Doug’s Corner VOLUME 3, ISSUE 1451 COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug’s Corner 1-3 Traffic/Active Work 4-5 Notices 6 Other Resources 7 October 26th, 2015 ONTRACTOR’S C W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1 Light Rail Superhero Maxx Transit was at the Washing- ton Elementary School District B.A.T. meeting. SSWJV and Mrs. Seay were honored for our work in creating e Adventures of Maxx Transit book.

Upload: others

Post on 11-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VOLUME 3, ISSUE 1451 October 26th, 2015 CONTRACTOR’S ...• Work scheduled for Sunday, October 25th thru Wednesday, October 28th. • One lane will remain open both eastbound and

Doug’s Corner

VOLUME 3, ISSUE 1451

COURTEOUS

RESPONSIVE

DEPENDABLE

IN THIS ISSUE

Doug’s Corner1-3

Traffic/Active Work4-5

Notices6

Other Resources7

October 26th, 2015

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

1

Light Rail Superhero Maxx Transit was at the Washing-ton Elementary School District B.A.T. meeting.

SSWJV and Mrs. Seay were honored for our work in creating The Adventures of Maxx Transit book.

Page 2: VOLUME 3, ISSUE 1451 October 26th, 2015 CONTRACTOR’S ...• Work scheduled for Sunday, October 25th thru Wednesday, October 28th. • One lane will remain open both eastbound and

A beautiful view from the Dunlap Art Plaza with the nearly completed Dunlap Station in the background.

Doug’s Corner

My Weekin Pictures

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

2

facebook.com/doug.ststevens

instagram.com/nwx_phx

#MOVEPHX

Deborah, Lisa and Carla (and Doug) enjoyed Friend’s of Transit Tuesday at Restaurant Atoyac.

Page 3: VOLUME 3, ISSUE 1451 October 26th, 2015 CONTRACTOR’S ...• Work scheduled for Sunday, October 25th thru Wednesday, October 28th. • One lane will remain open both eastbound and

ONTRACTOR’SCWU

EEKLYPDATE

Doug’s Corner

My Weekin Pictures

facebook.com/doug.ststevens

/maxxtransit

BETHANY HOME ROAD TO DUNLAP AVENUE

#MOVEPHX

One of our craft workers, Kelvin, brought out his drone and flew it around the Dunlap Park and Ride.

A bird’s-eye view of the Dunlap Art Plaza.3

Page 4: VOLUME 3, ISSUE 1451 October 26th, 2015 CONTRACTOR’S ...• Work scheduled for Sunday, October 25th thru Wednesday, October 28th. • One lane will remain open both eastbound and

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

10.26.15

NORTHDunlapAvenue

toOrangewood

Avenue

C-Street/Dunlap AvenueRoadway Striping - intermittent lane restrictions possible

Dunlap Avenue/19th Avenue IntersectionRoadway Striping - intermittent lane restrictions possible

Dunlap Avenue to Butler DriveTPSS Site Landscaping, Civil Punchlist, Roadway Striping• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.

Butler Drive/19th Avenue IntersectionNo restrictions

Butler Drive to Northern AvenueCivil Punch List, TPSS, Underground Fiber Pull, Roadway Striping• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.

Northern Avenue/19th Avenue IntersectionNo restrictions

Northern Avenue to Orangewood AvenueRubberized Asphalt, Station Work, Signal Building Landscape/Hardscape, Under-ground Fiber Pull• One (1) lane both northbound and southbound 19th Avenue will be maintain

with turns at signalized intersections.

4

#MOVEPHX

/maxxtransit

Page 5: VOLUME 3, ISSUE 1451 October 26th, 2015 CONTRACTOR’S ...• Work scheduled for Sunday, October 25th thru Wednesday, October 28th. • One lane will remain open both eastbound and

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

10.26.15

SOUTHOrangewood

Avenueto

MontebelloAvenue

Orangewood Avenue/19th Avenue IntersectionRubberized Asphalt• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained. Orangewood Avenue to Glendale AvenueRubberized Asphalt, Civil Punchlist, Landscaping• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained. Glendale Avenue/19th Avenue IntersectionRubberized Asphalt (see restriction notice page six)• Work scheduled for Sunday, October 25th thru Wednesday, October 28th.• One lane will remain open both eastbound and westbound Glendale Avenue

with left hand turn restrictions October 25th and 26th.• One (1) lane both northbound and southbound 19th Avenue will be maintained

with turns.Glendale Avenue to Maryland AvenueStation Work, Civil Punchlist, Landscaping• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.Maryland Avenue/19th Avenue IntersectionRubberized Asphalt• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained. Maryland Avenue to Bethany Home RoadCivil Punchlist, Landscaping• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.Bethany Home Road/19th Avenue IntersectionRubberized Asphalt (see restriction notice page six) • Work scheduled for Sunday, October 25th thru Wednesday, October 28th.• One lane will remain open both eastbound and westbound Bethany Home Road

with left hand turn restrictions on October 25th and 26th.• One (1) lane both northbound and southbound 19th Avenue will be maintained

with turns.Bethany Home Road to Montebello AvenueRubberized Asphalt• One (1) lane both northbound and southbound 19th Avenue will be maintained

with turns

5

#MOVEPHX

/maxxtransit

Page 6: VOLUME 3, ISSUE 1451 October 26th, 2015 CONTRACTOR’S ...• Work scheduled for Sunday, October 25th thru Wednesday, October 28th. • One lane will remain open both eastbound and

CN

QUESTIONS?SSWJVCommunity OutreachSuperintendentRyan Clark (480) 271.4117

VALLEY METROCommunity OutreachCoordinatorsCarla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Updated Rubberized AsphaltOctober 19th - November 3rd, 2015

Night work - 8PM and 6AM

Area A: Dunlap Avenue to Northern Avenue• Work scheduled for Monday, October 19th through Friday, Octo-

ber 23rd.Traffic Restrictions• One lane will remain open both eastbound and westbound on

Dunlap Avenue and Northern Avenue with left hand turn restric-tions October 19th and 20th

ONSTRUCTIONOTICE

Area B: Bethany Home Road to Glendale Avenue• Work scheduled for Sunday, October 25th thru Wednesday, Octo-

ber 28th.Traffic Restrictions• One lane will remain open both eastbound and westbound Glen-

dale Avenue and Bethany Home Road with left hand turn restric-tions October 25th and 26th.

Area C: Glendale Avenue to Northern Avenue• Work scheduled for Thursday, October 29th through Tuesday,

November 3rd.

DUNLAP

GLENDALE

NORTHERN

BETHANYA BC

Driveway and street restrictions possible as asphalt is placed and allowed to cool. One lane will remain open both northbound and southbound on 19th Avenue.

Northwest Extension

Page 7: VOLUME 3, ISSUE 1451 October 26th, 2015 CONTRACTOR’S ...• Work scheduled for Sunday, October 25th thru Wednesday, October 28th. • One lane will remain open both eastbound and

ONTRACTOR’SCWU

EEKLYPDATE OTHER RESOURCES

7

/maxxtransit/doug.ststevens

#MOVEPHX/maxxtransit