Tung, Nguyen Anh The, Le

Van Hoang, Do Truong Giang

- Short circuit studies:

o Faults analysis: Le Van Hoang, Nguyen Anh The, Le Quoc Anh

- Measuring system proposal: Le Van Hoang, Do Truong Giang

- Communication solution proposal: Mai Thanh Tung, Nguyen Anh The

- Cooperate with Bac Kan Material Construction Producing JSC. to reach agreement on

connection, metering with EVN and affiliates: Tran Anh Thai, Le Van Hoang

Technical design of metering system:

o Metering point: Le Van Hoang, Do Truong Giang

o Communication connection: Mai Thanh Tung, Nguyen Anh The

Advising and conducting negotiations for Power Purchase Agreement (PPA)

o Drafting and preparing documents for PPA: Tran Anh Thai, Le Van Hoang

o Regulations on Tariff studies of MOIT to apply for Bac Kan Material

Construction Producing JSC: Tran Anh Thai, Mai Thanh Tung, Le Van Hoang,

Nguyen Anh The, Le Quoc Anh, Do Truong Giang, Tran Duc Ky, Nguyen Tuyen

Tam

o Drafting Power Purchase Agreement (PPA): Tran Anh Thai, Le Van Hoang,

Nguyen Anh The, Do Truong Giang

o Preparing Appendix and Form relate to PPA: Tran Anh Thai, Mai Thanh Tung,

Nguyen Tuyen Tam, Tran Duc Ky, Le Quoc Anh, Nguyen Tuyen Tam

o Organizing Meetings and negotiating with EVN – NPC to get Power Purchase

Agreement (PPA): Tran Anh Thai, Le Van Hoang.

48. Guang Lian Steel Cogeneration Plant project

Assignment Name:

Consulting service for project “Investment,

providing electricity to Guang Lian Steel,

Dung Quat Economic Zone, Quang Ngai,

Vietnam”

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Quang Ngai

Duration of Assignment (months): 5 months

Page 54: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 54

Name of Client: Guang Lian Steel

(Vietnam) Co., Ltd (GLSC)

Total No of Staff-months of the assignment:

24 staff-months

Address: Dung Quat Industry Zone, Binh

Dong Commune, Binh Son District, Quang

Ngai

Approx. Value of Services provided by your

firm under the contract (in Current US$):

N/A

Start Date:

- Stage 1: 2nd Nov, 2010

- Stage 2: N/A

Completion Date:

- Stage 1: In Progress

- Stage 2: N/A

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

N/A

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical Supporter

Narrative Description of Project: Works to be conducted:

- Stage 1:

o Co-operation with GLSC to get connection point agreement and investment

bound from Vietnam Electricity (EVN) – National Power Transmission

Corporation (NPT)

o Grid connection impact study

o Co-operation with GLSC to get Grid connection agreement, Metering

agreement, SCADA/EMS connection agreement

o Power Purchase Agreement (PPA) from EVN – EPTC for buying electricity

- Stage 2: PRP will be as a coordinator cover all necessary coordinating work that

enabling GLSC and his main contractor to get final result what is EVN supply electricity

and issue the operation license:

o Support GLSC on Detail technical design

o Support GLSC to get Electricity License

o Support GLSC to working with NLDC and RLDC for Supplying and Operation

Description of Actual Services Provided by Your Staff within the assignment: We are

working on the first stage

49. The 110kV Bac Song Cam substation project (Phase 1)

Assignment Name:

Relay setting calculation for the 110kV Bac

Song Cam substation

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hai Phong

Duration of Assignment (months): 05 months

Name of Client: Power Construction JSC Total No of Staff-months of the assignment:

Page 55: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 55

No. 1

Address: 18 Ly Van Phuc Street, Dong Da,

Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: May, 2012

Completion Date: Sep, 2012

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis in year 2012

- Relay setting calculation for two lines 110kV Bac Song Cam – Hai Phong Power Plant

- Relay setting calculation for busbar and breakers

- Relay setting calculation for power transformer (63MVA)

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

50. The 110kV Bac Song Cam substation project (Phase 2)

Assignment Name:

Relay setting calculation for the 110kV Bac

Song Cam substation

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hai Phong

Duration of Assignment (months): 05 months

Name of Client: Power Construction JSC

No. 1

Total No of Staff-months of the assignment:

Address: 18 Ly Van Phuc Street, Dong Da,

Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: May, 2012

Completion Date: Sep, 2012

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis in year 2012

- Relay setting calculation for two lines 110kV Bac Song Cam – Hai Phong Power Plant

Page 56: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 56

- Relay setting calculation for busbar and breakers

- Relay setting calculation for power transformer (63MVA)

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

51. The 110kV Bridgestone substation project

Assignment Name:

Relay setting calculation for the 110kV

Bridgestone substation

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hai Phong

Duration of Assignment (months): 04 months

Name of Client: Bridgestone Vietnam Ltd,

Co.

Total No of Staff-months of the assignment:

N/A

Address: 9th Floor, 233 Dong Khoi Street,

Ben Nghe Ward, District 1, Ho Chi Minh City

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2015

Completion Date: 2015

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- Relay setting calculation for:

o The Power Transformer (T2-20MVA)

o The 110kV busbar Bridgestone

o The 110kV line Bridgestone – Dinh Vu

- Preparing the Procedure on cooperation of plant operation

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 57: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 57

52. The 110kV Nui Phao substation project

Assignment Name:

Relay setting calculation for the 110kV Nui

Phao substation

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Thai Nguyen

Duration of Assignment (months): 05 months

Name of Client: Power Construction JSC

No. 1

Total No of Staff-months of the assignment:

Address: 18 Ly Van Phuc Street, Dong Da,

Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Aug, 2012

Completion Date: Dec, 2012

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis in year 2012

- Relay setting calculation for line 110kV Nui Phao – Tuyen Quang (bay 171)

