VN_Fire Inspection
Factory Name : A First Vina Co., Ltd
Address: Street 2, Tam Phuoc Industrial Zone Bien Hoa Dong NaiVietnam
Discipline Name: VN_Fire Inspection
Assessment Date : 08 Oct 2019
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 1/13
Table of Contents
I Factory Information
II Findings and Remediation Issues
III Photo Evidence
IV Photo Documentation
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 2/13
FACTORY INFORMATION
Basic information
Country Vietnam
City/Town Bien Hoa
Postal Code
Phone (84)
Office Fax
Office City
Office Country Vietnam
Office Address
Country Code
Office Email
Assessment Information
Auditor Elevate
Executive Summary
1640 Assessment Closing Comments
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 3/13
F3.jpj.1.PNG
F3.jpj.2.PNG
FINDINGS AND REMEDIATION ISSUES
F1: Means of Escape - Exit doors
Issue type F1: Means of Escape
Details Of Issue Found It was observed that the doors in the means of egress are not the side-hinged swingingtype. There are sliding door in Boiler / Materials warehouse.
Recommended ActionDeadline Date
19 Oct 2019
Photo(s)
CAP Priority FP1
Reference Number F-3
Suggested Plan
Sub Issue Detail F1.2.2.1 Exit doors not side hung to swing correctly in direction of escape
Sub Issue Type Exit doors
Recommended Action Replace doors with side hung doors that open in the direction of escape in accordancewith Cl. 6.1, 6.3 and 6.9 of the LABS Standard
Issue type F1: Means of Escape
Details Of Issue Found It was observed that hasps, locks, slide bolts, and other locking devices were found in thedoors in the path of egress.
Recommended ActionDeadline Date
19 Oct 2019
Photo(s)
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 4/13
F4.jpj.1.PNG F4.jpj.2.PNG
F1-jpj.1.PNG
F1-jpj.2.PNG
F1-jpj.3.PNG F1-jpj.4.PNG
CAP Priority FP1
Reference Number F-4
Suggested Plan
Sub Issue Detail F1.2.1.1 Exit doors not always easily openable, doors have locking devices
Sub Issue Type Exit doors
Recommended Action Replace outside locks with locking mechanisms that allow easy opening from insidewithout the use of a key in accordance with Cl. 6.1 and 6.9 of the LABS Standard
F1: Means of Escape - Exit Signage
Issue type F1: Means of Escape
Details Of Issue Found It was observed that Illuminated exit signs are not placed at entrances to exits inDormitory/Boiler/Water purifying room/Material waste room/ Air compressor/ Securityroom.
Recommended ActionDeadline Date
27 Nov 2019
Photo(s)
CAP Priority FP2
Reference Number F-1
Suggested Plan
Sub Issue Detail F1.3.1.1Illuminated exit signs at emergency exits are missing or inadequate
Sub Issue Type Exit Signage
Recommended Action Provide illuminated exit signs above each emergency exit door in accordance with Cl.6.12 of the LABS Standard
F1: Means of Escape - Exit stairs
Issue type F1: Means of Escape
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 5/13
F2.jpj.1.PNG
F2.jpj.2.png
F6.jpj.1.PNG
F6.jpj.2.PNG
F6.jpj.3.PNG
F6.jpj.4.PNG
Details Of Issue Found It was observed that Handrail are not provided on both side of staircase Dormitory andoffice.
Recommended ActionDeadline Date
13 Apr 2020
Photo(s)
CAP Priority FP3
Reference Number F-2
Suggested Plan
Sub Issue Detail F1.4.4Inadequate or no handrails to stairs
Sub Issue Type Exit stairs
Recommended Action Provide handrails on both side of staircase to comply with Cl. 6.10 of the LABS Standard
F2: Fire Safety Construction - Other high risk areas
Issue type F2: Fire Safety Construction
Details Of Issue Found Boiler, Generator, Diesel Tank, Pump area, Chemical room, Transformer and AirCompressor were lacked fire separation.
Recommended ActionDeadline Date
27 Nov 2019
Photo(s)
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 6/13
F6.jpj.5.PNG
F6.jpj.6.PNG
F5.jpj.1.PNG
F5.jpj.2.PNG
CAP Priority FP2
Reference Number F-6
Suggested Plan
Sub Issue Detail F2.1.5Others
Sub Issue Type Other high risk areas
Recommended Action Generator sets to be separated from all other occupancy areas by a minimum 2-hourconstruction Boiler room to be separated from all other occupancy areas by a 1-hour firerated construction with an automatic suppression system, or 2-hour constructionCompressor to be separated from all other occupancy areas by a minimum 1-hour firerated construction Transformers to be separated from all other occupancy areas by aminimum 1-hour construction Chemical store to be separated from all other occupancyareas by a minimum 1-hour construction. Other hazardous areas to be separated from allother occupancy areas by fire rated construction in accordance with Cl. 3.11.5.3, Cl.3.11.5.2 , Cl. 3.11.5.4, Cl. 3.11.6.3 of the LABS Standard
F2: Fire Safety Construction - Storage areas
Issue type F2: Fire Safety Construction
Details Of Issue Found Separations between hazards are not provided with fire-resistive rated constructionbarriers. In the floors, finishing warehouse, material warehouse, were lacked fireseparation from production floor.
