Page 1: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

1 1

SOUTHERN OUTER BANGKOK RING ROAD PROJECT

SOBRR Contract No. 1 Erection of Precast Segmental Viaduct: Span-by-Span Method using Overhead Erection Gantry Padipat Chaemmangkang, Ph.D.

Page 2: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

2

Precast Segments Fabrication

Match Casting The successful use of precast segmental construction for bridges relies on the ease with which the contractor can erect and fix the segments and this in turn relies heavily on the quality of the joint between them. To ensure the best possible fit between the segments the concept of Match Casting was developed whereby each segment is cast directly against its neighbor.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 3: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

3

Precast Segments Fabrication

Short Line Match Casting Principle: Method of casting in which the form is stationary while the segments move from the casting position to the match casting position and then to the storage.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 4: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

4

Precast Segments Fabrication

Short Line Match Casting (Continued) Advantages: - much less space needed compared to long line (approximately three times the segment length) - the entire process is centralized - horizontal and vertical curves and twisting of the structure are obtained by adjusting the conjugate segment - the forms are reusable for other projects Disadvantages: - to obtain the desired structural configuration, the match cast segment must be accurately positioned. This requires a special geometry control software, the right setup in the casting yard and very skilled surveyors.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 5: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

5

Precast Segments Fabrication

Short Line Match Casting (Continued)

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 6: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

6

Precast Segments Fabrication

Long Line Match Casting Principle: Method of casting segments on a long casting bed which makes up the soffit of a complete cantilever or span between field closure pours. One or more formwork units move along this line. The formwork units are guided by the preset soffit.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 7: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

7

Precast Segments Fabrication

Long Line Match Casting (Continued) Advantages: - geometry control is done when constructing the soffit which simplifies the geometry control and segment production - after stripping the forms, it is not necessary to take away the segments immediately

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 8: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

8

Precast Segments Fabrication

Long Line Match Casting (Continued) Disadvantages: - requires a large area (minimum length is normally slightly more than half the length of the longest span) - requires a firm foundation which will not settle or deflect under the weight of the segments - if the structure is curved, the long line has to be designed curved also - since the form is mobile, the equipment for casting has to move from place to place - the soffit cannot be reused for a new project - the soffit can be made for one casting curve only

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 9: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

9

Precast Segments Fabrication

Long Line Match Casting

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 10: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

10

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR Project Contract No. 1 – Casting Yard

Page 11: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

11

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

SOBRR Project Contract No. 1 – Casting Yard

Page 12: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

12

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 13: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

13

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 14: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

14

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 15: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

15

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 16: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

16

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 17: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

17

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 18: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

18

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 19: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

19

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 20: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

20

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 21: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

21

Precast Segments Fabrication

TC-JV SOBRR Project Contract No. 1

Page 22: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

22 VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Precast Segments Fabrication

Geometry Control The effect of match casting the precast segments is to ensure an exact fit between segments on erection, as a result of this there is very little scope to adjust the bridge deck alignment on site and consequently it is important to ensure that each segment is accurately cast and more importantly that any errors which occur during casting are picked up and rectified. This is generally of much greater importance for short line casting than for long line.

Page 23: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

23

Precast Segments Fabrication

Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 24: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

24

Precast Segments Fabrication

Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 25: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

25

Precast Segments Fabrication

Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 26: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

26

Precast Segments Fabrication

Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 27: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

27

Precast Segments Fabrication

Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 28: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

28

Precast Segments Fabrication

Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 29: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

29

Precast Segments Fabrication

Geometry Control

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 30: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

30

Erection of Precast Segments

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

There are two principal methods of precast segmental erection: the Free Cantilever Method (FCM) and the Span-by-Span Method. Within these, there are 3 basic techniques for handling and placing the segments: - by Crane - by Lifting Frame - by Launching Girder (Erection Gantry)

Page 31: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

31

Span-by-Span Method

This system is based on the principle of assembling an entire span onto a temporary support, stressing the segments together to form the single span deck and then placing the span on its permanent supports. Advantages: - Relatively fast - Simple geometry control - Spans are stable once placed – less temporary works Disadvantages: - Limited span and structure size due to need for full span gantry or falsework.

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 32: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

32

Span-by-Span Method

Underslung Erection Gantry This system is based on the use of two or more trusses spanning between the piers on which the segments are placed and the span assembled. The segment placing is generally carried out by a crane or lifting frame. Advantages: - Relatively stable support of segments during assembly - Relatively cheap equipment for supporting and moving segments Disadvantages: - Not good on curved structure - Limited by ground conditions below – requires min. clearance below structure

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 33: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

33

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

Page 34: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

34

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

Page 35: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

35

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

Page 36: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

36

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

Page 37: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

37

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

Page 38: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

38

Span-by-Span Method

VSL (Thailand) Co., Ltd. SARL Project

Page 39: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

39

Overhead Erection Gantry In this system the individual segments are hung from an overhead gantry. Once the segments are all in their approximate position they are then aligned and connected (glue/unglue) together to form the final span, which is then lowered onto its bearings. Advantages: - Easy to launch and move - Can cope with curved structure - Not limited by ground conditions Disadvantages: - Segments are relatively unstable in temporary condition - Adjustment and gluing of segments is more difficult

Span-by-Span Method

VSL ASIA Precast Segmental Construction: Practical Aspects of Segment Fabrication & Erection, Neil Thorburn, Manager - Special Projects

Page 40: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

40

GANTRY TECHNICAL

SPECIFICATION

Page 41: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

41

Erection Gantry Technical Specification

DESIGN CRITERIA Viaduct Perimeters Maximum Design Span Length (Erection) 45m Maximum Design Span length (Launching) 54m Maximum Design Span Weight 1000T Maximum Design Segment Weight 85T Maximum Numbers of Segment per Span 15nos.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 42: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

42

Erection Gantry Technical Specification

DESIGN CRITERIA (CONT.) Viaduct Alignment Maximum Design Gradient ±4.5% Maximum Design Crossfall ±6% Minimum Radius in Plan 210m

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 43: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

43

MT ELEMENT NO.

LENGTH AT TOP

CHORD (MM)

LENGTH AT BOTTOM CHORD

(MM)

WEIGHT OF MT ELEMENT

(TONS)

11 & 1 9681 7740 8.89

10 & 2 8180 8180 8.95

9 & 3 10080 10080 12.12

8 & 4 8300 10200 25.97

7 & 5 10200 8300 21.11

6 10200 10200 22.11

Erection Gantry Main Truss (MT)

2 Trusses

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 44: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

44

Erection Gantry Upper Cross Beam (UCB)

1 No.

UCB

Function: Lifting of Precast Segments and Relocating LCB

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 45: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Upper Cross Beam (UCB)

45

Page 46: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

46

Erection Gantry Universal Lower Roller Support (ULRS)

4 Nos.

ULRS2 (2 Nos.) ULRS1

(2 Nos.)

Function: Support Structure for MT allowing Longitidinal and Transverse Movements as well as Rotational of MT

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 47: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

47 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Universal Lower Roller Support (ULRS)

Page 48: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

48 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Universal Lower Roller Support (ULRS)

Page 49: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

49 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Universal Lower Roller Support (ULRS)

Page 50: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

50 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Universal Lower Roller Support (ULRS)

Page 51: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

51

Erection Gantry Lower Cross Beam (LCB)

2 Nos.

LCB1 (1 No.)

LCB2 (1 No.)

Function: Transverse Load Spreader from MT to LCB Support Leg (SL)

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 52: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

52 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Lower Cross Beam (LCB)

Page 53: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

53

Erection Gantry LCB Support Leg (SL)

6 Nos.

SL (2 Nos.)

SL (2 Nos.)

SL (2 Nos.)

Function: Support Structure for LCB

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 54: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

54 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry LCB Support Leg (SL)

Page 55: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

55

Erection Gantry Front and Rear Support Leg (FSL/RSL)

2 Nos.

FSL (1 No.)

RSL (1 No.)

Function: Temporary Support to MT during some Stages of Operation

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 56: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

56 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Rear Support Leg (RSL)

Page 57: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

57 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Front Support Leg (FSL)

Page 58: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

58

Erection Gantry Lifting Spreader Beam (SPB)

1 No.

SPB

Function: Precast Segment Erection and Relocation of LCB/SL

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 59: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

59 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Lifting Spreader Beam (SPB)

Page 60: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

60 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Lifting Spreader Beam (SPB)

Page 61: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

61

Erection Gantry Connection Beam (CB)

24 Nos.

CB (1 No.)

CB Storage Area

Function: Individual Precast Segment Attachment to both SPB during Lifting and SBS during Erection

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 62: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

62 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Connection Beam (Standard & Deviator Segments)

Page 63: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

63 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Connection Beam (Pier Segments)

Page 64: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

64 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Connection Beam (Pier Segments)

Page 65: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

65

Erection Gantry Suspension Bar System (SBS)

17 Nos.

SBS

Function: Individual Precast Segment Suspension to MT during Erection

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 66: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

66 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Suspension Bar System (SBS)

Page 67: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

67 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Suspension Bar System (SBS)

Page 68: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

68

Erection Gantry Pier Bracket (PB)

PB

PB

Function: Support for FSL Operation and Provision of Longitudinal Stability of Front LCB/SL (LCB2 for Launching

Direction Shown)

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 69: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

69 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Pier Bracket (PB)

Page 70: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

70

Erection Gantry Chain Pulling Units (CPU)

Chain Spanner Wheel for MT (Element 3)

CPU for MT (Element 9)

CPU for UCB

Function: Longitudinal Movement of MT and UCB

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 71: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

71 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Chain Pulling Units (CPU) – Upper Cross Beam

Page 72: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

72 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Chain Pulling Units (CPU) – MT (Element 9)

Page 73: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

73 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Chain Pulling Units (CPU) – MT (Element 9)

Page 74: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

74 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 : 12 June 2006

Erection Gantry Overall Structure

Page 75: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

75

GANTRY OPERATIONS

Page 76: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

76

1 ASSEMBLY 2 ERECTION OPERATION 3 LAUNCHING OPERATION

Erection Gantry Operations

Page 77: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

77

ASSEMBLY

Page 78: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

78

Erection Gantry Assembly 45M Span

Stage 1

Page 79: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

79

Erection Gantry Assembly 45M Span

Page 80: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

80

Erection Gantry Assembly 45M Span

Stage 2

Page 81: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

81

Erection Gantry Assembly 45M Span

Stage 3

Page 82: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

82

Erection Gantry Assembly 45M Span

Page 83: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

83

Erection Gantry Assembly 45M Span

Stage 4

Page 84: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

Erection Gantry Assembly 45M Span

84

Page 85: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

85

Erection Gantry Assembly 45M Span

Stage 5

Page 86: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

86

Erection Gantry Assembly 45M Span

Page 87: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

87

Erection Gantry Assembly 45M Span

Stage 6

Page 88: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

88

Erection Gantry Assembly 45M Span

Page 89: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

89

Erection Gantry Assembly 45M Span

Stage 7

Page 90: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

90

Erection Gantry Assembly 45M Span

Page 91: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

91

Erection Gantry Assembly 45M Span

Stage 8

Page 92: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

92

Erection Gantry Assembly 45M Span

Stage 9

Page 93: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

93

Erection Gantry Assembly 45M Span

Page 94: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

94 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 95: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

95 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 96: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

96 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 97: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

97 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 98: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

98 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 99: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

99 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 100: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

100 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 101: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

101 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 102: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

102 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 103: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

103 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 104: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

104 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 105: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

105 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 106: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

106 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 107: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

107 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 108: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

108 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 109: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

109 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 110: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

110

Page 111: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

111 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 112: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

112 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 113: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

113 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection Gantry Assembly 45M Span

Page 114: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

114 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 : 12 June 2006

Erection Gantry

Page 115: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

115

ERECTION AND LAUNCHING OPERATION

Page 116: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

116

Averaged Erection Cycle: Single Decks - 3 shifts per span Twin Decks - 5 shifts per span Erection cycles include launching of the Erection Gantry, erection of all segments, installation and stressing of required PT, and load transferring of span weight.

Erection and Launching Operations Erection Cycle

Page 117: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

117

Single Decks – 3 shifts per span: - Span erection (max. 15 segments): 1 shift - PT installation, stressing and load transferring onto span jacks: 1 shift - Launching of the Gantry into next span: 1 shift Twin Decks - 5 shifts per span: - Span erection (max. 15 segments): 2 shifts - PT installation, stressing and load transferring onto span jacks: 2 shifts - Launching of the Gantry into next span: 1 shift

Erection and Launching Operations Erection Cycle

Page 118: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

118

Erection and Launching Operations Erection Cycle

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 119: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

119

Erection and Launching Operations 45M Span

Stage 1: upon completion of Span P(N-1) / P(N) two bounds -Store CB at respective position shown. -MT CPU fixity at pier P(N). -Brace LCB2 against previously erected viaduct. -Load transfer MT support from jack shim to crane wheel of ULRS

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 120: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

120

Erection and Launching Operations 45M Span

Stage 2 -Deactivate LCB2 prop to PB. -Move MT transversely to centerline of twin deck. -Align MT for launching. -Move UCB to centerline of pier P(N-1). -Launch MT forward until C.G. is over pier P(N); Keep UCB at centerline of pier P(N-1). -Engage MT fixity pin to ULRS2. -Activate FSL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 121: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

121

Erection and Launching Operations 45M Span

Stage 3 -Activate RSL to free ULRS1. -Deactivate LCB; Lift LCB1 off SL using UCB. -Move and position ULRS1/LCB1 near mid-span of P(N-1) / P(N). -Rotate LCB 1 by 90°.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 122: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

122

Erection and Launching Operations 45M Span

Stage 4 -Lift up and position LCB1 between MT. -Move ULRS1/LCB1 to mid-span of P(N) / P(N+1). -Lower down LCB1.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 123: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

123

Erection and Launching Operations 45M Span

Stage 5 -Rotate LCB1 by 90° and move ULRS1/LCB1 to pier P(N+1). -Engage LCB1 onto SL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 124: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

124

Erection and Launching Operations 45M Span

Stage 6 -Deactivate FSL and load transfer MT support to ULRS. -Move FSL away and install LCB1 prop to PB. -Release LCB1 temporary prop. -Deactivate RSL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 125: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

125

Erection and Launching Operations 45M Span

Stage 7 -Disengage MT fixity from ULRS2. -Launch MT forward to erection position; Keep UCB at centerline of pier P(N+1).

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 126: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

126

Erection and Launching Operations 45M Span

Stage 8 -Move MT transversely to centerline of left / right bound. -Move in CB storage trailer and position between pier P(N-1) and P(N). -Launch MT backward until C.G. is over P(N); Keep UCB at centerline of pier P(N+1). -Engage MT fixity pin to ULRS2. -Activate RSL on single deck.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 127: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

127

Erection and Launching Operations 45M Span

Stage 9 -Move UCB to pier P(N-1); Disengage and lift SL to span between P(N) and P(N+1) to be lowered to ground. -Move UCB to pier P(N); Disengage and lift PB to span between P(N) and P(N+1) to be lowered to ground.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 128: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

128

Erection and Launching Operations 45M Span

Stage 10 -Move UCB to lift and park 6 nos. of CB onto CB storage trailer. -Keep 1 no. of CB (for pier segment) suspended on SPB and move UCB to centerline of pier P(N+1). -Deactivate RSL.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 129: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

129

Erection and Launching Operations 45M Span

Stage 11 -Disengage MT fixity from ULRS2. -Launch MT forward to erection position; Keep UCB at centerline of pier P(N+1). -Load transfer MT support from crane wheel to jack shim. -Transfer MT CPU fixity from pier P(N) to P(N+1). -Gantry is ready for span P(N) / P(N+1) construction.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 130: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

130

Erection and Launching Operations 45M Span

Stage 12 -Rotate and fix RSL. -Deliver segment over previously erected deck. -Pick up segments using UCB/SPB/CB. -Move and hang segments to suspension bars on MT. -Stagger segments as shown to allow for last segment rotation.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 131: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

