vmm and the srs - update · michael lupberger rd51 collaboration meeting 2017 - cern 11 vmm3...
TRANSCRIPT
VMM and the SRS - updateMichael Lupberger (CERN)
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 2
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 3
4 VMM3 hybrids in full operation
2 Adapter cards in operation
New slow control,
DAQ and monitoring
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 4
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 5
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 6
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 7
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 8
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 9
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 10
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 11
VMM3 hybrids
4 VMM3 hybrids in full operation
● New configuration and start-up procedure implemented in firmware
● Problem with powering– Replacement of LDOs
– Tests at extreme conditions
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 12
VMM3 hybrids
Detector Frame
PCB outlines 50 x 85 mm
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 13
VMM3 hybrids
4 VMM3 hybrids in full operation
● New configuration and start-up procedure implemented in firmware
● Problem with powering– Replacement of LDOs
– Tests at extreme conditions
● ¼ hybrids not programmable by flash (hint to FPGA BGA on this hybrids)
● Tests of all functions in GDD lab
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 14
VMM3 hybrids
4 VMM3 hybrids in full operation
● Two RD51 test beam– 1st with one hybrids
– 2nd with 3 hybrids
– Upcoming with 4 hybrids
● Two test setups, each with– FECv6
– Adapter card
Lara's
talk
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 15
VMM3 hardware
Ongoing: finalise hybrid and adapter card
● Changes needed on adapter card– Switch HDMI lines for master/slave
– Manual switch:direct or external powering
– Improve direct powering
● Changes needed on hybrid– Switch HDMI lines for master/slave
– Add two I2C ADCs necessary for
calibration and quality control
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 16
VMM3 software
Advancement in last months
● New slow control– Derived from ATLAS VMM DCS
– Reflects SRS architecture
– Upcoming with 4 hybrids
● Support from BrightnESS partners:– Fast DAQ
– Wireshark plugin for monitoring
– Online monitoringD
Man
uel's talk
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 17
Master/slave
Problems:
1. Current adapter card/FEC cannot provide enough power for more than about 2-4 VMMs
→ external power supply but, want to keep flexibility to power few VMMs directly from FEC
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 18
Master/slave
Problems:
1. Current adapter card/FEC cannot provide enough power for more than about 2-4 VMMs
→ external power supply but, want to keep flexibility to power few VMMs directly from FEC
2. Not enough signal lines in HDMI cable for 4 VMMs
→ free lines by removing power
→ Master/salve only with external power or box
Master only with external power, box or from SRS
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 19
Master/slave
Power box: power for master/slave through HDMI
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 20
Master/slave
Direct power, master only
VMM
data-1-Mdata-2-M
controls
P2P1
up tp 8 x HDMI 1.4 cables A-D max 3mHDMI ports
DVMcardSwitch setting = test
FEC
Master only 128 ch.
Virtex6SFP+
SFP+
DDR3
Clk/Trig
Ack
Data 1-SClock/trigData 2-SP2
Switch =test
1 Gbethernet(Single FEC)
2x RG45DTCC 800Mbps
SRU(multiple FECs)
Trig INNIMSingle EFC
I2C VMM
NIMOut
(15,16)(13)
(1,3)(4,6)
(7,9)(10,12)
(14,19)(18)
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 21
Master/slave
External power, master/slave
VMM
VMM
data-1-Mdata-2-M
data-1-Sdata-2-S
controls
data-1-Mdata-2-M
controls
data-1-Sdata-2-S
Clock/trig
Power 12V/50W
2xP2
P12xP2
P1
I2C VMM
P1
Ack status
HDMI 1.4 cables A-A 2 x HDMI 1.4 cables A-D
DVM alive
Common CAT6 network cable
controls
< 25m max 3m
Large Power/MS splitter box( 2k channel version shown )
RJ45 RJ45clk
trgSCLSDA
powercycle
Clock/trig
Ack
HDMI ports
common clock/I2C
VMM hybridsMaster/slave pairsmax 8 pairs /powerbox
DVMcard
FEC
Master 128 ch.
Slave 128 ch.
Virtex6SFP+SFP+
UDP or SRIO Copper oroptical
UDP 1 GbpsSRIO 5 GBps
P2
P2
P1
P1
DDR3 8x
HDMI-ADVM ports
16xHDMI-A
VMM ports
I2C VMM
I2C VMM
Ack
Data 1-SClock/trigData 2-SP2
Switch = M/S
1 of 8 HDMI ports
2x RG45DTCC
Trig INNIM
ATX -SATA
SRU(multiple FECs)
NIMOut
LED
(1,3)(4,6)(7,9)(10,12)(14,19)
(15,16)
(18)
(13)
(14,19)(7,9)(15,16)(13)(1,3)(4,6)(10,12)(18)
Michael Lupberger RD51 Collaboration Meeting 2017 - CERN 22
Summary
Summer students had a significant impact on advancement of the project→ see their talks
● VMM3 is ready! Test systems exist and they were used in test beams, VMM3a will come soon
● Hardware design about to be completed
● Firmware operational but still needs improvements
● Reminder: VMM hybrid will have new connector!
FX10A-140S14-SV on Detector, FX10A-140P14-SV1 on hybrid
(there will be an adapter to the current samtec connector)
●