EMC ® VNX Procedure Generator Solution for Validating your engagement EMC CONFIDENTIAL version: 5.0.0.20 1 of 31 7.1 Control Station replacement Topic VNX 5300 Procedures Selections VNX5300 Activity Type: Hardware Replacements Hardware Replacements: File/Unified HW Replacements VNX5300 File/Unified HW Replacements: 7.1 Control Station replacement Generated: 02/may/2014 06:39:21 p.m. SolVe Generator Updated: IMPORTANT: To be sure you have the latest SolVe generator application and content, always choose Yes when asked if you want to update the application or repository. REPORT PROBLEMS If you find any errors in this procedure or have comments regarding this application, send email to [email protected] Copyright © 2011 2014 EMC Corporation. All rights reserved. Publication Date: May, 2014 EMC believes the information in this publication is accurate as of its publication date. The information is subject to change without notice. THE INFORMATION IN THIS PUBLICATION IS PROVIDED “AS IS.” EMC CORPORATION MAKES NO REPRESENTATIONS OR WARRANTIES OF ANY KIND WITH RESPECT TO THE INFORMATION IN THIS PUBLICATION, AND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. Use, copying, and distribution of any EMC software described in this publication requires an applicable software license. For the most up-to-date regulatory document for your product line, go to the Technical Documentation and Advisories section on EMC Powerlink. For the most up-to-date listing of EMC trademarks, see the list of EMC Corporation Trademarks on EMC.com. All other trademarks used herein are the property of their respective owners.

Upload: denial-torres

Post on 26-Dec-2015

248 views

Category:

Documents


4 download

DESCRIPTION

VNX PROCES FRU

TRANSCRIPT

Page 1: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

1 of 31

7.1 Control Station replacement

T o p i c

VNX 5300 Procedures

S e l e c t i o n s

VNX5300 Activity Type: Hardware Replacements

Hardware Replacements: File/Unified HW Replacements

VNX5300 File/Unified HW Replacements: 7.1 Control Station replacement

Generated: 02/may/2014 06:39:21 p.m.

SolVe Generator Updated:

IMPORTANT: To be sure you have the latest SolVe generator application and content, always choose

Yes when asked if you want to update the application or repository.

R E P OR T PR OBL E MS

If you find any errors in this procedure or have comments regarding this application, send email to

[email protected]

Copyright© 2011 – 2014 EMC Corporation. All rights reserved.

Publication Date: May, 2014

EMC believes the information in this publication is accurate as of its publication date. The information is subject to

change without notice.

THE INFORMATION IN THIS PUBLICATION IS PROVIDED “AS IS.” EMC CORPORATION MAKES NO

REPRESENTATIONS OR WARRANTIES OF ANY KIND WITH RESPECT TO THE INFORMATION IN THIS

PUBLICATION, AND SPECIFICALLY DISCLAIMS IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS

FOR A PARTICULAR PURPOSE.

Use, copying, and distribution of any EMC software described in this publication requires an applicable software

license.

For the most up-to-date regulatory document for your product line, go to the Technical Documentation and Advisories

section on EMC Powerlink.

For the most up-to-date listing of EMC trademarks, see the list of EMC Corporation Trademarks on EMC.com.

All other trademarks used herein are the property of their respective owners.

Page 2: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

2 of 31

Contents

Handling Field Replaceable Units (FRUs) ......................................................................... 3

FRUs and Power Issues ............................................................................................................................... 3

Avoiding Electrostatic Discharge (ESD) damage.......................................................................................... 3

Emergency procedures (without an ESD kit) ........................................................................................... 4

Removing, installing, or storing FRUs ..................................................................................................... 4

Replacing a Control Station (CS) in a 7.1 VNX system .................................................... 5

Task Summary .............................................................................................................................................. 5

Task 1: Collect Control Station Information ............................................................................................ 5

Task 2: Disabling ConnectHome and Email Notifications ...................................................................... 6

Task 3: Preserve CS0 System Configuration ......................................................................................... 6

Control Station Replacement ........................................................................................................................ 8

Task 4: Power Down the Faulted Control Station .................................................................................. 8

Task 5: Remove the Control Station ...................................................................................................... 9

Task 6: Install the New Control Station ................................................................................................ 10

Task 7: Setup to Configure the New Control Station ........................................................................... 11

Task 8: Configure Control Station 0 ..................................................................................................... 12

After you finish Configuring CS0 ............................................................................................................ 17

Task 9: Configure Control Station 1 ..................................................................................................... 18

After you finish Configuring CS1 ............................................................................................................ 24

Task 10: Restore System Configuration on CS0 ................................................................................... 24

Task 11: Re-apply Local Control Station Values .................................................................................... 25

Task 12: Configure ESRS client ( Applies to 7.1.56.x or higher code ) ................................................ 27

Task 1: Power Up CS1 ......................................................................................................................... 27

Task 2: Enabling ConnectHome and Email Notifications ..................................................................... 27

Finish ........................................................................................................................................................... 28

Parts Return ................................................................................................................................... 30

Task 3: (Alternative Task) Determine NAS Version when CS is not Working ..................................... 30

Page 3: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

3 of 31

Handling Field Replaceable Units (FRUs)

This section describes precautions you must take and general procedures you must follow when

removing, installing, or storing field-replaceable units (FRUs). The procedures in this section apply to FRU

handling during hardware upgrades as well as during general replacement.