- Relay setting calculation for line 110kV Nui Phao – Thai Nguyen (bay 172)

- Relay setting calculation for busbar and breakers

- Relay setting calculation for two power transformers (2x40MVA)

- Relay setting calculation for bay 22kV

- Preparing the Procedure on cooperation of plant operation

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

53. The 110kV Veam substation project

Assignment Name:

Relay setting calculation for the 110kV

Veam substation

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Thanh Hoa

Duration of Assignment (months): 04 months

Name of Client: VEngy Total No of Staff-months of the assignment:

Address: N/A Approx. Value of Services provided by your

Page 58: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 58

firm under the contract (in Current US$): N/A

Start Date: March, 2013

Completion Date: May, 2013

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis

- Relay setting calculation for the bays of breaker no. 631, 673, 675 and 677

- Relay setting calculation for the power transformer (T1 - 16MVA)

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

54. The 110kV Ton Hoa Sen substation project

Assignment Name:

Relay setting calculation for the 110kV Ton

Hoa Sen substation

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Nghe An

Duration of Assignment (months): 04 months

Name of Client: A Chau Industrial

Technology Joint Stock Company

Total No of Staff-months of the assignment:

N/A

Address: 4th Floor, 25 Tan Mai Street, Ha

Noi, Viet Nam

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2017

Completion Date: 2017

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Power system analysis:

o Data collection and update

o Energy & power balance studies

o Load flow analysis

o Short circuit studies

- Relay setting calculation for:

o The Power Transformer (T1-63MVA)

Page 59: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 59

o The 110kV busbar Ton Hoa Sen

o The 110kV line Ton Hoa Sen – Nghi Son & Quynh Luu

- Working with A1 to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 60: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 60

55. Technical Assistant project: ERAV Support Information Technology/Database: System Design and Training project

Assignment Name:

ERAV Support Information

Technology/Database: System Design and

Training

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hanoi

Duration of Assignment (months): 8 months

Name of Client: Electricity Regulatory

Authority of Vietnam (ERAV)

Total No of Staff-months of the assignment:

27 staff-months

Address: 11 Khuat Duy Tien St., Thanh

Xuan Dist., Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$):

N/A

Start Date: 29th May, 2008

Completion Date: 25th Dec, 2009

No of professional Staff-Months provided by

associated consultants: 18 staff-months

Name of Associated Consultants, If Any:

- Hoang Xuan Dau: IT Specialist

- Tu Minh Phuong: IT Specialist

- Pham Van Cuong: IT Specialist

- Ha Hai Nam: IT Specialist

- Savu Savulescu: International

consultant

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Team leader

- Mai Thanh Tung: Power Management

Narrative Description of Project: Works to be conducted:

- General structure design of database and communication system

- Detailed design of database, communication system, required applications for power

market monitoring, operation status of national power system, dispute resolution,

electricity license…

- System Implementation and Deployment

- User Manual and training for ERAV’s personnel

Description of Actual Services Provided by Your Staff within the assignment:

- General structure design of database and communication system: Tran Anh Thai, Mai

Thanh Tung, Le Van Hoang, Hoang Xuan Dau, Tu Minh Phuong, Pham Van Cuong, Ha

Hai Nam, Savu Savulescu

- Detailed design of database, communication system, required applications for power

market monitoring, operation status of national power system, dispute resolution,

electricity license…: Tran Anh Thai, Mai Thanh Tung, Ha Hai Nam, Le Van Hoang, Do

Truong Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam,

Tran Duc Minh Chau.

- System Implementation and Deployment: Tran Anh Thai, Mai Thanh Tung, Le Van

Hoang, Ha Hai Nam

Page 61: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 61

- User Manual and training for ERAV’s personnel: Tran Anh Thai, Mai Thanh Tung, Le

Van Hoang, Ha Hai Nam

56. Transmission charges calculation model development, data collection and calculation project

Assignment Name:

Transmission charges calculation model

development, data collection and calculation

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hanoi

Duration of Assignment (months): 4 months

Name of Client: Electricity Regulatory

Authority of Vietnam (ERAV)

Total No of Staff-months of the assignment:

28 staff-months

Address: 11 Khuat Duy Tien St., Thanh

Xuan Dist., Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$):

N/A

Start Date: 05th Dec, 2008

Completion Date: 31th Dec, 2009

No of professional Staff-Months provided by

associated consultants: 10 staff-months

Name of Associated Consultants, If Any:

- Tu Minh Phuong: IT Specialist

- Ha Hai Nam: IT Specialist

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Team leader

- Mai Thanh Tung: Power System

Engineer

- Le Van Hoang: Power System Engineer

Narrative Description of Project: Works to be conducted:

- Design database and calculation model, specific technical features and plan for

implementation

- Information collection

- Development of detailed database and computer models

- Transmission charges calculation

- Manuals, training on design and use of model and database

Description of Actual Services Provided by Your Staff within the assignment:

- Design database and calculation model, specific technical features and plan for

implementation: Tran Anh Thai, Mai Thanh Tung, Le Van Hoang, Tu Minh Phuong, Ha

Hai Nam

- Information collection: Tran Anh Thai, Mai Thanh Tung, Le Van Hoang, Do Truong

Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran

Duc Minh Chau

- Development of detailed database and computer models: Le Van Hoang, Do Truong

Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran

Duc Minh Chau

- Transmission charges calculation: Le Van Hoang, Do Truong Giang, Nguyen Anh The,

Page 62: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 62

Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran Duc Minh Chau

- Manuals, training on design and use of model and database: Le Van Hoang, Do Truong

Giang, Nguyen Anh The, Tran Duc Ky, Nguyen Tuyen Tam, Nguyen Duc Tam, Tran

Duc Minh Chau

57. Information Infrastructure for the Power Market in Vietnam project

Assignment Name:

Consulting Services on Information

Infrastructure for the Power Market in

Vietnam: Assessment, Design and Migration

Strategy

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hanoi

Duration of Assignment (months): 4 months

Name of Client: Vietnam Electricity (EVN) Total No of Staff-months of the assignment:

Address: 18 Tran Nguyen Han, Hanoi Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Jun, 2010

Completion Date: Oct, 2010

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Mr. Savu C. Savulescu

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Local consultant for main consultant (Savu C. Savulescu):

- Support main consultant review and assess overall current Information Infrastructure of

participants in VCGM

o Reviewing and assessing current information infrastructure in ERAV

o Reviewing and assessing current situation of information system, SCADA

system, metering system, Viet-pool system in SMO (A0, A1, A2, A3)

o Reviewing and assessing current situation of information system in MDMSP

o Reviewing and assessing current situation of information system in EPTC

o Reviewing and assessing current situation of information system in NPT and

other transmission company (including PTC1, PTC2, PTC3, PTC4)

o Reviewing and assessing current situation of information system in power

companies

o Reviewing and assessing current situation of information system in, SCADA

system, metering system in power plant

- Support for conceptual overall information architecture for VCGM

o Key solution and implementation criteria

Page 63: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 63

o Component of, and data interfaces within, the conceptual Overall Information

Architecture (OIA) of VCGM IT infrastructure :

o ERAV information system

o SMO integrated information system

o EPTC information system

o MDMSP metering management system

o NPT operation control center

o SCADA/DMS facilities of PCs

o Distributed control system at generators

- Support for implementation planning of information system for participants synchronous

with OIA

o Generic technical requirements

o Functional requirements at metering position

o Operation requirements

o Ordering and implementing suitable hardware and software

o Acceptance of software and hardware

Description of Actual Services Provided by Your Staff within the assignment: N/A

58. SCADA and metering system for Khanh Hoa power company project

Assignment Name:

Design and implement SCADA and metering

system for Khanh Hoa power company

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Khanh Hoa

Duration of Assignment (months): 3 months

Name of Client: Khanh Hoa Power Joint

Stock Company (KHPC) – EVN CPC

Total No of Staff-months of the assignment:

Address: 11 Ly Thanh Ton Street, Nha

Trang City, Khanh Hoa

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Feb, 2010

Completion Date: Apr, 2010

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Data collection in existing information system of KHPC

Page 64: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 64

o RTU exploration

o Metering system exploration

o Data collection of existing system

o Exploration and assessment of telecommunication system in KHPC

o ICCP ability survey

o Software and hardware exploration in KHPC

- Designing center hardware system

- Designing database systems (Real-Time Database; System Database; Historian

Database)

- Designing structure of GIS module for SCADA and metering system

- Designing structure of HMI module for SCADA and metering system

- Designing @IMIS Application

- Designing Web-Based interface Application

- Designing HIS Application

Description of Actual Services Provided by Your Staff within the assignment: N/A

59. Mini SCADA for Bac Ninh Power Company project

Assignment Name:

Design and implement Mini SCADA for Bac

Ninh Power Company

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Bac Ninh

Duration of Assignment (months): 6 months

Name of Client: Bac Ninh Power Company

(BNPC) – EVN NPC

Total No of Staff-months of the assignment:

Address: 03 Le Van Thinh Street, Bac Ninh

City

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Dec, 2010

Completion Date: May, 2011

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Data collection in existing information system of KHPC

o RTU exploration

o Metering system exploration

o Data collection of existing system

Page 65: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 65

o Exploration and assessment of telecommunication system

o ICCP ability survey

o Software and hardware exploration

- Designing center hardware system

- Designing database systems (Real-Time Database; System Database; Historian

Database)

- Designing structure of GIS module for SCADA and metering system

- Designing structure of HMI module for SCADA and metering system

- Designing @IMIS Application

- Designing Web-Based interface Application

- Designing HIS Application

Description of Actual Services Provided by Your Staff within the assignment: N/A

60. SCADA system for NLDC project

Assignment Name:

Design and implement SCADA system for

NLDC

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hanoi

Duration of Assignment (months): 5 months

Name of Client: National Load Dispatch

Centre (A0)

Total No of Staff-months of the assignment:

Address: 18 Tran Nguyen Han Street,

Hanoi

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Aug, 2008

Completion Date: Dec, 2008

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Data collection in existing information system

o RTU exploration

o Data collection of existing system

o Exploration and assessment of telecommunication system

o ICCP ability survey

o Software and hardware exploration

- Designing hardware system

Page 66: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 66

- Designing overall structure of SCADA system

- Designing structure of HMI module for SCADA system

Description of Actual Services Provided by Your Staff within the assignment: N/A

61. SCADA system for SRLDC project

Assignment Name:

Design and implement SCADA system for

SRLDC

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: HCMC

Duration of Assignment (months): 5 months

Name of Client: Southern Regional Load

Dispatch Center (A2)

Total No of Staff-months of the assignment:

Address: 5 Su Thien Chieu Street, HCMC Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Aug, 2010

Completion Date: Dec, 2010

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Data collection in existing information system

o RTU exploration

o Data collection of existing system

o Exploration and assessment of telecommunication system

o ICCP ability survey

o Software and hardware exploration

- Designing hardware system

- Designing overall structure of SCADA system

- Designing structure of HMI module for SCADA system

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 67: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 67

62. SCADA system for NPT project

Assignment Name:

Design and implement SCADA system for

NPT

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hanoi

Duration of Assignment (months): 2 months

Name of Client: National Power

Transmission Corporation (NPT)

Total No of Staff-months of the assignment:

Address: 15 Cua Bac Street, Hanoi Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Nov, 2010

Completion Date: Dec, 2010

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any: Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Data collection in existing information system

o RTU exploration

o Data collection of existing system

o Exploration and assessment of telecommunication system

o ICCP ability survey

o Software and hardware exploration

- Designing hardware system

- Designing overall structure of SCADA system

- Designing structure of HMI module for SCADA system

Description of Actual Services Provided by Your Staff within the assignment: N/A

63. Monitoring Operations of the Pilot and Full VCGM project

Assignment Name:

Support ERAV in Monitoring Operations of

the Pilot and Full VCGM

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hanoi

Duration of Assignment (months): 1 months

Name of Client: Electricity Regulatory

Authority of Vietnam (ERAV)

Total No of Staff-months of the assignment:

Address: 11 Khuat Duy Tien St., Thanh Approx. Value of Services provided by your

Page 68: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 68

Xuan Dist., Hanoi firm under the contract (in Current US$): N/A

Start Date: Nov, 2011

Completion Date: Dec, 2012

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

IES - Intelligent Energy Systems

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Senior Engineer

- Le Van Hoang: Technical supporter

Narrative Description of Project: local consultant for main consultant (IES - Intelligent Energy

Systems):

- Local contact point

- Making arrangements for translation of documents for project purposes

- Participating as required in the stakeholder workshop

Description of Actual Services Provided by Your Staff within the assignment: N/A

64. Data for Research Power Generation Market in Vietnam project

Assignment Name:

Provide Updated Data for Research Power

Generation Market in Vietnam

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Hanoi, HCMC

Duration of Assignment (months): 1 months

Name of Client: Masan Group Corporation

(Masan Group)

Total No of Staff-months of the assignment:

Address: 8th Floor, Central Plaza, 17 Le

Duan, District 1, Ho Chi Minh City

Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: Nov, 2011

Completion Date: Dec, 2011

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Le Van Hoang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Updating the data of power plants are in operation until 2011

o Updating data about owner, install capacity, number of units, power plant type,

commissioning year, location, contract price, revenue of the year 2008, 2009,

2010.

o Updating data about operation information include historical data of energy

Page 69: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 69

output and equivalent operating hours.

- Updating the data of power plants are expected to operate up to 2030

o Updating data about investor, install capacity, power plant type, expected

commissioning year, location.

Description of Actual Services Provided by Your Staff within the assignment: N/A

65. EVNNPT Information Technology Roadmap project

Assignment Name:

Supporting Tangible International

Corporation (TIC) to develop the Information

Technology Roadmap for EVNNPT

Approx. Value of the contract (in current

US$): N/A

Country: Vietnam

Location within Country: Ha Noi

Duration of Assignment (months): 05 months

Name of Client: TIC Total No of Staff-months of the assignment:

N/A

Address: N/A Approx. Value of Services provided by your

firm under the contract (in Current US$): N/A

Start Date: 2015-2016

Completion Date: 2016

No of professional Staff-Months provided by

associated consultants: N/A

Name of Associated Consultants, If Any:

Name of Senior Staff Involved and Functions

Performed:

- Tran Anh Thai: Project Manager

- Do Truong Giang: Technical supporter

Narrative Description of Project: Works to be conducted:

- Review and Assess EVNNPT's Current Transmission System and Ongoing and

Planned IT System Projects.

- Develop a 10-year Transmission System IT Roadmap for EVNNPT.

- Develop Integration Strategy, Implementation Plan, and Strategic Roadmap for

Proposed Investments.

- Working with EVNNPT to take approval

Description of Actual Services Provided by Your Staff within the assignment: N/A

Page 70: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 70

EXPERT CURRICULUM VITAE

Mr. Tran Anh Thai

1. Proposed Position: Team Leader of Local Experts, Power System Engineer and Markets

Expert

2. Name of Firm: Vietnam Power Resource Partners Corporation (PRP)

3. Name of Staff: Tran Anh Thai

4. Date of Birth: 1 July 1964 Nationality: Vietnamese

5. Education:

1985 Hanoi University of Technology, Power System Faculty

Power System Engineering Degree

1994 Hanoi University of Technology, and Tractabel (Belgium)

Diploma, Economic Operation and Maintenance of 500kV network

1995 JICA education centre (Japan)

Management of Local Economic development

6. Membership of Professional Associations: Member of IEEE and CIGRE since 1996

7. Other Training: Teacher Assistant for course on Management in Power Sector, organized

by ASEAN Institute of Economy and Education Centre of Energy Ministry, sponsored by

SIDA, Sweden.

8. Countries of Work Experience:

Vietnam

9. Languages:

Vietnamese, English

10. Employment Record:

2006 – present Vietnam Power Resources Partners Corp. (PRP), General Director

2005 – 2006 Applied Technical Systems, Chief Financial Officer and Technical

Advisor

2004 – 2005 Electricity of Vietnam (EVN), Director of National Load Dispatch

Center

2000 – 2004 Electricity of Vietnam (EVN), Director of Power Network Department

1996 – 2000 Electricity of Vietnam (EVN), Deputy Director of Power Network

Department

1995 – 1996 Electricity of Vietnam (EVN), Senior Engineer in Power Network

Department

1990 – 1995 Power Transmission Company No. 2, Head of Technical

Department

Page 71: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 71

1987 – 1990 Power Transmission Company No. 3, Senior Engineer in Technical

Department

1985 – 1987 Caudo Thermal Power, Engineer of plant project management board

(Danang)

Professional skills

Project management.

Power System planning and studies.

Operation and Maintenance of Power system facilities

Risk management and reliability in the operation of power plant, transmission and

distribution system.

Specializing in control and protection systems of power systems and power plants.

Specializing in information and data system designed for optimizing the operation of

power system and power plant

Power market design, operation and Power sector restructuring.

Optimizing the operation of power plant and power system

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Name of assignment or project: Developing and building

the 110-220kV Power Network of Central of Vietnam

Year: 1990-1994

Location: Vietnam

Client: EVN

Position held: Head of Technical Department

Activities performed:

Participating in designing, evaluating, supervising construction

process, commissioning tests, checking for acceptance and

taking over for operation and maintenance.

Name of assignment or project: 500kV Network, Line 1

Year: 1993-1994

Location: Vietnam

Client: EVN

Position held: Head of Technical Department

Activities performed:

Participating in designing, evaluating, supervising construction

process, commissioning tests, checking for acceptance and

taking over for operation and maintenance.

Name of assignment or project: 500kV Network, Line 1

Year: 1994-1996

Location: Vietnam

Page 72: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 72

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Client: EVN

Position held: Senior Engineer

Activities performed:

- Researching, analyzing, and dealing with system errors in

calculation, design and installation

- Organizing the operation and maintenance of the whole

system

Name of assignment or project: Planning, researching and

calculating Vietnam Power System

Year: 1996-2005

Location: Vietnam

Client: EVN

Position held: Senior Engineer

Activities performed:

Studying, Analyzing and researching in Power System

Name of assignment or project: Designing the national

power transmission system.

Year: 1996-2005

Location: Vietnam

Client: EVN

Position held: Senior Engineer

Activities performed:

Preparing technical specification of equipments and on the

whole system coordination

Name of assignment or project: Report on the need of

500kV system, line 2.

Year: 2003

Location: Vietnam

Client: EVN

Position held: Project Manager

Activities performed:

In charge of methodology, input and output analysis,

synthesizing and preparing the final report

Name of assignment or project: Report on system

aqueduct of five years of operation of Vietnam Power

Network (2004-2008).

Year: 2004

Location: Vietnam

Client: EVN

Position held: Project Manager

Page 73: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 73

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Activities performed:

In charge of methodology, input and output analysis,

synthesizing and preparing the formal proposals

Name of assignment or project: System Security report

and proposal program applied to Vietnam Power Network.

Year: 2004-2005

Location: Vietnam

Client: EVN

Position held: Project Manager

Activities performed:

In charge of methodology, input and output analysis

Name of assignment or project: Vietnam Power Market

Development

Year: 2004-2005

Location: Vietnam

Client: EVN

Position held: General Project Manager

Activities performed:

Market Design, technical specification, staff organizing and

Project Sponsor.

Name of assignment or project: Substation Integration

System Development

Year: 2005-2007

Location: Vietnam

Client: Applied Technical Systems Co. Ltd

Position held: Technical Advisor

Activities performed:

Substation Integration System Development with IEC 61850

compliance.

Name of assignment or project: Thang Long Coal Thermal

Power Plant (600MW Installed Capacity)

Year: 2007

Location: Vietnam

Client: Thang Long JSC.

Position held: Project Manager

Activities performed:

- Grid Impact study for Transmission Access International

Consultant hiring

Name of assignment or project: AES. Mong Duong 2 Coal

Thermal power plant (1200 MW Installed capacity)

Page 74: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 74

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Year: 2007

Location: Vietnam

Client: AES-VCM Mong Duong Power Company Limited

Position held: Project Manager

Activities performed:

Grid Impact study for Transmission Access

Name of assignment or project: Nhon Trach 2, Gas Fired

Combined Cycle Power Plant

Year: 2007

Location: Vietnam

Client: PV Power Nhon Trach 2 Jsc.

Position held: Project Manager

Activities performed:

Grid Impact study for Transmission Access

Name of assignment or project: Transmission charges

calculation model development, data collection and

calculation.

Year: 2008

Location: Vietnam

Client: ERAV.

Position held: Project Manager

Activities performed:

- Design database and calculation model, specific technical

features and plan for implementation

- Information collection

- Development of detailed database and computer models

- Transmission charges calculation

- Manuals, training on design and use of model and

database

Name of assignment or project: ERAV Support Information

Technology/Database: System Design and Training.

Year: 2008

Location: Vietnam

Client: ERAV.

Position held: Project Manager

Activities performed:

- General structure design of database and communication

Page 75: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 75

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

system

- Detailed design of database, communication system,

required applications for power market monitoring,

operation status of national power system, dispute

resolution, electricity license

- System Implementation and Deployment

- User Manual and training for ERAV’s personnel

Name of assignment or project: Ta Lang Hydro Power

Plant project (4.5 MW Installed capacity)

Year: 2009

Location: Vietnam

Client: Bac Kan Material Construction Producing Join-stock

Company

Position held: Project Manager

Activities performed:

- Grid impact study for power flow and short-circuit.

- Technical design of SCADA and metering system.

- Consulting for Power Purchase Agreement.

Name of assignment or project: Lower Se San 2 Hydro

power plant project (400 MW Installed capacity)

Year: 2010

Location: Vietnam & Cambodia

Client: EVN International.

Position held: Project Manager

Activities performed:

Verify and review Power Purchase Agreement (PPA), Lease

Agreement (LA), Implementation Agreement (IA)

Name of assignment or project: Guang Lian Steel project

(460 MW Installed capacity)

Year: 2010

Location: Dung Quat, Quang Ngai

Client: GLSC Ltd.

Position held: Project Manager

Activities performed:

- Grid impact study for power flow and short-circuit.

Page 76: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 76

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

- Technical design of SCADA and metering system.

- Consulting for Power Purchase Agreement (PPA).

- Working with ERAV to get Electricity License and

Generation Electricity License.

- Working with NLDC and RLDC for supplying and operation

Name of assignment or project: Detailed design of

Information and Intelligent Technology Infrastructure for the

electricity market in Vietnam

Year: 2010

Location: Vietnam

Client: Power Engineering Consulting Joint Stock Company

3 – PECC3.

