horticulture.ap.nic.inhorticulture.ap.nic.in/revisedeoiforpolyhouse.docx · web viewmanifold gi +...

49
GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF HORTICULTURE Public Gardens, Nampally, Hyderabad – 500004. Expression of Interest for establishment of Polyhouse/ Greenhouses & Shadenet Houses. Instructions to Firms Expression of Interest (EOI) is invited from the reputed Firms/ Agencies / Organizations for rate contract of greenhouses/ Polyhouses/ Shadenet houses for establishment of the units. The empanelment is valid for a period of two years (i.e. 2015-16 and 2016-17) from the date of confirmation. The application form along with EOI schedule can be collected from the MIDH cell O/o Commissioner of Horticulture, Andhra Pradesh, Hyderabad by paying the application fee of Rs. 25,000/- (Non- refundable) by way of DD in favour of Commissioner of Horticulture, Andhra Pradesh, Hyderabad from 26- 03-2015. Applications can also be downloaded from the Horticulture website (website http:horticulture.ap.nic.in). and the filled application form with all necessary documents along with application fee of Rs. 25,000/- ( Non- refundable) and Earnest Money Deposit for Rs. 5,00,000 (Rupees Five Lakhs Only) 1

Upload: hoangkhanh

Post on 22-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

GOVERNMENT OF ANDHRA PRADESHDEPARTMENT OF HORTICULTUREPublic Gardens, Nampally, Hyderabad – 500004.

Expression of Interest for establishment of Polyhouse/

Greenhouses & Shadenet Houses.

Instructions to FirmsExpression of Interest (EOI) is invited from the reputed Firms/ Agencies /

Organizations for rate contract of greenhouses/ Polyhouses/ Shadenet houses for

establishment of the units. The empanelment is valid for a period of two years (i.e.

2015-16 and 2016-17) from the date of confirmation.

The application form along with EOI schedule can be collected from the MIDH

cell O/o Commissioner of Horticulture, Andhra Pradesh, Hyderabad by paying the

application fee of Rs. 25,000/- (Non- refundable) by way of DD in favour of

Commissioner of Horticulture, Andhra Pradesh, Hyderabad from 26-03-2015.

Applications can also be downloaded from the Horticulture website (website

http:horticulture.ap.nic.in). and the filled application form with all necessary

documents along with application fee of Rs. 25,000/- ( Non- refundable) and Earnest

Money Deposit for Rs. 5,00,000 (Rupees Five Lakhs Only) (Refundable) by way of

DD in favour of Commissioner of Horticulture, Andhra Pradesh, Hyderabad.

Applications without EMD for Rs. 5.00 Lakhs (Rupees Five Lakhs Only) along

with required documents etc., can’t be considered for empanelment.

The filled application along with EMD etc., is to be submitted in the MIDH cell O/o

Commissioner of Horticulture, Andhra Pradesh, Hyderabad before 3.00 P.M. on

15-04-2015 and the same shall be opened on the same day at 5.00 P.M. in the

presence of representative of the concerned Firm, who may wish to present.1

Nature of Scheme:To ensure round the year supply of Vegetables to the consumer and also to promote cultivation of High value and exotic Vegetables and Flowers with high productivity which in turn increases the net income of the farmer, the Govt. of Andhra Pradesh has taken a new initiative for cultivation of Vegetables and Flowers under Polyhouses/ Shadenet Houses in an extent of nearly 700 acres, throughout the year including summer months.

I. SCOPE The scheme will be implemented during 2015-16 & 2016-17

II. HOW TO APPLY :Application is at Annexure-I.

III.SELECTION CRITERIA :

Please see terms & conditions

for empanelment at Annexure-II.

A.SELECTION OF FIRMS/BIDDERS

1. The firm shall be invited for the technical and financial proposals and shall be selected based on the evaluation of their prequalification criteria in technical and financial bids.

2. The selection will be done by the Committees constituted by the Govt. of Andhra Pradesh.

3. The selection of firm shall be based on Combined Quality cum Cost Based System (CQCBS) for this highly technical project.

4. The technical proposal will be allotted weightage of 70% and the financial proposal will be allotted weightage of 30%.

B. ELIGIBILITY CRITERIA FOR TENDERER

1. Company / firm should have at least Annual turnover of above Rs.1 crore per year in last five years in the establishment of Poly / Greenhouses for Agriculture / Horticulture sector with required technical man power for installation of the Poly / Greenhouse / Shadenet houses

2

2.Company / firm should have sufficient skilled man power and sophisticated machines which required for the fabrication unit as detailed below:

2A. IN HOUSE FABRICATION UNIT:

Well experienced Design Engineer for construction of structure and Micro Irrigation systems including foggers & misters.

Minimum 15 skilled workers for welding, bending, cutting, grinding, drilling, painting and other works which have to be taken for construction.

2B. AT INSTALLATION SITE: Well experienced design / Technical Engineer for structure

and Micro Irrigation systems including foggers & misters.

Maximum skilled workers to be available at least 15 persons along with toolkit per one unit.

2C. MACHINERY REQUIRED: Power press, Grinding, Bending, Lathe, Drilling and

Bensaw Cutting machines other required machinery to be available at work spot.

3. (i) The Company/ firm should submit the detailed designs & drawings for both Polyhouses & Shadenet houses in two views(i.e Isometric view and top view) which are suitable for various places in Andhra pradesh i.e. Rayalaseema, North Coastal & Coastal Districts of A.P. and detailed specifications of each part and quantity for the structure as per specification.

(ii) The Company/ firm should submit the detailed drawings, specifications and quantity for micro irrigation and fogging systems.

4. Thecompany / firm should have experience

of executing

orders

in minimum area of 15 acres in the business of Greenhouse /

Polyhouse in last 5 years under any Central/ State Government programmes in India.

5. The company / firm should posses units on their 3

manufacturing ownfor structure material and will not be permitted

to outsource (Sub-

contract) to other firms / sub-tenderers.

6.The Companies, who are seeking empanelment are supposed to have registered in any state of India, five years back as on the date of publication of notification. Products with BIS standards only are accepted.

7.The company / firm should submit their audited balance sheets for the last preceding three years and also submit turnover for Greenhouse / Polyhouse business duly signed by Chartered Accountant. IT return for last 3 years should be furnished.

8. The company should have ISO certification.The technical bid and financial bids are to be submitted

separately in a sealed cover duly super scribing Technical quote “EOI schedule for Poly/ Greenhouse fabrication and installation” & price quote “EOI schedule for Poly/ Greenhouse fabrication and installation”. Both the technical bid and financial bid sealed covers are to be placed in a third cover along with the covering letter and EMD in the form of Demand Draft duly super subscribing “EOI schedule for Poly/ Greenhouse fabrication and installation” & technical quote and price quote along with name and address of the bidder.

C. GENERAL CONDITIONS

1. Offer will be considered inclusive of all taxes/charges. 2. Any EOI which is not on the proper EOI form and received late

shall not be considered. 3. In case the date of opening falls on Holidays, gazetted or

subsequently declared, the EOI will be opened on the next working day following the closed day.

4. The firm shall have to open at least one sale depo in Andhra Pradesh State with technically qualified staff with all required material.

4

5. The offers should be typed or written in ink. Offers in pencil shall not be considered.

6. The firm shall have to provide test report of products if farmer demands it, but in case of purchase by Department of Horticulture, Govt. of Andhra Pradesh test report is mandatory with the delivery of material.

7. The Commissioner of Horticulture, Department of Horticulture, Govt. of Andhra Pradesh, will have the right of rejecting all or any of the quotations without assigning reasons.

ANNEXURE-IDEPARTMENT OF HORTICULTURE,ANDHRA PRADESH STATE, HYDERABAD.

APPLICATION FORM FOR EMPANELMENT OF COMPANIES FOR

ESTABLISHMENT OF POLY/ GREENHOUSES / SHADENET HOUSES

(To be submitted by the Poly /Greenhouse Companies)

1Name of the firm :

2Year of Registration of the firm and :Registration Number and certificate asbusiness entity registered with any ofGovt. of India registration authority.

3 Firm Profile with office address, :Name of proprietor/Director/Partnerwith photocopy of PAN number

4 Details of distribution network :along with full address

5Address of fabrication unit along with :list of machinery & equipments.

6 Deed of partnership, if applicable :

5

7Approved design, specifications, test :reports and component-wise break upof all type of structures the firm isinterested in

8Experience of firm with the list of :

Works completed.

9 Detailed report of R&D team and :company

10Brochures of the

Company if any to be :

enclosed

11 DD particulars (DD No & Date, :Drawn Bank) for Rs.5,00,000/- asEMD (Earnest Money Deposit)

12. Price quoted per sq.mt of Polyhouse / Shadenet houses erection (pl.see the indicative specifications- Annexure-III) Please note that the Drip Irrigation and foggers cost is inclusive of the Polyhouse / Shadenet houses erection.

I/We hereby declare that, I/We have read and understood the Terms and Conditions of EOI relevant to Notification dated:___/__/201_ and I/We have submitted all the prescribed ‘Annexures’ in accordance with the Terms and Conditions of the above Notification and the prices (inclusive of all taxes at delivery site) offered are in accordance with the technical specification of EOI and the prices quoted by our firm M/s ____________________________________________________________ is as follows.Naturally Ventilated - Polyhouses: (Aero dynamic)

Sl.No. Slab

Rate per sq.mt prices (inclusive of all taxesat delivery site including insulation) (in Rs.)

(Please indicate in words also)

6

1. 200-560 sq.mts

2. 560-1008 sq.mts

3. 1008-2080 sq.mts

4.2080-4000 sq.mts andabove.

As per MIDH Guidelines Shadenet houses ( Tubular Structure )

Sl.No. Slab

Rate per sq.mt prices (inclusive of all taxes

at delivery site including insulation) (in Rs.)(Please indicate in words also)

Dome shape Flat Shape1. 200-560 sq.mts

2. 560-1008 sq.mts

3. 1008-2080 sq.mts

4.2080-4000 sq.mts and

above.

Place: Signature with sealDate:(Last date for submission of filled-in application is on or before ___________ by 3.00 P.M.)

ANNEXURE-II

TERMS & CONDITIONS FOR EMPANELMENT OF FIRMS FOR

POLYHOUSES/ SHADENET HOUSES

The empanelment of firms shall be governed by terms & conditions of the Department. The firm has to submit undertaking on Rs. 100 stamp paper duly notarized to this effect that he is abiding by the following terms and conditions of empanelment:

A. ELIGIBLE CONDITIONS FOR OFFERER(S) :

7

1)Mere fulfilling of the requirements of Department does not entitle the firm to empanel in the State of Andhra Pradesh or empanelment for Polyhouse / Shadenet structures.

2)The Department is free to check the firm’s antecedents and verify firm claims. At any point of time, if any, discrepancy is noticed, then Department is free to cancel empanelment of the firm and the security amount shall be forfeited and liable for legal action.

3)The firm is empanelled subject to inspection of fabrication unit of firm and/or Polyhouses/net houses installed by firm. In case, of any defects / deficiency/ discrepancies found during inspection, the empanelment will be cancelled, no subsidy will be released in that case, bank guarantee shall be forfeited and the firm is liable for legal action.

4)The supplier should supply the material as per the standards mentioned in annexure for Polyhouse / Shadenet and should have agreement with the polythene sheet & structure manufacturers for minimum period of 3 years including structure material. All the test data sheets (TDS) should be included in the technical bid. CIPET report should not be less than 6 months old.

5)The supplier should have agreement with any Micro irrigation company of the approved list of APMIP of Govt. of Andhra Pradesh.

6) The supplier should have minimum 5 years of experience in manufacturing, designing and laying of structures and should submit the experience letters from the competent authority of the Government agencies concerned. They should prepare designs of Polyhouses and Shadenet houses suitable for Coastal / North Coastal districts and Rayalaseema Districts also. Submit both in soft and hard copies and Quote prices separately based on designs, duly following the specified and standard of materials.

