VIETNAM TEAM Cost a nd Benefits Analysis for: Building a Drainage System in Cau Khai Climate Resilience Mekong: Maintaining The Sediment Flows in downstream of the Sre Pok 3 Hydro Power. - PowerPoint PPT PresentationTRANSCRIPT
LOGOCapacity Building Programme on the Economics of Adaptation Supporting National/Sub-national Adaptation Planning and Action
VIETNAM TEAM
Cost and Benefits Analysis for:• Building a Drainage System in Cau Khai• Climate Resilience Mekong: Maintaining The Sediment Flows in downstream of the Sre Pok 3 Hydro Power
Building a Drainage System in Cau Khai- Project name: Building a drainage system in Cau Khai,
Thanh Hoa province
- Funding source: WB, Japan Social Development Fund (JSDF)
- Activities: Building a drainage system (pumping system) to protect 13 communes of Thanh Hoa province to mitigate disaster risks and adapt to climate change
- Total investment: 4.5 million USD
Building a Drainage System in Cau Khai
Costs :Investment costs (water pump, house, drainage system,…)Compensation costs Operation and maintenance costs (electricity, salary for technical and management staff,…)
BenefitsPreventing from flood for more than 1000 ha of crops (rice, maize) => increasing income for local people.Reduce damage to the infrastructures (house, well, traffic road, school and health center,…)Reduce unemployment
Climate Resilience Mekong: Maintaining The Sediment Flows in Downstream of the Sre Pok 3 Hydro Power
- Project name: Climate Resilience Mekong: Maintaining the Sediment Flows in Downstream of the Dam
Climate Resilience Mekong: Maintaining The Sediment Flows in Downstream of the Sre Pok 3 Hydro Power
- Project name: Climate Resilience Mekong: Maintaining the Sediment Flows in Downstream of the Dam
- Project Activities: Building a new sediment sluice gate system of the dam to supply a high nutrient flow for farming in downstream
- Funding source: American Natural Heritage Institute
- Total investment: 75.000 $
Climate Resilience Mekong: Maintaining The Sediment Flows in Downstream of the Sre Pok 3 Hydro Power
- Cost:
+ Investing a new sluice gate system
+ Reducing the product of electricity generation
- Benefits:
+ Improving the dam life
+ Supplying the nutrients for crops at downstream => increasing income for downstream people
+ Fish Passage