FRUs and Power Issues

FRUs are designed to be powered up at all times. This means you can replace FRUs and accomplish

most hardware upgrades while the cabinet is powered up. To maintain proper airflow for cooling and to

ensure EMI compliance, make sure all front bezels, filler panels, and filler modules are reinstalled after

the FRU replacement or hardware upgrade is completed. Do not remove a faulty FRU from the system

until you have a replacement available.

CAUTION: When you want to power down a storage processor enclosure (SPE), turn off the

power switch on the enclosure’s standby power supply (SPS). Never turn off the SPE’s power

supply switches. Turning off the SPE power supply switches instead of the SPS power switch

shuts down the storage processors before they have enough time to save the write-cache data to

the vault drives. This causes data loss.

If write-cache data is not saved, the storage processor log displays an error message similar to the

following:

Enclosure 0 Disk 5 0x90a (Can’t Assign - Cache Dirty) 0 0xafb40 0x14362c.

If you see this error message, contact Customer Service immediately.

Avoiding Electrostatic Discharge (ESD) damage

When replacing or installing FRUs, you can inadvertently damage the sensitive electronic circuits in the

equipment by simply touching them. Electrostatic charge that has accumulated on your body discharges

through the circuits. If the air in the work area is very dry, running a humidifier in the work area helps

decrease the risk of ESD damage. You must use the following procedures to prevent damage to the

equipment, so read the following instructions carefully.

Provide enough room to work on the equipment. Clear the work site of any unnecessary materials or

materials that naturally build up electrostatic charge, such as foam packaging, foam cups, cellophane

wrappers, and similar items.

Do not remove replacement or upgrade FRUs from their antistatic packaging until you are ready to

install them.

Gather the ESD kit and all other materials you will need before you service a component. Once

servicing begins, you should avoid moving away from the work site; otherwise, you may build up an

electrostatic charge.

Use the ESD kit when handling any FRU.

If an emergency arises and the ESD kit is not available, follow the procedures in the section

Emergency procedures (without an ESD kit).

Use the ESD wristband that is supplied with your system.

To use it, attach the clip of the ESD wristband (strap) to any bare (unpainted) metal on the cabinet

enclosure; then secure the wristband around your wrist with the metal button against your skin.

Page 4: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

4 of 31

Emergency procedures (without an ESD kit)

In an emergency, when an ESD kit is not available, use the following procedures to reduce the possibility

of an electrostatic discharge by ensuring that your body and the subassembly are at the same

electrostatic potential.

IMPORTANT: These procedures are not a substitute for the use of an ESD kit. You should follow them

only in the event of an emergency.

Before touching any FRU, touch a bare (unpainted) metal surface of the enclosure.

Before removing any FRU from its antistatic bag, place one hand firmly on a bare metal surface of the

enclosure, and at the same time, pick up the FRU while it is still sealed in the antistatic bag. Once you

have done this, do not move around the room or contact other furnishings, personnel, or surfaces

until you have installed the FRU.

When you remove a FRU from the antistatic bag, avoid touching any electronic components and

circuits on it.

If you must move around the room or touch other surfaces before installing a FRU, first place the

FRU back in the antistatic bag. When you are ready again to install the FRU, repeat these

procedures.

Removing, installing, or storing FRUs

Use the following precautions when you remove, handle, or store FRUs:

Do not remove a FRU from the cabinet until you have the replacement available.

Handle a FRU only when wearing a properly attached ESD wristband:

Attach the clip of the ESD wristband to the ESD bracket or to a bare metal portion of the FRU’s

enclosure.

Secure the wristband around your wrist with the metal button against your skin.

Handle a FRU gently. A sudden jar, drop, or vibration can permanently damage some FRUs.

The weight of some FRUs is not evenly distributed. To prevent personal injury or equipment damage

when removing, installing, or handling theses FRUs, use both hands and provide extra support at the

heavy end of the FRU.

Never use excessive force to remove or install a FRU.

Store a FRU in the antistatic bag and the specially designed shipping container in which you received

it. Use this special shipping container when you need to return the FRU.

If you need to store a FRU for a short time, make sure the temperature of the location where you

store FRU is within the limits specified by the FRU’s Technical Specifications.

Disk modules are sensitive to the extreme temperatures sometimes encountered during shipping. We

recommend that you leave a new disk modules in its shipping container and allow it to acclimate to

the installation site’s ambient temperature for at least four hours before operating the new module in

the system.

When removing a disk module, pull the module part way out of the slot, then wait 30 seconds for the

drive to spin down before removing it.

When installing multiple disks in a powered-up system, wait at least 6 seconds before sliding the

second and each subsequent disk into the system.

Page 5: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

5 of 31

Place a disk module on a soft, antistatic surface, such as an industry-standard antistatic foam pad or

the container used to ship the module. Never place a disk module directly on a hard surface.

WARNING: The weight of some FRU assemblies is not evenly distributed. To prevent personal

injury or equipment damage when handling FRU assemblies, make sure you provide extra support

at the heavy end of a FRU assembly.

Replacing a Control Station (CS) in a 7.1 VNX system

This procedure defines the tasks to replace a failed Control Station in a version 7.1 VNX OE for

File/Unified (integrated) system. The procedure only applies to VNX5300 through VNX7500 hardware

models, but describes tasks for both single and dual control station configurations. If this is 7.0 version

system, rerun the procedure generator, selecting the right version.

Note that replacing the Control Station reinstalls the Linux operating system. As a result, any resident

customer settings/configurations must be re-entered after this service activity completes.

CAUTION: Electrostatic discharge (ESD) can damage equipment and impair electrical circuitry.

Always follow ESD prevention procedures when removing and replacing Customer-Replaceable

Units (CRUs) and Field-Replaceable Units (FRUs).

Task Summary

So that you can understand what is involved, the table of Contents lists the high-level tasks required for

this procedure. Take a moment to become familiar with these tasks. If you have any questions, contact

Customer Support before you begin the procedure.

Task 1: Collect Control Station Information

1. [ ] Obtain the following control station values (Table 1), where applicable, from the site

administrator:

Table 1 Control Station/Array Parameters

Site parameter Site value Site parameter Site value

Primary internal network IP address:

Control Station primary nameserver (IP):

IPv4:

IPv6:

Primary internal network IP netmask:

Control Station domain name:

IPMI network IP address: Control Station host name:

IPMI network IP netmask: Control Station secondary nameserver (IP):

IPv4:

IPv6:

Backup internal network IP address:

Control Station tertiary nameserver (IP):

IPv4:

IPv6:

Backup internal network IP netmask:

Control Station IP Alias Address

IPv4:

IPv6:

Control Station network IP address:

IPv4:

IPv6:

VNX/CLARiiON array SP A IP address:

IPv4:

IPv6:

Page 6: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

6 of 31

Control Station network IP netmask:

IPv4:

IPv6:

VNX/CLARiiON array SP B IP address:

IPv4:

IPv6:

Control Station default gateway IP address:

IPv4:

IPv6:

VNX/CLARiiON array administrator login:

EMCNAS version on Control Station:

VNX/CLARiiON administrator password:

EMCNAS version on Blades:

nasadmin password:

nas.exe patch in use?: Yes ____ No _____ root password:

Name:

Remote shell (rsh): On _____ Off _____ Network Time Protocol daemon (ntpd):

Running _____ Not running _____

/home administrator accounts:

System type shown by /nas/tools/nas_summary

(Please circle one):

Gateway

Fibre Channel enabled

Integrated

Task 2: Disabling ConnectHome and Email Notifications

For VNX OE for File 7.0 or later, use a HyperTerminal or PuTTY session to disable ConnectHome:

2. [ ] From the root directory, disable ConnectHome:

/nas/sbin/nas_connecthome -service stop

3. [ ] Disable the email notification service:

/nas/bin/nas_emailuser -modify -enabled no

4. [ ] Verify that the email notification service has stopped (is not enabled):

/nas/bin/nas_emailuser –info

5. [ ] ConnectHome and email notifications are now disabled on your VNX OE File system. Skip over

the next Block task to begin the service activity.

Task 3: Preserve CS0 System Configuration

Skip this task, if you are replacing the secondary Control Station (CS1).

If there is no communication with the Control Station, and you want to determine the NAS version, Note:

go to Determine NAS version when CS is not working task at the end of this document and come back

to Power Down the Faulted Control Station in the next task.

This task captures the current system configuration on CS0:

1. [ ] If not already logged in, log in to CS0 as nasadmin. Change to the root user:

su root

2. [ ] Check that NAS services are running:

/nasmcd/getreason

Page 7: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

7 of 31

If slot 0 has a reason code of 10, then NAS services are running. Note:

3. [ ] Run the upgrade-ck script to verify system status and back up files. a. Download and install the latest EMC VNX Procedure Generator (using default settings) on your

PC.

b. Unzip the upgrd-ck script.zip file located in C:\ VNX Procedure Generator\Scripts

in the folder created by the VNX PG during installation.

c. Transfer the upgrd-ckv10-<xx>.tar.gz file to the Control Station /home/nasadmin directory

and untar it.

tar xvfz upgrd-ckv10-<xx>.tar.gz

d. From the /home/nasadmin directory, run the upgrade-ck script:

./upgrd-ckv<xx>.bin -vb 1

Where <xx> is the latest version of the script.

For example:

./upgrd-ckv10-38.bin -vb 1

e. Resolve errors displayed in the Error List section.

4. [ ] If possible, after successfully running the upgrade-ck script, back up the information in

/nbsnas/var/dump/recover_cs0 and the nasdb_backup.1.tar.gz file to the

/nas/var/backup directory:

tar cvf /nas/var/backup/recover_cs0_backup.tar /nbsnas/var/dump/recover_cs0

/nas/var/backup/nasdb_backup.1.tar.gz

5. [ ] Back up the contents of the /home directory:

tar cvf /nas/var/backup/home_backup.tar /home

If the backups are successful, administrator accounts that were created in the /home directory Note:

are preserved; otherwise, these accounts must be recreated after the installation.

6. [ ] Determine the EMCNAS version on CS0 and the model name:

/nasmcd/bin/nas_version

/nas/sbin/model

The NAS software version on the install CD must match the EMCNAS version currently Note:

installed on the Control Station.

7. [ ] Determine the EMCNAS version running on the Blades:

/nas/bin/server_version ALL

Example output:

server_2 : Product: EMC Celerra File Server Version: T7.1.10.0

server_3 : Product: EMC Celerra File Server Version: T7.1.10.0

server_4 : Product: EMC Celerra File Server Version: T7.1.10.0

server_5 : Product: EMC Celerra File Server Version: T7.1.10.0

In this example, all the Blades (2, 3, 4, and 5) are running a NAS patch (7.1.10.0). Note:

Page 8: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

8 of 31

8. [ ] Compare the NAS version running on CS0 (from 6. [ ]) with the NAS versions running on the

Blades (from 7. [ ]). a. If the NAS versions do not match, go to 9. [ ].

b. If the NAS versions match, go to 11. [ ].

9. [ ] Determine the DART image filename contained in the boot.bat file:

grep gload /nas/dos/slot_*/boot.bat

Example:

/nas/dos/slot_2/boot.bat:gload -or c:\bin\nas.exe c:\slot_2\boot.cfg

/nas/dos/slot_3/boot.bat:gload -or c:\bin\nas.exe c:\slot_3\boot.cfg

/nas/dos/slot_4/boot.bat:gload -or c:\bin\nas.exe c:\slot_4\boot.cfg

/nas/dos/slot_5/boot.bat:gload -or c:\bin\nas.exe c:\slot_5\boot.cfg

10. [ ] Back up the nas.exe file (see 9. [ ]) to the /nas/var/backup directory:

tar cvf /nas/var/backup/<nas_patch_version>.tar /nas/dos/bin/nas.exe

Example:

tar cvf /nas/var/backup/7.1.10.0.tar /nas/dos/bin/nas.exe

11. [ ] Copy the following tar backup files to another location on the network or to the service laptop:

/nas/var/backup/recover_cs0_backup.tar

/nas/var/backup/home_backup.tar

/nas/var/backup/<nas_patch_version>.tar (if 10. [ ] was necessary)

Control Station Replacement

CAUTION: Handle a Control Station assembly carefully, and use an ESD wristband. Do not

remove the assembly until you have a replacement available. You can remove a Control Station

assembly while the system is powered up.

As part of the Control Station replacement, the root password is changed to nasadmin. You are not

asked to enter the root passwords as part of the Linux reinstallation.

Task 4: Power Down the Faulted Control Station

CAUTION: If the system is equipped with two Control Stations and you are replacing CS0, you

must completely power down both Control Stations using the procedure below. If CS1 is powered

up during CS0 replacement, the Control Station recovery will fail!

This task powers down a faulted Control Station, do the following:

1. [ ] If you are replacing:

CS0, perform 2. [ ] thru 5. [ ] to power down CS1 (if equipped); then perform 2. [ ] thru 5. [ ] to

power down CS0 (see note).

CS1, perform 2. [ ] thru 5. [ ] to power down only CS1 (in this case, CS0 remains powered up).

Blade failover is disabled while both Control Stations are powered down. Note:

2. [ ] Halt the Control Station by entering the following command:

/sbin/halt

Page 9: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

9 of 31

This may take a few minutes to complete. Make sure it is finished before you continue. Note:

3. [ ] Press and hold the power button to power down the Control Station (Figure 1). Remove the bezel

to access this button.

Figure 1 Control Station power button

4. [ ] Wait 30 seconds for the internal disk drive to stop spinning and safely park its heads before

continuing.

5. [ ] Disconnect the Control Station power cable from the power distribution panel (PDP).

6. [ ] If two Control Stations are equipped, and you are replacing CS0, repeat 2. [ ] thru 5. [ ] to

power down Control Station 1.

Task 5: Remove the Control Station

This task removes the faulted Control Station:

1. [ ] Use masking tape or similar material to label each cable on the Control Station that you are

removing so that you can correctly reconnect the cables later.

Do not bend, pull, or stress other rack cables when disconnecting cables from the Control Note:

Station.

2. [ ] Disconnect all of the Ethernet, serial, and power cables from the rear of the Control Station.

3. [ ] At the front of the rack, remove the two small Phillips screws that hold the assembly in position

(Figure 2).

CAUTION: The Control Station has the majority of its weight in the rear of the assembly. Make

sure the back end of the Control Station is supported while installing or removing it. Dropping

a Control Station could result in personal injury or damage to equipment.

4. [ ] Carefully slide out the assembly from the front of the rack.

Page 10: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

10 of 31

Figure 2 Removing a Control Station

Task 6: Install the New Control Station

This task installs a replacement assembly:

1. [ ] Remove the replacement Control Station assembly from its static-free packaging.

CAUTION: The Control Station has the majority of its weight in the rear of the assembly. Make

sure the back end of the Control Station is supported while installing or removing it. Dropping

a Control Station could result in personal injury or damage to equipment

2. [ ] At the front of the rack, slide the assembly into the 1U rail opening (Figure 3).

Page 11: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

11 of 31

Figure 3 Installing a Control Station

3. [ ] Install the two Phillips-head screws to reattach the assembly. Make sure you use the two latch

brackets when inserting the two screws.

4. [ ] Reconnect and dress all cables on the replacement Control Station except for the power cable.

Do not reconnect the power cable at this time.

