9. 10. 11. 12. $17,265.54 $1,640.19 $1,007.84 $585.03 $580.00 Cost Plus + 50% $582.00 $14,250.00 $117,000.00 $14,250.00 $720.00 1 1 1 1 1 1 13. 1 14. Mass Spectrometer Units (Include vacumm pump, pro cal and required equipment to have 2 more full units on location) Will not add cost plus. 2 $58,500/month $60.00 $3,213.28 $3,213.28 1 $192,265.00 $17,265.54 1000' Fig 1002 Hose to pipe 20/4x100' W/SS t-m/sv spr guard pvc 12 ea. 1 HSE TO HSE 9/16-18 THD HSE TO HSE 1-5/6" THD 5/4x50' W/SS T-M&SLV&PVC Cover 5/4x100' W/SST-M&SLV W/PVC Cover 20/4 x 50' W/SS T-M & SLV Total 600' of 20mm Spir Star 1in x 50' 10K Water Blast W/MP JSM-Z176-CTC-WAT-CHV-000-00001-00 Weatherford Pipeline needs to obtain more high pressure hoses and the associated hardware that goes with them. We (Weatherford) is now using our our only mass spectrometer replacement in order to maintain optimal production and performace. Efficiency could then be further inproved my securing the only other two that we have and having them on location. At this point we would have optimal utilization of 3 full units and a back up in the event the mass spectrometer or one of it's components fails thus reducing production Offshore Agreement Between Chevron Exploration and Production Company (Hereinafter referred to as 'Client') And Weatherford International Ltd. (hereinafter referred to “Contractor”) Pipeline & Specialty Services for the Jack & St. Malo He/N2 testing project Description Unknown at this time 7. $66.05 50'X20/4 SS T=M/SLV PVC SG Heat Shrink 25'x 5/4 W/SS T-M & SLV 5. $1,640.19 $66.05 $1,007.84 $528.00 6. $585.03 8. Extended Cost Unit Cost 4. $33.29 $33.29 50'x 5/4 W/SS T-M &SLV $2,152.80 2. $335.00 1 1 3. $528.00 $335.00 1. 1 $2,152.80 Variance: Impact on Contract Schedule / Key Dates: Impact on Contract Price: *All currency in USD Chevron Exploration and Production Company Jack & St. Malo He/N2 testing VARIANCE ORDER VO #: 018285-VO-01 Contract No.: Revision: # 6-Jun-2014 Date: Project: -VO-01_Rev 00 Company: 018285 Project No.: Client: 00 Qty

Upload: michael-haise

Post on 05-Nov-2015

215 views

Category:

Documents


2 download

DESCRIPTION

process facility

TRANSCRIPT

  • 9.

    10.

    11.

    12.

    $17,265.54

    $1,640.19

    $1,007.84

    $585.03

    $580.00

    Cost Plus + 50%

    $582.00

    $14,250.00

    $117,000.00

    $14,250.00

    $720.00

    1

    1

    1

    1

    1

    1

    13. 1

    14. Mass Spectrometer Units (Include vacumm pump, pro cal and required equipment to have 2 more full units on location) Will not add cost plus. 2 $58,500/month

    $60.00

    $3,213.28 $3,213.281

    $192,265.00

    $17,265.54

    1000' Fig 1002

    Hose to pipe

    20/4x100' W/SS t-m/sv spr guard pvc

    12 ea.

    1

    HSE TO HSE 9/16-18 THD

    HSE TO HSE 1-5/6" THD

    5/4x50' W/SS T-M&SLV&PVC Cover

    5/4x100' W/SST-M&SLV W/PVC Cover

    20/4 x 50' W/SS T-M & SLV

    Total

    600' of 20mm Spir Star

    1in x 50' 10K Water Blast W/MP

    JSM-Z176-CTC-WAT-CHV-000-00001-00

    Weatherford Pipeline needs to obtain more high pressure hoses and the associated hardware that goes with them. We (Weatherford) is now using our our only mass spectrometer replacement in order to maintain optimal production and performace. Efficiency could then be further inproved my securing the only other two that we have and having them on location. At this point we would have optimal utilization of 3 full units and a back up in the event the mass spectrometer or one of it's components fails thus reducing production

    Offshore Agreement Between

    Chevron Exploration and Production Company (Hereinafter referred to as 'Client')

    And

    Weatherford International Ltd. (hereinafter referred to Contractor) Pipeline & Specialty Services

    for the Jack & St. Malo He/N2 testing project

    Description

    Unknown at this time

    7.

    $66.05

    50'X20/4 SS T=M/SLV PVC SG Heat Shrink

    25'x 5/4 W/SS T-M & SLV

    5.

    $1,640.19

    $66.05

    $1,007.84

    $528.00

    6. $585.03

    8.

    Extended CostUnit Cost

    4. $33.29 $33.29

    50'x 5/4 W/SS T-M &SLV

    $2,152.80

    2. $335.001

    1

    3. $528.00

    $335.00

    1.

    1

    $2,152.80

    Variance:

    Impact on Contract Schedule / Key Dates:

    Impact on Contract Price:

    *All currency in USD

    Chevron Exploration and Production Company

    Jack & St. Malo He/N2 testing

    VARIANCE ORDER

    VO #: 018285-VO-01 Contract No.:

    Revision:

    #

    6-Jun-2014Date:

    Project:

    -VO-01_Rev 00 Company:

    018285Project No.:

    Client:00

    Qty

  • Upon signature of the Variation Order, Contractor hereby conclusively accepts it shall perform the Services described herein in accordance with the terms and conditions, delivery date, schedule and price adjustments of this Variation Order.

    For and on behalf of

    Chevron Exploration and Production Company

    PM/PE

    2014 Weatherford International, Inc.

    Client hereby agrees that when Contractor executes the Services, which are the subject of this Variation Order, all in accordance with the terms and conditions of this Variation Order, the price, delivery and schedule adjustments indicated above will be made to the Contract.

    For and on behalf of

    Weatherford International Ltd.Pipeline & Specialty Services

    1 FORM REV:

    Warning: This information is controlled, and any printed version is deemed as uncontrolled unless suitably endorsed by a controlling authority or accompanied by a controlled table of contents in order to ensure adequate revision control

    Date:

    Name:

    Title:

    Michael C. Haise

    Page 1 ofX-X-XX-XX-XXX-XXXXX XX/XX/XXXX FORM NUMBER:

    Contractor hereby agrees to provide the services described in this variation order in accordance with the terms and conditions of the executed contract or work order referrenced above.

    Sign:

    Date:

    Sign:

    XX ORIGINAL ISSUE DATE XX/XX/XXXX REVISION DATE:

    6-Jun-2014

    Name:

    Title: