W A I S D I V I D E 2 0 1 1 - 2 0 1 2 DISC DRILL WAIS DIVIDE PARENT BOREHOLE COMPLETED! Ice Drilling Design and Operations Assist with borehole logging Install rooftop and slot-spanning sheaves Remove old 3,400m cable from DISC Drill winch Spool on new 4,200m cable Terminate fiber optics Deepen the main borehole to ~50m above the bed at the Chief Scientists direction Produce high quality ice core Adjust drilling procedures and techniques to drill and deliver warm ice, if encountered. Test Replicate Coring capability Elizabeth Morton served as a winch operator with Gary Clow and Frank Urban First round of logging completed between 12/3/11-12/21/11 Second round of logging completed between 1/1/12-1/4/12 Five logging tools deployed Optical dust logger Sonic ‘snake’ logger Seismic tool Temperature logger Sonic pinger Total IDDO days at WAIS: 73 18 days for crew arrival, Arch work, slot work, logging set up 9 days for cable operations 7 days for drill start up and other Arch prep 2 days of borehole reaming 6 days of drilling (2 shifts) Starting depth: 3,331.538m Ending depth: 3,405.077m Total meters drilled: 73.539 Tripping speeds Descended at 1.0 m/s with the pump running Ascended at up to 2.0 m/s Cutter Speed 80rpm continues to be the sweet spot Penetration rates Varied with ice conditions; between 2.5-5.7 mm/s Bore hole fluid density Density was maintained at .920 @ -31°C throughout the season Fluid was mixed to .935 @ -31°C to compensate for 141b loss 4,391L (1,160 gal) of drilling fluid were used 3,140L (830 gal) of Isopar K 1,251L (330 gal) of 141b Unspooled 3,400m cable off of the winch drum using the P05 cable spooler Spooled on new 4,200m cable using the Pengo cable tensioner It was difficult to get enough pick on the cranes due to the floor heaving in the middle of the Arch New for 2011-2012 season Real-time viewing of the borehole from the surface Steffen Bo Hansen, from the Centre for Ice and Climate (CIC) in Copenhagen, Denmark, visited as a drill observer for two weeks in January Terminated both ends of the fiber optic cable over a period of 5 days Very acceptable levels of dB loss across all fibers FINAL BOREHOLE DEPTH: 3,405.077 meters CABLE OPERATIONS: BOREHOLE CAMERA: BOREHOLE LOGGING OPERATIONS: SEASON GOALS: DRILLING OPERATIONS: SPECIAL VISITOR:

Upload: others

Post on 15-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WAIS DIVIDE PARENT BOREHOLE COMPLETED!...WAIS DIVIDE PARENT BOREHOLE COMPLETED! Ice Drilling Design and Operations •Assist with borehole logging • Install rooftop and slot-spanning

WAIS

DIVIDE

2011-2012

DISCDRILL

WAIS DIVIDE PARENT BOREHOLE COMPLETED!Ice Drilling Design and Operations

• Assistwithboreholelogging• Installrooftopandslot-spanningsheaves

• Removeold3,400mcablefromDISCDrillwinch• Spoolonnew4,200mcable• Terminatefiberoptics• Deepenthemainboreholeto~50mabovethebedattheChiefScientistsdirection

• Producehighqualityicecore• Adjustdrillingproceduresandtechniquestodrillanddeliverwarmice,ifencountered.

• TestReplicateCoringcapability

• ElizabethMortonservedasawinchoperatorwithGaryClowandFrankUrban• Firstroundofloggingcompletedbetween12/3/11-12/21/11• Secondroundofloggingcompletedbetween1/1/12-1/4/12• Fiveloggingtoolsdeployed

• Opticaldustlogger• Sonic‘snake’logger• Seismictool• Temperaturelogger• Sonicpinger

• TotalIDDOdaysatWAIS:73• 18daysforcrewarrival,Archwork,slotwork,loggingsetup• 9daysforcableoperations• 7daysfordrillstartupandotherArchprep• 2daysofboreholereaming• 6daysofdrilling(2shifts)

• Startingdepth:3,331.538m• Endingdepth:3,405.077m• Totalmetersdrilled:73.539• Trippingspeeds

• Descendedat1.0m/swiththepumprunning• Ascendedatupto2.0m/s

• CutterSpeed• 80rpmcontinuestobethesweetspot

• Penetrationrates• Variedwithiceconditions;between2.5-5.7mm/s

• Boreholefluiddensity• Densitywasmaintainedat.920@-31°Cthroughouttheseason• Fluidwasmixedto.935@-31°Ctocompensatefor141bloss

• 4,391L(1,160gal)ofdrillingfluidwereused• 3,140L(830gal)ofIsoparK• 1,251L(330gal)of141b

• Unspooled3,400mcableoffofthewinchdrumusingtheP05cablespooler

• Spooledonnew4,200mcableusingthePengocabletensioner• ItwasdifficulttogetenoughpickonthecranesduetothefloorheavinginthemiddleoftheArch

• Newfor2011-2012season• Real-timeviewingofthe

boreholefromthesurface

• SteffenBoHansen,fromtheCentreforIceandClimate(CIC)inCopenhagen,Denmark,visitedasadrillobserverfortwoweeksinJanuary

• Terminatedbothendsofthefiberopticcableoveraperiodof5days

• VeryacceptablelevelsofdBlossacrossallfibers

FINALBOREHOLEDEPTH:3,405.077meters

CABLEOPERATIONS:

BOREHOLECAMERA:

BOREHOLELOGGINGOPERATIONS:

SEASONGOALS:

DRILLINGOPERATIONS:

SPECIALVISITOR: