vital energy link of north east asia niigata loading arm ... · niigata loading arm for oil &...
TRANSCRIPT
1(FORMER NAME: NIIGATA ENGINEERING CO., LTD.)
VITAL ENERGY LINK OF NORTH EAST ASIAVITAL ENERGY LINK OF NORTH EAST ASIA
NIIGATA LOADINGARM FOR OIL & GASTRANSFER
NIIGATA LOADINGARM FOR OIL & GASTRANSFER
The 10th Japan-Russia Energy and Environment Dialogue in Niigata14th November 2017 – Toki Messe, Niigata
2
Tokyo Beki Engineering Ltd.Company Profile
Head Quarter : Tokyo, JapanFactory : Nagaoka, Niigata, JapanEmployee : 200 (as of April 2017)Main Product : LOADING ARM (OIL & GAS)
Swivel JointButterfly Valve
Tokyo Beki Engineering Ltd.Company Profile
Head Quarter : Tokyo, JapanFactory : Nagaoka, Niigata, JapanEmployee : 200 (as of April 2017)Main Product : LOADING ARM (OIL & GAS)
Swivel JointButterfly Valve
The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA
©ERINA
1959 : Started manufacturing Marine Loading Arms.
1968 : Supplied the first LNG Loading Arms to Tokyo GasNegishi Terminal, Japan
1977 : Supplied 13 units of Marine Loading Arms for Oilproduct to Novorosiysk Port
1983 Supplied first LNG Loading Arms to Sea of Japan(North East Asia) at NIHONKAN LNG
1985 Supplied 14 units of Oil Transfer Loading Arm toROSNEFTE-NAKHODKA PORT
2005 ::Supplied 4 sets of LNG loading arms with Niigata’soriginal H-QCDC and ERS to SAKHALIN project .
2006 :: Supplied replacement LNG Arms to HIHONKAI LNG
2010 :: Supplied 4 sets of LNG Arms to JOETSU LNG
2013 :: Supplied 4 sets of LNG Arms to NAOETSU LNG
3
Brief History
4
100% of LNG ARMS at JAPANESE LNG IMPORT TERMINALSTotal of 300 LNG Arms over the world
The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA
©ERINA
5
LOADING ARM SYSTEMLOADING ARM SYSTEM
6
SAFE GUARD SYSETM FOR LOADING ARM
The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA
©ERINA
7
SAFE GUARD SYSETM FOR LOADING ARM
8
Overhauling in NiigataShop
- Remove the armfrom the Jetty
- Transport to Shop- Overhaul andInspection byprofessional staff
The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA
©ERINA
9
AFTERSALES SERVICE ACTIVITIESAFTERSALES SERVICE ACTIVITIES
• Overhauling at the Site• Provide professional advisefor preparation includingpreparation of work procedure.
• Provide technical advisoryservice by qualified fieldspecialist(s)
• Overhauling at the Site• Provide professional advisefor preparation includingpreparation of work procedure.
• Provide technical advisoryservice by qualified fieldspecialist(s)
10
AFTERSALES SERVICE ACTIVITIESAFTERSALES SERVICE ACTIVITIES
• Training• Provide comprehensive training atmanufacturer's factory.
• On-site training is also available onrequest to train maximized numberof customer’s personnel.
• Training• Provide comprehensive training atmanufacturer's factory.
• On-site training is also available onrequest to train maximized numberof customer’s personnel.
The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA
©ERINA
11
THANK YOU
PRESENTED BY
TOKYO, JAPAN
PRESENTED BY
TOKYO, JAPAN
The Tenth Japan–Russia Energy and Environment Dialogue in Niigata A-ISHIKAWA & TAKADA
©ERINA