vo 1
DESCRIPTION
process facilityTRANSCRIPT
-
9.
10.
11.
12.
$17,265.54
$1,640.19
$1,007.84
$585.03
$580.00
Cost Plus + 50%
$582.00
$14,250.00
$117,000.00
$14,250.00
$720.00
1
1
1
1
1
1
13. 1
14. Mass Spectrometer Units (Include vacumm pump, pro cal and required equipment to have 2 more full units on location) Will not add cost plus. 2 $58,500/month
$60.00
$3,213.28 $3,213.281
$192,265.00
$17,265.54
1000' Fig 1002
Hose to pipe
20/4x100' W/SS t-m/sv spr guard pvc
12 ea.
1
HSE TO HSE 9/16-18 THD
HSE TO HSE 1-5/6" THD
5/4x50' W/SS T-M&SLV&PVC Cover
5/4x100' W/SST-M&SLV W/PVC Cover
20/4 x 50' W/SS T-M & SLV
Total
600' of 20mm Spir Star
1in x 50' 10K Water Blast W/MP
JSM-Z176-CTC-WAT-CHV-000-00001-00
Weatherford Pipeline needs to obtain more high pressure hoses and the associated hardware that goes with them. We (Weatherford) is now using our our only mass spectrometer replacement in order to maintain optimal production and performace. Efficiency could then be further inproved my securing the only other two that we have and having them on location. At this point we would have optimal utilization of 3 full units and a back up in the event the mass spectrometer or one of it's components fails thus reducing production
Offshore Agreement Between
Chevron Exploration and Production Company (Hereinafter referred to as 'Client')
And
Weatherford International Ltd. (hereinafter referred to Contractor) Pipeline & Specialty Services
for the Jack & St. Malo He/N2 testing project
Description
Unknown at this time
7.
$66.05
50'X20/4 SS T=M/SLV PVC SG Heat Shrink
25'x 5/4 W/SS T-M & SLV
5.
$1,640.19
$66.05
$1,007.84
$528.00
6. $585.03
8.
Extended CostUnit Cost
4. $33.29 $33.29
50'x 5/4 W/SS T-M &SLV
$2,152.80
2. $335.001
1
3. $528.00
$335.00
1.
1
$2,152.80
Variance:
Impact on Contract Schedule / Key Dates:
Impact on Contract Price:
*All currency in USD
Chevron Exploration and Production Company
Jack & St. Malo He/N2 testing
VARIANCE ORDER
VO #: 018285-VO-01 Contract No.:
Revision:
#
6-Jun-2014Date:
Project:
-VO-01_Rev 00 Company:
018285Project No.:
Client:00
Qty
-
Upon signature of the Variation Order, Contractor hereby conclusively accepts it shall perform the Services described herein in accordance with the terms and conditions, delivery date, schedule and price adjustments of this Variation Order.
For and on behalf of
Chevron Exploration and Production Company
PM/PE
2014 Weatherford International, Inc.
Client hereby agrees that when Contractor executes the Services, which are the subject of this Variation Order, all in accordance with the terms and conditions of this Variation Order, the price, delivery and schedule adjustments indicated above will be made to the Contract.
For and on behalf of
Weatherford International Ltd.Pipeline & Specialty Services
1 FORM REV:
Warning: This information is controlled, and any printed version is deemed as uncontrolled unless suitably endorsed by a controlling authority or accompanied by a controlled table of contents in order to ensure adequate revision control
Date:
Name:
Title:
Michael C. Haise
Page 1 ofX-X-XX-XX-XXX-XXXXX XX/XX/XXXX FORM NUMBER:
Contractor hereby agrees to provide the services described in this variation order in accordance with the terms and conditions of the executed contract or work order referrenced above.
Sign:
Date:
Sign:
XX ORIGINAL ISSUE DATE XX/XX/XXXX REVISION DATE:
6-Jun-2014
Name:
Title: