Corporate Performance Report: 2016/17 Quarter 2
HEADLINES/KEY STATISTICS
1 53%2 8% remained the same 3 38% declined
For RAG-rated KPIs:
4 53% met or exceeded the agreed target5 23% missed target by up to 5%
6 23% missed the target by a margin of more than 5%
SUMMARY
4 KEEP YOUR NEIGHBOURHOOD CLEAN AND SAFE
6 BUILD A STRONG LOCAL ECONOMY AND THRIVING TOWN CENTRES8 SUPPORT AFFORDABLE HOUSING FOR EVERYONE’S NEEDS
10 HELP ALL OF OUR RESIDENTS ENJOY A GOOD QUALITY OF LIFE11 KEEP VULNERABLE CHILDREN AND ADULTS SAFE AND HEALTHY
14 ACHIEVING EXCELLENCE
REPORT KEY
Target
• A green arrow means that performance has met its target or exceeded it.
• An amber arrow indicates that performance has missed its target by up to 5%.
• A red arrow indicates that performance has performance has missed the target by a margin of more than 5%.
• A black arrow in any direction (,,) means the indicator has no target
The direction of the arrow indicates whether performance has improved, declined or been maintained compared with the same period last year (or the most recent data otherwise available)
and Quarter 1. An arrow in the up direction indicates improved performance.
This report summarise progress against the Council’s priorities in Quarter 2 of the Financial Year 2016/2017. The colours used in each section of the report refers to its relation to one of the
following corporate priorities:
For further information about the content of this report or the performance management framework in general, please contact Ed Maguire in the Business Intelligence Team via
[email protected] or 020 8496 4855.
of KPIs show an improvement compared with the previous result
Executive SummaryQuarter 2
And in the lowest quartile for the following:
Compared with Q1 there has been general decline in performance for both Direction of Travel (DoT) and RAG rated Key Performance Indicators (KPIs). Whilst 70% of RAG
indicators met or exceeded their targets in Q1, this decreased to 53% in Q2 and 23% missed their target by a margin of more than 5% compared with 14% in Q1.
HEADLINES KEY STATISTICS
Benchmarking data is obtained from a number of external sources including:
• Local Area Performance Solution (LAPS) – London Councils
• Communities and Local Government statistical returns – Live tables
• HouseMark Benchmarking Services
Benchmarking analysis shows that in Q1 (April - June) Waltham Forest in in the top London quartile for the following:• Average number of sickness days in the year per employee
• Percentage of top 5% of earners who are women
• Percentage of top 5% earners who are from a black or minority ethnic group
• Average number of days taken to process a new housing benefits claim
• Average number of days taken to process a change in circumstances affecting an existing housing benefit claim
• Percentage of older people still at home 91 days after discharge from hospital into re-enablement/rehabilitation services
• Percentage of care leavers in suitable education, employment or training in their 19th birthday
• Percentage of reception aged children who are a healthy weight
• Percentage of Year 6 children who are a healthy weight
• Gap between the lowest achieving 20% and the rest at the EYFS
• Percentage of council tax collected (YTD)
• Percentage of young people (Academic Age Yr 12-13) not in education, employment or training
• Percentage of ASC service users who receive self-directed support
• Percentage of adults with secondary mental health services in paid employment
• Number of homelessness decisions finding that the applicant is eligible, homeless and in priority need
59% 11% 31% 70% 16% 14% 53% 8% 38% 53% 23% 23%
DoT: Show an improvement inperformance
DoT: Remained the same DoT: Performance decreased RAG KPIs: met or exceededtarget
RAG KPIs: Missed target by upto 5%
RAG KPIs: missed target by amargin of more than 5%
Q1 (June 2016)
Q2 (Sept 2016)
3
Executive SummaryQuarter 2
COMMENTARY
PREVIOUS Q22016/17
TARGET
42(Q2
2015/16)
48 39(Q2)
318 274 150
98.60% 90% 95%
PREVIOUS Q22016/17
TARGET
39 40 29
95.35%(Q2
2015/16)
93.07% 95.09%
74% 82% 90% Percentage of other planning applications processed within 8 weeks: These are the performance stats we report to government through
the PS1 and PS2 returns. Where we have agreed an extension of time or have a planning performance agreement with the applicant, the
application is excluded from the statistics. Performance for processing of 8 week planning applications is improving and is expected to
continue to do so given the improved processes that have been put in place across the Development Management service.
Percentage of fly tips that are removed within 24 hours of reporting: System changes (with Urbaser moving to Achieve) resulted in
multiple occasions where the system failed to allow them access, meaning that jobs could not be closed. The contractor reported that all
jobs were cleared within the time scales, and cross-referencing with other information (e.g. from complaints) shows this to be accurate.
KEEP YOUR NEIGHBOURHOOD CLEAN AND SAFE
SUPPORT AFFORDABLE HOUSING FOR EVERYONE’S NEEDS
Average relet time for Council-owned homes: Performance was impacted by one very long term major void coming back into use and
increased levels of asbestos works to void properties in 2016/17.
Rent collected as a percentage of rent due: Performance has been impacted by comparatively high levels of HB suspensions (as a result of
change of circumstances). WFH are contacting all tenants that are known to have suspended HB, to prompt them to submit the required
evidence, providing face-to-face support to tenants and liaising with HB Team. HB is being re-instated for a number of cases and there is a
positive outlook for Q3 performance.
Number of recorded instances of serious youth violence (YTD): The number of instances has decreased over the last few years making our
target very low for this financial year. We discuss cases involving serious violence in our High Risk Panel and the young people involved are
closely monitored to manage their risk of further offending.
Average number of domestic waste and recycling collections confirmed as missed per week: It should be noted that there are on average
around 230,000 bins collected each week, and so the reported performance here means that only around one in every thousand bins were
missed each week. Performance has improved slightly since the previous quarter, but was also affected by the same problems in
spring/summer, when Kier experienced issues with their vehicle fleet and staff which has led to a number of bins being missed.
4
Executive SummaryQuarter 2
PREVIOUS Q22016/17
TARGET
55,558 52,420 56,375
12,959 11,519 12,075
PREVIOUS Q22016/17
TARGET
16% (2015)
12% (2016)
n/a
71 55 44.8
134 (Q2
2015/16)
122 297
56% 53% 65%
Percentage of looked after children achieving at least five A*-C grade GCSEs: This is slightly lower than the latest available National LAC
average of 13.8% (from 2014-15) and is down from last year’s local performance of 16%. This cohort had 6 young people with recognised
special education needs (35%) and there was also one young person on remand and a young person who had a baby. 76% of the cohort
was educated out of borough. In terms of the length of time in care, the two young people with the highest achievement have only been in
care for 1-2 years and most of those in care for the longest time – between 3 and 15 years - are those with significant special educational
needs.
Number of reoffences by the gang cohort that is being targeted by the Community Safety programme: The indicator represents the
number of convictions before and after the referral to GPP (Gangs Prevention Programme) measuring the impact GPP has had on nominals
after the referral to programme’
Number of Troubled Families whose lives have been turned around: It has been agreed that the target for this indicator for 2016/17
should be decreased from 800 to 594. The previous target of 800 has been superseded, as the upper limit of funding we are allowed to
draw down will only allow for us to may a 'payment by results' claim for 594 families this year; these budget constraints were not set when
the original target was set. Achieving 594 successful PBR claims would lead to funding of £475,000. The shortfall of £157,000 will be offset
by previous successful PBR income.
Percentage of care leavers in suitable education, employment or training on their 19th birthday: In addition to the ongoing reporting
and recording issues which are being resolved through a new tracking process in the Virtual School’s CLA Live system, the EET worker and
Leaving Care Coaches are targeting those who are NEET for a range of education and employment options to improve this performance.
HELP ALL OF OUR RESIDENTS ENJOY A GOOD QUALITY OF LIFE
Number of visits to the William Morris Gallery: Below target mostly due to a quiet August compared to previous years. With a busy
autumn/winter programme ahead, and a PR company to publicise the programme, we should get back on target.
Number of visits to Vestry House Museum: Visitor figures at Vestry House Museum were slow in the beginning of the year, but have
picked up in the most recent two months, which looks positive for reaching targets in the next quarter.
KEEP VULNERABLE CHILDREN AND ADULTS SAFE AND HEALTHY
5
Executive SummaryQuarter 2
PREVIOUS Q22016/17
TARGET
5.6 6.25 6.25
634 613435
(less than
14% of staff)
7.67 7.94 7.5
BUSINESS INTELLIGENCE (BI) NEWS
1
2
The Business Intelligence Team has been working with external consultants Price, Waterhouse & Cooper to develop a business case for improvement to the
current Performance Management Framework, especially around linking financial activity, performance outcomes and resident perception data. A proof of
concept dashboard using Qlikview (BI software) is now with the Waste Management Team.
A review of the current suite of performance indicators will take place in in Q4 (Jan - March 2017). The review will include target setting and determining the
indicators for 2017/18.
ACHIEVING EXCELLENCE
Average number of days taken to process a change in circumstances affecting an existing housing benefit claim: The target for change in
circumstances has been revised from 6 to 6.25 days. The reason for this is due to the delay in scanning and indexing which has a
detrimental impact on our performance indicators. This does not affect the new claims process so much as claims can only be made via
online claim forms and requests for information are automated.
Number of Agency Workers: The annual target for this indicator is less than 14%. The Target values shown are 14% of all staff (permanent
+ agency) at the end of each quarter. At the end of September 19.7% of all staff were agency compared with 20.2% at the end of June (Q1)
Average number of days sickness per full time employee: In the past 12 moths performance has fluctuated between 7.2 - 7.9 days.
Whilst performance for Q2 is does not meet the Waltham Forest target (less than 7.5 days), this is still below the London average for Q2
(8.06 days - source LAPS Q1)
6
Q2 Summary
Green Amber Red No RAG Total
23 4 3 16 46
4 2 1 0 7
5 8 10 10 33
All indicators 32 14 14 26 86
Summary of annual and Q2 indicators (excluding Residents Insight Survey KPIs)
Performance by Priority: Direction of Travel Performance by Priority: RAG rating
Performance summary: All indicators
53%
50%
85%
41%
60%
43%
52%
8%
18%
7%
14%
38%
50%
15%
41%
40%
50%
33%
All KPIs Direction of Travel
Keeping your neighbourhood clean and safe
Build a strong local economy and thrivingtown centres
Support affordable housing for everyone’s needs
Help all of our residents enjoy a goodquality of life
Keep vulnerable children and adults safeand healthy and ensure all our residents…
Achieving Excellence
Up Same Down
53%
38%
80%
50%
60%
29%
63%
23%
63%
19%
29%
21%
23%
0%
20%
31%
40%
43%
16%
All RAG-rated KPIs
Keep your neighbourhood clean and safe
Support our schools and colleges toprovide top quality education and…
Support affordable housing for everyone’s needs
Help all of our residents enjoy a goodquality of life
Keep vulnerable adults and children safeand healthy, ensuring that they have…
Achieving Excellence
Green Amber Red
5
4
23
8
2
4
10
1
3
10
16
0% 25% 50% 75% 100%
Green Amber Red No RAG
7 of 24
Q2 (April - Sept 2016): Outcome indicator highlights
Keep your neighbourhood clean and safe
m
Achieving excellence(Note: Income collection figures are year to date)
Percentage of household
waste sent for reuse,
recycling and composting
(Q1)
37.4%
61358.3% 1.1% 7.4£
Percentage of MTFS savings targets currently expected to
be achieved
Percentage of Year 6
children who are a healthy
weight
Percentage of young
people aged 16-18 not in
education, employment or
training
Keep vulnerable children and adults
safe and healthy
Help all our residents enjoy a good
quality of life
Cost of Agency Workers
and Consultants
(£m)
Build a strong local economy and thriving town centres
Support affordable housing for everyone's needs
Number of ASB related
calls made to the police
(rolling year)
Total number of recorded
crimes (rolling year)
7,666
Number of visits to the
William Morris Gallery
Number of visits to leisure
centres
52,420 858,090
21,474
Number of businesses in Waltham Forest
9,940
69,300 6.4%
Total workplace
employment (jobs) in
Waltham Forest
Percentage of residents
who are unemployed
(16 and over)
Number of agency
workers
(FTE)
442
Average number of days sickness in the year per full-time
employee
7.94
Percentage of non-
domestic rates collected
Percentage of council tax
collected
Percentage of fly tips
that are removed within
24 hours of reporting
90%
Number of admissions into temporary accommodation
(year to date)
54.2% 56.2%
97.5% 96.3% 99.7% 92.1% 99.9%
85.5% 90.0% 97.0% 100.0%
Q2 Q3 Q4 Q1 Q2Target
70%
Percentage of WalthamForest Housing tenants
satisfied with the overalllevel of service they
receive
page 8 of 24
Keep your neighbourhood clean and safeCrime and ASB in Waltham Forest continue to fall
Q1 Q2 Q3 Q4 Q1 Q27987 7651 7605 7458 7646 7666
48 78%
Jun-16 Resident satisfaction and perception:
Crime and ASB
Total number of recorded crimes (rolling year): Data for this indicator is taken from the Metropolitan Police Crime Mapping website. The
reported figure covers the period October 2015 - September 2016. the data is taken from 2 spreadsheets.
Number of 'MOPAC-7' offences (rolling year): This data is covers the period January 2015 - February 2016 and is obtained from The Mayor of
London's Crime Dashboard. This is the latest data available.
Number of recorded instances of serious youth violence (YTD): The number of instances has decreased over the last few years making our
target very low for this financial year. We discuss cases involving serious violence in our High Risk Panel and the young people involved are
closely monitored to manage their risk of further offending.
Total number of recorded
crimes (rolling year)
Number of 'MOPAC-7'
offences (rolling year)
Number of recorded instances of serious
youth violence (YTD)
Percentage of young offenders in
suitable education, employment or
training
Number of ASB related calls
made to the police (rolling year)21,474 10,232
Number of bed nights for young
offenders remanded to secure estate
(YTD)
7,666
124
73%
36%
25%
Percentage of residents who say theyfeel safe after dark
Percentage of residents who say thatthey are worried about crime
Percentage of residents who say thatthey are worried about ASB in the area
21,085 21,597 21,740 21,956 21,474
Q2 Q3 Q4 Q1 Q2
42 66 76 28 48 20
39
Q2 Q3 Q4 Q1 Q2
581 1307 1489 133 124 369
737
Q2 Q3 Q4 Q1 Q2
7432 7394 7252 7436 7466
219 211 206 210 200
Q2 Q3 Q4 Q1 Q2
Number of repeat ASB-related calls made to the police
Number of ASB-related calls made to the police (excluding repeat calls)
92% 61% 74% 59% 78%
70%
Q2 Q3 Q4 Q1 Q2
10102 10048 10272 10232
12135 11954 11773 11652
Q1 Q2 Q3 Q4
9 of 24 pages
Keep your neighbourhood clean and safeResidents recycle moreMore residents say their neighbourhood is clean
37.4% 274 92%
Not yet
available
Not yet
available
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q414/19 11/18 5/16 10/14 8/17 9/17 6/15 8/17
2015/16 2015/16
26/32
2013/14
Percentage of household
waste sent for reuse,
recycling and composting166.96
Number of kilograms of
residual waste collected
per household (YTD)
Percentage of bulky waste
collections that are picked
up on the agreed date
Average number of domestic
waste and recycling collections
confirmed as missed per week
2014/15 2015/16 2015/162014/152013/14
20/32
Percentage of public land and
highways with an unacceptable
level of litter
Percentage of public land
and highways with an
unacceptable level of
detritus
28/32
3,077Number of reported
fly tips (year to date) 90%Percentage of fly tips
that are removed within
24 hours of reporting
Percentage of residents who are satisfied with how
the council keeps the streets clean
14/32
Average number of domestic waste and recycling collections confirmed as missed per week: It should be noted
that there are on average around 230,000 bins collected each week, and so the reported performance here means
that only around one in every thousand bins were missed each week. Performance has improved slightly since the
previous quarter, but was also affected by the same problems in spring/summer, when Kier experienced issues with
their vehicle fleet and staff which has led to a number of bins being missed.
Percentage of fly tips that are removed within 24 hours of reporting: System changes (with Urbaser moving to
Achieve) resulted in multiple occasions where the system failed to allow them access, meaning that jobs could not
be closed. The contractor reported that all jobs were cleared within the time scales, and cross-referencing with other
information (e.g. from complaints) shows this to be accurate
9/17 14/15
38% 36% 33% 34% 37%
36% 38%
Q1 Q2 Q3 Q4 Q1
156 308 462 635 167
168.75 337.5
506.25 675
160
Q1 Q2 Q3 Q4 Q1
86.4% 78.0% 90.5% 98.0% 92.4%
95%
Q2 Q3 Q4 Q1 Q2
3121 4947 6698 1986 3077
Q2 Q3 Q4 Q1 Q2
5.0% 4.0% 0.0% 4.0% 0.0%
5%
Q1 Q2 Q3 Q4 Q1
4.0% 5.0% 0.0% 4.0% 0.0%
5%
Q1 Q2 Q3 Q4 Q1
99.2% 98.0% 93.7% 98.6% 90.0%
95%
Q2 Q3 Q4 Q1 Q2
169 141 183 318 274
150
Q2 Q3 Q4 Q1 Q2
60%
62%
53%
Mar '13
Jun/Jul '14
Feb-Mar '15
Not Available
Not Available
10 of 24 pages
Build a strong local economy and thriving town centresTown centres are thriving and at the heart of local communities
More residents have the skills they need to access high quality employment
9,940 71% 6.4% 69,300
88%
86.79%
2014/15 2013/14 2014/15
20/33 20/33 24/33
13/33 16/33 21/32
percentage of schools that are good or
outstanding
2012/13 2013/14
18/32
Total workplace
employment (jobs) in
Waltham Forest
Percentage of residents who
are unemployed (16 and
over)
Number of businesses in
Waltham Forest
Percentage of residents
who say that they shop
regularly on their local
high street (annual)
2012/13 2013/14
Number of businesses in Waltham Forest: Source - Inter-departmental Business Register, ONS. The latest figure published by the are for March 2016. The data is published annually. (Next update October 2017)
Total workplace employment (jobs) in Waltham Forest: Source - Business Register and Employment Survey, ONS . This data was published by in September this year. (Next Update October 2017)
Percentage of residents who are unemployed (16 and over): Source - Annual Population survey ,ONS. This is updated quarterly but data relates to interviews conducted over a one year e.g. the latest available is for Apr 2015 – Mar 2016.
Percentage of schools that
are Good or Outstanding
Percentage of pupils
attending schools that are
Good or Outstanding
Percentage of residents
who think Waltham
Forest schools and
colleges are doing well in
providing a good quality
education (annual)
Percentage of children
achieving a Good Level of
Development at the Early
Years Foundation Stage
Gap between the lowest
achieving 20% and the rest at
the EYFS61% 72.2% 30.5%
6,880 7,505 8,910 9,940
2013/14 2014/15 2015/16 2016/17
63,000 69,500 72,500 69,300
2012/13 2013/14 2014/15 2015/16
11.2% 9.8% 8.2% 6.4%
2012/13 2013/14 2014/15 2015/16
72% 70% 71%
2012/13 2013/14 2014/15
69%
61% 61%
2013/14 2014/15 2015/1655.8%
63.0%
67.5%
72.2%
2012/13
2013/14
2014/15
2015/16
36.3% 34.0% 33.7% 30.5%
2012/13 2013/14 2014/15 2015/16
82% 86% 84% 88%
85.5%
77.87% 78.51%
86.79%
2012/13 2013/14 2014/15 2015/16
Percentage of schoolsthat are Good orOutstanding
11 of 24 pages
Build a strong local economy and thriving town centresTown centres are thriving and at the heart of local communities
More residents have the skills they need to access high quality employment
2014/15 2015/16
20/32 20/32
Benchmarking
Average progress KS2 2012/13 Average KS5 score
Reading at Key Stage 2 27/32 Per pupil
Writing at Key Stage 2 19/32 Per entry
Maths at Key Stage 2 26/32
Average score at end
19/32
33/33 27/33
17/32
17/32
9/32
27/32
Percentage of pupils achieving at least
Level 4 in Reading, Writing and Maths
at Key Stage 2
Key stage 2Proportion of children achieving the Key Stage 2
standards
2013/14 2014/15
24/32 28/32
2012/13
25.6755%
2014/15
16/32 23/32
Key Stage 5 Assessment, the average
points per entry
Final Key Stage figures will be published by DfE November 2016
Please note the advice from the DfE on interpreting results this year:
Children sitting Key Stage 2 tests this year were the first to be taught and assessed under the new national curriculum. The expected standard has been raised and the accountability framework for schools has also changed. These
changes mean that the expected standard this year is higher and not comparable with the expected standard used in previous year’s statistics. It would therefore be incorrect and misleading to make direct comparisons showing changes
over time.
Key Stage 5 Assessment, the average points per entry: For A Level qualifications, the average points per entry were below the national and London averages, when converted to average grades this shows a C- in Waltham Forest
compared with C nationally and in London. For Academic qualifications, the average points per entry were equivalent to a C- two fine grades below the national average of C+. Waltham Forest schools were 146th out of 150 LAs.
Technical Level qualifications had average point score slightly below national average but the average grade of Dist.- was the same as the national and London average. Waltham Forest pupils were slightly below national average for
Applied General qualifications.
Percentage of pupils achieving at least Level 4 in Reading, Writing and Maths at Key Stage 2: The figure is provisional and is likely to increase when final figures are published in the Performance Tables. This is due to re-marks and removal
of non-English speaking pupils recently arrived from abroad.
27/32 28/32
2013/14
19/32
63% 73% 75%
66%
72% 70%
KS2 Reading Standard KS2 Grammar,Punctuation andSpelling Standard
KS2 MathematicsStandard
2015/16 National Average
0.75 0.81 0.8 0.55
0.78
2012/13 2013/14 2014/15 2015/16
25.67 31.52 30.22 28.79
Waltham Forest National London Statistical Neighbour
12 of 24 pages
Support affordable housing for everyone's needsReduction in homelessnessIncreased tenant satisfaction with Waltham Forest Housing
69.9% 73.6%
40 93.97%
Q2 26/32
Percentage of Waltham Forest Housing
tenants satisfied with the overall level of
service they receive
Percentage of tenants satisfied with
their most recent repair
Average relet for Council-owned homes (all
relets, including time spent in works)
Rent collected from current and former
tenants as a percentage of the rent due
(including current tenant arrears brought
forward)
Tenant satisfaction: The STAR (Survey for tenants and residents) closed
12th September 2016. The outcomes for both satisfaction KPIs are within
the +10% margin of error .
Tenant satisfaction: The Q2 wave is in progress and the results will be
reported in early December.
Average relet time for Council-owned homes: Performance was impacted
by one very long term major void coming back into use and increased
levels of asbestos works to void properties in 2016/17.
Rent collected as a percentage of rent due: Performance has been
impacted by comparatively high levels of HB suspensions (as a result of
change of circumstances). WFH are contacting all tenants that are known
to have suspended HB, to prompt them to submit the required evidence,
providing face-to-face support to tenants and liaising with HB Team. HB is
being re-instated for a number of cases and there is a positive outlook for
Q3 performance.
2016/17
Number of admissions into temporary
accommodation (year to date)
Number of homelessness decisions finding
that the applicant is eligible, homeless and
in priority need (year to date)403442
21 25 51 39 40
42
29
Q2 Q3 Q4 Q1 Q2
76% 64%
71% 76% 70%
75%
Q1 Q2 Q3 Q4 Q1
79% 74% 78% 79% 74%
78%
Q1 Q2 Q3 Q4 Q1
95.35% 97.52% 98.02% 88.89% 93.97%
93.05% 96.76% 96.57%
88.89%
95.09%
Q2 Q3 Q4 Q1 Q2
668 907 1161 224 442 255 510
Q2 Q3 Q4 Q1 Q2
546 855 1,045 197 403
250 498
Q2 Q3 Q4 Q1 Q2
13 of 24 pages
Support affordable housing for everyone's needs12,000 new homes by 2020
Increase the quality of Private Rented Sector
997 77.8% 4.7% 9
401 109
Number of homelessness
preventions borough-wide
(P1E) - Year to date (YTD)
Percentage of privately rented
homes requiring a licence that
are licensed
Percentage of privately
rented properties inspected
for compliance
Number of empty private sector
properties returned to occupation
following Council intervention (YTD)
Number of new homes provided: Up to 30/09/2016, 401 units (net) were completed in 2016/17 with 162 units completed in Q1 and 239 units completed in Q2. With construction works in good progress , it is expected substantial
completions from large developments at Banbury Park, Walthamstow Stadium and Hainault Triangle will be reported in the coming two quarters. The latest estimate of 2016/17 housing completions is 1,353 units (net), which is below
the target of 1500 units but above the 'Lower threshold target' of 1275 units (i.e. 1500 x 0.85).
Number of new affordable homes provided (practical completions) - YTD: The number of new affordable homes scheduled to complete in 2016/17 is from schemes that are at an advanced delivery stage, i.e. on site and scheduled to
complete up to March 2017. This is significantly below the target for the fiscal year set early in the calendar year, and there is very little that can be done to increase delivery in year. This is because new build homes have long lead in
times, the minimum realistic delivery time being two years, though most take longer. Compounding this long lead in time, affordable housing delivery is also partly cyclic in response to funding regimes, with the majority of new homes
being delivered at the end of funding programmes. It is expected that the bulk of new homes from the current 2015-18 Mayor’s Housing Covenant will be completed late in 2017/18.
Number of new homes
provided (minus any
demolitions or losses) fit for
occupation -YTD
Number of new affordable
homes provided (practical
completions) - YTD
44.6% 64.4% 70.7% 73.1% 77.8%
70% 73%
Q2 Q3 Q4 Q1 Q2
428 667 947 148 401
431 581
862
375
750
Q2 Q3 Q4 Q1 Q2
281 450 821 2 109
216 324
431
188 187
Q2 Q3 Q4 Q1 Q2
6 11 18 0 9
Q2 Q3 Q4 Q1 Q2
4.0% 1.8% 4.7%
2%
5.5%
Q4 Q1 Q2
624 961 1316 358 997
1100
330 660
Q2 Q3 Q4 Q1 Q2
Not Available
14 of 24 pages
Support affordable housing for everyone's needs12,000 new homes by 2020
Increase the quality of Private Rented Sector
85% 80% 80%
100% 82%
Percen
tage
of
reside
nts
Percentage of other planning applications processed within 8 weeks
These are the performance stats we report to government through the PS1 and PS2 returns. Where we have agreed an extension of time or have a planning performance agreement with the applicant, the application is excluded from
the statistics. Performance for processing of 8 week planning applications is improving and is expected to continue to do so given the improved processes that have been put in place across the Development Management service.
Percentage of Level B priority
planning enforcement cases
that are completed within 30
weeks
Percentage of Level C priority
planning enforcement cases
that are completed within 39
weeks
Percentage of Level A priority
planning enforcement cases
that are completed within 17
weeks
Percentage of other planning
applications processed within 8
weeks
New indicator
Percentage of major planning
applications processed within
13 weeks
86% 89% 83% 100% 100%
0.8
Q2 Q3 Q4 Q1 Q2
86% 85% 78% 74% 82%
90%
Q2 Q3 Q4 Q1 Q2
85% 85% 85% 85% 85%
85%
Q2 Q3 Q4 Q1 Q2
80% 80% 85% 80%
70%
Q3 Q4 Q1 Q2
85% 80% 85% 80% 80%
70%
Q2 Q3 Q4 Q1 Q2
15 of 24 pages
Help all our residents enjoy a good quality of lifeCultural participation is above outer London average
Increase in residents who say that people from different backgrounds get on
52,420 Resident perception: place 25,763
11,519 Resident perception: support 24,837
82% 858,090Number of visits to
leisure centres
Number of visits to the
William Morris Gallery
Number of free swims by
residents aged 60 and
over
Percentage of residents who agree that people from different
backgrounds get on well together. (Equality Indicator)
Number of visits to Vestry House
Museum
Number of free swims by
residents under the age of
18
Number of visits to the William Morris Gallery: Below target mostly due to a
quiet August compared to previous years. With a busy autumn/winter
programme ahead, and a PR company to publicise the programme, we should
get back on target.
Number of visits to Vestry House Museum: Visitor figures at Vestry House
Museum were slow in the beginning of the year, but have picked up in the
most recent two months, which looks positive for reaching targets in the next
quarter.
Resident satisfaction data: The survey has now been completed and the
results are currently being validated
55,558 80,743 112,607 26,713 52,420
55,000
82,500
110,000
27,500
56,375
Q2 Q3 Q4 Q1 Q2
12,959 19,647 24,783 5,605 11,519
11,500
17,250
23,000
5,750
12,075
Q2 Q3 Q4 Q1 Q2
22,197 30,924 40,412 10,964 25,763
18,000 27,000
36,000
11,250
22,500
Q2 Q3 Q4 Q1 Q2
12,959 32,277 39,014 10,265 24,837
18,000 27,000
36,000
11,250
22,500
Q2 Q3 Q4 Q1 Q2
808,139 1,179,882 1,610,824 439,070 858,090
790,000
1,180,000
1,570,000
400,000
800,000
Q2 Q3 Q4 Q1 Q2
77%
60%
79%
67%
81%
70%
0%
0%
Percentage of residents who are satisfied with their localarea as a place to live
Percentage of residents who agree that the Council ismaking the area a better place to live
2015/16 2014/15 2013/14 2012/13
38%
36%
47%
31%
30%
26%
0%
0%
Percentage of residents who are satisfied with the council’s services and support for children and young people
Percentage of residents who are satisfied with the council’s services and support for disabled and older people
2015/16 2014/15 2013/14 2012/13
0.83 0.77 0.82
2012/13 2013/14 2014/15
16 of 24 pages
Keep vulnerable children and adults safe and healthy and ensure all our residents are safe, well, independent and resilientChildren, young people , adults and older residents are safe
Increase the proportion of children, young people, adults and older residents are well
29244.8
2014/15 2014/15
6/32 21/32
Looked after childrenKey stage 1 Key stage 2
Annual indicator
13/3015/32
58.3%Annual indicator Annual indicator
2015/16 data due end of November
2013/14
15/30
2012/13 2013/14
Percentage of Year 6 children
who are a healthy weight 75.2% 88.3
2015/16
4/12 25/32
2012/13
Number and rate of
children subject to a child
protection plan
Rate of children admitted
to hospital for
unintentional and
deliberate injuries (aged 0-
14)
Percentage of reception
aged children who are a
healthy weight
42.1 44 41.7 45.6 44.8
266 283 268 297 292
0
50
100
150
200
250
300
06
121824303642485460
Q2 Q3 Q4 Q1 Q2
95.1 88.3
2013/14 2014/15
77.1% 75.5% 74.9% 75.2%
2012/13 2013/14 2014/15 2015/16
60.1% 59.4% 62.0% 58.3%
2012/13 2013/14 2014/15 2015/16
80%
60%
60%
75%
50%
75%
100%
100%
100%
67%
83%
67%
Percentage of looked after children achieving atleast Level 2 in Reading at Key Stage 1
Percentage of looked after children achieving atleast Level 2 in Writing at Key Stage 1
Percentage of looked after children achieving atleast Level 2 in Maths at Key Stage 1
2015/16 2014/15 2013/14 2012/13 65%
53%
71%
63%
75%
63%
73%
55%
45%
56%
56%
33%
Percentage of looked after children achieving at leastLevel 4 in Reading at Key Stage 2
Percentage of looked after children achieving at leastLevel 4 in Writing at Key Stage 2
Percentage of looked after children achieving at leastLevel 4 in Maths at Key Stage 2
2015/16 2014/15 2013/14 2012/13
17 of 24 pages
Keep vulnerable children and adults safe and healthy and ensure all our residents are safe, well, independent and resilientChildren, young people , adults and older residents are safe
Increase the proportion of children, young people, adults and older residents are well
12% 3.4% 53% 1.13%
2014/15 16/17 16/1720/32 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
25/49 25/49 10/13 3/6 1/32 3/32 29/32 29/32
Not yet
available 55 5,208 122
Percentage of looked after
children achieving at least
five A*-C grade GCSEs
including English and
Maths at Key Stage 4
Percentage of care leavers
in suitable education,
employment or training
on their 19th birthday
2012/13 2013/14
Number of incidents of
domestic violence (per
1,000)
Percentage of pupils who
are persistently absent
from school (Academic
Year)
20/32 19/322015/16
Rate of first time entrants
to the youth justice
system per 100,000 young
people aged 10-17
Percentage of looked after children achieving at least five A*-C grade GCSEs: This is slightly lower than the latest available National LAC average of 13.8% (from 2014-15) and is down from last year’s local performance of 16%. This cohort had 6 young people with recognised
special education needs (35%) and there was also one young person on remand and a young person who had a baby. 76% of the cohort was educated out of borough. In terms of the length of time in care, the two young people with the highest achievement have only been in care
for 1-2 years and most of those in care for the longest time – between 3 and 15 years - are those with significant special educational needs.
Number of reoffences by the gang cohort that is being targeted by the Community Safety programme: The indicator represents the number of convictions before and after the referral to GPP (Gangs Prevention Programme) measuring the impact GPP has had on nominals after
the referral to programme’
Number of Troubled Families whose lives have been turned around: It has been agreed that the target for this indicator for 2016/17 should be decreased from 800 to 594. The previous target of 800 has been superseded, as the upper limit of funding we are allowed to draw down
will only allow for us to may a 'payment by results' claim for 594 families this year; these budget constraints were not set when the original target was set. Achieving 594 successful PBR claims would lead to funding of £475,000. The shortfall of £157,000 will be offset by previous
successful PBR income.
Percentage of care leavers in suitable education, employment or training on their 19th birthday: In addition to the ongoing reporting and recording issues which are being resolved through a new tracking process in the Virtual School’s CLA Live system, the EET worker and
Leaving Care Coaches are targeting those who are NEET for a range of education and employment options to improve this performance.
Percentage of young people
(Academic Age Yr 12-13) not in
education, employment or
training
Number of Troubled Families
whose lives have been turned
around
Number of reoffences by
the gang cohort that is
being targeted by the
Community Safety
programme
2015/16
3.7% 3.1% 3.4%
0.06 0.044 0.038
2012/13 2013/14 2014/15
1.4% 2.2% 3.1% 3.4% 1.1%
4.5%
Q2 Q3 Q4 Q1 Q2
104 312 395 0
300
100
Q2 Q3 Q4 Q1 Q2
51% 51% 68% 56% 53%
65%
Q2 Q3 Q4 Q1 Q2
25% 25% 17% 16% 12%
2012 2013 2014 2015 2016
134 161 219 122
181 148.5
297
Q2 Q3 Q4 Q1 Q2
73 63 56 71 55
44.8
Q2 Q3 Q4 Q1 Q2
4,918 4,885 5,004 5,165 5,208
Q2 Q3 Q4 Q1 Q2
18 of 24 pages
Keep vulnerable children and adults safe and healthy and ensure all our residents are safe, well, independent and resilientChildren, young people , adults and older residents are safe
Increase the proportion of children, young people, adults and older residents are well
64% 90.8% 4.1% 81.6%
16/17
2015/16 Q2 Q3 Q4 Q1
7/32 9/23 4/18 16/20 13/17
39% 56.6% 29% 0
201431/33
Percentage of older
people still at home 91
days after discharge from
hospital into reablement /
rehabilitation services
Percentage of adults in
contact with secondary
mental health services in
paid employment
Percentage of adults
receiving social care
services who feel as safe
as they want to be
2015/16
Q4
2015/16
Percentage of ASC service users
who receive self-directed
support
2013/14 2014/15
6/3211/31
2012
Percentage of ASC carers who can find the information they seek on support, services or benefits: This is reported once every two years (biennial). The source is the PSS Carers Survey. No results expected until end of Q1 2017-18
Percentage of older people still at home 91 days after discharge from hospital into reablement / rehabilitation services: This is reported three months in arears, Q2 data will be available in January 2017.
32/32
201331/33 30/33
Percentage of ASC service
users who have as much
social contact as they
would like
Percentage of ASC carers
who can find the
information they seek on
support, services or
benefits
Rate of death in usual
place of residence for
people of all ages
Biannual survey
59% 60%
65% 64%
2012/13 2013/14 2014/15 2015/16
92% 93% 92% 92% 91%
92%
Q1 Q2 Q3 Q4 Q1
2.8% 3.2% 4.9% 3.7% 4.1%
5%
Q2 Q3 Q4 Q1 Q2
79.3% 71.3% 72.5% 81.6% 81.6%
80%
Q2 Q3 Q4 Q1 Q2
38% 44% 39%
2013/14 2014/15 2015/16
62% 57%
2012/13 2014/15
30.32% 31.01% 29.75% 29.00%
2012 2013 2014 2015
19 of 24 pages
Achieving excellenceKey service standards
13.4 6.25 12.7 5.9
16/17 16/17
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
11/32 6/32 9/32 10/32 10/32 9/32 9/32 8/32
54.2% 56.2% 91.0% 90%
16/17 16/17 16/17
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
19/26 15/21 16/22 15/18 24/26 17/21 19/22 12/18 9/13 7/12 9/14 8/13
Percentage of invoices
that are paid within 30
calendar days of
receipt
Percentage of invoices
received from local
businesses that are paid
within 10 working days of
receipt
Percentage of council tax
collected (YTD)
Percentage of non-
domestic rates collected
(YTD)
2015/16 2015/16
Average number of days taken to process a change in circumstances affecting an existing housing benefit claim: The target for change in circumstances has been revised from 6 to 6.25 days. The reason for this is due to
the delay in scanning and indexing which has a detrimental impact on our performance indicators. This does not affect the new claims process so much as claims can only be made via online claim forms and requests for
information are automated.
Average number of days
taken to process a new
housing benefit claim
Average number of days
taken to process a change
in circumstances affecting
an existing housing
benefit claim
Average number of
days taken to process
a new council tax
support claim
Average number of days
taken to process a change
in circumstances affecting
an existing council tax
support claim
2015/16 2015/16 2015/16
18 18 19 18.35 13.37
21 18
Q2 Q3 Q4 Q1 Q2
6 6 6 5.38 5.91
8 6.25
Q2 Q3 Q4 Q1 Q2
54.20% 81.00% 96.00% 28.36% 54.19%
54.3% 80.8% 96.0%
28.2%
54.2%
Q2 Q3 Q4 Q1 Q2
54.8% 80.6% 97.0% 31.0% 56.2%
53.6%
80.2% 96.5%
30.0%
54.7%
Q2 Q3 Q4 Q1 Q2
86% 92% 87% 87% 82% 94% 91%
CorporateDevelopment
Families & Homes Finance &Governance
Property and AssetManagement
Neighbourhoods &Commissioning
Regeneration &Growth
Overall performance
Q2: Invoice payments - invoices by Directorate
6.0 7.0 6.0 5.6 6.25
8 6.25
Q2 Q3 Q4 Q1 Q2
16 17 17 16.4 12.72
21 18
Q2 Q3 Q4 Q1 Q2
20 of 24 pages
Achieving excellenceKey service standards
96% 89%
0.08% 96.2% Percentage downtime for
15 key ICT systems
Percentage of death
registrations completed
within 5 days
Percentage of birth
registrations completed
within 42 days 10,952
Number of service
requests and
transactions made
online
Percentage availability of
the Council’s public
website
95% 96% 96% 96% 96%
97%
Q2 Q3 Q4 Q1 Q2
88% 87% 87% 87% 89%
85% 89.25%
Q2 Q3 Q4 Q1 Q2
99.4% 98.1% 98.2% 97.5% 96.2%
99.5%
Q2 Q3 Q4 Q1 Q2
0.1% 0.5% 0.2% 0.2% 0.08%
0.5%
Q2 Q3 Q4 Q1 Q2
3,911 5,190 6,272 9,548 10,952
Q2 Q3 Q4 Q1 Q2
21 of 24 pages
Achieving excellenceCorporate Health
7.94 50.2% 20.1% 2.3%
16/17 16/17 16/17 16/17
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
7/23 6/17 9/16 4/13 4/15 8/11 9/12 3/11 11/15 8/12 3/12 3/11 9/13 3/10 7/11 6/10
613 £7.4 99.9%
Percentage of top 5% of
earners who are women
Percentage of top 5% of earners
who are from a black or minority
ethnic group
Percentage of MTFS savings
targets currently expected to be
achieved
Cost of Agency Workers
and Consultants (£m)
Number of Agency
Workers (Headcount) 2014/15
2015/162015/16
Average number of days
sickness in the year per
full-time employee
Percentage of top 5% of
earners who are disabled
2015/16
Number of Agency Workers: The annual target for this indicator is less than 14%. The Target values shown are 14% of all staff (permanent + agency) at the end of each quarter. At the end of September 19.7% of all staff were agency
compared with 20.2% at the end of June (Q1)
Resident
perception
2015/16
7.38 7.45 8.81 7.10 7.40 £0
Q2 Q3 Q4 Q1 Q2
£m
457.9 639 635 634 613
443 444 439 435
Q2 Q3 Q4 Q1 Q2
7.2 7.65 7.89 7.67 7.94
7.8 7.5
Q2 Q3 Q4 Q1 Q2
55.9% 49.5% 49.5% 53.1% 50.2%
51%
Q2 Q3 Q4 Q1 Q2
22.5% 22.0% 22.0% 20.8% 20.1%
0.2
Q2 Q3 Q4 Q1 Q2
4.5% 2.8% 2.8% 2.3% 2.3%
3.5%
Q2 Q3 Q4 Q1 Q2
97.5% 96.3% 99.7% 92.1% 99.9%
85.5% 90.0% 97.0% 100.0%
Q2 Q3 Q4 Q1 Q2
70% 43% 72% 52% 74% 52%
Residents satisfied with the waythe Council is running the area
Residents who agree the Councilgives local people good value for
money2012/13 2013/14 2014/15
22 of 24 pages
Achieving excellenceCorporate Health
Value of the Council's revenue under/overspend (as a % of the total revenue budget): The projection at month 6 shows a potential overspend of £46,000, which is an adverse movement of £347,000 from the previously reported
underspend of £301,000. However, it is anticipated that the year-end position will be spend to budget. In view of the projected service overspend position, Cabinet agreed on the 6 September that services should seek to find alternative
savings and if possible to not enter into new commitments for non-statutory services; and, that where services are currently under spending they should not assume that this funding is available for new commitments without
consultation with the Director of Finance and Governance.
Value of the Council's revenue
under/overspend (as a % of the total revenue
budget)£46,000
-£2,550,000 -£2,050,000
-£1,340,000
£0 £46,000
-0.01
-0.0064
-1.2%
-0.8%
-0.4%
0.0%
£3,000,000
£3,000,000
2013/14 2014/15 2015/16 Q1 Q2
Value of over/underspend
% of the total revenue budget
23 of 24 pages
Achieving excellenceComplaints
1689Main reasons for complaints Outcome of complaints
Areas with highest number of complaints
Complaints received by type
Total number of
complaints received
Areas with highest number of complaints
Neighbourhoods & Commercial Services - 1132
Waltham Forest Housing - 208
Finance & Governance - 208
Complaints received by type
During the period 1 April 2016 to 30 September 2016, the Council received a total of 1689 complaints. This is made up of 1454 Stage 1 and
153 Stage 2 corporate complaints; a combined total of 45 complaints dealt with under the Social Care Statutory Procedure - Adults (20) and
Children’s Services (25); and a combined total of 38 complaints received from the Local Government Ombudsman (LGO - 34) and the
Housing Ombudsman Service (HOS - 4).
67% 12% 12%
Neighbourhoods &Commercial Services
Waltham Forest Housing Finance & Governance
957 41%
406 17%
222 9%
784 33%
Service failures (delay, poorquality and non-provision)
Disagreement with policy ordecision
Communication issues
Staff conduct
684 46%
186 12%
620 42%
Upheld Partly upheld Not upheld
1454
153
44
33
4
1
Stage 1 corporate complaints
Stage 2 corporate complaints
Stage 1 statutory complaints
Local Government Ombudsmancomplaints
Housing Ombudsman complaints
Stage 2 statutory complaints
24