Page 1: W06 siesta beach low impact development-strum

Siesta Beach Low Impact Development (LID) Design

Approach

2013 APWAAnnual Meeting & Trade Show

April 24, 2013

Page 2: W06 siesta beach low impact development-strum

History of Siesta Beach

Page 3: W06 siesta beach low impact development-strum

Goals and Objectives Met• Improve appearance and aesthetics of this world

class beach Updated restroom and new concession facilities Increased landscaping throughout New entrance/gateway design for the park

• Improve environmental quality of the park Improved stormwater treatment providing better

water quality Low Impact Development (LID) features

Pervious parking areas Bioswales in paved parking area

Phased removal of exotic plants and enhanced natural plantings

Energy efficient buildings and fixtures

Page 4: W06 siesta beach low impact development-strum

4

BOCC Approved Project - $21,500,000

(Includes $16,700,000 for construction)

Page 5: W06 siesta beach low impact development-strum

5

Beach Road Aerial Site Plan

Page 6: W06 siesta beach low impact development-strum

6

Beach Road Paving Grading And Drainage Plan

Page 7: W06 siesta beach low impact development-strum

7

Hydraulic Schematic Profile

Page 8: W06 siesta beach low impact development-strum

8

Stormwater Vault Site Plan

Page 9: W06 siesta beach low impact development-strum

9

Contech Stormwater Vault

Page 10: W06 siesta beach low impact development-strum

10

Stormwater Lift Station

Page 11: W06 siesta beach low impact development-strum

11

Aquionics UV Reactor

Page 12: W06 siesta beach low impact development-strum

Halma UV Group Background

• Over 300,000 installations

• In house MP Lamp R&D and Manufacturing

• Part of Halma Group (photonics & water measurement tech.)

Industrial Municipal

Est. 1929 Est. 1983 Est. 1972

Page 13: W06 siesta beach low impact development-strum

Virus Disinfection

Chlorine Reduction

TOC Reduction

Bacteria Disinfection

Chloramine Reduction

SRB Control

Ozone Reduction

Syrup/Brine Disinfection

EDC Reduction

Core business is understanding the science associated with diverse applications and delivering solutions

Aquionics Background

Page 14: W06 siesta beach low impact development-strum

14

InLine+ Series

A trusted solution for over 15 years

• Small footprint/compact design

• Medium pressure lamps

• Vertical or horizontal flow design

• Proven more effective for preventing photo-reactivation

• Proven for non-filtered applications with low UV-T

• USEPA/DVGW/NWRI/NSF 61 validation & certifications

Page 15: W06 siesta beach low impact development-strum

Optional single sided model with easy access

Page 16: W06 siesta beach low impact development-strum

16

Automatic Cleaning

• High torque drive mechanism

• Long life Viton rings

• Chemical assisted option

• Field adjustable wiper frequency

• Wiped sensor window

Page 17: W06 siesta beach low impact development-strum

17

Reference: Disk Filters

Insert AQX site photo………

Thomasville, NC InLine 16000+

UVT 65% 15 MGD

Page 18: W06 siesta beach low impact development-strum

18

BOCC Approved Project - $21,500,000

(Includes $16,700,000 for construction)

Page 19: W06 siesta beach low impact development-strum

19

Siesta Beach Park Aerial

Page 20: W06 siesta beach low impact development-strum

20

Siesta Beach Park Pavement Plan

Page 21: W06 siesta beach low impact development-strum

West Parking Area

Page 22: W06 siesta beach low impact development-strum

22

Western Park PGD Plan

Page 23: W06 siesta beach low impact development-strum

23

Western Park PGD Plan

Page 24: W06 siesta beach low impact development-strum

24

Bioswale Typical Cross Section

Page 25: W06 siesta beach low impact development-strum

25

Landscaped Bioswale

Page 26: W06 siesta beach low impact development-strum

East Parking Area (Pervious pavement)

Page 27: W06 siesta beach low impact development-strum

27

Seepage Analysis byLeggette, Grashears & Graham, Inc.

Page 28: W06 siesta beach low impact development-strum

28

Pervious Pavement Underdrain Plan

Page 29: W06 siesta beach low impact development-strum

29

Eastern Park PGD Plan

Page 30: W06 siesta beach low impact development-strum

30

Eastern Park PGD Plan

Page 31: W06 siesta beach low impact development-strum

31

Eastern Park PGD Plan

Page 32: W06 siesta beach low impact development-strum

32

Pervious Concrete Typical Section

Page 33: W06 siesta beach low impact development-strum

33

Tierra Geotechnical Engineering Recommendation

Page 34: W06 siesta beach low impact development-strum

34

Geotechnical Recommended Pervious Concrete Section

Page 35: W06 siesta beach low impact development-strum

35

Engineer Recommended Section for Main Drive Isle

Page 36: W06 siesta beach low impact development-strum

36

Detail for Abutting Sections

Page 37: W06 siesta beach low impact development-strum

37

Permeable Pavers for Cross Walks

Page 38: W06 siesta beach low impact development-strum

Overview – Pervious Concrete

• Pervious or no-fines Concrete – mixture of Coarse Aggregate, Portland Cement, Admixtures and Water