131

Erection and Launching Operations 45M Span

Stage 13 -Rearrange and joint segments using UCB/SPB/CB from pier P(N) to about final level. -Install longitudinal PT required. -Stress longitudinal PT required at pier P(N+1) and lower ULRS jacks in stages to load transfer span weight from Gantry to piers.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 132: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

132

Erection and Launching Operations 45M Span

Stage 14 -Release and remove suspension bars from CB and store in MT. -Brace LCB2 against placed viaduct. -Store CB using UCB on placed viaduct. -Load transfer MT support from jack shim to crane wheels. -Repeat stages 8 to 14 for adjacent viaduct.

VSL Singapore PTE. LTD. Technical Center Asia/Australia, Precast Segmental Viaduct Erection Gantry: Methodology Report, MF05017/R01A Issue A, 2005.

Page 133: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

133

ERECTION GANTRY KINEMATICS FOR 49.5M-54M-49.5M SPAN

Page 134: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

134 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 1 - Span erection for Span 45-2/45-3 completed.

Page 135: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

135 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 3 -Deactivate FSL/RSL -Launch MT to position shown -Erect Span 45-3/45-4

Page 136: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

136 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 4 -Erect Span on Pier 45-4 as shown

Page 137: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

137 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 7 -Deactivate RSL -Launch MT to position shown -Erect Span 45-4/45-5

Page 138: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

138 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 8 -Erect Span on Pier 45-5 as shown

Page 139: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

139 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 49.5M-54M-49.5M Span

Stage 11 -Deactivate RSL -Launch MT to position shown -Erect Span 45-5/45-6

Page 140: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

140 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 1 -Shorten FSL module during MT launching into Span 45-19/45-20 -Erect Span 45-19/45-20

Page 141: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

141 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 2 -Launch MT to position shown -Activate FSL/RSL

Page 142: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

142 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 3 -Move ULRS1/LCB1 to position shown with special support shims on deck

Page 143: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

143 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 4 -Deactivate FSL/RSL -Launch MT to position shown

Page 144: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

144 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 5 -Launch MT to position shown -Activate FSL/RSL

Page 145: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

145 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 6 -Move ULRS2/LCB2 to position shown with special support shims on deck

Page 146: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

146 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 7 -Deactivate FSL/RSL -Launch MT to position shown

Page 147: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

147 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 8 -Launch MT to position shown -Activate FSL/RSL

Page 148: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

148 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 9 -Move ULRS1/LCB1 to Pier 46-2

Page 149: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

149 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 10 -Deactivate FSL/RSL -Launch MT to position shown

Page 150: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

150 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 11 -Launch MT to position shown -Activate FSL/RSL

Page 151: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

151 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 12 -Move ULRS2/LCB2 to Pier 46-3

Page 152: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

152 VSL Singapore PTE. LTD. Technical Center Asia/Australia, Erection Gantry Kinematics for 49.5m-54m-49.5m Span, MF05017/KN/22 Revision B, 2005.

Erection Gantry Kinematics 40M-70M-40M Span

Stage 13 -Remove and lower PB from Pier 46-2 -Gantry is ready to erect Span 46-2/46-3

Page 153: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

153 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 154: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

154 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 155: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

155 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 156: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

156 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 157: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

157 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 158: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

158 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 159: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

159 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 160: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

160 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 161: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

161 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 162: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

162 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 163: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

163

Span-by-Span Method

VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Page 164: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

164 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 165: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

165 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 166: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

166 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 167: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

167 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 168: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

168 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 169: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

169 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 170: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

170 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 171: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

171 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 172: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

172 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 173: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

173 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 174: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

174 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 175: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006

SO

BR

R C

ON

TR

AC

T N

O. 1

175 VSL (Thailand) Co., Ltd. SOBRR Project Contract No. 1 .

Erection and Stressing Works First Span

Page 176: VSLTH's Presentation: SOBRR C1-Precast Segmental Viaducts Erection-15 June 2006