Position held: Senior Expert

Activities performed:

Participating in designing of Information and Intelligent

Technology Infrastructure for the electricity market in

Vietnam.

Name of assignment or project: SCADA and metering

system for Khanh Hoa power company

Year: 2010

Location: Vietnam

Client: Khanh Hoa Power Joint Stock Company (KHPC) –

EVN CPC

Position held: Project Manager

Activities performed:

Participating in designing and implement of SCADA and

metering system for Khanh Hoa power company.

Name of assignment or project: Design and implement Mini

SCADA for Bac Ninh Power Company

Year: 2010, 2011

Location: Vietnam

Client: Bac Ninh Power Company (BNPC) – EVN NPC

Position held: Project Manager

Activities performed:

Participating in designing and implement of SCADA and

metering system for Bac Ninh power company.

Name of assignment or project: Design and implement

SCADA system for NLDC

Year: 2010, 2011

Location: Vietnam

Page 77: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 77

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Client: National Load Dispatch Centre (A0)

Position held: Project Manager

Activities performed:

Participating in designing and implement of SCADA and

metering system for NLDC

Name of assignment or project: Design and implement

SCADA system for SRLDC

Year: 2010

Location: Vietnam

Client: Southern Regional Load Dispatch Center (A2)

Position held: Project Manager

Activities performed:

Participating in designing and implement of SCADA and

metering system for SRLDC

Name of assignment or project: Design and implement

SCADA system for NPT

Year: 2010

Location: Vietnam

Client: National Power Transmission Corporation (NPT)

Position held: Project Manager

Activities performed:

Participating in designing and implement of SCADA and

metering system for NPT

Name of assignment or project: Support ERAV in

Monitoring Operations of the Pilot and Full VCGM

Year: 2011, 2012

Location: Vietnam

Client: Electricity Regulatory Authority of Vietnam (ERAV)

Position held: Senior Engineer

Activities performed:

Participating as assistant for main consultant

Name of assignment or project: Provide Updated Data for

Research Power Generation Market in Vietnam

Year: 2011

Location: Vietnam

Client: Masan Group Corporation (Masan Group)

Position held: Project Manager

Activities performed:

Participating in updating data for Research Power Generation

Market in Vietnam

Name of assignment or project: Support SAM in the

Financial and Technical Due Diligence of An Khanh 1 Power

Plant (115MW)

Year: 2011, 2012

Page 78: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 78

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Location: Vietnam

Client: Saigon Asset Management (SAM)

Position held: Project Manager

Activities performed:

Participating in Support SAM in the Financial and Technical

Due Diligence

Name of assignment or project: Grid Impact Study and

Electrical Engineering Consultant Service for Coc San

hydropower plant

Year: 2012-2013

Location: Vietnam

Client: Colben Energy Vietnam JSC.

Position held: Project Manager

Activities performed:

Participating in Consultant Service

Name of assignment or project: Technical design and

assist Doosan Vina in Mong Duong 2 Thermal Power Project

Year: 2011, 2012

Location: Vietnam

Client: Doosan Vina

Position held: Project Manager

Activities performed:

Participating as assistant for Doosan Vina

Name of assignment or project: Relay setting calculation

for Nghi Son 1 Thermal Power Plant (2x300MW)

Year: 2012

Location: Vietnam

Client: Alstom Grid Vietnam

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for the 110kV Bac Song Cam substation (T1)

Year: 2012

Location: Vietnam

Client: Power Construction JSC No. 1

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for the 110kV Nui Phao substation

Year: 2012

Location: Vietnam

Client: Power Construction JSC No. 1

Page 79: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 79

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for Nam Hong 1 hydropower plant

Year: 2013

Location: Vietnam

Client: Nam Hong Hydropower JSC.

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for the 110kV Veam substation

Year: 2013

Location: Vietnam

Client: VEngy

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for the 110kV Bac Song Cam substation (T2)

Year: 2013

Location: Vietnam

Client: Power Construction JSC No. 1

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for Song Bac hydropower plant

Year: 2013

Location: Vietnam

Client: Song Bac Hydropower JSC.

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for Ngoi Phat hydropower plant

Year: 2014

Location: Vietnam

Client: NEDI 2.

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Page 80: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 80

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Name of assignment or project: Relay setting calculation

for Nam Gion hydropower plant

Year: 2014

Location: Vietnam

Client: Nam Gion Jsc.

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for the 110kV Bridgestone substation (T2)

Year: 2015

Location: Vietnam

Client: Bridgestone Vietnam Ltd, Co

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for Coc San hydropower plant

Year: 2015-2016

Location: Vietnam

Client: LCRE.

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: EVNNPT Information

Technology Roadmap project

Year: 2015-2016

Location: Vietnam

Client: Tangible International Corporation (TIC)

Position held: Project Manager

Activities performed:

Supporting Tangible International Corporation (TIC) to

develop the Information Technology Roadmap for EVNNPT

Name of assignment or project: Relay setting calculation

for Thai Binh 1 Thermal Power Plant (2x300MW)

Year: 2016-2017

Location: Vietnam

Client: TPSC Vietnam & FUJI & Marubeni

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Relay setting calculation

for the 110kV Ton Hoa Sen substation

Year: 2017

Page 81: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 81

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Location: Nghe An, Vietnam

Client: A Chau Industrial Technology Joint Stock Company

Position held: Project Manager

Activities performed:

Participating in Relay setting calculation

Name of assignment or project: Dam Nai Wind Power

project (40MW)

Year: 2017

Location: Ninh Thuan, Vietnam

Client: Dam Nai Wind Power Joint Stock Company

Position held: Project Manager

Activities performed:

Grid connection impact study of Damnai wind power plant

Name of assignment or project: Hoa Thuan hydropower

plant project (17.4MW)

Year: 2017-2018

Location: Cao Bang, Vietnam

Client: Hoa Thuan Joint Stock Company

Position held: Project Manager

Activities performed:

Technical Consultant services and Relay setting calculation

for Hoa Thuan hydropower plant

Name of assignment or project: CMX RE-SUNSEAP Solar

Power Plant project

Year: 2017-2018

Location: Ninh Thuan, Vietnam

Client: SUNSEAP Group (CMX RE CMX-SUNSEAP Vietnam

Solar Power Joint Stock Company)

Position held: Project Manager

Activities performed:

Feasibility Study and Technical Agreements Consulting

Service for CMX RE Solar Power Plant project

Name of assignment or project: Da Bac Solar Power Plant

project

Year: 2018

Location: Ba Ria, Vietnam

Client: Dong A Joint Stock Company

Position held: Project Manager

Activities performed:

Technical Agreements Consulting Service for Da Bac Solar

Power Plant project

Name of assignment or project: Da Bac 2 Solar Power

Plant project

Year: 2018

Page 82: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 82

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Location: Ba Ria, Vietnam

Client: Tai Tien Co.,Ltd

Position held: Project Manager

Activities performed:

Technical Agreements Consulting Service for Da Bac 2 Solar

Power Plant project

Name of assignment or project: The 220kV Da Bac

substation of Da Bac and Da Bac 2 Solar Power Plant project

(2x63MVA)

Year: 2018

Location: Ba Ria, Vietnam

Client: Tai Tien Co.,Ltd

Position held: Project Manager

Activities performed:

Feasibility Study (FS) and Basic Design for Consulting

Service for the 220kV Da Bac substation and 220kV

transmission lines of Da Bac and Da Bac 2 Solar Power

Plant project

Name of assignment or project: Phuong Mai 3 Wind Power

Plant project (21MW)

Year: 2018

Location: Binh Dinh, Vietnam

Client: Central Wind-Power Investment & Development Co.

Position held: Project Manager

Activities performed:

Feasibility Study and Basic Design and Technical

Agreements Consulting Service for Phuong Mai 3 Wind

Power Plant project

Name of assignment or project: Xuan Tho 1 Solar Power

Plant project (49MWp)

Year: 2018

Location: Phu Yen, Vietnam

Client: Nam Viet Hung Investment Corp.

Position held: Project Manager

Activities performed:

Feasibility Study and Basic Design and Technical

Agreements Consulting Service for Xuan Tho 1 Solar Power

Plant project

Name of assignment or project: Xuan Tho 2 Solar Power

Plant project (49MWp)

Year: 2018

Location: Phu Yen, Vietnam

Client: Nam Viet Hung Investment Corp.

Position held: Project Manager

Page 83: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 83

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Activities performed:

Feasibility Study and Basic Design and Technical

Agreements Consulting Service for Xuan Tho 2 Solar Power

Plant project

Name of assignment or project: Rung Xanh Solar Power

Plant project (150MWp)

Year: 2018

Location: Dak Lak, Vietnam

Client: Dak Lak Forestry Co.Ltd

Position held: Project Manager

Activities performed:

Grid Impact Study for Rung Xanh Solar Power Plant project

Name of assignment or project: Nexif Ben Tre 3 Wind

Power Plant project (Phase 1: 30MW and Phase 2: 30MW)

Year: 2018-2019

Location: Ben Tre, Vietnam

Client: NEXIF ENERGY BEN TRE CO., LTD

Position held: Project Manager

Activities performed:

Feasibility Study and Basic Design and Technical

Agreements Consulting Service for Nexif Ben Tre Wind

Power Plant project

Name of assignment or project: My Son Solar Power

Plant project (50MWp)

Year: 2018

Location: Ninh Thuan,

Vietnam

Client: BG Energy Solution

Company Limited

Position held: Project

Manager

Activities performed:

Feasibility Study (FS) and Basic Design examination

Grid Impact Study for Rung Xanh Solar Power Plant project

Support for negotiating EPC contract

Name of assignment or project: Ham Kien Solar Power

Plant project (49MWp)

Year: 2018

Location: Binh Thuan,

Vietnam

Client: BG Energy Solution

Company Limited

Position held: Project

Page 84: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 84

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Manager

Activities performed:

Appraising for Feasibility Study (FS) and Basic Design

Grid Impact Study for Rung Xanh Solar Power Plant project

Support for negotiating EPC contract

Name of assignment or project: Phuoc Trung Solar

Power Plant project (50MWp)

Year: 2018

Location: Ninh Thuan,

Vietnam

Client: SAVINA POWER

JSC

Position held: Project

Manager

Activities performed:

Design for 22/220kV – 50MVA substation and double line

of Phuoc Trung Solar power plant.

Grid Impact Study for Phuoc Trung Solar power plant.

Name of assignment or project: BIM2 Solar Power

Plant project (250MWp)

Year: 2018

Location: Ninh Thuan,

Vietnam

Client: ATS JSC

Position held: Project

Manager

Activities performed:

Calculating the capacitor volume.

Preparing the Procedure on cooperation of plant operation

Participating in Relay setting calculation

Grid Impact Study

Advising on Licensing Power Operation

Prepare profile for the official commercial operation date.

Name of assignment or project: Dami floating Solar

Power Plant project (50MWp)

Year: 2018

Location: Binh Thuan,

Vietnam

Client: ATS JSC

Position held: Project

Manager

Page 85: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 85

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Activities performed:

Calculating the capacitor volume.

Preparing the Procedure on cooperation of plant operation

Participating in Relay setting calculation

Grid Impact Study

Advising on Licensing Power Operation

Prepare profile for the official commercial operation date.