Task 7: Setup to Configure the New Control Station

The process to configure the replacement Control Station depends on the software version running on the

system. Follow this task to determine the correct process to use when configuring the replacement

Control Station.

Use the EMCNAS Express Install installation software iso (containing Linux and NAS software) to install

the replacement Control Station.

1. [ ] Connect the null modem cable from the serial port on the back of the Control Station to your

service laptop (Figure 4).

Figure 4 Control Station Serial Port

2. [ ] Open a HyperTerminal or PuTTY session using settings:

Page 12: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

12 of 31

Bits per second: 19200

Data bits: 8

Parity: None

Stop bits: 1

Flow control: None

Emulation: Auto Detect

Telnet terminal ID: ANSI

CAUTION: If you disconnect the serial cable from your service laptop to the Control Station

during this procedure, the setup script may abort and return you to the command prompt.

Ensure that this does not occur during the configuration process.

3. [ ] Reconnect the Control Station power cable to the appropriate power distribution unit (PDU) and

insert the EMCNAS Express Install software into the Control Station.

The NAS software version on the installation media must match the EMCNAS version installed Note:

on the system. The system displays a message if a mismatch exists.

4. [ ] Configure the replacement Control Station by following the appropriate tasks:

To configure a replacement CS0, follow the Configure Control Station 0 task next.

To configure a replacement CS1, skip to the Configure Control Station 1 task.

If at any point during this task you enter incorrect information into an installation prompt, reboot Note:

the CS and restart the appropriate configuration task.

Task 8: Configure Control Station 0

To configure CS0, do the following:

1. [ ] The Control Station displays its boot messages followed by the prompt shown in Figure 5. You

have one minute to type the installation command required for the Control Station being replaced. At

the boot prompt, enter:

recovery

If you did not see the screen shown here or did not enter the installation command within the Note:

allotted time, press and hold the Control Station power button for 5 seconds; then repeat this step.

Page 13: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

13 of 31

Figure 5 Install Software Prompt

2. [ ] Accept the default internal network configuration values: a. The Primary Internal Network Setup dialog box appears (Figure 6), tab to OK and press Enter to

accept the default values.

Figure 6 Example -- Primary Internal Network Settings

Page 14: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

14 of 31

b. When the IPMI Network Setup dialog box appears (Figure 7). Tab to OK and press Enter to

accept the default values,

Figure 7 Example -- IPMI Private Network Settings

c. When the Backup Internal Network Setup dialog box appears (Figure 8), tab to OK and press

Enter.

Figure 8 Example -- Backup Private Network Settings

Page 15: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

15 of 31

3. [ ] Enter the Control Station external networking configuration values. This is the network

connection to the Control Station for remotely administering the system. a. The Network Configuration dialog box appears (Figure 9). Tab to Yes and then press Enter.

Figure 9 Network Configuration Type

b. The Boot Protocol dialog box appears (Figure 10). Select Static IP address, tab to OK, and

press Enter.

Figure 10 Boot Protocol

c. The Configure TCP/IP dialog box appears (Figure 11). To make a selection, tab to a check box

then tab to OK and press Enter. Valid selections include:

IPv4

or

IPv4 and IPv6 (you must select both check boxes!)

Page 16: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

16 of 31

Figure 11 Select IP Version

d. The Configure TCP/IP dialog box appears (Figure 12). Enter the port IP address, netmask,

default gateway IP address, and primary nameserver IP address. Tab to OK and press Enter

when finished.

Figure 12 Example -- Configure TCP/IP

e. The Configure Network dialog box appears (Figure 13),. Enter the domain name and hostname for

the CS. You can optionally enter secondary and tertiary nameserver IP addresses. Tab to OK and

press Enter when finished.

Page 17: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

17 of 31

Figure 13 Example -- Configure Network

4. [ ] The Celerra Install/Upgrades dialog box appears (Figure 14). Select the Integrated option that

describes this File/Unified system.

Figure 14 System Configuration Integrated

5. [ ] If the system prompts with the remaining install schedule. To continue type Yes and press Enter.

After the nas_checkup completes, if any errors or warnings appear, fix these issues before

continuing the installation process.

6. [ ] If the EMCNAS software installation fails, the system should display one or more error messages

with resolution instructions. Start by correcting any problems indicated by error messages.

7. [ ] When the installation completes, the system displays a message that the installation succeeded.

Press Enter.

After you finish Configuring CS0

8. [ ] To reboot the Control Station, log in as user root and reboot:

reboot

Rebooting the Control Station verifies that it will start up normally.

Page 18: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

18 of 31

9. [ ] Wait 10 minutes for the CS to fully boot.

10. [ ] From the primary CS, log in as nasadmin and check the system status using the nas_checkup

command.

/nas/bin/nas_checkup

11. [ ] If any issues arose during this replacement process, review the latest entries in the

/nas/log/recover.<rev>.<date>.log using the nas_logviewer command.

Here is an example of the log file name:

recover.7.1.44-0.May-18-15:15.log

Skip this next task if you had just replaced and configured Control Station 0, go to Task 10:.

Task 9: Configure Control Station 1

This task configures the replacement secondary Control Station:

(Skip this task if you had just replaced CS0.)

The NAS Express Install installation software iso will be on a single DVD (containing Linux and Note:

NAS software).

