vrvs session, 8th march 2006cern ab-atb-ea1 layout of passages between tt2 and tt2a adrian fabich,...

8
VRVS session, 8th Mar ch 2006 CERN AB-ATB-EA 1 Layout of Passages between TT2 and TT2A Adrian Fabich, CERN AB-ATB-EA http://cern.ch/merit/ VRVS session, 8 th March 2006

Post on 19-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

VRVS session, 8th March 2006

CERN AB-ATB-EA 1

Layout of Passages between TT2 and TT2A

Adrian Fabich, CERN AB-ATB-EA

http://cern.ch/merit/

VRVS session, 8th March 2006

VRVS session, 8th March 2006

CERN AB-ATB-EA 2

Updated ACAD filehttps://edms.cern.ch/document/695011/

Entrance

modifications

Actual

cryogenics line

Passages

TT2/TT2A Cinematics

VRVS session, 8th March 2006

CERN AB-ATB-EA 3

Layout of the passages

3 holes 1x upstream of solenoid: cryogenic lines (dia 30 cm) 2 x downstream of solenoid: other (dia each 20 cm)

Downstream holes 1: fragile parts (fibers, detector signals ...) 2: high pressure hoses

Passages with interior lining of stainless steel

VRVS session, 8th March 2006

CERN AB-ATB-EA 4

Passages (top view)

ABC

VRVS session, 8th March 2006

CERN AB-ATB-EA 5

Passages (cut view 1)

A

BC

VRVS session, 8th March 2006

CERN AB-ATB-EA 6

Passages (cut view 2)

B,C

A

0.4-0.7 m

VRVS session, 8th March 2006

CERN AB-ATB-EA 7

Length of fiber path

From z=0 to exit into TT2 5.8 m See orange line

VRVS session, 8th March 2006

CERN AB-ATB-EA 8

Schedule