Volume: XII Chapter: 5 Page No: 265 Comprehensive CAT Plan of Satluj River Basin Chapter 5: Estimates & Cost Models Per Hac. cost Model for Replinishment/Enrichment planting Sr. No Name Area Rate Non Tribal Tribal 1 Survey and demarcation of plantation and area I/C marking of seditions, path preparation of map. 1 hac 1500 1500.00 1875.00 2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape 80 Nos 949.9 759.92 949.90 3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.5 KM 80 Nos 499.95 per % per KM 199.98 249.98 4 Preparation and digging of holes 20-30 cm dia & 45 cm deep 80 Nos 665.1 per % 532.08 665.10 5 Fixing of wooden posts I/C strutting 80 Nos 510.45 per % 408.36 510.45 6 Carriage of barbed wire bundles up hill over an overage distance of 1 km 1.36 qtls. 125.10 per qtl per Km. 170.10 212.60 7 Streching and fixing of barbed wire with U-stapple in each strand (4 strand) 960 Rmt. 3.45 per Rmt. 3312.00 4140.00 8 Interlacing of thorny bushes with barbed wire obtained from planting side 240 Rmt. 3.00 per Rmt 0.00 0.00 9 Preparation of inspection path 60 cm wide 35 Rmt. 7.95 per Rmt 278.25 347.81 10 Layout of pits/patches 124.9 124.90 156.13 11 Digging of pits (30x30x30) cm 200 No. 350 per % 700.00 875.00 12 Digging of pits (45x45x45) cm 500 No. 699.9 per % 3499.50 4374.38 13 Filling of pits (30x30x30) cm 200 No. 139.95 per % 279.90 249.88 14 Filling of pits (45x45x45) cm 500 No. 200.50 per % 1002.50 1253.13 15 Carriage of Plants in P/bags from Nursery site over an average distance of 0.5 Km. 700 No. 133.25 per % per Km. 466.38 582.97 16 Planting of entire Plants I/C ramming raised in P/bages 700 No. 160.05 per % 1120.35 1400.44 17 Cost of B/Wire/U-nail 1.36 qtls. 5500 7480.00 9350.00 18 Nursery Cost of P/bags raised Plants 700 No. 5 per plant 3500.00 4375.00 19 100 Trenches (Size 1x.30x.30m) 100 Nos 6.30 per Rm 630.00 787.50 20 Weeding hoeing 1 Hac L/S 2000.00 2500.00 G.Total 27964.22 34855.26 Or Say 27900.00 35000.00

Upload: shilpa-gupta

Post on 09-Mar-2016

236 views

Category:

Documents


0 download

DESCRIPTION

Vol12 - Estimate Vol. XII

TRANSCRIPT

Volume: XII Chapter: 5 Page No: 265

Comprehensive CAT Plan of Satluj River Basin

Chapter 5: Estimates & Cost Models

Per Hac. cost Model for Replinishment/Enrichment planting

Sr. No

Name Area Rate Non Tribal

Tribal

1 Survey and demarcation of plantation and area I/C marking of seditions, path preparation of map. 1 hac 1500 1500.00 1875.00

2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape

80 Nos 949.9 759.92 949.90

3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.5 KM 80 Nos 499.95 per % per KM 199.98 249.98

4 Preparation and digging of holes 20-30 cm dia & 45 cm deep 80 Nos 665.1 per % 532.08 665.10

5 Fixing of wooden posts I/C strutting 80 Nos 510.45 per % 408.36 510.45

6 Carriage of barbed wire bundles up hill over an overage distance of 1 km 1.36 qtls. 125.10 per qtl per Km.

170.10 212.60

7 Streching and fixing of barbed wire with U-stapple in each strand (4 strand) 960 Rmt. 3.45 per Rmt. 3312.00 4140.00

8 Interlacing of thorny bushes with barbed wire obtained from planting side 240 Rmt. 3.00 per Rmt 0.00 0.00

9 Preparation of inspection path 60 cm wide 35 Rmt. 7.95 per Rmt 278.25 347.81

10 Layout of pits/patches 124.9 124.90 156.13

11 Digging of pits (30x30x30) cm 200 No. 350 per % 700.00 875.00

12 Digging of pits (45x45x45) cm 500 No. 699.9 per % 3499.50 4374.38

13 Filling of pits (30x30x30) cm 200 No. 139.95 per % 279.90 249.88

14 Filling of pits (45x45x45) cm 500 No. 200.50 per % 1002.50 1253.13

15 Carriage of Plants in P/bags from Nursery site over an average distance of 0.5 Km. 700 No. 133.25 per % per Km.

466.38 582.97

16 Planting of entire Plants I/C ramming raised in P/bages 700 No. 160.05 per % 1120.35 1400.44

17 Cost of B/Wire/U-nail 1.36 qtls. 5500 7480.00 9350.00

18 Nursery Cost of P/bags raised Plants 700 No. 5 per plant 3500.00 4375.00

19 100 Trenches (Size 1x.30x.30m) 100 Nos 6.30 per Rm 630.00 787.50

20 Weeding hoeing 1 Hac L/S 2000.00 2500.00

G.Total 27964.22 34855.26

Or Say 27900.00 35000.00

Volume: XII Chapter: 5 Page No: 266

Comprehensive CAT Plan of Satluj River Basin

Per Hac. cost Model for Grazing Land

Sr. No

Name Area Rate Non Tribal

Tribal

1 Survey and demarcation of plantation and area I/C marking of seditions path & preparation of map. 1 hac 1500 1500.00 1875.00

2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape

60 Nos 949.9 569.94 712.43

3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.3 KM 60 Nos 499.95 per % per KM

99.99 124.99

4 Preparation and digging of holes 20-30 cm dia & 45 cm deep 60 Nos 665.1 per % 399.06 498.83

5 Fixing of wooden posts I/C strutting 60 Nos 510.45 per % 306.27 382.84

6 Carriage of barbed wire bundles up hill over an overage distance of 1 km 1.08 qtls.

125.10 per qtl per Km.

135.11 169.00

7 Streching and fixing of barbed wire with U-stapple in 4 strand 720 Rmt.

3.45 per Rmt. 2484.00 3105.00

8 Interlacing of thorny bushes with barbed wire obtained from planting side 240 Rmt.

3.00 per Rmt 720.00 900.00

9 Preparation of inspection path 60 cm wide 35 Rmt.

7.95 per Rmt 278.25 347.81

10 Preparation of gradoni treanchies 30x30 200 Rmt.

9.90 Rmt. 1980.00 2475.00

11 Layout of pits/patches Ha 124.9 124.90 156.13

12 Digging of pits (45x45x45) cm 200 No.

699.90 per % 1399.80 1749.75

13 Filling of pits (45x45x45) cm 200 No.

200.50 per % 401.00 501.25

14 Carriage of Plants in P/bags from Nursery site over an average distance of 0.3 Km. 200 No.

139.95 per % per Km.

93.30 116.63

15 Planting of entire Plants I/C ramming raised in P/bages 200 No.

160.05 per % 320.10 400.13

16 Planting of grass tufts in gradoni structure/treanchies over ridge 2000 No.

2.20 per % 44.00 55.00

17 Cost of B/Wire/U-nail 1.08qtl 5500.00 prt qtl 7480.00 9350.00

18 Nursery Cost of P/bags raised Plants 200 No.

5.00 per plant 1000.00 1250.00

19 Cost of grass tufts 2000 No.

0.80 per % 1600.00 2000.00

20 contingencies 800 1000

G.Total 21735.72 27169.76

Or Say 21700.00 27000.00

Volume: XII Chapter: 5 Page No: 267

Comprehensive CAT Plan of Satluj River Basin

LIVE HEDGE ESTIMATE

Item No Unit Quantity Unit Cost

Preparation of furrows for live hedge fencing Rms 1 0.95

Planting of live hedge plant species in furrows Rms 1 8.65

Total 9.6

BRUSHWOOD ESTIMATE

Item No Unit Quantity Unit Cost

Brushwood Check dams Rms 1 31.8

Add 96.08% increase on above i.e. on Rs 31.8 Rms 1 30.55

Total 62.35

Or Say 62

Volume: XII Chapter: 5 Page No: 268

Comprehensive CAT Plan of Satluj River Basin

CHECK DAM ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Dam Gabion Providing & laying steel

Gabions or equivalent type of required section

including boxes made of mechanically woven,

double Twisted , hexagonal shaped steel wire

mesh Gabions as per En standards mesh type 10

x 12 as per EN 10223 , edges are to be

mechanically selvedge made of heavily ( Zn+PVC)

coated G.I. wire as per B.S. 443 mesh wire 3 mm

die & edge wire dia 3.9mm dia of maccaferri type

or equivalent type & filled with 20 to 50 kg weight

trap Stones ,including conveying with all leads &

lifts and required placing at required places in

required line , level, slope, section as directed. etc

complete under tidal condition. Gabions of Size -

1.5X1.5M

a) Excavation 1 1 2 0.5 1

1 1 2 0.3 0.6

1.6 198.6 m3 317.76

b) Gabion Structure 1 1 1 1 1

1 1 1.5 0.5 0.75

1 1 2 0.5 1

c) Apron 1 1 2 0.3 0.6

3.35 2900 m3 9715

Total 10032.76 10033

Volume: XII Chapter: 5 Page No: 269

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 270

Comprehensive CAT Plan of Satluj River Basin

CHECK DAM ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Dam Gabion Providing & laying steel

Gabions or equivalent type of required section

including boxes made of mechanically woven,

double Twisted , hexagonal shaped steel wire

mesh Gabions as per En standards mesh type 10

x 12 as per EN 10223 , edges are to be

mechanically selvedge made of heavily ( Zn+PVC)

coated G.I. wire as per B.S. 443 mesh wire 3 mm

die & edge wire dia 3.9mm dia of maccaferri type

or equivalent type & filled with 20 to 50 kg weight

trap Stones ,including conveying with all leads &

lifts and required placing at required places in

required line , level, slope, section as directed.

etc complete under tidal condition. Gabions of

Size -2X2.5M

a) Excavation 1 1 2.5 0.5 1.25

1 1 3.5 0.3 1.05

2.3 198.6 m3 456.78

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 0.5 1

1 1 2.5 0.5 1.25

c) Apron 1 1 3.5 0.3 1.05

5.8 2900 m3 16820

Total 17276.78 17277

Volume: XII Chapter: 5 Page No: 271

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 272

Comprehensive CAT Plan of Satluj River Basin

CHECK DAM ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Dam Gabion Providing & laying steel

Gabions or equivalent type of required section

including boxes made of mechanically woven,

double Twisted , hexagonal shaped steel wire

mesh Gabions as per En standards mesh type 10

x 12 as per EN 10223 , edges are to be

mechanically selvedge made of heavily ( Zn+PVC)

coated G.I. wire as per B.S. 443 mesh wire 3 mm

die & edge wire dia 3.9mm dia of maccaferri type

or equivalent type & filled with 20 to 50 kg weight

trap Stones ,including conveying with all leads &

lifts and required placing at required places in

required line , level, slope, section as directed.

etc complete under tidal condition. Gabions of

Size - 2.5X3M

a) Excavation 1 1 2.5 0.5 1.25

1 1 3.5 0.3 1.05

2.3 198.6 m3 456.78

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

1 1 2.5 0.5 1.25

c) Apron 1 1 3.5 0.3 1.05

6.8 2900 m3 19720

Total 20176.78 20177

Volume: XII Chapter: 5 Page No: 273

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 274

Comprehensive CAT Plan of Satluj River Basin

CHECK DAM ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Dam Gabion Providing & laying steel

Gabions or equivalent type of required section

including boxes made of mechanically woven,

double Twisted , hexagonal shaped steel wire

mesh Gabions as per En standards mesh type 10

x 12 as per EN 10223 , edges are to be

mechanically selvedge made of heavily ( Zn+PVC)

coated G.I. wire as per B.S. 443 mesh wire 3 mm

die & edge wire dia 3.9mm dia of maccaferri type

or equivalent type & filled with 20 to 50 kg weight

trap Stones ,including conveying with all leads &

lifts and required placing at required places in

required line , level, slope, section as directed. etc

complete under tidal condition.Gabions of Size -

3X4M

a) Excavation 1 1 3 0.5 1.5

1 1 4.5 0.3 1.35

2.85 198.6 m3 566.01

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 2 2 1 2

1 1 2.5 1 2.5

1 1 3 0.5 1.5

c) Apron 1 1 4.5 0.3 1.35

9.85 2900 m3 28565

Total 29131.01 29131

Volume: XII Chapter: 5 Page No: 275

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 276

Comprehensive CAT Plan of Satluj River Basin

RETAINING WALL ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Wall/ Retaining Wall in Gabion Providing &

laying steel Gabions or equivalent type of required

section including boxes made of mechanically

woven, double Twisted , hexagonal shaped steel

wire mesh Gabions as per En standards mesh type

10 x 12 as per EN 10223 , edges are to be

mechanically selvedge made of heavily ( Zn+PVC)

coated G.I. wire as per B.S. 443 mesh wire 3 mm

die & edge wire dia 3.9mm dia of maccaferri type or

equivalent type & filled with 20 to 50 kg weight trap

Stones ,including conveying with all leads & lifts

and required placing at required places in required

line , level, slope, section as directed. etc complete

under tidal condition. Gabions of Size - 1.5X1.5M

a) Excavation 1 1 2 0.5 1

1 1 2 0.3 0.6

1.6 198.6 m3 317.76

b) Gabion Structure 1 1 1 1 1

1 1 1.5 0.5 0.75

1 1 2 0.5 1

c) Apron 1 1 2 0.3 0.6

3.35 2900 m3 9715

Total 10032.76 10033

Volume: XII Chapter: 5 Page No: 277

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 278

Comprehensive CAT Plan of Satluj River Basin

RETAINING WALL ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Wall/ Retaining Wall in Gabion Providing &

laying steel Gabions or equivalent type of

required section including boxes made of

mechanically woven, double Twisted , hexagonal

shaped steel wire mesh Gabions as per En

standards mesh type 10 x 12 as per EN 10223 ,

edges are to be mechanically selvedge made of

heavily ( Zn+PVC) coated G.I. wire as per B.S.

443 mesh wire 3 mm die & edge wire dia 3.9mm

dia of maccaferri type or equivalent type & filled

with 20 to 50 kg weight trap Stones ,including

conveying with all leads & lifts and required

placing at required places in required line , level,

slope, section as directed. etc complete under

tidal condition. Gabions of Size -2X2.5M

a) Excavation 1 1 2.5 0.5 1.25

1 1 3.5 0.3 1.05

2.3 198.6 m3 456.78

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 0.5 1

1 1 2.5 0.5 1.25

c) Apron 1 1 3.5 0.3 1.05

5.8 2900 m3 16820

Total 17276.78 17277

Volume: XII Chapter: 5 Page No: 279

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 280

Comprehensive CAT Plan of Satluj River Basin

RETAINING WALL ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Wall/ Retaining Wall in Gabion Providing &

laying steel Gabions or equivalent type of

required section including boxes made of

mechanically woven, double Twisted , hexagonal

shaped steel wire mesh Gabions as per En

standards mesh type 10 x 12 as per EN 10223 ,

edges are to be mechanically selvedge made of

heavily ( Zn+PVC) coated G.I. wire as per B.S.

443 mesh wire 3 mm die & edge wire dia 3.9mm

dia of maccaferri type or equivalent type & filled

with 20 to 50 kg weight trap Stones ,including

conveying with all leads & lifts and required

placing at required places in required line , level,

slope, section as directed. etc complete under

tidal condition. Gabions of Size - 2.5X3M

a) Excavation 1 1 2.5 0.5 1.25

1 1 3.5 0.3 1.05

2.3 198.6 m3 456.78

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

1 1 2.5 0.5 1.25

c) Apron 1 1 3.5 0.3 1.05

6.8 2900 m3 19720

Total 20176.78 20177

Volume: XII Chapter: 5 Page No: 281

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 282

Comprehensive CAT Plan of Satluj River Basin

RETAINING WALL ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Check Wall/ Retaining Wall in Gabion Providing &

laying steel Gabions or equivalent type of required

section including boxes made of mechanically

woven, double Twisted , hexagonal shaped steel

wire mesh Gabions as per En standards mesh type

10 x 12 as per EN 10223 , edges are to be

mechanically selvedge made of heavily ( Zn+PVC)

coated G.I. wire as per B.S. 443 mesh wire 3 mm

die & edge wire dia 3.9mm dia of maccaferri type or

equivalent type & filled with 20 to 50 kg weight trap

Stones ,including conveying with all leads & lifts

and required placing at required places in required

line , level, slope, section as directed. etc complete

under tidal condition. Gabions of Size - 3X4M

a) Excavation 1 1 3 0.5 1.5

1 1 4.5 0.3 1.35

2.85 198.6 m3 566.01

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

1 1 2.5 1 2.5

1 1 3 0.5 1.5

c) Apron 1 1 4.5 0.3 1.35

9.85 2900 m3 28565

Total 29131.01 29131

Volume: XII Chapter: 5 Page No: 283

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 284

Comprehensive CAT Plan of Satluj River Basin

SPUR ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Deflecting Spur Gabions of Size – 1.5X2M

a) Excavation 1 1 2 1 2

1 1 3 0.3 0.9

2.9 198.6 m3 575.94

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

c) Apron 1 1 3 0.3 0.9

5.4 2900 m3 15660

Total 16235.94 16236

Volume: XII Chapter: 5 Page No: 285

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 286

Comprehensive CAT Plan of Satluj River Basin

SPUR ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount

Say Per

Rm

Gabions of Size – 2X3.5M

a) Excavation 1 1 3 1 3

1 1 4 0.3 1.2

4.2 198.6 m3 834.12

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

1 1 2.5 0.5 1.25

1 1 3 1 3

c) Apron 1 1 4 0.3 1.2

9.95 2900 m3 28855

Total 29689.12 29689

Volume: XII Chapter: 5 Page No: 287

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 288

Comprehensive CAT Plan of Satluj River Basin

SPUR ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Deflecting Spur Gabions of Size – 2X3M 1 1 2.5 1 2.5

a) Excavation 1 1 4 0.3 1.2

3.7 198.6 m3 734.82

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

1 1 2.5 1 2.5

c) Apron 1 1 4 0.3 1.2

8.2 2900 m3 23780

Total 24514.82 24515

Volume: XII Chapter: 5 Page No: 289

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 290

Comprehensive CAT Plan of Satluj River Basin

DROP STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Drop Structure Gabion Gabions of Size – 3X4M

a) Excavation 1 1 3 1 3

1 1 5 0.5 2.5

5.5 198.6 m3 1092.3

b) Gabion Structure 5 1 3 1 15

d) Apron 1 1 5 0.5 2.5

17.5 2900 m3 50750

Total 51842.3 51842

Volume: XII Chapter: 5 Page No: 291

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 292

Comprehensive CAT Plan of Satluj River Basin

DROP STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Drop Structure Gabion Gabions of Size – 4X5M

a) Excavation 1 1 3 1 3

1 1 5 0.5 2.5

5.5 198.6 m3 1092.3

b) Gabion Structure 5 1 3 1 15

d) Apron 1 1 5 0.5 2.5

17.5 2900 m3 50750

Total 51842.3 51842

Volume: XII Chapter: 5 Page No: 293

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 294

Comprehensive CAT Plan of Satluj River Basin

SILT DETENTION DAMS ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say

Per Rm

Silt Detention Dams in Gabion Gabions of

Size - 2X3M

a) Excavation 1 1 2.5 0.5 1.25

1 1 3.5 0.3 1.05

2.3 198.6 m3 456.78

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

1 1 2.5 0.5 1.25

c) Apron 1 1 3.5 0.3 1.05

6.8 2900 m3 19720

Total 20176.78 20177

Volume: XII Chapter: 5 Page No: 295

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 296

Comprehensive CAT Plan of Satluj River Basin

SILT DETENTION DAMS ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Silt Detention Dams in Gabion Gabions of

Size - 3X4M

a) Excavation 1 1 3 0.5 1.5

1 1 4.5 0.3 1.35

2.85 198.6 m3 566.01

b) Gabion Structure 1 1 1 1 1

1 1 1.5 1 1.5

1 1 2 1 2

1 1 2.5 1 2.5

1 1 3 0.5 1.5

c) Apron 1 1 4.5 0.3 1.35

9.85 2900 m3 28565

Total 29131.01 29131

Volume: XII Chapter: 5 Page No: 297

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 298

Comprehensive CAT Plan of Satluj River Basin

WATER HARVESTING STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Water Harvesting Structure Gabions of Size - 2X4M

a) Excavation 2 1 3 1 6

1 1 2 0.5 1

7 198.6 m3 1390.2

b) Gabion Structure 2 1 1 1 2

2 1 1.5 1 3

2 1 2 1 4

2 1 2.5 1 5

2 1 3 1 6

c) Apron 1 1 2 0.5 1

21 2900 m3 60900

Total 62290.2 62290

Volume: XII Chapter: 5 Page No: 299

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 300

Comprehensive CAT Plan of Satluj River Basin

WATER HARVESTING STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per Rm

Water Harvesting Structure Gabions of Size - 3X4M

a) Excavation 2 1 3 1 6

1 1 3 0.5 1.5

7.5 198.6 m3 1489.5

b) Gabion Structure 2 1 1 1 2

2 1 1.5 1 3

2 1 2 1 4

2 1 2.5 1 5

2 1 3 1 6

c) Apron 1 1 3 0.5 1.5

21.5 2900 m3 62350

Total 63839.5 63840

Volume: XII Chapter: 5 Page No: 301

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 302

Comprehensive CAT Plan of Satluj River Basin

WATER HARVESTING STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say

Per Rm

Water Harvesting Structure Gabions of Size -

3X5M

a) Excavation 2 1 3.5 1 7

1 1 3 0.5 1.5

8.5 198.6 m3 1688.1

b) Gabion Structure 2 1 1 1 2

2 1 1.5 1 3

2 1 2 1 4

2 1 2.5 1 5

2 1 3 1 6

2 1 3.5 1 7

c) Apron 1 1 3 0.5 1.5

28.5 2900 m3 82650

Total 84338.1 84338

Volume: XII Chapter: 5 Page No: 303

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 304

Comprehensive CAT Plan of Satluj River Basin

WATER HARVESTING STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Water Harvesting Structure Gabions of Size -

4X5M

a) Excavation 2 1 3.5 1 7

1 1 4 0.5 2

9 198.6 m3 1787.4

b) Gabion Structure 2 1 1 1 2

2 1 1.5 1 3

2 1 2 1 4

2 1 2.5 1 5

2 1 3 1 6

2 1 3.5 1 7

c) Apron 1 1 4 0.5 2

29 2900 m3 84100

Total 85887.4 85887

Volume: XII Chapter: 5 Page No: 305

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 306

Comprehensive CAT Plan of Satluj River Basin

WATER HARVESTING STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say

Per Rm

Water Harvesting Structure Gabions of Size - 4X6M

a) Excavation 2 1 4 1 8

1 1 4 0.5 2

10 198.6 m3 1986

b) Gabion Structure 2 1 1 1 2

2 1 1.5 1 3

2 1 2 1 4

2 1 2.5 1 5

2 1 3 1 6

2 1 3.5 1 7

2 1 4 1 8

c) Apron 1 1 4 0.5 2

37 2900 m3 107300

Total 109286 109286

Volume: XII Chapter: 5 Page No: 307

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 308

Comprehensive CAT Plan of Satluj River Basin

DROP STRUCTURE ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Drop Structure Gabion Gabions of Size – 3X3M

a) Excavation 1 1 3 1 3

1 1 4 0.5 2

5 198.6 m3 993

b) Gabion Structure 4 1 3 1 12

d) Apron 1 1 4 0.5 2

14 2900 m3 40600

Total 41593 41593

Volume: XII Chapter: 5 Page No: 309

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 310

Comprehensive CAT Plan of Satluj River Basin

Spill Way in Gabion ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Spill Way in Gabion Gabions of Size – 5X3M

a) Excavation 2 1 2.5 1 5.00

1 1 5 0.5 2.50

7.50 198.6 m3 993

b) Gabion Structure 2 1 1 1 2.00

2 1 1.5 1 3.00

2 1 2 1 4.00

2 1 2.5 1 5.00

d) Apron 1 1 5 0.5 2.50

16.50 2900 m3 47850.00

Total 49339.50 49340

Volume: XII Chapter: 5 Page No: 311

Comprehensive CAT Plan of Satluj River Basin

Volume: XII Chapter: 5 Page No: 312

Comprehensive CAT Plan of Satluj River Basin

Toe Wall Gabion ESTIMATE

Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per

Rm

Toe Wall Gabion Gabions of Size – 4X6M

a) Excavation 1 1 4 1 4.00

1 1 5 0.3 1.50

5.50 198.6 m3 993

b) Gabion Structure 1 1 1 1 1.00

1 1 1.5 1 1.50

1 1 2 1 2.00

1 1 2.5 1 2.50

1 1 3 1 3.00

1 1 4 1 4.00

d) Apron 1 1 5 0.3 1.50

15.50 2900 m3 44950.00

Total 46042.30 46042.00

Volume: XII Chapter: 5 Page No: 313

Comprehensive CAT Plan of Satluj River Basin