Recommended ActionDeadline Date
27 Nov 2019
Photo(s)
CAP Priority FP2
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 7/13
F9.jpj.1.PNG
F9.jpj.2.PNG
F9.jpj.3.PNG
F9.jpj.4.PNG
Reference Number F-5
Suggested Plan
Sub Issue Detail F2.3.1Designated storage areas not separated with FR construction
Sub Issue Type Storage areas
Recommended Action Separate storage areas from adjacent areas by means of 1-hour fire rated construction inaccordance with Cl. 3.10 and 3.11 of the LABS Standard
F3: Fire Safety Systems - Emergency Lighting
Issue type F3: Fire Safety Systems
Details Of Issue Found It was observed that Emergency exit lights are not provided in the waste storage,Dormitory, Chemical room, Boiler, Security room.
Recommended ActionDeadline Date
27 Nov 2019
Photo(s)
CAP Priority FP2
Reference Number F-9
Suggested Plan
Sub Issue Detail F3.1.2Emergency Lighting at Exits
Sub Issue Type Emergency Lighting
Recommended Action Provide emergency lighting in compliance with Cl.6.8 of the LABS Standard on all escapepaths
F3: Fire Safety Systems - Fire Alarm
Issue type F3: Fire Safety Systems
Details Of Issue Found It was observed that Factory has no fire Alarm system in Waste storage, chemical store,Air compressor, Generator room Boiler, Parking, Diesel tank storage, Main office floor
Recommended ActionDeadline Date
19 Oct 2019
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 8/13
F8.jpj.1.PNG
F8.jpj.2.PNG
F8.jpj.3.PNG
F8.jpj.4.PNG
F7.jpj.1.PNG
F7.jpj.2.PNG
F7.jpj.3.PNG
F7.jpj.4.PNG
Photo(s)
CAP Priority FP1
Reference Number F-8
Suggested Plan
Sub Issue Detail F3.2.2Inadequate Fire Alarm coverage
Sub Issue Type Fire Alarm
Recommended Action Provide a Fire Alarm system to comply with cl.5.9 of the LABS Standard
F3: Fire Safety Systems - Fire Detection
Issue type F3: Fire Safety Systems
Details Of Issue Found It was observed that Factory has no auto fire detection system in Waste storage,chemical store, Air compressor, Boiler, Parking, Diesel tank storage, Main office floor.
Recommended ActionDeadline Date
19 Oct 2019
Photo(s)
CAP Priority FP1
Reference Number F-7
Suggested Plan
Sub Issue Detail F3.3.4Inadequate Fire Detector coverage
Sub Issue Type Fire Detection
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 9/13
F10.jpj.1.PNG
Recommended Action Provide detectors to all enclosed areas to ensure compliance with Cl.5.9 of the LABSStandard
F4: Provisions for Fire Fighting - Water supply
Issue type F4: Provisions for Fire Fighting
Details Of Issue Found It was observed that Capacity of Fire Pumps appears to be insufficient to provideadequate pressure for Fire Hoses.
Recommended ActionDeadline Date
27 Nov 2019
Photo(s)
CAP Priority FP2
Reference Number F-10
Suggested Plan
Sub Issue Detail F4.3.2.1 Inadequate water pump-set and/or standby pump
Sub Issue Type Water supply
Recommended Action Provide new pumps that meet the pressure and flow capacity requirementsof LABSStandard Cl.5.3, 5.5 & 5.6
F5: Maintenance and Housekeeping - Maintenance records
Issue type F5: Maintenance and Housekeeping
Details Of Issue Found Inadequate maintenance records for Alarm, Detector, Sprinkler, Emergency Lightingsystem ,extinguishing and Water Pumps,
Recommended ActionDeadline Date
27 Nov 2019
Photo(s)
CAP Priority FP2
Reference Number F-11
Suggested Plan
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 10/13
Sub Issue Detail F5.3.5
Sub Issue Type Maintenance records
Recommended Action Carry out maintenance of the Alarm, Sprinkler, Detector, Emergency Lighting system,extinguishing and Water Pumps in accordance with CL.12.8, 12.10, 5.7, 5.11 and 5.3 ofthe LABS Standard and ensure that records are kept of all maintenance activities forfuture inspection
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 11/13
PHOTO EVIDENCE
Factory Name : A First Vina Co., Ltd
Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. Page 12/13
PHOTO DOCUMENTATION
SharingPlatformReminder
Factory Name : A First Vina Co., Ltd