Virtual Design & Construction Andy Kayhanfar

Vice President of Visual Solutions

InEight

ineight.com

2000 2003 2005 2007 2014

Andy Kayhanfar

ineight.com

Steve Jones, Senior Director, ENR (9/30/14 Keynote)

My Takeaways:

Business value of BIM/VDC Collaboration to develop workflows and business process that drive value

How are we going to deal with it… 4D (Schedule), 5D (Cost)

Project Certainty (Safety & Risk mitigation)

Status & progress monitoring

Closing remarks Lean + BIM/VDC

Integration and Industrialization will be the dominant driving trends of the next 10-20 years

McGraw Hill - Construction Perspective

ineight.com

The Connected Solution

Jobsite

Field office

Front office

Mobile Work Order

Play of the Day

Daily Visual Inspection

Operations Management

HD Performance

HD Estimating Virtual Design &

Construction

Primavera P6 Integration SAP Integration

Microsoft Project Integration Oracle JDE Integration

CREW

Project Reporting & Dashboards

InEight solutions bring everything together – from back office to jobsite

ineight.com

Typical ERP Framework

Owner’s / Sub-Contractors

ERP CORE

3rd Party Services

(Banks/Pay/etc)

Financials

HR

Logistics

Procurement

Reporting

Sales

Production

ineight.com

InEight’s ERP for Construction

Mobility and Jobsite Collaboration

Estimating Scheduling

Opportunity Management

Equipment Management Enterprise

Content Management

Operations Compliance and Controls

ERP CORE Virtual Design

and Construction

Owner’s / Sub-Contractors

3rd Party Services (Banks/Pay/etc)

Mobility and Jobsite Collaboration

Mobile and Visual Reporting

ineight.com

The Vision: One Model for Construction

Quantities

Scheduling

Procurement

Project Controls

Resources

Field Management

Intelligent

Model for

Construction

Asset Management

ineight.com

Different Industries = Different Formats

Power and OG&C

Building

Transportation

Water/Wastewater

ineight.com

Challenge then becomes…

Quantities (HD)

Scheduling (P6)

Procurement (SAP)

Project Controls (HD)

Resources (SAP)

Field Management

Autodesk

Bentley

Intergraph

Trimble

Asset Management

ineight.com

Solution

VDC Warehouse

(IFC)

Autodesk

Bentley

Intergraph

Trimble

Quantities (HD)

Scheduling (P6)

Procurement (SAP)

Project Controls (HD)

Resources (SAP)

Field Management

Asset Management

ineight.com

The interoperability solution from Design to Construction through Client delivery.

Keys:

Mature Building industry products all create IFC

IFC exchange in all other industries products is well underway

As more Authoring tools come along it becomes simply an authoring tool

to IFC problem and ERP connection is established

Ability to add more intelligence to model using design authoring API’s

Neutral format for asset management and retention

Industry Foundation Classes (IFC) – ISO 16739

ineight.com

VDC Warehouse

Demonstration

ineight.com

Quantity Reporting

Functionally recap… IFC “Master Data”

Model Management

Version Control & Change Management

ineight.com

Visually enable your ERP

with VDC Master Data

ineight.com

• SAP

• Hard Dollar

• Primavera

• SharePoint

• ProjectWise

• ODBC

• ODS

The Connected Solution - Master Data Management

ineight.com

Visual Scheduling

Integration with P6 and MS Project

ineight.com

Visual Scheduling

ineight.com

Integration with Hard Dollar

Visual Estimate & Project Controls

ineight.com

Visual Estimate & Project Controls

ineight.com

Visual Documentation

Integration with SharePoint & ProjectWise

ineight.com

Visual Procurement

Integration with SAP SRM Business Case Review

ineight.com

Enterprise Resource Viewer (ERV)

ineight.com

Visual Schedule Dashboard

End user technology focused on simplicity

ineight.com

Visual Schedule Dashboard

end user technology focused on simplicity

ineight.com

Kiewit Offshore Services

Customer Business Case Visual Procurement, Scheduling & Materials Management

ineight.com

Existing Procurement Process

ineight.com

Visual Procurement

ineight.com

Customer Key Objectives

1. Associate to WBS

2. Create material in SAP

3. Nest (optimize) for purchase

4. Create shopping cart (for pricing)

ineight.com

Visual Procurement

Demonstration

ineight.com

Visual Procurement Dashboard

= Bought

= Ready

= Not

ineight.com

Visual

Procurement Model

eBOM

HD Association WBS Association KOS Cost Code

MTO

Manual Req

mBOM

Material Groups Material Code

Bridging the Industry Gap

ineight.com

Future Work - On The Horizon

ineight.com

Use filters to

locate Open

PO’s

Check off open

inventory of

items received

Material Receiving

Use app triggers

for stored goods

/ problems with

goods

ineight.com

Visual Scheduling

ineight.com

Visual Procurement Dashboard

= Bought

= Ready

= Not Ready

end user technology focused on simplicity

ineight.com

Work Face Planning

= Received

= Bought

= Ready

= Not

ineight.com

Find My Material

ineight.com

Thank you