7)The Offerer (s) should have a full fledged workshop with sufficient skilled technical personnel for fabrication of Structure as per the prescribed specifications and to attend

8

installation and after sales service.

8)The firm should have VAT (TIN), CST Registration and PAN number and Sales Tax assessment returns.

B. INSTRUCTIONS FOR SUBMISSION OF EOI SCHEDULE:

1. The offerer(s) shall submit in their EOI Schedule with all documents indicated in Annexure-III in a separate sealed cover duly super scribing “EOI Schedule for Fabrication and installation of Greenhouse and Price quotes as per Annexure-VII & VIII (indicative specification) in a separate sealed cover duly super scribing “Price quote for naturally ventilated Polyhouse / Greenhouse / Shadenet hoses with name and address of the Offerer(s). Both covers are to be placed in a third cover along with covering letter and EMD Demand draft as stipulated under the Instructions for Submission of EOI Schedule duly super scribing “EOI Schedule for Fabrication and installation of Greenhouse & Shadenet hoses”.

2. Earnest Money Deposit (EMD) for an amount of Rs.5,00,000/- (Rupees Five Lakhs only) shall be paid in the shape of Demand Draft drawn in favour of Commissioner of Horticulture, Andhra Pradesh State, payable at Hyderabad along with a covering letter and should be enclosed along with technical schedule EOI Schedule without EMD will be rejected.

3. The Offerer(s) shall submit duly notarized declaration along with EOI, as per the proforma furnished under Annexure-IV, with Rs.100/- Non-Judicial stamp paper.

4. The authorized person representing the firm who is signing on the EOI documents and also participating in the EOI opening shall invariably attach a copy of authorization from the competent authority of the firm as per the Bye-laws of the firm / Company.

5. Thelast date for submission of EOI schedule is 15.04.2015

up to 3.00 p.m.The technical quotations will be opened

at 5.00 p.m on the same day.9

6. The EMD amount will be returned to un-successful Offerer(s) on finalization of EOIs i.e., after agreement / price acceptance within 3 months from the date of opening.

7. The EMD of successful Offerer(s) shall be retained by the Department and refunded only after satisfactory completion of the contract. The EMD shall be adjusted against the Performance Bank Guarantee for the successful Offerer(s). This deposit will not carry any interest.

8. The suppliers who are willing to appoint dealers & service centers in Andhra Pradesh States are only eligible to participate in the EOI.

C. GENERAL TERMS AND CONDITIONS :

1. The Offerer(s) have to quote the prices as per the technical specifications given in the EOI schedule in Annexure-VII & VIII.

2. The Price quotes of only those Firms whose EOI Schedules are qualified for acceptance will be opened with due intimation to them.

3. Negotiations will be held as per the decision of the Technical Committee appointed by the Government of Andhra Pradesh at the address indicated in the data sheet. The aim is to reach agreement on all the points and sign a contract.

4. The agreement period will be up to 2 years from the date of signing the agreement. The successful Offerer(s) have to submit their price acceptance letter, agreement etc., within 10 days from the date of receipt of draft agreement. No Escalation charges will be paid for supply of equipment during the agreement period. If the contractor or firm fails to supply the material within the stipulated period without obtaining prior permission from the authority, such agreement will be terminated. When a firm or contractor indulges in fraud, mischief, representation in obtaining the contract such firm or contractor shall be blacklisted.

5. The manufacturers should submit list of dealers along with mail address & bank account details at the time of agreement without fail. No addition & deletion shall be entertained afterwards.

6. Performance Bank Guarantee of Rs. 50,00,000/- (Rupees Fifty 10

Lakhs only) should be furnished at the time of agreement in favour of Commissioner of Horticulture, Andhra Pradesh State.

11

7. The supplies made shall be invoiced on VAT invoice with serial No. of invoice printed on it. No invoice other than Tax invoice will be accepted. VAT applicable, if any, shall be clearly mentioned in the Tax invoice.

8. The supplier shall submit minimum 20 no. of satisfied farmers list along with contact numbers, full address for whom they have installed the Polyhouse/ Greenhouses/ Shadenet houses from the last 3 years i.e. 2012-13 to 2014-15 for physical verification by the technical team to ascertain the quality and function.

9. The Suppliers, Fabricators of Polyhouse who is participating in the EOI should indicate the details of authorized dealers in the EOI Schedule. The authorized dealer / distributor/ Fabricator of the successful offerer(s) will have to pay the Performance Bank Guarantee of Rs.50,00,000/- for Polyhouse and Shadenet hoses to empanel their firm as authorized dealer/distributor before entering into contract agreement. The dealer should have TIN/CST/ PAN numbers. The name of the firm once included in the approved list will not be deleted up to the end of the financial year unless felt by the EOI agency or Commissioner of Horticulture, Andhra Pradesh State.

10.a) Performance Bank Guarantee produced by the successful Offerer (S) shall be forfeited and alternative arrangements shall be made, if the firm does not fulfil the obligation of supply of stocks as per orders / specification / quality and alternate arrangements will be made for procurement of such products and any additional cost incurred in this regard will be recovered from the concerned firm. The arbitration will be initiated and shall remain final.

b) The responsibility of quality and quantity (eg. Misbranding / Substandard material) of the material supplied lies with supplier only.

11.Warranty: 10 years warranty from the date of installation for structure excluding poly film and Shadenet. For poly film 3 years warranty for all material and installation defects.

12.All those manufacturers, who had filed valid EOI and are willing to supply the Material at the accepted rate will be given opportunity to supply the Material for which they have offered

12

subject to the acceptance of the terms and conditions .

13

13.The firm has to provide at least five years after sales service of structures including Polyhouse / Shadenet houses and for Irrigation systems after installation of unit.

14. For testing of material, the fee shall be borne by the firm as and when required.

15. The firm or contractor deemed to be indulged in unfair business practice such as erection of Polyhouse structure with a faulty design and supply of sub-standard material, and deficiency in after sale service, penalty will be imposed as decided by the Commissioner of Horticulture as the case may be.

16. Penalties:- Penalty will be imposed for the below mentioned reasons other than departmental failures at following rates. S.No Item Penalty in Rs.

1.a. Delay in erection of Rs. 35/- per square meter shall be paid

Polyhouse for 15 to the farmer by the concerneddays from the contractor /firm.stipulated date.

b. Delay in erection of Rs. 70/- per square meter shall be paid

Polyhouse/ Shadenet houses for 30 to the farmer by the concerneddays from the contractor /firm.stipulated date.

c. Delay in erection of Rs. 140/- per square meter shall be paid

Polyhouse for 45 to the farmer by the concerneddays from the contractor /firm.stipulated date.

d. Delay in erection of In case of delay in erection of Polyhouse

Polyhouse / Shadenet houses even after even after EOT the work order will beEOT. cancelled.

2.Erection of Polyhouse The structure should be re-laid by theStructure with faulty concerned contractor / firm on their

Designown cost within a period of 30 days fromthe date of complaint received from the

14

farmer/department. A penalty ofRs.70/- per square meter shall be paidto the farmer by the concernedcontractor /firm. If the firm does notrespond than the penalty shall berecovered from the performance bankguarantee and necessary action shall beinitiated against the firm.

3.Supply of Sub-standard

The material shall be replaced as per

Materialthe technical specifications of the EOI bythe concerned contractor / firm on theirown cost within a period of 30 days fromthe date of complaint received from thefarmer/department. A penalty ofRs.140/- per square meter shall be paidto the farmer by the concernedcontractor /firm. If the firm does notrespond than the penalty shall berecovered from the performance bankguarantee and necessary action shall beinitiated against the firm..

4. Deficiency in AfterThe firm/ contractor shall attend to the

Sales Servicecomplaint within 15 days from the dateof complaint received from the farmer/department. A penalty of Rs.5000/-shall be paid to the farmer by theconcerned contractor /firm. If the firmdoes not respond than the penalty shallbe recovered from the

15

performancebank guarantee and necessary actionshall be initiated against the firm.

17. If the supplying firms fail to supply the material within the scheduled time i.e. 21 days from the date of receipt of purchase order, the firm/ contractor shall seek extension of time (EOT) from the authority duly explaining the reasons for EOT. If the firm fails to supply the material within the stipulated time without getting EOT from the authority the contract is liable to be terminated. In case of any eventuality such as, natural calamities and things which are beyond the control of the firm/contractor, such cases may be brought to the notice of the authority for consideration and obtaining prior written permission. Otherwise the penalty will be levied as indicated above.

18. Liquidated damages will be levied at the rate of 0.5% of the total value of work per week up to a maximum of 5% in case of default in the supply of material as per technical specifications.

19. The firm has to undergo Tri Party Agreement (TPA) with the farmer and Department in each case after administrative sanction before execution of work. This TPA will be signed and followed by each involved party and will be submitted in O/o ADH / DDH.

20. The firm has to follow norms & guidelines of Polyhouses/ Shadenet houses issued by the Department from time to time and shall abide by it.

21. A) Assistance amount including the farmers contribution will be released by the Department to the empanelled firm.Schedule of payment in case of non-loanee cases.

I. 25% of the farmer contribution will be released to firms along with Administration sanction.

II. 25% of the farmer contribution will be released at the time of completion of work (i.e. 75% of the work should be completed).

III. Subsidy will be released only on successfully completion of units as per the specification, standards and designs, and with the recommendation of Joint inspection

16

Committee report etc.B) In case of bankable projects the release of subsidy to farmer will be back ended with credit linked facility.

22.The firm has to abide by the inspection report of the Department and shall abide by its terms & recommendations. Pre-installation physical verification of material at the time of supply of material and post installation physical verification after installation will be carried out by the team of department.

23. The supplier has to show the demonstration of the functioning of foggers / drip irrigation to the beneficiary before taking signature of the beneficiary on Utilization Certificate. The firm has to educate the farmer on do’s and don’ts of operation of Polyhouse.

24. The acknowledgement (Proof of Delivery) along with photograph and other required documents for the material delivered should be signed by the beneficiary and countersigned by the concerned Horticulture officer and Assistant Director of Horticulture for all the material. Material should not be delivered without valid purchase order/ Indent from the competent authority.

25. The loading, un-loading, handling charges and demonstration expenses, should be borne by the supplier only.

26. The Supplier shall provide detailed operational and maintenance manuals, parts catalogue (in the local language) at the time of supply of the material to the beneficiary and training should be imported to the farmers in operation and maintenance of the Polyhouse.

27.Random inspection of all material distributed under subsidy schemes will be conducted by suitable committee / team appointed by the Commissioner of Horticulture, Andhra Pradesh State before / after the equipment is supplied to the beneficiaries.

28.The assistance shall be released as per guidelines or as decided by competent authority.

29. Commissioner of Horticulture, Government of Andhra Pradesh may add or delete or modify any term & condition as per requirement and in public interest and as recommended by the committees constituted by Govt. of Andhra Pradesh.

30.Commissioner of Horticulture, Andhra Pradesh State reserves 17

the right to award the EOI either in part or full or to empanel on rate contract or follow any other suitable procurement procedure. Commissioner of Horticulture, Andhra Pradesh State at its sole discretion and without assigning any reason thereof, reserves the right to accept / reject any or all bids at any stage of the EOI process.

31.In case of any dispute or difference arising out of the agreement between the two parties relating to any aspect of the agreement, the parties should attempt to settle the dispute through mutual and amicable discussions.

32.It is further to be agreed by both the parties that all differences and disputes if not resolved as above, shall be got remedied through the Court of Law of Hyderabad jurisdiction only.

33.The EOI Schedule can be rejected if at any stage of the procurement process, it comes to knowledge that any Offerer(s) is involved in any fraudulent practice or misrepresentation of the facts or tried to influence the selection process or indulged in any corrupt activities in competing with others.

34.The agency shall submit an affidavit attested by the authorised notary that "the agency has not been blacklisted by any Government of India / State Government or its department and no legal issues regarding any works is pending in any court of law during the last three years.

35.The Firm/Contractor is liable for prosecution and also blacklisting, when he deliberately and intentionally suppress the facts and plays fraud or mischief and gives false information in the affidavit submitted by the Firm/Contractor, in such event, the Firm/Contractor shall be liable for prosecution and blacklisting.

Sd/- Smt. V.Usha Rani, IAS,Commissioner of Horticulture

Andhra Pradesh State, Hyderabad

ANNEXURE-IIILIST OF DOCUMENTS TO BE ENCLOSED (CHECK LIST)

Sl.18

Documents to be enclosed to the EoINo.

1Application Format – Annexure-I along with details of EMD for Rs. 500000 (Rupees Five Lakhs only) bearing DD.NO. with date and drawee Bank

2 Brief Profile of the Firm

3

Bank particulars for online transfer of amounts ( i.e. Bank name , SB A/c No. , Branch , Bank code and IFSC code etc.)

4Whether the firm is having valid manufacturing license fromthe competent authority (copy to be enclosed)

5Details of dealer network in Andhra Pradesh State and Operating Districts

6Documents pertaining to VAT Registration, CST No, SSIRegistration etc., as applicable

7 TIN, PAN etc. having validity8 Annual Turn Over of the firm for the last (5) years

9Whether the Company is ISO certified or not (If ‘yes’ copy tobe enclosed)

10Proof of having sufficient no. of technicians with experience(List out details about names of persons / Experience /qualification with temporary and permanent addresses alongwith E-mail address)

11Authorization letter from the Competent authority as perthe rules of the firm in case of authorized personrepresenting the firm.-Annexure - VI

12 Audited accounts balance sheet for the last (3) years

13Income Tax assessment Certificate for the last (3) years

14 Declaration– Annexure – IV15 Declaration for not Black Listed – Annexure – V16 Farmers list and contact numbers along with

19

permanentaddress.

On Rs. 100/- Non Judicial stamp paper

ANNEXURE-IV

DECLARATION

1. I/We have read and understood the Terms and Conditions of EOI relevant to Notification dated:___/__/201_ and I/We have submitted the ‘Annexures’ in accordance with the Terms and Conditions of the above Notification.

2. The information furnished in the ‘Application for EOI’ are true and factual and I/We clearly understand that our EOI is liable for rejection, if any vital information is found either not true or incorrect at any point of time.

3. I/ We shall not sell the products being quoted through this EOI schedule, at a lower price either to Government/ Private Parties in the State of Andhra Pradesh by of giving any additional trade discount or incentives. If any such incident is noticed, The Commissioner of Horticulture, Andhra Pradesh has the right to restrict all payments to such a lower rate apart from the initiating penal action.

PLACE: Signature of the applicantwith seal of firm

DATE:

Full address:Email ID:Contact No.

20

WITNESSES SIGNATURE WITH FULL ADDRESS:

1.

2.

ANNEXURE-V

(DECLARATION ON BLACKLISTING ISSUE)

ToThe Commissioner of Horticulture,Andhra Pradesh State,Hyderabad.

Dear Sir / Madam,

Sub :-

Ref :- _______________________________________

***

I / We __________________________________________ hereby confirm that our firm has not been banned or blacklisted by any Government Organization / Financial Institutions / Court / Public Sector Unit / Central Government.

PLACE: Signature of the Offerer(s)with Seal

DATE: Name :Designation :

21

Annexure –VI (Letter head of the Firm) AUTHORIZATION LETTER

M / s . … … … … … … … … … … … … … … … … … … … … … … … … . . . … … … … ………………………………………….………………………… (Name & address with telephone no. of dealer) is working with/on behalf of our firm as our authorized representative for the State of Andhra Pradesh.

He / She is authorized to submit, collect & represent us and provide full support in making your empanelment successful. Further, we authorize him to furnish technical and to quote and negotiate price information.

Signature of Authorized signatory

NameDesignation

22

Permanent address

Contact No:E-mail ID :

Seal of the firm

Dated…………………

23

Annexure-VII

A.Technical specifications for NATURALLY VENTILATED POLYHOUSE.

* Products with BIS standards only are accepted. Items Description / specifications

Product Naturally ventilated greenhouse/ PolyhouseSize The following 4 slabs are proposed in the

programmea. 200-560 sq.mtsb. 560-1008 sq.mtsc. 1008-2080 sq.mtsd. 2080-4000 sq.mts and above.

OrientationPreferably North South direction

Width of each bay 8 meters

Distance between consecutive 4.0 mcolumn pipes

Area (m2) Plane land Hilly area (m)(m)

Ridge (Central ) height560 6.5 6.25

1008 7.5 71008 to 4000 7.5 7 to 7.5

Hieght can be fixed as 6.5 mts for Costal region and 7.5 mts for Rayalaseema region1.3 m vertical height and 1.3 to 1.5 slanting

Ridge ventheight; roof ventilator should be provided inslanting position.4 mt- upto 560sq.mts Polyhouse and 4.5mt

Gutter heightfrom 1000sq.mt onwards from the ground level(based on area of greenhouse and climaticconditions)

Gutter slope 2%

Longitudinal slope 2%

2 mm thick and 450 mm width GI Sheet with

Gutter materialperimeter of 450 mm and with industrial press,

24

100% leakage proof of galvanized sheetminimum of 275 GSM ( grams per sq.mt.) Zinccoating.Gothic shape with roof and side ventilation.The structure is designed to be enough to with

Structural designstand wind speed minimum 120 km / hour. It isto provide provision for opening one port ateither side for entry of small tractor / powertiller for inter cultural practices.

Items Description / specificationsComplete structure made of hot dip galvanizedsteel tubular pipes with a minimum of 360 GSM(with Zinc coated on continuous procedure to

Structure meet the quality requirements or equivalentsection confirming). BIS standards having wallthickness 2mm; structural member should bejoined with fasteners (HOT Dip Galvanized nutsand bolts) Properly.

Columns 76mm OD,2mm thick. Hot Dip 360GSM GI.

Trusses without joints 8 mts long Bottom cord 60mm OD, 2mm thick, 8 mt. long,for better load bearing. Hot Dip 275 GSM GI.

50mm OD with 2mm thickness. Bracing 33mmTrusses member/ Arch’s OD with 2.0mm thickness G.I. Pipe Structural

members to be fitted in plated nuts, bolts andwashers without welding. (33 mm bracing toincrease the strength and to with stand verticaland horizontal pressures.)

Stay/ Hockey pipes 60mm OD with 2mm thickness, fixed in theground without any joints and welding.

Purline 48 mm OD with 2.0mm thickness at ridge gutterarch and 42/43 OD with 2.0 mm thickness for2nd purline.

Purline member and other 43 mm,2mm thicknessHorizontal bracings 42mm OD with 2mm thickness horizontal

bracing 2 No’s must provide each bay in bothsides.Every 2 column to 3 column of both sides must

Cross Bracing be connected 42mm OD with 2mm thickness GIpipe to ground the wind load. (In vegetablePolyhouses to take the weight of the crop andtransfer the wind pressure cross bracings are

25

essential).Bottom to pillar Bracing 33mm OD with 2mm thickness 1.2m long

bracing to be fixed from pillar to bottom.Insert GI Pipes of minimum 76mm OD 3mmthickness with 1mm tapered top 1ft. or more to

Foundations have foundation depth of not less than100cm ormore depth depending upon soil type andprevailing wind condition, grouted withcement concrete mixture of 1:2:3 usingtelescopic insertion of column.

Fasteners All nuts and bolts must be of high tensilestrength and electro galvanized.

ItemsDescription / specifications

Entrance room Indoor (notrequired upto 560 sq.mt. from1000sq. mts it is required.)

One entrance room of size 3x3x2.5 mts.(LxWxH) need to be provided and covered withPoly carbonate UV stabilized transparent withsliding arrangement. Outer hinge door of size1.5m width and 2.5m height and sliding type.

UV stabilized 200 micron 5 layers co-extrudedanti drip/mist, anti dust, diffused, IR coolinghaving minimum 85% level of light

Cladding material (Poly film)

transmittance.All ends/ joints of plastic film need to be fixed

Fixing of cladding materials with two way aluminium profiles(220grams/RM) with suitable lockingarrangements along with curtain top.Zig zag spring high carbon steel with spring

Spring insertaction wire, galvanized of 2-3 mm diameter

26

must be inserted to fix shade net intoaluminium profile.i)UV stabilized 200 micron 5 layers co-extrudedtransparent plastic film should be provided ascurtains on all sides having manual operated

Curtains and insect screens crank mechanism.

(monox mono is nylon fibre,ii) 40 mesh ( 115 to 120gsm) nylon insect proof

inter locked, woven mesh, more

nets (UV stabilized), of 4.5 mts height above all

life) four sides.iii)35% Mono x Mono white Shadenet, should befixed at side ventilators below the curtains. GIpipes are suggested to ensure smoothfunctioning of the curtain.

UV stabilized mono x mono 35 % ( 115 to120gsm) shading net has to be provided

Shadenethorizontally at gutter height, below the UVsheet – inside the greenhouse with manuallyoperated mechanism for expanding andretracting. The area covered by shade netshould be equal to the floor area of greenhouse.

UV stabilized HDPE woven fabric, 150 GSM thickfor a height of 60cm and 40 cm buried below

Side apronground vertically and 20cm horizontally. (HDPEwoven fabric of 150 GSM will have morestability and with stand the pressure of upward

27

as well as horizontal wind better than thepolythene film)

28

Items Description / specificationsErection of Trellies For cultivation of Capsicum, Tomato and

Cucumber, GI wire of 3 mm thickness to befixed over the beds in horizontal/ verticaldirection. Two wires over the bed.Provision of PVC pipe of 4” diameter should be

Rain water harvestingmade, from gutter to ground for collecting rainwater from the roof top. Drainage gutter andend caps to be provided.

* Hard surface path of 1 mt. wide is to be provided to facilitate the movement in the Polyhouse

After sales services (the firm have to provide)

10 years warranty from the date of

Warrantyinstallation for structure excluding poly filmand net. For poly film 3 years warranty forall material and installation defects.

TrainingFree training for operation and maintenancefor one year.All plastic materials used in the Greenhouse

Testing should be tested by the CIPET for qualityassurance (not older than 6 months report)

B. MI Component

Indicative Quantity of Material of Drip/Fogging System in Polyhouse/ Shadenet House

** Products with BIS standards only are accepted.29

Sl.No Description of Items Unit

A Drip System1 Main and Sub-main Line PVC 63 mm x 4 Meter

kg/cm22 Main Line PVC 75 mm x 4 kg/cm2 Meter3 16mm LLDPE Lateral line CL-2 Meter

4Inline 16mm, 1.3 to 2.4LPH @ 20-40 cm CL2 Meter

30

5 Ball Valve 63 mm (Moulded Seal, Plain) Nos.6 Ball Valve 75 mm (Moulded Seal, Plain) Nos.7 Sub-main Flush Valve 40mm Nos.8 Sub-main Line for Flushing 40 mm X 6 kg MeterB Fogging Machine1 Main and Sub-main Line PVC 50 mm x 6 Meter

kg/cm22 Main and Sub-main Line PVC 63 mm x 6 Meter

kg/cm23 16mm LLDPE Lateral line Meter4 4 way Fogger Assembly with HP LPD Nos.5 Ball Valve 50mm (Teflon Seal, Plain) Nos.6 Ball Valve 63mm (Teflon Seal, Plain) Nos.7 Sub-main Flush Valve 40mm Nos.8 GI Wire 2mm thick Meter9 Sub-main Line for Flushing 40 mm X 6 kg MeterC Filtration Unit Nos.1 Disc filter 25 m3/hr Nos.2 Disc filter 40 m3/hr Nos.3 Sand filter 10 m3/hr Nos.4 Sand filter 25m3/hr Nos.5 Sand filter 40 m3/hr Nos.6 Manifold GI + GMV Nos.7 Ventury Assembly Complete Nos.8 Air Release Valve Assembly 1" Nos.

Note:1.For any additional/optional item that is fitted/provided in

structure by firm with the consent of farmer that shall not be part of cost norms*.

2. The list above under MI component is tentative. However, the actual material to be used at site may vary as per structural design requirement and this will be binding to the firm.

31

Annexure - VIII

SPECIFICATIONS FOR SHADENET HOUSE

Sl.

NoITEM SPECIFICATIONS

01 STRUCTURESIZE According to requirementShape As per designWithstand to wind velocity

-Structure may be design to withstand wind velocity upto 104 Km/hr-120Km/Hour per hrs in high wind velocity zone

Foundation2 mm thickness GI Pipes compatible with columns, length 1.2m

Main ColumnSize 60.OD, Thickness 2 mm, Wt per length 2.85 kg, length -4m

Purlins

Purlin GI pipes-size 42/43 OD/thickness 2mm, Wt per length 2.00/2.10kg length -4m purlin members-33/32 mm OD/2 mm thickness, Wt. per length 1.60 kg

ComerSize 60 OD, Thickness 2 mm, Wt. per length 2.30 kg, length 0.15m

Four Way Pipe Couplers

Size 48 OD, Thickness 2 mm, Wt. per length 2.30kg, length-0.15m

Five Way Pipe Couplers

Size 48 OD, Wt. per length 2.30 kg Thickness 2 mm, length-0.15m

Nut Bolts Size 3/8”

Grid Size 4x4, 8x4,4x6 (m)

Gable length4.0m,

Centre Height * Flat Structure -4m*Hut /dome type structure – Centre height -4m, side height -2.5 m

2. Aluminum Profile

C type Aluminum profile to fix Shadenet to the structure by means of self tapping screws. Weight of aluminum profile is 200-220 gm/ meter. Self Drilling Screw should be fixed on profile every 40 cm along the full length of the profile.

32

Sl.

NoITEM SPECIFICATIONS

3. Spring Insert

A coated spring I preferable compared to cold galvanized spring as a coated spring transfer less heat to the plastic and thus enhances the life of the plastic.If we are using GI spring it is better to use a two inch strip of new poly film to be placed over the main plastic in the profile and then lock it with GI profile. This will help in longer life of the plastic as the rusted spring will not directly come in contact with the main plastic. Wire material should be high carbon spring steel with spring action.

4. Shadenet

UV stabilized, ranging from 30% to maximum 75% GSM shade depending upon the crop, made up of ISI/applicable national standard, white/green/ black/suitable colour.

5. DoorPolycarbonate/polythene sheet door with 1m widths and 2m height and another door of 1m X2 m Box section frame is embedded inside for the strength.

6. Anti-Room Anti-room of size 4m X 3 m attached to net house.

7.Civil work/foundation

Cement concrete 1:2:4 block of size 40cm X 40 cm X 90 cm for embedding vertical poll/pipe of Shadenet, subject to revision as per requirement of site.

8. Overall slop 1 to 1.5%APRON Use of APRON in Shadenet

B. Shadenet House/Insect House (Dome shaped)

S.no. Particulars Description

1 Area in sqm 1000 to 4000 sqm

2 Length of structure As per design

3 Width of the structure As per design

4 Grid 4 m x 6 m

5 Straight Corridors Maximum 2 m all sides for area calculationStructural parts (GI Pipes)-

33

Sl.No.

Name of the part Length in m Dia in mm

Thickness in mm

1 Foundation pipe 1m to 1.2 m 48 mm OD

3 mm

2 Net house column- centre

4 m 60 mm OD

2 mm

3 Top purlins 4 m and 6 m 43 mm OD

2 mm

4 Clamps and nut bolts As per requirement

5 Corridors 2.0 m 60 mm OD

2 mm

6 Horizontal members 1 to 1.5 m 42 or 33 mm OD

2 mm

7 Cross Bracings at top corners

As per requirement 42 mm OD

2 mm

8

Knee bracing to connect horizontal and vertical member at the corner

0.5 m 33/42mm OD

2 mm

9 Arches As per requirement 42 mm OD

2 mm

10 Column- side 3m 60 mm OD

2 mm

Other parts of the structure:-

Sl.No.

Particulars Description

1 Shadenet OR Insect Net

50% at the top of the structure fitted in Aluminum profile and springs. (Red, Green or white) UV stabilized, UV stabilized 40/50 mesh white colored insect net.1m high woven fabric should be allover periphery (150GSM/200GSM)

2Shadenet (On top underneath top net)

Non- motorized for all sizes. Gear wire manual operation system with rotary handle having ball bearings. Shadenets 40/50/75 % based on crop requirement of any color.

3 Aluminum Profiles Al profiles of 200 to 220 gr per running m 4 Spring Insert Zigzag spring (UV stabilized plastic

coating) insert to fix Shadenet/insect net to Profile. 2.3 mm diameter of spring wire

34

Sl.No.

Particulars Description

and cold galvanization is applied on the wire. Wire material is high carbon steel with spring action.

5

Foundation work Telescopic type. The column size to be 45 cm x 45 cm x 90 cm depth of CC 1:2:4 ratio properly compacted over 10 cm layer of 1:8:16. Two hold fast to be used in perpendicular direction at 20 cm apart in concrete starting from 20 cm from base.

6 Top purlins To be fixed on each column on top (4 m x 6 m)

Entry Room (2 door of 2m x 2m Aluminium and poly carbonate mix)

Sl.No.