• Increased/Enhanced Porosity due to limited fines

• Can be placed directly on parent soils with no aggregate sub-base (rigid pavement type)

Page 39: W06 siesta beach low impact development-strum

I-4 TRUCK STOP (Shoulder application)

Page 40: W06 siesta beach low impact development-strum

FCPA – Florida Concrete Products Association BUILDING (Orlando)

Page 41: W06 siesta beach low impact development-strum

Overview – Permeable Pavers

• Expanded openings at the sides/edges encouraging water to infiltrate

• Openings are filled with small size stone

• Many different styles/patterns

Page 42: W06 siesta beach low impact development-strum

Permeable Pavers studied at UCF

Page 43: W06 siesta beach low impact development-strum

ERIK TESTING

E.R.I.K. Embedded Ring Infiltrometer Kit

-In-situ, nondestructive, replicable

- Constant head test @ 1” above surface

- Measures rate of water “upstream” of sample

- Infiltrometers can be embedded from surface of pavement down into parent soil, in order to monitor where clogging is taking place (ie. near the surface or deeper in the pore structure)

Page 44: W06 siesta beach low impact development-strum

PARENT EARTH SOIL

SUB-BASE LAYER(S)

PAVEMENT LAYER(S)

1.5 "

1.5 "

3.0 "2 " - 12 "

0 " - 24 "

4.0 "

ELEVATION VIEW

PLAN VIEW

6" ID PVC COUPLING FITTING(SCHED 80)

INSTALLATION INSERT COLLAR

PAVEMENT SURFACE LAYER

INSTALLATION INSERT COLLAR

PERMANENT INSERT COLLAR

6 " PVC COUPLING FITTING (SCHED 80)

6 " ID PVC PIPE (SCHED 80)

FILTER FABRIC(NON-WOVEN)

0.3 "

6.0 "6.85"7.53"

STORMWATER MANAGEMENT ACADEMY

UNIVERSITY OF CENTRAL FLORIDA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PAGE

3 OF 4

DATE:

ERIK STUART, E.I.

DR. MARTY WANIELISTA, P.E.

ERIK STUART, E.I.

01-26-10NOTESDRAWINGS NOT TO SCALE.

DR. MANOJ CHOPRA, P.E.

Page 45: W06 siesta beach low impact development-strum

18.0 "

18.0 "

73.0 "

58.75 "

4.5 "9.0 "

10.75 "

PLAN VIEW

ELEVATION VIEW

3/4 " ID (CLEAR) VINYL TUBING

1/8 " VALVE (BRASS)

3/4" VALVE (BRASS)

2" ID (CLEAR) PVC PIPE

2" PVC TEE FITTING

2" PVC 45 DEGREE FITTING

2" PVC TEE FITTING

2" PVC 45 DEGREE FITTING

2" PVC CAP FITTING

25.75 "

2" PVC CAP FITTING

2" PVC 45 DEGREE FITTING

2" PVC TEE FITTING

2" PVC 45 DEGREE FITTING

2" PVC TEE FITTING

2" PVC PIPE

2" (CLEAR) PVC PIPE

2.0 "

2 " PVC PIPE

STORMWATER MANAGEMENT ACADEMY

UNIVERSITY OF CENTRAL FLORIDA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PAGE

1 OF 4

DATE:

ERIK STUART, E.I.

DR. MARTY WANIELISTA, P.E.

ERIK STUART, E.I.

01-26-10NOTESDRAWINGS NOT TO SCALE.

DR. MANOJ CHOPRA, P.E.

Page 46: W06 siesta beach low impact development-strum

SEDIMENTS INTENTIONALY LOADED AND COMPACTED INTO SURFACE PORES *for clogging and rejuvenation studies

Page 47: W06 siesta beach low impact development-strum

PREVACUUMED ERIK TESTING

Page 48: W06 siesta beach low impact development-strum

REJUVENATION WITH VACUUM TRUCK

Page 49: W06 siesta beach low impact development-strum

SEDIMENTS REMOVED

SANDY SEDIMENTS FINE GRAINED SEDIMENTS

Pervious Pavements are a “DOOR MAT” to sensitive ecosystems that allows for easy removal of sediments(maintenance) with vac truck before they get carried downstream to receiving waters.

Page 50: W06 siesta beach low impact development-strum

SUSTAINABLE VOID SPACE (POROSITY) TESTING OF PAVEMENT AND AGGREGATES

Page 51: W06 siesta beach low impact development-strum

FWD- Falling Weight Deflectometer

Page 52: W06 siesta beach low impact development-strum

Heavy Vehicle Loading

Page 53: W06 siesta beach low impact development-strum

The Rainfall/Runoff Simulator*Up to 12 in/hr rainfall

- Hydrographs- Fertilizer/erosion testing- Rainfall/Runoff

World’s largest RAINFALL SIMULATOR

of its kind

Page 54: W06 siesta beach low impact development-strum

54

Questions?