vital energy link of north east asia niigata loading arm ... · niigata loading arm for oil &...

6
(FORMER NAME: NIIGATA ENGINEERING CO., LTD.) VITAL ENERGY LINK OF NORTH EAST ASIA VITAL ENERGY LINK OF NORTH EAST ASIA NIIGATA LOADING ARM FOR OIL & GAS TRANSFER NIIGATA LOADING ARM FOR OIL & GAS TRANSFER The 10 th Japan-Russia Energy and Environment Dialogue in Niigata 14 th November 2017 – Toki Messe, Niigata 2 Tokyo Beki Engineering Ltd. Company Profile Head Quarter : Tokyo, Japan Factory : Nagaoka, Niigata, Japan Employee : 200 (as of April 2017) Main Product : LOADING ARM (OIL & GAS) Swivel Joint Butterfly Valve Tokyo Beki Engineering Ltd. Company Profile Head Quarter : Tokyo, Japan Factory : Nagaoka, Niigata, Japan Employee : 200 (as of April 2017) Main Product : LOADING ARM (OIL & GAS) Swivel Joint Butterfly Valve The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA ©ERINA

Upload: doxuyen

Post on 30-Jul-2018

231 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: VITAL ENERGY LINK OF NORTH EAST ASIA NIIGATA LOADING ARM ... · NIIGATA LOADING ARM FOR OIL & GAS TRANSFER The 10th Japan-Russia Energy and Environment Dialogue in Niigata ... 1977

1(FORMER NAME: NIIGATA ENGINEERING CO., LTD.)

VITAL ENERGY LINK OF NORTH EAST ASIAVITAL ENERGY LINK OF NORTH EAST ASIA

NIIGATA LOADINGARM FOR OIL & GASTRANSFER

NIIGATA LOADINGARM FOR OIL & GASTRANSFER

The 10th Japan-Russia Energy and Environment Dialogue in Niigata14th November 2017 – Toki Messe, Niigata

2

Tokyo Beki Engineering Ltd.Company Profile

Head Quarter : Tokyo, JapanFactory : Nagaoka, Niigata, JapanEmployee : 200 (as of April 2017)Main Product : LOADING ARM (OIL & GAS)

Swivel JointButterfly Valve

Tokyo Beki Engineering Ltd.Company Profile

Head Quarter : Tokyo, JapanFactory : Nagaoka, Niigata, JapanEmployee : 200 (as of April 2017)Main Product : LOADING ARM (OIL & GAS)

Swivel JointButterfly Valve

The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA

©ERINA

Page 2: VITAL ENERGY LINK OF NORTH EAST ASIA NIIGATA LOADING ARM ... · NIIGATA LOADING ARM FOR OIL & GAS TRANSFER The 10th Japan-Russia Energy and Environment Dialogue in Niigata ... 1977

1959 : Started manufacturing Marine Loading Arms.

1968 : Supplied the first LNG Loading Arms to Tokyo GasNegishi Terminal, Japan

1977 : Supplied 13 units of Marine Loading Arms for Oilproduct to Novorosiysk Port

1983 Supplied first LNG Loading Arms to Sea of Japan(North East Asia) at NIHONKAN LNG

1985 Supplied 14 units of Oil Transfer Loading Arm toROSNEFTE-NAKHODKA PORT

2005 ::Supplied 4 sets of LNG loading arms with Niigata’soriginal H-QCDC and ERS to SAKHALIN project .

2006 :: Supplied replacement LNG Arms to HIHONKAI LNG

2010 :: Supplied 4 sets of LNG Arms to JOETSU LNG

2013 :: Supplied 4 sets of LNG Arms to NAOETSU LNG

3

Brief History

4

100% of LNG ARMS at JAPANESE LNG IMPORT TERMINALSTotal of 300 LNG Arms over the world

The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA

©ERINA

Page 3: VITAL ENERGY LINK OF NORTH EAST ASIA NIIGATA LOADING ARM ... · NIIGATA LOADING ARM FOR OIL & GAS TRANSFER The 10th Japan-Russia Energy and Environment Dialogue in Niigata ... 1977

5

LOADING ARM SYSTEMLOADING ARM SYSTEM

6

SAFE GUARD SYSETM FOR LOADING ARM

The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA

©ERINA

Page 4: VITAL ENERGY LINK OF NORTH EAST ASIA NIIGATA LOADING ARM ... · NIIGATA LOADING ARM FOR OIL & GAS TRANSFER The 10th Japan-Russia Energy and Environment Dialogue in Niigata ... 1977

7

SAFE GUARD SYSETM FOR LOADING ARM

8

Overhauling in NiigataShop

- Remove the armfrom the Jetty

- Transport to Shop- Overhaul andInspection byprofessional staff

The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA

©ERINA

Page 5: VITAL ENERGY LINK OF NORTH EAST ASIA NIIGATA LOADING ARM ... · NIIGATA LOADING ARM FOR OIL & GAS TRANSFER The 10th Japan-Russia Energy and Environment Dialogue in Niigata ... 1977

9

AFTERSALES SERVICE ACTIVITIESAFTERSALES SERVICE ACTIVITIES

• Overhauling at the Site• Provide professional advisefor preparation includingpreparation of work procedure.

• Provide technical advisoryservice by qualified fieldspecialist(s)

• Overhauling at the Site• Provide professional advisefor preparation includingpreparation of work procedure.

• Provide technical advisoryservice by qualified fieldspecialist(s)

10

AFTERSALES SERVICE ACTIVITIESAFTERSALES SERVICE ACTIVITIES

• Training• Provide comprehensive training atmanufacturer's factory.

• On-site training is also available onrequest to train maximized numberof customer’s personnel.

• Training• Provide comprehensive training atmanufacturer's factory.

• On-site training is also available onrequest to train maximized numberof customer’s personnel.

The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA

©ERINA

Page 6: VITAL ENERGY LINK OF NORTH EAST ASIA NIIGATA LOADING ARM ... · NIIGATA LOADING ARM FOR OIL & GAS TRANSFER The 10th Japan-Russia Energy and Environment Dialogue in Niigata ... 1977

11

THANK YOU

PRESENTED BY

TOKYO, JAPAN

PRESENTED BY

TOKYO, JAPAN

The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA

©ERINA