Description Specification

1 Entry room size 4 m x 4 m, 4 m x 3 m, 3 m x 3 m

2 No of doors 02 (inner door may be of frame stitched with 40 mesh insect net of minimum 50 cm overlapping)

3 Door size 1.2 m x 2 m; Door of GI square pipe

4Frame of door (ISA four sides to cover the gap below the door)

Galvanized

5 Half part of door (Downside)

Aluminium sheet

6 Upper half part of door Poly carbonate sheet 5 mm thick

7 Flooring Bricks flooring with plaster 15 mm thick

MI Component35

Indicative Quantity of Material of Drip/Fogging System in Polyhouses/Net House

Sl.No Description of Items UnitSize of Polyhouse(sqm)

500 1008 2080 4000

A Drip System

1 Main and Submain Line PVC 63

mm x 4 kg/cm2

Meter 36 48 70 110

2 Main Line PVC 75 mm x 4

kg/cm2

Meter 0 0 0 60

3 16mm LLDPE Lateral line CL-2 Meter 60 70 130 200

4 Inline 16mm, 1.3 to 2.4LPH @

20-40 cm CL2

Meter 260 500 2000 4000

5 Ball Valve 63 mm (Moulded Seal,

Plain)

Nos. 2 2 2 2

6 Ball Valve 75 mm (Moulded Seal,

Plain)

Nos. 0 0 0 1

7 Submain Flush Valve 40mm Nos. 2 2 2 2

8 Submain Line for Flusing 40 mm

X 6 kg

Meter 30 40 60 110

B Fogging Machine

1 Main and Sub-main Line PVC 50

mm x 6 kg/cm2

Meter 36 42 70 110

2 Main and Sub-main Line PVC 63

mm x 6 kg/cm2

Meter 0 0 210 60

3 16mm LLDPE Lateral line Meter 250 450 900 1900

4 4 way Fogger Assembly with HP

LPD

Nos. 82 125 280 585

5 Ball Valve 50mm (Teflon Seal,

Plain)

Nos. 2 1 1 0

6 Ball Valve 63mm (Teflon Seal,

Plain)

Nos. 0 0 0 1

7 Submain Flush Valve 40mm Nos. 2 2 2 236

Sl.No Description of Items UnitSize of Polyhouse(sqm)

500 1008 2080 4000

8 GI Wire 2mm thick Meter 200 350 800 1400

9 Submain Line for Flusing 40 mm

X 6 kg

Meter 36 42 60 110

C Filteration Unit Nos. 1 1 1 0

1 Disc filter 25 m3/hr Nos. 0 0 0 1

2 Disc filter 40 m3/hr Nos. 1 1 0 0

3 Sand filter 10 m3/hr Nos. 1 1 0 0

4 Sand filter 25m3/hr Nos. 0 0 1 0

5 Sand filter 40 m3/hr Nos. 0 0 0 1

6 Manifold GI + GMV Nos. 1 1 1 1

7 Ventury Assembly Complete Nos. 1 1 1 1

8 Air Release Valve Assembly 1" Nos. 1 1 1 1

Note:

1. For any additional/optional item that is fitted/provided in structure by firm

with the consent of farmer that shall not be part of cost norms*.

2. The list above under MI component is tentative. However, the actual

material to be used at site may vary as per structural design

requirement and this will be binding to the firm.

General conditions of Erection

37

1. No pipes should be welded as all length GI pipes are available in the

market.

2. The net must be buried in the ground at least 50 cm from ground level.

3. The main column and small column must touch the concrete of the

foundation and the foundation pipe should not be visible. In other words,

the foundations should be leveled.

4. Supplier should ensure checking of net-house construction materials for

specifications by department representatives after supply of materials at

site.

5. Trellising system – Trellising wires of 2 mm gear wire or 3 mm dia high

carbon steel to be used at 3 m height from ground level parallel to beds

and No of wires will be 6 for 6 m span. The trellis support wires for

support to trellising wires should be of 4 mm or 3 mm gear wire rope

and to be fitted at 4 m distance. The trellising wires should be

connected to a Base wire connected to both ends to the periphery

columns. The dia of such wires should be 8/10 mm. These wires should

be fitted to anchor buried in ground at each end. The dia of such anchor

should be minimum 12 mm and it should be buried in ground at least 90

cm in ground with 1:2:4 concrete. A pit of 45 cm x 45 cm x 90 cm to be

used for foundation and the anchor should be buried with hold fast.

6. If fixtures found rusted the structure will be considered incomplete.

7. Regarding material used under MI component the firm will use BIS mark

material. The system should run smoothly and there shall be no

leakage.

8. The overall structure should perform satisfactorily in all respects.

C. Shadenet House/Insect Net House (Top Flat) 38

** The above specifications are indicative only and Commissioner of Horticulture, Government of Andhra Pradesh may add or delete or modify any term & condition as per requirement and in public interest and as recommended by the committees constituted by Govt. of Andhra Pradesh.

Important activities and Dates:

SNO. Activity Amount/ Date1. Non Refundable Application fee Rs. 25,000/- in favour of

Commissioner of Horticulture,Government of Andhra Pradesh

(Payable at Hyderabad)2. Earnest Money Deposit Rs. 5,00,000/- in favour of

(Refundable) Commissioner of Horticulture,Government of Andhra Pradesh

(Payable at Hyderabad)3. Performance Bank Guarantee (at

thetime of agreement for the shortlisted firms)

Rs. 50,00,000/- in favour ofCommissioner of Horticulture,Government of Andhra Pradesh

4. Issue of Application 26.03.2015

5.Last date Submission of Application 15-04-2015 by 3:00 PM

6. Opening of Applications 15-04-2015 at 5:00 PM

Sd/- Smt. V.Usha Rani, IAS,Commissioner of Horticulture,

A.P, Hyderabad

39

Sl.No Particulars Description

1 Area in sqm 1000 to 4000 sqm2 Length of structure As per design3 Width of the structure As per design4 Grid 6 m x 6 m5 Straight Corridors Maximum 2 m all sides

for area calculation