Name of assignment or project: LocNinh5 Solar Power

Plant project (50MWp)

Year: 2018

Location: Binh Thuan,

Vietnam

Client: LocNinh 5 power JSC

Position held: Project

Manager

Activities performed:

Feasibility Study (FS) and Basic Design examination

Grid Impact Study for Rung Xanh Solar Power Plant project

Support for negotiating EPC contract

Name of assignment or project: LocNinh4 Solar Power

Plant project (200MWp)

Year: 2018

Location: Binh Thuan,

Vietnam

Client: LocNinh 4 power JSC

Position held: Project

Manager

Activities performed:

Feasibility Study (FS) and Basic Design examination

Grid Impact Study for Rung Xanh Solar Power Plant project

Support for negotiating EPC contract

Name of assignment or project: LocNinh3 Solar Power

Plant project (150MWp)

Year: 2018

Location: Binh Thuan, Vietnam

Client: LocNinh 3 power JSC

Position held: Project Manager

Activities performed:

Feasibility Study (FS) and Basic Design examination

Grid Impact Study for Rung Xanh Solar Power Plant project

Page 86: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 86

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Support for negotiating EPC contract

Name of assignment or project: LocNinh2 Solar Power

Plant project (200MWp)

Year: 2018

Location: Binh Thuan, Vietnam

Client: LocNinh 2 power JSC

Position held: Project Manager

Activities performed:

Feasibility Study (FS) and Basic Design examination

Grid Impact Study for Rung Xanh Solar Power Plant project

Support for negotiating EPC contract

Name of assignment or project: LocNinh1 Solar Power

Plant project (200MWp)

Year: 2018

Location: Binh Thuan, Vietnam

Client: LocNinh 1 power JSC

Position held: Project

Manager

Activities performed:

Feasibility Study (FS) and Basic Design examination

Grid Impact Study for Rung Xanh Solar Power Plant project

Support for negotiating EPC contract

Name of assignment or project: Huong Tan Solar

Power Plant project (48MW)

Year: 2019

Location: Quang Tri, Vietnam

Client: Phu Dien Construction Investment And Trading Joint

Stock Company

Position held: Project Manager

Activities performed:

Preliminary Agreement on Power Purchasing

Grid Impact Study and and Agreement on Grid Connection

Agreement on Tariff Metering System

Agreement on Relay Protection and Automation System

Agreement on SCADA and Telecommunication System

Name of assignment or project: Tan Linh Solar Power

Plant project (48MW)

Year: 2019

Location: Quang Tri, Vietnam

Client: Phu Dien Construction Investment And Trading Joint

Page 87: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 87

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Stock Company

Position held: Project Manager

Activities performed:

Preliminary Agreement on Power Purchasing

Grid Impact Study and and Agreement on Grid Connection

Agreement on Tariff Metering System

Agreement on Relay Protection and Automation System

Agreement on SCADA and Telecommunication System

Name of assignment or project: Lien Lap Solar Power

Plant project (48MW)

Year: 2019

Location: Quang Tri, Vietnam

Client: Phu Dien Construction Investment And Trading Joint

Stock Company

Position held: Project Manager

Activities performed:

Preliminary Agreement on Power Purchasing

Grid Impact Study and and Agreement on Grid Connection

Agreement on Tariff Metering System

Agreement on Relay Protection and Automation System

Agreement on SCADA and Telecommunication System

Name of assignment or project: Soc Son biomass

thermal power plant project (75MW)

Year: 2019

Location: Ha Noi, Vietnam

Client: Ha Noi Thien Y Environmental Energy Joint Stock

Company

Position held: Project Manager

Activities performed:

Agreement on Tariff Metering System

Agreement on Relay Protection and Automation System

Agreement on SCADA and Telecommunication System

Name of assignment or project: Song Giang

Hydropower plant project (49MW)

Year: 2019

Location: Khanh Hoa, Vietnam

Client: ATS JSC

Position held: Project Manager

Activities performed:

Grid Impact Study

Page 88: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 88

11. Detailed Tasks Assigned 12. Work Undertaken that Best Illustrates Capability to

Handle the Tasks Assigned

Support contract negotiation

Name of assignment or project: BIM3 Solar Power

project (50MWp)

Year: 2019

Location: Ninh Thuan, Vietnam

Client: BIM RENEWABLE ENERGY JOINT STOCK

COMPANY

Position held: Project Manager

Activities performed:

Load flow calculation.

Contingency calculation.

Short circuit calculation.

Active and Reactive power capability calculation

Fault-Ride-Through.

Frequency Regulation

Harmonic effect from PV project to grid connection

Name of assignment or project: Cat Hiep Solar Power

project (50MWp)

Year: 2019

Location: Binh Dinh, Vietnam

Client: Binh Dinh TTP Energy and high technology., JSC

Position held: Project Manager

Activities performed:

Load flow calculation.

Contingency calculation.

Short circuit calculation.

Active and Reactive power capability calculation

Fault-Ride-Through.

Frequency Regulation

Harmonic effect from PV project to grid connection

13. Certification:

I, the undersigned, certify that to the best of my knowledge and believe, this CV correctly

describes myself, my qualifications, and my experience. I understand that any wilful

misstatement described herein may lead to my disqualification or dismissal, if engaged.

Page 89: VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite …vietnamprp.com.vn/prp/images/CLIENT/PRP Profile_ENG.pdf · VietnamPRP profile Page 1 VIETNAM POWER RESOURCE PARTNERS CORPORATION

VIETNAM POWER RESOURCE PARTNERS CORPORATION Suite 703, 11 Tran Hung Dao Street, Hoan Kiem District, Hanoi, Vietnam

Tel. (84-4) 3 8259620; Fax. (84-4) 3 8259628; Email: [email protected]

VietnamPRP profile Page 89

[Signature of staff member and authorized representative of the firm]

06/03/2019