1. [ ] The Control Station displays its boot messages followed by the prompt shown in Figure 15. Type

integrated and then press Enter.

If you did not see the screen shown here or did not enter the installation command within the Note:

allotted, press and hold the CS power button for 5 seconds; then repeat this step.

Page 19: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

19 of 31

Figure 15 CS1 Install Software Prompt

You have one minute to type an installation command; otherwise the system will look for an Note:

existing installation.

2. [ ] A confirmation dialog appears asking if you are ready to begin. To begin, select Yes. (twice)

3. [ ] Select OK and press Enter to confirm this is Control Station install.

4. [ ] Enter the Control Station internal networking configuration values. a. In the Primary Internal Network Setup dialog box, enter the IP address and netmask for the

primary internal LAN connection (port eth0), as shown in Figure 16. To accept the default values,

tab to OK and press Enter.

Page 20: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

20 of 31

Figure 16 CS1 Primary Internal Network Settings

The system displays the IPMI Network Setup dialog box (Figure 17).

b. Enter the IP address and netmask for the IPMI connection between the two Control Stations (port

eth1), as shown in Figure 17. To accept the default values, tab to OK and press Enter.

Figure 17 IPMI Private Network Settings

The system displays the Backup Internal Network Setup dialog box (Figure 18).

Page 21: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

21 of 31

c. Enter the IP address and netmask. To accept the default values, tab to OK and press Enter.

Figure 18 Backup Private Network Settings

5. [ ] Enter the Control Station external networking configuration values. This is the network

connection to the Control Station used to remotely administer the VNX system. a. The system displays the Network Configuration dialog box (Figure 19). Tab to Yes and then

press Enter.

Figure 19 Network Configuration

The system displays the Boot Protocoldialog box (Figure 20).

b. Select Static IP address. Tab to OK and press Enter.

Page 22: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

22 of 31

Figure 20 CS1 Boot Protocol

The Configure TCP/IP dialog box appears (Figure 21).

c. To make a selection, tab to a check box then tab to OK and press Enter. Valid selections include:

IPv4

or

IPv4 and IPv6 (you must select both check boxes!)

If you select IPv4 and IPv6, you will be prompted to enter IP addresses in the IPv6 format. Note:

Figure 21 Configure TCP/IP Protocol

d. Enter the port IP address, netmask, default gateway IP address, and primary nameserver IP

address (Figure 22). Tab to OK and press Enter.

Page 23: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

23 of 31

Figure 22 Configure TCP/IP Configuration

The system displays the Configure Network dialog box (Figure 23).

e. Enter the domain name and hostname for the Control Station. You can optionally enter secondary

and tertiary nameserver IP addresses. Tab to OK and press Enter.

Figure 23 Configure Network

6. [ ] If you receive the following error message, you must upgrade the software on the VNX, VNX for

File, or VNX for Block array:

Backend Storage Requirements Check Failed:

7. [ ] When the installation is complete, the system displays a message that the installation

succeeded. At the following prompt, press Enter to exit the install process.

====================================SUMMARY===================================

Congratulations!! Install for NAS software to release 7.1.10-0 succeeded.

Page 24: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

24 of 31

Status: Success

Actual Time Spent: 20 minutes

Total Number of attempts: 1

Log File:

/nas_standby/log/install.7.1.10-0.Jan-10-15:39.log

=====================================END=======================================

After you finish Configuring CS1

8. [ ] To reboot the Control Station 1, log in as root, type reboot, and press Enter.

Rebooting the Control Station verifies that it will start up normally.

9. [ ] Wait 10 minutes for the CS to fully boot.

10. [ ] From the primary CS, log in as nasadmin and check the system status using the nas_checkup

command.

/nas/bin/nas_checkup

11. [ ] If any issues arose during this replacement process, review the latest entries in the

/nas/log/install.<rev>.<date>.log on the secondary CS:

nas_logviewer /nas/log/install.<rev>.<date>.log

Here is an example of the log file name:

install.7.1.44-0.May-18-15:15.log

12. [ ] Skip this next task, since you have replaced CS1.

Task 10: Restore System Configuration on CS0

If the system configuration files were not collected on CS0, or if you had replaced CS1, skip this

procedure. If system configuration files were collected on CS0, do the following steps to restore the

configuration files to the replacement Control Station.

Analyze these potentially corrupt backup files to ensure that restoring them will not damage or Note:

contaminate the replacement Control Station. If there is any concern about the safety of the files, do not

restore.

1. [ ] Log in to CS0 as nasadmin. Change to the root user:

su root

2. [ ] Verify that /nas, /nbsnas, /nas/dos, and /nas/var are mounted:

df

3. [ ] Verify that the following files are in the /nas/var/backup directory. If they are not present,

from your laptop or network location, copy the files back to the /nas/var/backup directory.

ls -l /nas/var/backup/*tar

Sample output:

-rw-r--r-- 1 root root 56985600 Aug 18 15:15

/nas/var/backup/home_backup.tar

-rw-r--r-- 1 root root 10158080 Aug 18 15:20

/nas/var/backup/recover_cs0_backup.tar

-rw-r--r-- 1 root root 20879360 Aug 18 16:15

Page 25: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

25 of 31

/nas/var/backup/<NAS_version>.tar

4. [ ] Create a temporary directory to analyze the NASDB backup (nasdb_backup.1.tar.gz):

mkdir -p /tmp/recover_cs0

5. [ ] Change to this temporary directory:

cd /tmp/recover_cs0

6. [ ] Untar the backup files created by the Upgrade Script:

tar xpvf /nas/var/backup/recover_cs0_backup.tar

7. [ ] Change to the root directory:

cd /

8. [ ] Restore the etc files to CS0:

tar zxpvf /tmp/recover_cs0/nas/var/backup/nasdb_backup.1.tar.gz etc

9. [ ] Restore the contents of the /home directory:

tar xpvf /nas/var/backup/home_backup.tar home

10. [ ] If the Blades were running an EMCNAS patch (for example, 5643300.exe), restore the patch

from the /nas/var/backup directory and copy it to the /nas/dos/bin directory. For example:

cd /tmp/recover_cs0

tar xvpf /nas/var/backup/<NAS_version>.tar

cp /tmp/recover_cs0/nas/dos/bin/nas.exe /nas/dos/bin/nas.exe

11. [ ] Remove the tar files and temporary directories from the system.

cd /

rm -rf /tmp/recover_cs0

12. [ ] Reboot CS0 to ensure that the Control Station works with the new configuration:

reboot

Task 11: Re-apply Local Control Station Values

Certain CS properties may need to be manually reset following the replacement of a faulted Control

Station, such as:

Setting the timezone

Setting up NTP on the CS

Verifying Replication

This task configures these Control Station properties:

1. [ ] Setting up the timezone on the replacement CS: a. View the time zone names:

ls /usr/share/zoneinfo

b. Determine the time zone by name like “Chicago”?

ls /usr/share/zoneinfo/America

c. Create a backup of the localtime file:

Page 26: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

26 of 31

cp /etc/localtime /etc/localtime.old

d. Delete the file localtime:

rm -f /etc/localtime

e. Create a localtime file for your time zone. American, Chicago is used in this example:

ln -sf /usr/share/zoneinfo/America/Chicago /etc/localtime

f. Verify that the correct time zone file was created:

ls -l /etc/localtime lrwxrwxrwx 1 root root 35 Jan 29 14:04 /etc/localtime ->

/usr/share/zoneinfo/America/Chicago

g. Set the current date using the form:

date <mmddhhmmyy>

h. Verify that the date was correctly set:

date

i. Display the hardware clock time and date:

/usr/sbin/hwclock

j. Set the hardware clock to the current time and date:

/usr/sbin/hwclock –systohc

k. Verify the hardware clocks:

date

and

/usr/sbin/hwclock

The two times displayed should match within a second or two.

2. [ ] Setting up NTP on the replacement CS: a. Restart the NTP service if in use before the upgrade:

/sbin/service ntpd start

b. Set up a drift value if required:

cat /var/lib/ntp/drift

c. Edit /var/lib/ntp/drift and enter 27.391 or another drift value.

d. Verify the /var/lib/ntp/drift edit.

cat /var/lib/ntp/drift

e. Restart the ntpd service:

/sbin/service ntpd restart

3. [ ] If the Control Station was replaced on destination side of replication pair. The Control Stations

may not see each other, even when they are listed in the /etc/hostsfile and

/nas/site/cshosts file. a. Pair the replacement CS to the replacement CS:

nas_cel -name<cel_name_of_remote_CS>-modify -passphrase<passphrase>

Page 27: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

27 of 31

b. Verify that the contents of /nas/site/cshosts on the source and destination are identical.

The system is case sensitive for these entries. Note:

Task 12: Configure ESRS client ( Applies to 7.1.56.x or higher code )

1. [ ] Use the following command to see if the ESRS IP client, is provisioned and running, the output

indicates that ESRS is not running.

# /celerra/esrs2/Configurators/esrs_client_configurator --show-esrs-configuration

Agent not running. Can not process the request!

2. [ ] If the output is not as expected then run the following command to provision the ESRS IP client :

# /celerra/esrs2/Configurators/esrs_client_configurator --configure-esrs

Check Primus emc319455 if re-provisioning fails. Note:

Task 1: Power Up CS1

If you have a single Control Station configuration, skip this task.

If you have a dual Control Station configuration and have completed replacing CS0, you must power up

CS1 as described in this task.

First view the usage notification settings for a file system:

1. [ ] If you have completed replacement of: a. CS1, go to 4. [ ] (because CS1 is already powered up in this case).

b. CS0, you must power up CS1 before continuing; go to 2. [ ]

2. [ ] Verify that CS0 has completed rebooting (see )

3. [ ] Power up CS1 by reconnecting the CS1 power cable to the power distribution panel. Wait for

CS1 to initialize.

4. [ ] From CS0, as root, fail over to CS1 to verify that the failover function is working.

/nasmcd/sbin/cs_standby –failover

5. [ ] From CS0, as root, fail back to CS0 to make CS0 the primary Control Station.

/nasmcd/sbin/cs_standby –takeover

Task 2: Enabling ConnectHome and Email Notifications

For VNX OE for File 7.0 or later, use a HyperTerminal session with the primary CS to enable

ConnectHome and email notification:

6. [ ] From the root directory, clear any existing ConnectHome files and enable ConnectHome:

/nas/sbin/nas_connecthome -service start –clear

7. [ ] From the ConnectHome configuration, determine the connections that are enabled:

/nas/sbin/nas_connecthome –i

8. [ ] For each enabled connection, verify that ConnectHome works:

/nas/sbin/nas_connecthome –test connection_name

Page 28: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

28 of 31

For example:

/nas/sbin/nas_connecthome -t -email_1

or

/nas/sbin/nas_connecthome -t -email_2

or

/nas/sbin/nas_connecthome -t –https

or

/nas/sbin/nas_connecthome -t -modem_1

9. [ ] 4. Verify email notifications is configured:

/nas/bin/nas_emailuser –info

10. [ ] If the Recipient Address(es) field is empty, email notifications has not been configured and

does not need to be enabled. If you want to configure email notifications, use the

/nas/bin/nas_emailuser command or Unisphere to configure it.

11. [ ] If the Recipient Address(es) field is populated, email notifications was enabled. Re-enable

email notifications: a. Enable email notifications:

/nas/bin/nas_emailuser -modify -enabled yes

b. Verify that email notification works:

/nas/bin/nas_emailuser –info

c. Test the configuration and verify that the configured Recipient Address(es) received the test

email:

/nas/bin/nas_emailuser –test

The array will now call home or responded to any other template applied to the VNX OE File array.

Skip over the next Block task to conclude the service activity.

Finish

12. [ ] Upon completion of this service activity, update the CSI database with the new VNX system

information for this site. Standard Global Services discipline requests you to register this service

activity in CSI, particularly for an Install or an Upgrade. You can use CRM or MS Outlook IB Database

email form in accordance with your team's reporting policy. Verify that all the customer site

information is correct (Table 2).

Page 29: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

29 of 31

Information for Updating IB Database

1. General Information (always required)

CE / Requestor Name:

CE / Requestor Badge Number:

CE / Requestor Phone Number (when applicable):

Task or Service Request (SR) Number:

Sales Order Number:

Procedure Performed at Party ID Number:

Installation or Completion Date:

Integrated or Gateway System? Check One: Integrated [ ] Gateway [ ]

2. VNX System Installation (when applicable)

VNX Serial Number:

VNX OE Software Version:

Remote Connection Phone Number:

AUX Array (when applicable)

TLA Serial Number:

TLA Part Number:

FLARE Software Version:

3. VNX Hardware Upgrade Conversion (when applicable)

VNX Model Number Change: From (original): To (final):

Added Data Mover or Blade (when applicable)

TLA Serial Number:

TLA Part Number:

Added or Changed Data Mover Enclosure (when applicable)

TLA Serial Number:

TLA Part Number:

Added or Changed Storage Processor Enclosure (when applicable)

TLA Serial Number:

TLA Part Number:

4. VNX Software Upgrade (when applicable)

NAS Software Upgrade Version:

FLARE Code Upgrade Version:

5. VNX FRUs Replaced, Added, or Removed (when applicable)

Serial Numbers or Instance Numbers of FRUs:

Table 2 Site Information for CSI

Page 30: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

30 of 31

Parts Return

13. [ ] Locate the Parts Return Label package and fill out the shipping label and apply to box for return

to EMC.

14. [ ] Apply other labels for the box appropriate to this returning part. Check for any Engineering

bulletin and with the Customer to determine if it is FA bound.

IMPORTANT: If Engineering has requested the part to be shipped back for an FA, ensure the proper

ship to information has been entered and Attention to and/or Contact Name is provided in the shipping

label.

15. [ ] Securely tape the box and Ship the failed part back to EMC.

Task 3: (Alternative Task) Determine NAS Version when CS is not Working

When performing Task 3: and if there is only one Control Station, and it is not working, you cannot

determine the NAS version by the usual method. However, if the Control Station is down, you can

determine the NAS version that is running on any Blade.

CAUTION: Remember that the NAS version on a particular Blade might be a patch version.

Determining the NAS version on more than one Blade may help to determine the NAS version that

is installed on the Control Station. If possible, perform this procedure on standby Blades instead

of primary Blades.

1. [ ] Connect a serial cable (mini-DB9) from the service laptop (COM1 or COM2) to the serial

maintenance port [ ] on the management module that is associated with the Blade.

When viewed from the rear, the serial maintenance port on the right (A) side management Note:

module connects to the even-numbered Blade in the Blade enclosure (for example, Blade 2). The

serial port on the left (B) side management module connects to the odd-numbered Blade (for

example, Blade 3).

2. [ ] Open and configure a HyperTerminal session using the following settings:

Bits per second: 9600

Data bits: 8

Parity: None

Stop bits: 1

Flow control: None

Emulation: Auto Detect

Telnet terminal ID: ANSI

3. [ ] Click the Call icon to connect to the Blade console. The CONSOLE prompt appears:

CONSOLE>

4. [ ] Redirect the output to the console:

logsys add output console

Page 31: VNX_VNX 5300 Procedures.s - 1

EMC® VNX

™ Procedure Generator

Solution for Validating your engagement

EMC CONFIDENTIAL version: 5.0.0.20

31 of 31

5. [ ] Run the version command on the Blade:

version

6. [ ] Reset the console output to log:

logsys delete output console

7. [ ] Go back to the Task 4: to power down the Control Station.