visual verification bridge kt
TRANSCRIPT
Vista
CKB-304v2 Wiring Guide
Visual Verification Bridge CH KTeCH KTePowered by c
Step 1 Power up the Bridge
Note: The Bridge draws 400mA peak. When powering the Bridge with the alarm, consider this when estimating your powered devices and back up battery.
In most cases*, an additional power supply is recommended. If a separate power supplyis used, the ground must remain common.
1
Vista
CKB-304v2Visual Verification Bridge
*The Vista provides 600mAmps of AUX power
Step 2 Run wire from OUTPUT 17 to the Arming Input
2
2
Vista
Note: This will allow you to arm/disarm the Bridge with the alarm panel.
CKB-304v2Visual Verification Bridge
CKB-304v2Visual Verification Bridge
EXAMPLE
This is a typical burg zone with the EOL at the device.
Vista
CKB-304v2Visual Verification Bridge
STEP 4
Run wire from the Bridge inputthe zone terminal of the panel.
3
This wiring method requires the Bridge to share a common ground with the alarm panel. Otherwise, the Zone Ground must be wired to the Bridge Input Ground.
Vista
Vista
ALARM PANEL PROGRAMMING: Bridge ProgrammingIn this scenario, program the following (assuming no output function previously used):
*80 [01]**2*31*2*17**[02]**2*22*0*17** (Change 01 and 02 to unused outputfunction if necessary.
**If using a 4204/4229 ensure proper programming is completed in *79 menuprior to assigning output functions in *80**
CHeKT DEALER PORTAL: Output 17 To Arm/DisarmWe recommend using “Voltage Arming” when possible. This defaults to the bridge being in an armed state if the wiring for the Arming Pin gets compromised or disconnected for any reason.